CN107780662A - The construction method and construction equipment of a kind of chimney shaft - Google Patents

The construction method and construction equipment of a kind of chimney shaft Download PDF

Info

Publication number
CN107780662A
CN107780662A CN201610750376.3A CN201610750376A CN107780662A CN 107780662 A CN107780662 A CN 107780662A CN 201610750376 A CN201610750376 A CN 201610750376A CN 107780662 A CN107780662 A CN 107780662A
Authority
CN
China
Prior art keywords
template
construction
barrel
radiation beam
bearing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610750376.3A
Other languages
Chinese (zh)
Inventor
徐建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610750376.3A priority Critical patent/CN107780662A/en
Publication of CN107780662A publication Critical patent/CN107780662A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/164Tools or apparatus specially adapted for working-up chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/28Chimney stacks, e.g. free-standing, or similar ducts

Abstract

The present invention provides a kind of construction method and construction equipment of chimney shaft, is related to the realm of building construction.The present invention passes through rigorous construction procedure, it ensure that the construction safety in work progress, and construction quality, a whole set of construction equipment are that work progress provides the foundation guarantee, can effectively ensure that the concentricity of chimney in work progress, and ensure that chimney shaft reaches the effect of clear water concrete, provided convenience for the maintenance during the use of postorder, and the present invention relates to ingenious, it is simple in construction, it is easy to promote, there is higher social value and economic value.

Description

The construction method and construction equipment of a kind of chimney shaft
Technical field
The present invention relates to the construction method and its construction equipment of the realm of building construction, especially a kind of chimney shaft.
Background technology
In building engineering construction field, the construction of the similar building such as chimney shaft is always the larger engineering item of difficulty Mesh.In work progress, due to height, some potential safety hazards are frequently encountered, in addition, too high construction height so that The concentricity of chimney upper strata and bottom also is difficult to be effectively guaranteed.Most of all, conventional construction method is difficult to accomplish Barrel surface is smooth clean, influences outward appearance, and cause very big trouble to subsequent use cleaning.A kind of therefore it provides energy Enough overcome the chimney construction method of above mentioned problem to have to have very important significance.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides a kind of construction method and construction equipment of chimney shaft.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of construction method of chimney shaft, comprises the following steps:
1st, suitable adjusting template is prepared according to the barrel gradient and the difference of radius;
2nd, it is adjacent to tube wall surface brush releasing agent in adjusting template;
3rd, by configuration adjustment template bolt together with dies plate tap;
4th, two bolts hole are worn in template, places and reinforces wall-crossing opposite-drawing bolt;
5th, split bolt overcoat PVC sleeve pipes, the two ends of split bolt install special valve rubber;
6th, sponge strip is added between template seam;
7th, by ready formwork hoisting on platform girder steel;
The 8th, 3 fastening reinforcing bars are vertically set on the outside of template per 1.5m, laterally set circumferential reinforcement to enclose rib per 600mm;
9th, lower template lower port sets plastic cloth to place stream slurry pollution barrel;
10th, casting concrete, concrete water-cement ratio are less than 0.5;
11st, vibrating makes concrete uniformly be evenly distributed on template inner chamber;
12nd, concrete setting is waited to finish, dismounting template and split bolt;
13rd, the mortar higher than barrel concrete strength one-level is used to block tightly the bolt hole after form removal, light is received on surface, makes color and cylinder Wall is consistent;
14th, with water curing barrel 7 round the clock.
A kind of construction equipment of chimney shaft, by laser vertical instrument, construction elevator, radiation beam, jack, steel enclosure, branch Support steel pipe, reinforcing bar suspension cable, template, split bolt, reinforcing bar enclose rib, suspension bracket scaffold board, safety net, barrel, construction tower, bearing frame group Into, wherein, laser vertical instrument is arranged on construction tower bottom center;Construction elevator is arranged on construction tower;Bearing frame, which is arranged on, to be applied Stack shell is concordant locates with construction for work tower;Beam is radiated uniformly into the radial circular diameter direction being distributed in centered on bearing frame, spoke She Liang one end connects bearing frame, one end connection supporting steel pipe;Supporting steel pipe is arranged on wall inner portion;Jack is arranged on supporting steel Guan Shang;Steel enclosure is evenly distributed on the concentric circles centered on bearing frame, and outermost steel enclosure is connected with supporting steel pipe, its His steel enclosure is that radiating beam intersection is fixedly connected;Reinforcing bar suspension cable one end connects bearing frame, one end connection steel enclosure and radiation Beam junction;Template and suspension bracket scaffold board are connected on radiation beam;Safety net is set on the outside of suspension bracket scaffold board;Set on the outside of template It is equipped with reinforcing bar and encloses rib;Inner template and exterior sheathing are provided with split bolt.
Further, the steel enclosure a minimum of five.
Further, the radiation beam quantity is even number, and at least 16.
Further, it is every piece of template at least three that the reinforcing bar, which encloses rib quantity, and distance is less than 50cm between per pass.
Further, the adjusting template is the plastic plate of different gradient easy to process.
The beneficial effects of the invention are as follows:The present invention ensure that the construction peace in work progress by rigorous construction procedure Entirely, and construction quality, a whole set of construction equipment is that work progress provides the foundation guarantee, be can effectively ensure that in work progress The concentricity of chimney, and ensure that chimney shaft reaches the effect of clear water concrete, carried for the maintenance during the use of postorder Supply facility, and the present invention relates to ingenious, it is simple in construction, it is easy to promote, there is higher social value and economic value.
Brief description of the drawings
Fig. 1 the structural representation of present invention.
Fig. 2 radiates beam, jack and steel enclosure distribution schematic diagram.
In figure:1st, laser vertical instrument, 2, construction elevator, 3, radiation beam, 4, jack, 5, steel enclosure, 6, supporting steel pipe, 7, Reinforcing bar suspension cable, 8, template, 9, split bolt, 10, reinforcing bar enclose rib, 11, suspension bracket scaffold board, 12, safety net, 13, barrel, 14, apply Work tower, 15, bearing frame.
Embodiment
With reference to embodiment, the present invention will be further described:
Referring to Fig. 1-2, a kind of construction equipment of chimney shaft, enclosed by laser vertical instrument, construction elevator, radiation beam, jack, steel Circle, supporting steel pipe, reinforcing bar suspension cable, template, split bolt, reinforcing bar enclose rib, suspension bracket scaffold board, safety net, barrel, construction tower, hold Weight frame composition, wherein, laser vertical instrument is arranged on construction tower bottom center;Construction elevator is arranged on construction tower;Load-bearing is set up Put in construction tower with constructing that stack shell is concordant locates;Beam is radiated uniformly into the radial circular diameter side being distributed in centered on bearing frame To, radiation beam one end connection bearing frame, one end connection supporting steel pipe;Supporting steel pipe is arranged on wall inner portion;Jack is arranged on On supporting steel pipe;Steel enclosure is evenly distributed on the concentric circles centered on bearing frame, the enclosure of outermost steel and supporting steel pipe Connection, other steel enclosures are that radiating beam intersection is fixedly connected;Reinforcing bar suspension cable one end connects bearing frame, one end connection steel enclosure With radiation beam junction;Template and suspension bracket scaffold board are connected on radiation beam;Safety net is set on the outside of suspension bracket scaffold board;Template Outside is provided with reinforcing bar and encloses rib;Inner template and exterior sheathing are provided with split bolt.
A kind of construction method of chimney shaft, comprises the following steps:
1st, suitable adjusting template is prepared according to the barrel gradient and the difference of radius;
2nd, it is adjacent to tube wall surface brush releasing agent in adjusting template;
3rd, by configuration adjustment template bolt together with dies plate tap;
4th, two bolts hole are worn in template, places and reinforces wall-crossing opposite-drawing bolt;
5th, split bolt overcoat PVC sleeve pipes, the two ends of split bolt install special valve rubber;
6th, sponge strip is added between template seam;
7th, by ready formwork hoisting on platform girder steel;
The 8th, 3 fastening reinforcing bars are vertically set on the outside of template per 1.5m, laterally set circumferential reinforcement to enclose rib per 600mm;
9th, lower template lower port sets plastic cloth to place stream slurry pollution barrel;
10th, casting concrete, concrete water-cement ratio are less than 0.5;
11st, vibrating makes concrete uniformly be evenly distributed on template inner chamber;
12nd, concrete setting is waited to finish, dismounting template and split bolt;
13rd, the mortar higher than barrel concrete strength one-level is used to block tightly the bolt hole after form removal, light is received on surface, makes color and cylinder Wall is consistent;
14th, with water curing barrel 7 round the clock.
Finally it should be noted that embodiment is unrestricted to further explanation of the invention, to this area For those of ordinary skill, further conversion can be done in the case where not departing from substantive content of the present invention, and all these changes The protection domain of appended claims of the present invention should all be belonged to by changing.

Claims (6)

  1. A kind of 1. construction method of chimney shaft, it is characterised in that:Comprise the following steps:
    1) suitable adjusting template, is prepared according to barrel (12) gradient and the difference of radius;
    2), it is adjacent to tube wall surface brush releasing agent in adjusting template;
    3), configuration adjustment template is tightened together with bolt with template (8);
    4) two bolts hole, are worn in template (8), places and reinforces wall-crossing opposite-drawing bolt (9);
    5), split bolt (9) overcoat PVC sleeve pipes, the two ends of split bolt (9) install special valve rubber;
    6), sponge strip is added between template (8) seam;
    7), ready template (8) is lifted on radiation beam (3);
    8), 3 fastening reinforcing bars are vertically set on the outside of template (8) per 1.5m, laterally set circumferential reinforcement to enclose rib per 450mm (10);
    9), lower template (8) lower port sets plastic cloth to place stream slurry pollution barrel (13);
    10), casting concrete, concrete water-cement ratio are less than 0.5;
    11), vibrating makes concrete uniformly be evenly distributed on template (8) inner chamber;
    12), concrete setting is waited to finish, dismounting template (8) and split bolt (9);
    13), to use the mortar higher than barrel concrete strength one-level to block the bolt hole after form removal tight, and light is received on surface, make color with Barrel (13) is consistent;
    14), with water curing barrel (13) 7 round the clock.
  2. A kind of 2. construction equipment of chimney shaft, it is characterised in that:By laser vertical instrument (1), construction elevator (2), radiation beam (3), jack (4), steel enclosure (5), supporting steel pipe (6), reinforcing bar suspension cable (7), template (8), split bolt (9), reinforcing bar enclose rib (10), suspension bracket scaffold board (11), safety net (12), barrel (13), construction tower (14), bearing frame (15) composition, wherein, laser lead Straight instrument (1) is arranged on construction tower (14) bottom centre;Construction elevator (2) is arranged on construction tower (14);Bearing frame (15) is set In construction tower (14) with constructing that stack shell is concordant locates;Radiation beam (3) is uniformly distributed in centered on bearing frame (15) into radial Circular diameter direction, radiation beam (3) one end connection bearing frame (15), one end connection supporting steel pipe (6);Supporting steel pipe (6) is set It is internal in barrel (13);Jack (4) is arranged on supporting steel pipe (6);Steel enclosure (5) is evenly distributed in bearing frame (15) Centered on concentric circles on, outermost steel enclosure (15) is connected with supporting steel pipe (6), other steel enclosures (6) be radiate beam (3) Intersection is fixedly connected;Reinforcing bar suspension cable (7) one end connection bearing frame (15), one end connection steel enclosure (5) and radiation beam (3) handing-over Place;Template (8) and suspension bracket scaffold board (11) are connected on radiation beam (3);Safety net is set on the outside of suspension bracket scaffold board (11) (12);Reinforcing bar, which is provided with, on the outside of template (8) encloses rib (10);Inner template (8) and exterior sheathing (8) are provided with split bolt (9).
  3. A kind of 3. construction equipment of chimney shaft according to claim 2, it is characterised in that:The steel enclosure (5) is minimum Have five.
  4. A kind of 4. construction equipment of chimney shaft according to claim 2, it is characterised in that:Described radiation beam (3) quantity For even number, and at least 16.
  5. A kind of 5. construction equipment of chimney shaft according to claim 2, it is characterised in that:The reinforcing bar encloses rib (10) number Measure as every piece of template (8) at least three, and distance is less than 50cm between per pass.
  6. A kind of 6. construction method of chimney shaft according to claim 1, it is characterised in that:The adjusting template is to be easy to The plastic plate of the different gradient of processing.
CN201610750376.3A 2016-08-30 2016-08-30 The construction method and construction equipment of a kind of chimney shaft Pending CN107780662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610750376.3A CN107780662A (en) 2016-08-30 2016-08-30 The construction method and construction equipment of a kind of chimney shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610750376.3A CN107780662A (en) 2016-08-30 2016-08-30 The construction method and construction equipment of a kind of chimney shaft

Publications (1)

Publication Number Publication Date
CN107780662A true CN107780662A (en) 2018-03-09

Family

ID=61441401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610750376.3A Pending CN107780662A (en) 2016-08-30 2016-08-30 The construction method and construction equipment of a kind of chimney shaft

Country Status (1)

Country Link
CN (1) CN107780662A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200207166Y1 (en) * 2000-07-25 2000-12-15 세신건설주식회사 Aaa
CN102444310A (en) * 2011-10-08 2012-05-09 中国十七冶集团有限公司 Method for constructing concrete chimney cylinder body through formwork lifting process
CN103590648A (en) * 2013-11-28 2014-02-19 中国二十二冶集团有限公司 Chimney sliding lifting platform construction method and construction device
CN104712143A (en) * 2015-03-12 2015-06-17 山东电力建设第三工程公司 Reversed mould construction method for circular reinforced concrete chimney wall
CN206158204U (en) * 2016-08-30 2017-05-10 徐建新 Construction equipment of chimney shaft

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200207166Y1 (en) * 2000-07-25 2000-12-15 세신건설주식회사 Aaa
CN102444310A (en) * 2011-10-08 2012-05-09 中国十七冶集团有限公司 Method for constructing concrete chimney cylinder body through formwork lifting process
CN103590648A (en) * 2013-11-28 2014-02-19 中国二十二冶集团有限公司 Chimney sliding lifting platform construction method and construction device
CN104712143A (en) * 2015-03-12 2015-06-17 山东电力建设第三工程公司 Reversed mould construction method for circular reinforced concrete chimney wall
CN206158204U (en) * 2016-08-30 2017-05-10 徐建新 Construction equipment of chimney shaft

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN101225708A (en) Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN206158204U (en) Construction equipment of chimney shaft
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN103255866B (en) Roof circular arc-shaped dome structure and manufacturing method
CN206289945U (en) A kind of assembled Portable safety crosshead
CN106639608A (en) Built-in tower for construction for prestress steel strand concrete tower barrel and installation method
CN201190408Y (en) Tool type exterior scaffolding of section steel fastening tube
CN110616706B (en) Construction method for layering binding in large-diameter pile foundation reinforcing steel bar hole
CN1048065C (en) Method and equipment for construction of concrete cylinder
CN205777489U (en) A kind of support system of high and big die plate
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN201714056U (en) Truss-type operating platform
CN111140254A (en) Full-circle double-lining inverted arch construction template system for long-distance tunnel and template transferring method
CN107780662A (en) The construction method and construction equipment of a kind of chimney shaft
CN105822128A (en) Interior masonry and exterior sliding construction process method for chimney
CN106284997A (en) The big punching block construction method for lifting whole of reinforced concrete chimney
CN210621713U (en) Circular foundation pit inside lining wall template construction system
CN103184792B (en) A kind of major diameter water tower stack shell is from Hoisting System and using method thereof
CN202689531U (en) Flexible and retractable climbing shuttering system for single-cylinder-body structure
CN113001749A (en) Column prefabricating construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Zhao Min

Document name: Notification of Passing Examination on Formalities