CN107782520B - 微小卫星随机振动试验下凹控制方法 - Google Patents

微小卫星随机振动试验下凹控制方法 Download PDF

Info

Publication number
CN107782520B
CN107782520B CN201710868972.6A CN201710868972A CN107782520B CN 107782520 B CN107782520 B CN 107782520B CN 201710868972 A CN201710868972 A CN 201710868972A CN 107782520 B CN107782520 B CN 107782520B
Authority
CN
China
Prior art keywords
test
recessed
random vibration
frequency
satellite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710868972.6A
Other languages
English (en)
Other versions
CN107782520A (zh
Inventor
张华�
宗益燕
李强
韦锡峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Satellite Engineering
Original Assignee
Shanghai Institute of Satellite Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Satellite Engineering filed Critical Shanghai Institute of Satellite Engineering
Priority to CN201710868972.6A priority Critical patent/CN107782520B/zh
Publication of CN107782520A publication Critical patent/CN107782520A/zh
Application granted granted Critical
Publication of CN107782520B publication Critical patent/CN107782520B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M7/00Vibration-testing of structures; Shock-testing of structures
    • G01M7/02Vibration-testing by means of a shake table
    • G01M7/022Vibration control arrangements, e.g. for generating random vibrations

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
  • Apparatuses For Generation Of Mechanical Vibrations (AREA)

Abstract

本发明提供了一种微小卫星随机振动试验下凹控制方法,其主要步骤有:完成卫星与振动台的安装、调试及试验测点确认后,先进行正弦扫频试验,再进行小量级的随机振动摸底试验,确定卫星的共振频段及响应放大情况,对于相对于输入功率谱密度放大较大的频段,根据放大倍数、位移幅值和峰值频率明确下凹量级、下凹频段宽度,进行下凹处理,再进行随机振动满振试验,试验后进行卫星及设备状态确认,然后进行正弦扫频试验,并比较前后两次扫频试验各测点的响应曲线一致性,转换试验振动台或卫星方向,完成剩余方向试验直至试验结束。本发明简单易行,可以保证微小卫星整星级随机振动试验安全、有效的开展。

Description

微小卫星随机振动试验下凹控制方法
技术领域
本发明涉及卫星试验技术领域,特别是涉及一种微小卫星随机振动试验下凹控制方法,该方法适用于质量介于23~450kg之间的微小卫星,对于其它大型卫星、航天器可参考使用。
背景技术
卫星等航天器经历发射环境时,需要承受一系列的动力学环境,包括火箭点火、推进、关机、级间分离、切变风、跨音速抖振及星箭分离的振动等。这些恶劣的振动环境效应可能诱发卫星于火箭的耦合振动机卫星结构大部件之间的振动耦合,从而导致对振动敏感的星上产品的损伤与毁坏。
卫星设计时需要保证充分的可靠性裕度设计及足够的设计余量,以确保卫星能够经受主动段的动力学环境及其环境效应。同时,地面开展环境模拟试验,检验卫星及其产品设计与工艺的合理性,验证卫星及其产品对各种环境的承受能力。
卫星低频段的动力学环境通常由整星正弦振动试验予以考核,已经形成了标准的试验方法与流程。卫星高频段的动力学环境由随机振动、噪声试验予以考核,对质量低于450kg的结构紧凑卫星开展随机振动试验,而大质量卫星则采用噪声试验考核高频动力学环境。
在地面模拟试验中,由于试验方法的限制,为了避免卫星在某些频段由于共振等产生的过试验,对于质量大于23kg的微小卫星,通常需要在卫星及部组件的结构频率处对输入量级进行下凹处理,以确定一个合理的激励条件,保证卫星既能够通过主动段的力学环境考核,又不会过试验。
随机振动的试验条件和试验要求在GJB 1027A等标准规范中均有说明,但是对于具体的试验方法,尤其是微小卫星的试验下凹控制方法没有规范可以参考。查阅公开发表的论文中主要给出的是基于力限控制的下凹方法,此方法需要专门设计的工装夹具,且方法本身有待进一步考证,因此未在型号工程上得到推广使用。
目前,没有发现同本方法类似的说明或报告,也尚未收集到国内外类似的资料。
发明内容
本发明提供一种微小卫星随机振动试验下凹控制方法,这种试验方法我们称之为工程实践法。本方法适用于质量介于23~450kg之间的微小卫星。正式试验前,先进行小量级的随机振动摸底试验,确定卫星的共振频段及响应放大情况,对于相对于输入功率谱密度放大较大的频段,根据放大倍数、位移幅值和峰值频率明确下凹量级、下凹频段宽度,进行下凹处理。
本发明是通过下述技术方案来解决上述技术问题的:一种微小卫星随机振动试验下凹控制方法,其特征在于,其包括如下步骤:
步骤一:完成卫星与振动台的安装、调试,并完成试验测点确认后,先进行正弦扫频试验,再进行小量级的随机振动摸底试验,通过摸底试验确定卫星的共振频段及响应放大情况;
步骤二:对于相对输入功率谱密度放大较大的频段,并兼顾运载的频率约束要求,进行下凹处理,确定试验条件,估算试验振动台的位移情况,对于达到或超过试验台额定位移行程90%的频段,进一步进行下凹处理,保证试验设备安全;
步骤三:确定试验输入条件后,进行随机振动满振试验,试验完成后检查试验各测点振动响应曲线,并进行卫星状态确认;
步骤四:进行正弦扫频试验,试验条件同步骤一,并比较两次扫频试验各测点的响应曲线一致性;
步骤五,转换试验振动台或卫星方向,重复上述步骤完成剩余方向试验直至试验结束。
优选地,所述步骤一包括如下步骤:
步骤十一:正弦扫频试验的试验量级为0.1g,扫描速率为4oct/min,扫描频率起始于5Hz并覆盖卫星此方向的固有频率;
步骤十二:小量级的随机振动摸底试验的量级为:平直段功率谱密度为0.01g2/Hz,上升与下降段的斜率与满振试验保持一致。
优选地,所述步骤二包括如下步骤:
步骤二十一:频率下凹应避开运载的主要频率,对于相对输入功率谱密度放大50%且40Hz以上的频段,下凹后的随机振动试验功率谱密度为其中p为下凹前的随机振动试验输入功率谱密度,p0为小量级随机振动的输入功率谱密度,ph为小量级随机振动的功率谱密度放大值;
步骤二十二:下凹的频段宽度为:在40~100Hz频段,共振峰处向左、向右各扩5~10Hz;在100~600Hz,共振峰处向左、向右各扩10~30Hz;在600~2000Hz,共振峰处向左、向右各扩30~50Hz;
步骤二十三:试验振动台位移峰峰值的波动达到6σ计算公式为式中Xpp为台面工作位移的峰峰值,w0为功率谱密度,f0为频率。
与现有技术相比,本发明具有如下的有益效果:
一、本发明解决了微小卫星随机振动试验下凹控制的试验流程问题;
二、本发明解决了微小卫星随机振动试验及其下凹的原则和方法,减小了测试过程的过试验风险。
附图说明
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明的其它特征、目的和优点将会变得更明显:
图1为正弦扫频试验条件示意图;
图2为小量级的随机振动摸底试验条件示意图;
图3为本发明的步骤流程图。
具体实施方式
下面结合具体实施例对本发明进行详细说明:本实施例将有助于本领域的技术人员进一步理解本发明,但不以任何形式限制本发明。应当指出的是,对本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。
在本实施例中,如图1、图2、图3所示,本发明微小卫星随机振动试验下凹控制方法包括如下步骤:
步骤一:完成卫星与振动台的安装、调试,并完成试验测点确认后,先进行正弦扫频试验,再进行小量级的随机振动摸底试验,通过摸底试验确定卫星的共振频段及响应放大情况;
步骤二:对于相对输入功率谱密度放大较大的频段,并兼顾运载的频率约束要求,进行下凹处理,确定试验条件,估算试验振动台的位移情况,对于达到或超过试验台额定位移行程90%的频段,进一步进行下凹处理,保证试验设备安全;
步骤三:确定试验输入条件后,进行随机振动满振试验,试验完成后检查试验各测点振动响应曲线,并进行卫星状态确认;
步骤四:进行正弦扫频试验,试验条件同步骤一,并比较两次扫频试验各测点的响应曲线一致性;
步骤五,转换试验振动台或卫星方向,重复上述步骤完成剩余方向试验直至试验结束。
所述步骤一包括如下步骤:
步骤十一:正弦扫频试验的试验量级为0.1g,扫描速率为4oct/min,扫描频率起始于5Hz并覆盖卫星此方向的固有频率(如卫星某方向的一阶频率为260Hz,则扫描频率宜到300Hz);
步骤十二:小量级的随机振动摸底试验的量级为:平直段功率谱密度为0.01g2/Hz,上升与下降段的斜率与满振试验保持一致。
步骤二包括如下步骤:
步骤二十一:频率下凹应避开运载的主要频率,对于相对输入功率谱密度放大50%且40Hz以上的频段,进行下凹处理,下凹后的随机振动试验功率谱密度的计算公式如下式(1):
式中,p为下凹前的随机振动试验输入功率谱密度(g2/Hz),p0为小量级随机振动的输入功率谱密度(g2/Hz),ph为小量级随机振动的功率谱密度放大值(g2/Hz);
步骤二十二:下凹的频段宽度为:在40~100Hz频段,共振峰处向左、向右各扩5~10Hz;在100~600Hz,共振峰处向左、向右各扩10~30Hz;在600~2000Hz,共振峰处向左、向右各扩30~50Hz;
对于达到或超过试验台额定位移行程90%的频段,应进行下凹处理,保证试验设备安全。步骤二十三:试验振动台位移峰峰值的波动达到6σ的计算公式如下式(2):
式中,Xpp为台面工作位移的峰峰值,w0为功率谱密度(g2/Hz),f0为频率(Hz)。
综上所述,本实施例提供的一种微小卫星随机振动试验下凹控制方法减小了测试过程的过试验风险,解决了微小卫星随机振动试验及其下凹控制的试验流程问题。
以上所述的具体实施例,对本发明的解决的技术问题、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施例而已,并不用于限制本发明,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (2)

1.一种微小卫星随机振动试验下凹控制方法,其特征在于,其包括如下步骤:
步骤一:完成卫星与振动台的安装、调试,并完成试验测点确认后,先进行正弦扫频试验,再进行小量级的随机振动摸底试验,通过摸底试验确定卫星的共振频段及响应放大情况;
步骤二:对于相对输入功率谱密度放大较大的频段,并兼顾运载的频率约束要求,进行下凹处理,确定试验条件,估算试验振动台的位移情况,对于达到或超过试验台额定位移行程90%的频段,进一步进行下凹处理,保证试验设备安全;
步骤三:确定试验输入条件后,进行随机振动满振试验,试验完成后检查试验各测点振动响应曲线,并进行卫星状态确认;
步骤四:进行正弦扫频试验,试验条件同步骤一,并比较两次扫频试验各测点的响应曲线一致性;
步骤五,转换试验振动台或卫星方向,重复上述步骤完成剩余方向试验直至试验结束;
所述步骤二包括如下步骤:
步骤二十一:频率下凹应避开运载的主要频率,对于相对输入功率谱密度放大50%且40Hz以上的频段,下凹后的随机振动试验功率谱密度为其中p为下凹前的随机振动试验输入功率谱密度,p0为小量级随机振动的输入功率谱密度,ph为小量级随机振动的功率谱密度放大值;
步骤二十二:下凹的频段宽度为:在40~100Hz频段,共振峰处向左、向右各扩5~10Hz;在100~600Hz,共振峰处向左、向右各扩10~30Hz;在600~2000Hz,共振峰处向左、向右各扩30~50Hz;
步骤二十三:试验振动台位移峰峰值的波动达到6σ计算公式为式中Xpp为台面工作位移的峰峰值,w0为功率谱密度,f0为频率。
2.根据权利要求1所述的微小卫星随机振动试验下凹控制方法,其特征在于,所述步骤一包括如下步骤:
步骤十一:正弦扫频试验的试验量级为0.1g,扫描速率为4oct/min,扫描频率起始于5Hz并覆盖卫星此方向的固有频率;
步骤十二:小量级的随机振动摸底试验的量级为:平直段功率谱密度为0.01g2/Hz,上升与下降段的斜率与满振试验保持一致。
CN201710868972.6A 2017-09-22 2017-09-22 微小卫星随机振动试验下凹控制方法 Active CN107782520B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710868972.6A CN107782520B (zh) 2017-09-22 2017-09-22 微小卫星随机振动试验下凹控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710868972.6A CN107782520B (zh) 2017-09-22 2017-09-22 微小卫星随机振动试验下凹控制方法

Publications (2)

Publication Number Publication Date
CN107782520A CN107782520A (zh) 2018-03-09
CN107782520B true CN107782520B (zh) 2019-08-30

Family

ID=61433476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710868972.6A Active CN107782520B (zh) 2017-09-22 2017-09-22 微小卫星随机振动试验下凹控制方法

Country Status (1)

Country Link
CN (1) CN107782520B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109981897A (zh) * 2019-03-13 2019-07-05 东莞理工学院 一种基于单个智能手机细粒度振动的定位方法
CN110186632B (zh) * 2019-05-22 2020-11-20 航天科工空间工程发展有限公司 一种基于三角形下凹的基础激励振动条件的振动试验方法
CN112444366B (zh) * 2020-12-08 2022-07-12 中国工程物理研究院总体工程研究所 一种随机振动试验分频段混合控制方法
CN112836351B (zh) * 2021-01-11 2023-03-10 上海利正卫星应用技术有限公司 商业微小卫星装星产品正弦振动试验设计方法和系统
CN113932914B (zh) * 2021-09-23 2024-02-23 北京机电工程研究所 一种振动测量通道方向修正方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498616A (zh) * 2009-02-24 2009-08-05 航天东方红卫星有限公司 整星试验中基于应变反馈的载荷输入方法
CN102494859A (zh) * 2011-11-15 2012-06-13 上海卫星工程研究所 一种航天器振动定频标定试验方法
CN102539097A (zh) * 2011-12-09 2012-07-04 北京卫星环境工程研究所 航天器正弦振动试验高量级试验条件预测系统
CN102539101A (zh) * 2011-12-31 2012-07-04 北京卫星环境工程研究所 力限控制振动试验系统及试验方法
CN102810127A (zh) * 2012-07-26 2012-12-05 北京卫星环境工程研究所 航天器虚拟振动试验系统
CN105659904B (zh) * 2010-12-10 2014-04-09 北京空间飞行器总体设计部 基于力限控制的航天器部组件随机振动加速度谱下凹方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3615916B2 (ja) * 1997-09-08 2005-02-02 三菱重工業株式会社 構造物起振装置
JP2000234951A (ja) * 1999-02-16 2000-08-29 Toshiba Corp 振動または形状の計測制御方法および装置
JP2007292644A (ja) * 2006-04-26 2007-11-08 Japan Aerospace Exploration Agency パネルのランダム振動予測手法を自動的に選択する装置及び方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498616A (zh) * 2009-02-24 2009-08-05 航天东方红卫星有限公司 整星试验中基于应变反馈的载荷输入方法
CN105659904B (zh) * 2010-12-10 2014-04-09 北京空间飞行器总体设计部 基于力限控制的航天器部组件随机振动加速度谱下凹方法
CN102494859A (zh) * 2011-11-15 2012-06-13 上海卫星工程研究所 一种航天器振动定频标定试验方法
CN102539097A (zh) * 2011-12-09 2012-07-04 北京卫星环境工程研究所 航天器正弦振动试验高量级试验条件预测系统
CN102539101A (zh) * 2011-12-31 2012-07-04 北京卫星环境工程研究所 力限控制振动试验系统及试验方法
CN102810127A (zh) * 2012-07-26 2012-12-05 北京卫星环境工程研究所 航天器虚拟振动试验系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
力限技术在航天器振动试验中的应用;钱志英 等;《航天器工程》;20120615;第21卷(第3期);第101-106页
基于力限的加速度谱下凹技术研究;李正举 等;《航天器工程》;20100715;第19卷(第4期);第23-28页

Also Published As

Publication number Publication date
CN107782520A (zh) 2018-03-09

Similar Documents

Publication Publication Date Title
CN107782520B (zh) 微小卫星随机振动试验下凹控制方法
Ozbek et al. Challenges in testing and monitoring the in-operation vibration characteristics of wind turbines
Ozbek et al. Operational modal analysis of a 2.5 MW wind turbine using optical measurement techniques and strain gauges
Liu et al. Interference reduction of high-energy noise for modal parameter identification of offshore wind turbines based on iterative signal extraction
Guo et al. Experimental study on the dynamic responses of a freestanding bridge tower subjected to coupled actions of wind and wave loads
CN102466597B (zh) 一种金属构件/材料剩余寿命的无损检测和评价方法
Rodríguez et al. Fatigue of steam turbine blades at resonance conditions
Kavrakov et al. A synergistic study of a CFD and semi-analytical models for aeroelastic analysis of bridges in turbulent wind conditions
Kilikevičius et al. Analysis of external dynamic loads influence to photovoltaic module structural performance
CN106815552B (zh) 基于时频分析的数字信号后处理方法
Maes et al. Inverse estimation of breaking wave loads on monopile wind turbines
Shravankumar et al. Identification of stiffness and periodic excitation forces of a transverse switching crack in a Laval rotor
Nguyen et al. Vibration‐Based Damage Assessment in Gravity‐Based Wind Turbine Tower under Various Waves
CN105388210B (zh) 基于临时钢斜撑的斜拉索损伤检测装置及检测方法
Rokicki et al. Frequency and modeshape evaluation of steam turbine blades using the metal magnetic memory method and vibration wave propagation
Chiang et al. Remote measurements and vibration analysis of existing wind turbines
Gross et al. Application of damage detection techniques using wind turbine modal data
Wait et al. Wind-induced instabilities and monitoring of wind turbine
Haldar et al. Data analysis challenges in structural health assessment using measured dynamic responses
Kumar et al. Frequency monitoring of forced oscillation in PMU's data from NASPI
Nguyen et al. Vibration-based damage alarming criteria for wind turbine towers
Hu et al. Use of seismic analyses for the wind energy industry
Myrent et al. A robust algorithm to detecting wind turbine blade health using vibro-acoustic modulation and sideband spectral analysis
Park et al. Development of temperature-robust damage factor based on sensor fusion for a wind turbine structure
Jahjouh et al. A modified metaheuristic optimization approach on the structural identification and damage detection of an experimentally tested wind turbine supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant