CN107764498B - A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system - Google Patents

A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system Download PDF

Info

Publication number
CN107764498B
CN107764498B CN201710986880.8A CN201710986880A CN107764498B CN 107764498 B CN107764498 B CN 107764498B CN 201710986880 A CN201710986880 A CN 201710986880A CN 107764498 B CN107764498 B CN 107764498B
Authority
CN
China
Prior art keywords
test
fall
rack
bed
falling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710986880.8A
Other languages
Chinese (zh)
Other versions
CN107764498A (en
Inventor
王金华
张作义
李悦
吴彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINERGY CO LTD
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201710986880.8A priority Critical patent/CN107764498B/en
Publication of CN107764498A publication Critical patent/CN107764498A/en
Application granted granted Critical
Publication of CN107764498B publication Critical patent/CN107764498B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M7/00Vibration-testing of structures; Shock-testing of structures
    • G01M7/08Shock-testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention provides a kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system, comprising: the test-bed positioned at middle part and the base support component positioned at bottom;The test-bed, including the rack batter post being arranged on the base support component, the rack column with preset height being connect with the rack batter post, the winding staircase being set on the outside of the rack batter post and the rack column and at least one operating platform for being set to the rack column;The base support component, the support for carrying out the test-bed by isolated component respectively is fixed and falls the undertaking of object.The present invention provides the experimental stands for falling from high altitude, and the experimental stand is separated with the undertaking for finally falling object, it realizes test-bed and falls being effectively isolated for object, ensure the safety of the experimental stand and durable, realize the experimental condition of rigid foundation, it is ensured that the reasonability and validity of test.

Description

A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system
Technical field
The present invention relates to the field of test technology more particularly to a kind of examinations of Nuclear Power Station's Exhausted Fuels storage falling from high altitude of falling Check system.
Background technique
Nuclear power station operation can generate spentnuclear fuel, after drawing off due to spentnuclear fuel from reactor, also continue to generate heat, and have very Strong radioactivity, it is therefore desirable to temporarily store and cool down near reactor, during storage, afterheat heat output is gradually decreased, spoke It penetrates dosage constantly to decay, after the temporary regular period, other positions can will be transported to outside spentnuclear fuel, carry out related disposition, including Intermediate storage, post-processing and final geologic storage.
It is transported in the factory of spentnuclear fuel and outside factory, requires spentnuclear fuel shielded coffin, held since spentnuclear fuel shields transport The spentnuclear fuel that device transports has very strong radioactivity, therefore very high to the technical requirements of spentnuclear fuel shielded coffin, need into Row properties are examined and verification experimental verification, and a test therein is to carry out the fall-down test of shielded coffin, guarantee container During lifting and transport, container is caused to fall in case of accident, it is still desirable to guarantee that the structure of container is intact, radioactivity Substance will not be leaked and be spread, it is ensured that equipment, the radiation safety of personnel and environment.
Need to carry out the related work of irradiated fuel store fortune container falling from high altitude test thus, however currently without suitable Pilot system is tested.
Summary of the invention
The present invention provides a kind of falling from high altitude test system for overcoming the above problem or at least being partially solved the above problem System.
According to an aspect of the present invention, a kind of falling from high altitude pilot system is provided, comprising: the test-bed positioned at middle part With the base support component for being located at bottom;
The test-bed connects including the rack batter post being arranged on the base support component and the rack batter post The rack column with preset height that connects is set to the rack batter post and the winding staircase on the outside of the rack column and is set to At least one operating platform of the rack column;
The base support component carries out the support fixation of the test-bed by isolated component respectively and falls mesh Mark the undertaking of object.
Further, the system also includes top structure, the top structure includes that equipment room, derricking gear and remote control are de- Hook device;
The equipment room is set to the top of the experimental stand, is the room with predetermined space;
The bottom of the remote control tripping gear is provided with suspension hook, the remote control tripping gear for according to telecommand by institute It states the object that falls that suspension hook is sling to break off relations, so that the object that falls falls;
The derricking gear is set to the top of the equipment room, connects the remote control tripping gear, for by described Remote control tripping gear is lifted by crane to the object that falls or makes to fall.
Further, the base support component includes: falling base support column, be set to described fall positioned at bottommost Falling foundation platform and being set to described fall on base support column falls base steel plates on foundation platform, further includes rack Pile foundation;
The steel plate described to fall base steel plates, that target weight can be accepted for one;
The rack pile foundation is set to the bottom of the rack batter post, for the pile foundation for supporting the test-bed.
It further, further include being set to be used to control with a plurality of guide rail inside the experimental stand, a plurality of guide rail Fall guiding of the object in fall-down test to fall and posture.
It further, further include top platform, the top platform is the top for being set to the experimental stand, sets with described The workbench being located on the same floor between standby.
Further, the system also includes lightning arrester, the lightning arrester be respectively arranged at the equipment room top, Multiple positions of multiple positions of the experimental stand and the base support component.
It further, further include cable pipe, the cable pipe is set on the experimental stand;The derricking gear and The power and instrument control cable of the remote control tripping gear carry out cabling and fixation by the cable pipe.
Further, the base support component includes: falling base support column, be set to described fall positioned at bottommost Falling foundation platform and being set to described fall on base support column falls base steel plates on foundation platform, further includes rack Pile foundation;The steel plate described to fall base steel plates, that target weight can be accepted for one;The rack pile foundation, is set to the rack The bottom of batter post, for the pile foundation for supporting the test-bed;
The system also includes a plurality of guide rail being set to inside the experimental stand, a plurality of guide rail falls for controlling Guiding of the object in fall-down test is fallen to fall and posture;
The system also includes top platform, the top platform be the top for being set to the experimental stand, with it is described The workbench that equipment is located on the same floor;
The system also includes lightning arrester, the lightning arrester is respectively arranged at the top of the equipment room, the reality Test multiple positions of rack and multiple positions of the base support component;
The system also includes cable pipe, the cable pipe is set on the experimental stand;The derricking gear It is fixed with the power and instrument control cable of the remote control tripping gear by the cable pipe.
A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system that the embodiment of the present invention proposes, provides and is used for The experimental stand of falling from high altitude, and the experimental stand is separated with the undertaking for finally falling object, realize test-bed With fall being effectively isolated for object, it is ensured that the safety of the experimental stand and durable realizes the test bar of rigid foundation Part, it is ensured that the reasonability and validity of test.
Detailed description of the invention
Fig. 1 is the falling from high altitude pilot system schematic diagram that the embodiment of the present invention is equipped with Nuclear Power Station's Exhausted Fuels storage;
Fig. 2 is the falling from high altitude pilot system partial enlargement that the embodiment of the present invention is equipped with Nuclear Power Station's Exhausted Fuels storage Figure.
Wherein, 1, fall base support column;2, fall foundation platform;3, fall base steel plates;4, test-bed pile foundation;5, Winding staircase entrance;6, rack batter post;7, rack column;8, winding staircase;9, operating platform;10, guide rail;11, top platform;12, equipment Between entrance;13, spentnuclear fuel storage;14, it is remotely controlled tripping gear;15, derricking gear;16, equipment room;17, lightning arrester; 18, cable pipe.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
In the description of the embodiment of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", The orientation or position of the instructions such as "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner" and "outside" Relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, without referring to Show or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot manage Solution is limitation of the present invention.
Firstly the need of explanation, the embodiment of the present invention is only to be applied to the falling from high altitude test that nuclear power station falls object For be illustrated, it is clear that by suitably modified, the nuclear power station of the embodiment of the present invention falls object falling from high altitude pilot system It can be used for the falling from high altitude test of nuclear power station other equipment, research reactor relevant device and industrial circle relevant device.
As shown in Figure 1, the embodiment of the present invention provides a kind of falling from high altitude pilot system, comprising: the testing stand positioned at middle part Frame and base support component positioned at bottom;
The test-bed includes: that the rack batter post 6 being arranged on the base support component and the rack batter post connect The rack column 7 that connects, the winding staircase 8 being set on the outside of the rack batter post and the rack column and it is set to the rack column At least one operating platform 9.
The base support component, for carrying out the support fixation of the test-bed by isolated component respectively and falling Fall the undertaking of object.
Falling from high altitude pilot system described in the embodiment of the present invention is divided into bottom, middle part and top three parts, in which:
Bottom structure mainly includes base support component, the base support component include two separation parts, one Divide and be used to support the fixed test-bed, another part falls object for accepting.It is described to fall object, it is the height Sky falls the target detection object of experiment, falls object due to the embodiment of the present invention with nuclear power station and is illustrated, described Falling object is spentnuclear fuel storage;But the object that falls is not belonging to the test of falling from high altitude described in the embodiment of the present invention System, and only it is applied to the object that the falling from high altitude pilot system carries out fall-down test.
Central structure includes test-bed, and test-bed includes that rack batter post 6, rack column 7, winding staircase 8 and operation are flat again Platform 9 etc.;The experimental stand is based on certain altitude, i.e. preset height, and the specific height of preset height can be according to the actual needs Depending on, it is only necessary to increase the height of rack column 7.
Fig. 2 is the falling from high altitude pilot system partial enlargement that the embodiment of the present invention is equipped with Nuclear Power Station's Exhausted Fuels storage Figure, as shown in Fig. 2, test-bed described in the embodiment of the present invention includes rack batter post 6, rack column 7, winding staircase 8 etc., can be used steel Pipe structure and flanged joint form, can also be used other structures and type of attachment.The steel tubing of rack batter post 6 and rack column 7 Material is selected more excellent than the selection of other supplementary structures (such as winding staircase 8).Horse structure strength and stiffness must meet various Load Combinations The requirement of (including load lifting and fall-down test), to guarantee that rack and guide rail structure have enough strength and stiffness to guarantee to fall Fall the safe and reliable of test.The bottom design of fall-down test rack uses the door type structure form of batter post, passes in and out convenient for equipment, And meet the requirement for transporting the automobile disengaging of storage.
The external winding staircase 8 for setting up steel and marking time of the test-bed, makes operator can be convenient arrival bench top With each layer operation platform, 8 two sides of winding staircase are respectively provided with guardrail, it is ensured that and testing crew can reach each layer height position of test-bed, And it can ensure the personnel safety under all kinds of operating conditions.The design of test-bed platform and winding staircase meets in earthquake, sleet, strong wind Etc. the safety under the conditions of all kinds of.
The embodiment of the present invention proposes a kind of falling from high altitude pilot system, provides a kind of experimental stand for falling from high altitude, And the experimental stand is separated with the undertaking for finally falling object, realize test-bed and fall object it is effective every From, it is ensured that the safety of the experimental stand and durable, the experimental condition of rigid foundation is realized, it is ensured that the reasonability of test And validity.
In an alternative embodiment, the system also includes top structure, the top structure include equipment room 16, Derricking gear 15 and remote control tripping gear 14;
The equipment room 16, is set to the top of the experimental stand, is the room with predetermined space, for fall The equipment such as the hoisting mechanism of object provide accommodation space, and the bottom of equipment room 16 is equipped with hole for hoist, allow to fall object and It is remotely controlled between the equipment such as tripping gear or more access device;
The bottom of the remote control tripping gear 14 is provided with suspension hook, and the remote control tripping gear is used for will according to telecommand What the suspension hook was sling falls object unhook, so that the object that falls falls;
The derricking gear 15 is set to the top of the equipment room 16, the remote control tripping gear 14 is connected, for leading to It crosses the remote control tripping gear 14 object that falls is lifted by crane or makes to fall.
In the embodiment of the present invention, after object lifting will be fallen, fall-down test can be carried out.In falling process, target Falling objects pass through the experimental stand and drop down, and the part for falling object that is used to accept in base support component is located at The intermediate region of the experimental bench bottom does not simultaneously have structure connection relationship with the experimental stand, thus falls object and fall The structure of the experimental stand will not be impacted afterwards.
Derricking gear 15 described in the embodiment of the present invention can be electric block, for storage lifting, promoted with Fall-down test.During lifting, the center that electric block makes suspension centre remain at the experimental stand, electric block are promoted Installation site in 2 directions of horizontal plane can adjust, and the position of derricking gear 15 can be locked after adjustment.Derricking gear 15 Handheld box is wirelessly or non-wirelessly mode, for example handheld box of wired connection, then the riding position of handheld box is located on the outside of steel tower.
Repeatedly used remote control tripping gear 14 is installed on the suspension hook of derricking gear 15, is remotely controlled the specified of tripping gear 14 Load is greater than institute's lifting load to be tested, and remote control distance also needs to meet test requirements document.When unhook, remote control tripping gear 14 guarantees To falling model and storage without lateral force.Before storage falls, remote control tripping gear 14 can pass through the fixed dress of traction It sets and is connect with rack, sprung back at the time of to prevent storage from disengaging.Be remotely controlled tripping gear 14 remote controler be it is wireless or Wired mode, for example remote controler of wired connection need to consider that its riding position is located on the outside of steel tower, in order to avoid influence to set in steel tower Standby installation.
In an alternative embodiment, the base support component includes: to fall base support column positioned at bottommost 1, it is set to and described fall falling foundation platform 2 and being set on base support column 1 and described fall falling on foundation platform 2 Base steel plates 3 further include rack pile foundation 4;
The steel plate described to fall base steel plates 3, that target weight can be accepted for one;The target weight is according to falling target The weight of object and determine;
The rack pile foundation 4 is set to the bottom of the rack batter post 6, for the pile foundation for supporting the test-bed.
In the embodiment of the present invention, falling foundation platform 2 can be poured by armored concrete, and cushion cap bottom can be set 4 Root or more support columns 1, support column 1 can equally be poured by armored concrete, fall each of foundation platform 2 and lower section Fall base support column 1 securely to connect by reinforcing bar and concrete, it can be ensured that entirely fall foundation platform be able to bear it is sufficiently large Dropping shock load.Fall the multiple position setting pre-embedded steel slabs in 2 top of foundation platform, falls base steel plates 3 for fixation.
Fall base steel plates 3 and be mounted on and fall on foundation platform 2, can weld be reliably fixed by fashioned iron and hold falling basis On the pre-embedded steel slab of platform 2, it is ensured that fall the impact displacement and bounce of base steel plates 3 during fall-down test.Fall base Plinth steel plate 3 can be spliced to form by 1 piece or plurality of steel plates, fallen base steel plates 3 and fallen and need rigid pad between foundation platform 2 It is real, it prevents that there are gap or filled soft materials, absorbs impact energy in order to avoid falling base steel plates 3 in fall-down test and deforming Amount, it is ensured that test result is rationally credible, feasible method first is that by being thrown to the surface structure for falling foundation platform 2 Light is smooth.Fall base steel plates 3 for simulating rigid foundation bottom surface in load fall-down test, while protecting falling for steel and concrete structure Fall foundation platform 2, prevent its occur local pressure unevenness cause structural failure, while also ensure test result conservative and Reasonability.Fall after base steel plates 3 are installed to and fall foundation platform 2, the anti-corrosion treatments such as surface cleaning and japanning need to be carried out.
The test-bed is mounted in rack pile foundation 4, is fixed by the rack batter post 6.Rack pile foundation 4 can be by Armored concrete pours, and is centered around the surrounding for falling foundation platform 3, circumferentially uniformly distributed in array.Rack pile foundation 4 with Fall and be physically isolated completely between foundation platform 2, between fill soft soil, in fall-down test, prevent from falling basis The vibration of cushion cap 2 is passed on rack pile foundation 4 and test-bed, it is ensured that the safety and stability of test-bed.In rack pile foundation 4 Pre-embedded steel slab is arranged in the multiple positions in portion, for fixing the steel construction of test-bed.
In an alternative embodiment, the system also includes be set to and a plurality of guide rail inside the experimental stand 10, a plurality of guide rail 10 falls guiding of the object in fall-down test and falls and posture for controlling.
In the embodiment of the present invention, the inside of the test-bed is equipped with guiding device (guide rail 10), to guarantee that storing is held Device is falling and is remaining vertical state in lifting process, and without obviously scratching.I-steel or its alloytype can be used in guide rail 10 Steel makes, and carries out high strong ties with connecting plate between each section of guide rail, while being connected and fixed with tower body frame structure.It can be set and lead The straightening roll-setting gear of rail 10, connection and adjusting between meeting each section require.Specifically, 4 can be arranged inside test-bed Guide rail, the distance between 4 guide rails is adjustable, carries out wanting for lifting and fall-down test to meet the storage of various outer diameter It asks.It transports and enters in guide rail for the ease of storage and promoted, 4 guide rails of bottom are detachable structure, this part Guide rail is fallen base steel plates 3 and horse structure with bottom and is fixed using bolt or other structures easy to disassemble.
In an alternative embodiment, the system also includes top platform 11, the top platform 11 is to be set to The top of the test-bed, the workbench being located on the same floor with the equipment room 16, for providing the working space at top.
In an alternative embodiment, the equipment room 16 offers the entrance 12 between access device, for passing in and out State equipment room 16.
In the embodiment of the present invention, protection board house (equipment room 16) is installed, for protecting platform at the top of the test-bed Power and the I&C systems such as top of the trellis storage jack up unit, are in safe environment, prevent these equipment in rain The bad weathers such as snow descend to break down.16 design meets in all kinds of items such as earthquake, sleet, strong wind between rack and its top apparatus Security reliability under part.
Set multilayer operation platform on the test-bed altogether, lowest level platform as storage suspender install it is fixed and to The platform of test element is loaded in container, this layer of platform is 3 face structures, a side opening, to facilitate the vapour for loading storage Vehicle enters inside rack;Intermediate operating platform 9 is prevented for connecting suspension hook and detacher with horse structure before fall-down test Locking hook rear hanger whipping;The absolute altitude of top layer platform 11 is the installation and maintenance of storage jack up unit, electric-control system equipment Platform, the platform have equipment room 16, lightning arrester 17 are housed at the top of equipment room 16.Each each orientation of layer platform is required to setting shield Column, it is ensured that testing crew can facilitate arrival each position, and can ensure the personnel safety under all kinds of operating conditions.
In an alternative embodiment, the system also includes cable pipe 18, the cable pipe 18 is set to institute It states on experimental stand;The power and instrument control cable of the derricking gear 15 and the remote control tripping gear 14 are worn by the cable Pipe carries out cabling and fixation.
The steel construction of test-bed described in the embodiment of the present invention is equipped with 2 sets of cable pipes 18 of power and instrument control, can be with It realizes being reliably fixed for power and instrument control cable, and avoids mutual signal interference.In addition to installing rack top in cable pipe 18 Outside the power supply of portion's equipment and instrument control cable, it is additionally provided with cable in stock, and be pre-loaded into steel wire, it can when needed, above and below rack Cable is filled behind both ends.
In an alternative embodiment, the system also includes lightning arrester 17, the lightning arrester 17 is respectively set In the top of the equipment room 16, multiple positions of multiple positions of the experimental stand and the base support component.
Sufficiently long lightning arrester 17 is arranged in the top of equipment room described in the embodiment of the present invention, and one and lightning-arrest dress is arranged The lightning-arrest downlead for setting 17 connections leads to the ground connection anchor being mounted in subsurface test-bed basis and is fixed, it is ensured that power and Reliability and safety of the I&C system under thunder and lightning and all kinds of meteorological conditions.
In conclusion falling from high altitude experimental system described in the embodiment of the present invention has the advantages that
1. falling base steel plates by what is be arranged, realizing test-bed and falling being effectively isolated for target basis, can have Target basis is fallen in effect protection, and realizes the experimental condition of rigid foundation, it is ensured that the reasonability and validity of test.
2. it is each highly, each position to realize test-bed for the winding staircase structure and multilayer platform that are arranged by rack periphery The accessibility of key position improves the safety and convenience of the operation of operator's rack.
3. by the remote control tripping gear being arranged on rack, realize that fall falling at a distance for target in test distant Control operation control, improves the safety of test operation, realizes the analogue simulation of operating condition of test.
4. by bench top be arranged derricking gear, realize test prepare and test operation during fall target and The lifting of each testing equipment improves safety and the working efficiency of test preparation and operation;Pass through what is be arranged in bench top Equipment room realizes the effective protection of the equipment such as bench top derricking gear, improves the reliability of test and extends equipment Service life.
5. by a plurality of guide rail being arranged inside rack, realizes and fall guiding of the target in fall-down test in test and fall It falls and gesture stability.
6. the lightning arrester by being arranged in bench top and the ground connection anchor in the setting of rack bottom, improve testing stand The anti-lightning performance of frame, ensure that the safety of test-bed equipment and neighbouring personnel.
Finally, method of the invention is only preferable embodiment, it is not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (7)

1. a kind of nuclear power station falls object falling from high altitude pilot system characterized by comprising the test-bed positioned at middle part With the base support component for being located at bottom;
The test-bed, including be arranged on the base support component rack batter post, connect with the rack batter post It rack column with preset height, the winding staircase being set on the outside of the rack batter post and the rack column and is set to described At least one operating platform of rack column;
The base support component, the support for carrying out the test-bed by isolated component is fixed and falls holding for object It connects, the base support component includes: falling base support column, be set to described fall on base support column positioned at bottommost Fall foundation platform and be set to described fall and fall base steel plates on foundation platform, further include rack pile foundation;It is described to fall Base steel plates are fallen, the steel plate that can accept target weight for one, the base steel plates of falling are by 1 piece or plurality of steel plates splicing structure At, it is described fall base steel plates be mounted on it is described fall above foundation platform, and fall base steel plates described and described fall Rigid pad crucial point reason or filled soft material are carried out between foundation platform, to prevent from falling base steel plates in fall-down test Deformation;The rack pile foundation is set to the bottom of the rack batter post, for the pile foundation for supporting the test-bed.
2. nuclear power station falls object falling from high altitude pilot system according to claim 1, which is characterized in that the system is also Including top structure, the top structure includes equipment room, derricking gear and remote control tripping gear;
The equipment room is set to the top of the test-bed, is the room with predetermined space;
The bottom of the remote control tripping gear is provided with suspension hook, and the remote control tripping gear according to telecommand by described for hanging What hook block rose falls object unhook, so that the object that falls falls;
The derricking gear is set to the top of the equipment room, connects the remote control tripping gear, for passing through the remote control Tripping gear is lifted by crane to the object that falls or makes to fall.
3. nuclear power station falls object falling from high altitude pilot system according to claim 1, which is characterized in that further include setting A plurality of guide rail inside the test-bed, a plurality of guide rail is for controlling the guiding for falling object in fall-down test Fall and posture.
4. nuclear power station falls object falling from high altitude pilot system according to claim 2, which is characterized in that further include top Platform, the top platform are the top for being set to the test-bed and the workbench that the equipment room is located on the same floor.
5. -4 any one nuclear power station falls object falling from high altitude pilot system according to claim 1, which is characterized in that Further include lightning arrester, the lightning arrester be respectively arranged at the top of the system, the test-bed multiple positions and Multiple positions of the base support component.
6. nuclear power station falls object falling from high altitude pilot system according to claim 2, which is characterized in that further include cable Poling, the cable pipe are set on the test-bed;The derricking gear and it is described remote control tripping gear power and Instrument control cable is fixed by the cable pipe.
7. nuclear power station falls object falling from high altitude pilot system according to claim 2, which is characterized in that
The base support component includes: falling base support column, be set to and described fall base support column positioned at bottommost On fall foundation platform and be set to described fall and fall base steel plates on foundation platform, further include rack pile foundation;It is described Fall base steel plates, the steel plate that target weight can be accepted for one;The rack pile foundation is set to the bottom of the rack batter post Portion, for the pile foundation for supporting the test-bed;
The system also includes a plurality of guide rail being set to inside the test-bed, a plurality of guide rail falls mesh for controlling Guiding of the mark object in fall-down test falls and posture;
The system also includes top platform, the top platform is the top for being set to the test-bed and the equipment Between the workbench that is located on the same floor;
The system also includes lightning arrester, the lightning arrester is respectively arranged at the top of the equipment room, the testing stand Multiple positions of multiple positions of frame and the base support component;
The system also includes cable pipe, the cable pipe is set on the test-bed;The derricking gear and institute The power and instrument control cable for stating remote control tripping gear are fixed by the cable pipe.
CN201710986880.8A 2017-10-20 2017-10-20 A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system Active CN107764498B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710986880.8A CN107764498B (en) 2017-10-20 2017-10-20 A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710986880.8A CN107764498B (en) 2017-10-20 2017-10-20 A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system

Publications (2)

Publication Number Publication Date
CN107764498A CN107764498A (en) 2018-03-06
CN107764498B true CN107764498B (en) 2019-11-22

Family

ID=61269794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710986880.8A Active CN107764498B (en) 2017-10-20 2017-10-20 A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system

Country Status (1)

Country Link
CN (1) CN107764498B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113358315B (en) * 2021-06-03 2022-12-06 中国建筑一局(集团)有限公司 Installation and construction method of large drop test platform
CN113804384A (en) * 2021-08-10 2021-12-17 中国核电工程有限公司 Rigid platform for heavy impact load test

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202916063U (en) * 2012-08-08 2013-05-01 胜利油田油建华大实业总公司 Multifunctional impact detection apparatus for safety belt
CN103264818B (en) * 2013-05-16 2015-04-01 国家电网公司 Multifunctional fixed frame for drop and impact tests
CN204043883U (en) * 2014-08-18 2014-12-24 中国航天空气动力技术研究院 A kind of unmanned plane skid landing system drop-test platform
CN105222976A (en) * 2015-10-20 2016-01-06 大连宝原核设备有限公司 A kind of spent fuel storage rack fall-down test automatic releasing device
CN105222975A (en) * 2015-10-20 2016-01-06 大连宝原核设备有限公司 Spent fuel storage rack fall-down test stand
CN205785741U (en) * 2016-05-27 2016-12-07 广州特种机电设备检测研究院 A kind of fall-down test device

Also Published As

Publication number Publication date
CN107764498A (en) 2018-03-06

Similar Documents

Publication Publication Date Title
US10590622B2 (en) Drop hammer height adjusting device for high strain detection of pile foundation
CN101328746B (en) Steel structure high altitude mounting method
CN107764498B (en) A kind of Nuclear Power Station's Exhausted Fuels storage falling from high altitude pilot system
CN108597633B (en) The shielding conveyer method and equipment of spentnuclear fuel
CN101967886A (en) Assembly and installation methods of steel containment vessel of nuclear power station
KR100958350B1 (en) Inspection and Repair Stand
JP4237445B2 (en) How to handle structures
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN210194603U (en) Empty pile steel pipe column positioning device
CN106544957B (en) Length adjustment device, stiffening girder of suspension bridge mounting system and method
CN206468084U (en) A kind of anti-climbing electric power pylon
CN112411760B (en) Construction method for integrally hoisting and combining cantilever installation of head unit
CN111472533B (en) Block detachable annular operation platform and construction method
CN206174438U (en) Prevent construction platform that inclines
JP4295733B2 (en) How to store in-furnace structures
CN114164994A (en) Prefabricated column construction method
CN103274320A (en) Wind speed detection device and tower crane
KR20110028756A (en) Drop test system of a radioactive waste package
CN118067348B (en) Assembled high-energy drop hammer impact test system
CN104213715A (en) Venue giant arch structure high-altitude inclination deflection lifting method
CN105467350B (en) A kind of vehicle-mounted extra-high voltage CVT verifications Z-type lifting gear and method
Hu et al. Risk Analysis and Control Strategies for the Assembly of Major Structure Module in AP1000 Nuclear Power Project
CN213198127U (en) Prefabricated stand prevents device that topples
CN211719273U (en) Hidden lifting device for mounting equipment in high-temperature gas cooled reactor spent fuel vertical shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210113

Address after: 100193 building 26, Zhongguancun Software Park, 8 Dongbeiwang West Road, Haidian District, Beijing

Patentee after: CHINERGY Co.,Ltd.

Address before: 100084 mailbox, 100084-82 Tsinghua Yuan, Beijing, Haidian District, Beijing

Patentee before: TSINGHUA University

TR01 Transfer of patent right