CN107762534A - A kind of complete opening once quick grouting construction method - Google Patents

A kind of complete opening once quick grouting construction method Download PDF

Info

Publication number
CN107762534A
CN107762534A CN201710973943.6A CN201710973943A CN107762534A CN 107762534 A CN107762534 A CN 107762534A CN 201710973943 A CN201710973943 A CN 201710973943A CN 107762534 A CN107762534 A CN 107762534A
Authority
CN
China
Prior art keywords
grouting
hole
pipe
slip casting
complete opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710973943.6A
Other languages
Chinese (zh)
Other versions
CN107762534B (en
Inventor
高海东
史鹏飞
范旭阳
郭彦兵
赵涛
郑涛
孟妍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201710973943.6A priority Critical patent/CN107762534B/en
Publication of CN107762534A publication Critical patent/CN107762534A/en
Application granted granted Critical
Publication of CN107762534B publication Critical patent/CN107762534B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of complete opening once quick grouting construction method, including cloth hole, make the process such as Grouting Pipe dispensing and slip casting, complete opening once grouting is realized, suitable for backfill, muck soil, riprap layer, layer of sand, the complete, quality such as differentiation layer, and slip casting effect is good by force.

Description

A kind of complete opening once quick grouting construction method
Technical field
The present invention relates to a kind of complete opening once quick grouting construction method.
Background technology
Slurry injection technique is widely used in China constructing tunnel field, be particularly applied to Weathered Trough, crushed zone, Plenty water weak surrounding rock grouting for water blocking, strengthening stratum;Type has tunneling boring, half section, periphery and local curtain-grouting, single hole note Slurry etc.;For main grouting mode based on protrusive, retrusive, wall for grouting uses form concrete, more than thickness 2m;Cloth well format With tunneling boring, upper half section note tunneling boring, periphery or local curtain-grouting cloth hole, the whole slip casting cycle is longer, slip casting effect Have some limitations, how to realize complete opening once quick slip casting so that slurries can uniformly be diffused into the every of injected hole Individual section, it is ensured that complete opening slip casting effect, be worth our further further investigations and experiment.
Traditional slurry injection technique, mainly based on dual slurry, using protrusive, retrusive grouting mode, each injected hole Leading portion installs Φ 127 × 5mm sleeve pipes, length 5m;Casing section uses Φ 94mm using Φ 130mm drill bits pore-forming, follow-up slip casting section Drill bit pore-forming;Grouting pressure is based on middle pressure, and typically using 2.5~4.0 times of hydrostatic pressures, grouting sequence is from outside to inside.
Either protrusive, retrusive, slurries can not uniformly spread, and cloth hole number is more, and wall for grouting uses mould Concrete is built, thickness is big, should not operate, and the whole slip casting cycle, time-consuming, and the sealing of wall for grouting is poor, and the later stage is not easy to cut, slurry Liquid setting time, adjustable scope was small, and slip casting effect has some limitations, and surface uplift value is larger during slip casting.
The content of the invention
In order to solve the above-mentioned technical problem, it is an object of the invention to provide a kind of complete opening once quick grouting construction method, Suitable for backfill, muck soil, riprap layer, layer of sand, the complete, quality such as differentiation layer, and slip casting effect is good by force.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
A kind of complete opening once quick grouting construction method, comprises the following steps:
A, cloth hole
Excavated section, using upper half section note tunneling boring slurry, beat injected hole several, slip casting hole length 20m, excavation 15m, Reserved 5m presses 3m fixing collar, dilation angle 1m outside as sealing batholite, excavation contour line;
Wherein punch according to " inner ring, gets on, get off behind first outer ring, symmetrical, is constructed with hole is jumped between sequence ", subtract as far as possible Few disturbance to stratum;
Wall for grouting uses 80cm thickness C25 in-network processings, if compound steel muscle net, and set thick tendons skeleton more than Φ 22mm with Bow member firm welding;
B, Grouting Pipe is made
The pvc pipe being fixedly connected by more piece by straight joint forms the main body of Grouting Pipe, is provided with each pvc pipe Device to hole, each device to hole are wrapped up with rubber strip, and tapered the first sharp wire leading pipe of Grouting Pipe one end connection contracting point, the other end stays Screw thread is used to be connected with slip casting pump line;
The long 4m of pvc pipe is wherein often saved, totally 5 section, one group of device to hole is set per spacing 1m;
C, dispensing
75% common dual slurry (1:1:1, waterglass 38Be ' initial set 40~50s, final set 5min), 25% superfine cement slurry Liquid;
D, slip casting
In each injected hole that first wire leading pipe one end quick insertion of each Grouting Pipe one end is accomplished fluently, aperture uses Anchor Agent Anchoring closure, Grouting Pipe other end screwed connection slip casting pump line start slip casting, and slurries break through rubber strip, are overflowed from injected hole, Realize complete opening once grouting;
Wherein:Once drill at a slow speed 20m, quick insertion Grouting Pipe;Lower half section grouting pressure control 2.5Mpa with Interior, the grouting pressure of upper half section is controlled within 1.2Mpa, and grouting pressure of the arch close to pipeline region is controlled in 0.8Mpa Within;
Single hole slip casting ending standard:Grouting amount, grouting pressure dual control, porosity control is 10%, per linear meter(lin.m.) about 0.3m3Slurry Liquid, the porosity of total slurry amount ≯ 15%.
Further, a diameter of 75mm of the injected hole, a diameter of 25mm of the Grouting Pipe, the aperture of device to hole is 8mm, first wire leading pipe is by the tapered point of 20mm wire leading pipes contracting point.
Further, hot weather biliquid can effectively be controlled by a certain amount of disodium hydrogen phosphate being mixed in the blending process The setting time of slurry.
Further, the average injected hole set per square meter is 4 on the section upper half section.
Compared with prior art, advantageous effects of the invention:
1st, once punch, PVC Grouting Pipe total length perforates (pitch of holes 1m), within 40s~50s setting times, slurries can Uniformly spread out, 2h completes an injected hole, realizes quick slip casting;
2nd, compound steel muscle net, 80cm thickness C25 in-network processings, and set thick tendons skeleton more than Φ 22mm and bow member welding jail Gu wall for grouting thickness is effectively reduced, no spillage phenomenon;
3rd, dual slurry setting time is effectively controlled, slurries just can uniformly be spread out, and avoid slurries from concentrating Effect, reduces surface uplift value (within 10cm), and protuberance presents harmonious;
4th, by grouting test, the disposable slurry injection technique of this complete opening disclosure satisfy that a variety of stratum (are applied to backfill, mud Matter soil, riprap layer, layer of sand, it is complete, break up layer by force), and slip casting effect is more satisfactory.
Brief description of the drawings
The invention will be further described for explanation below in conjunction with the accompanying drawings.
Fig. 1 is the schematic diagram of Grouting Pipe;
Fig. 2 is enlarged drawing at A;
Fig. 3 is sectional view at B;
Description of reference numerals:1-PVC is managed;2- straight joints;3- device to hole;4- adhesive tapes;The wire leading pipes of 5- first;6- screw threads;7- valves Door.
Embodiment
As shown in figure 1, a kind of complete opening once quick grouting construction method, comprises the following steps:
A, cloth hole
Excavated section, using upper half section note tunneling boring slurry, beat injected hole several, slip casting hole length 20m, excavation 15m, Reserved 5m presses 3m fixing collar, dilation angle 1m outside as sealing batholite, excavation contour line;
Wherein punch according to " inner ring, gets on, get off behind first outer ring, symmetrical, is constructed with hole is jumped between sequence ", subtract as far as possible Few disturbance to stratum;
Wall for grouting uses 80cm thickness C25 in-network processings, if compound steel muscle net, and set thick tendons skeleton more than Φ 22mm with Bow member firm welding;
B, Grouting Pipe is made
The pvc pipe 1 being fixedly connected by more piece by straight joint 2 forms the main body of Grouting Pipe, is respectively provided with each pvc pipe There is device to hole, each device to hole is wrapped up with rubber strip, tapered the first sharp wire leading pipe 5 of Grouting Pipe one end connection contracting point, another Screw thread 6 is stayed to be used to be connected with slip casting pump line in end;Valve 7 is additionally provided with Grouting Pipe;
The long 4m of pvc pipe is wherein often saved, totally 5 section, one group of device to hole is set per spacing 1m;
C, dispensing
75% common dual slurry (1:1:1, waterglass 38Be ' initial set 40~50s, final set 5min), 25% superfine cement slurry Liquid;
D, slip casting
In each injected hole that first wire leading pipe one end quick insertion of each Grouting Pipe one end is accomplished fluently, aperture uses Anchor Agent Anchoring closure, Grouting Pipe other end screwed connection slip casting pump line start slip casting, and slurries break through rubber strip, are overflowed from injected hole, Realize complete opening once grouting;
Wherein:Once drill at a slow speed 20m, quick insertion Grouting Pipe;Lower half section grouting pressure control 2.5Mpa with Interior, the grouting pressure of upper half section is controlled within 1.2Mpa, and grouting pressure of the arch close to pipeline region is controlled in 0.8Mpa Within;
Single hole slip casting ending standard:Grouting amount, grouting pressure dual control, porosity control is 10%, per linear meter(lin.m.) about 0.3m3Slurry Liquid, the porosity of total slurry amount ≯ 15%.
Wherein, a diameter of 75mm of the injected hole, a diameter of 25mm of the Grouting Pipe, the aperture of device to hole are 8mm, institute The first wire leading pipe is stated by the tapered point of 20mm wire leading pipes contracting point.
Wherein, hot weather dual slurry can effectively be controlled by a certain amount of disodium hydrogen phosphate being mixed in the blending process Setting time.
Wherein, the average injected hole set per square meter is 4 on the section upper half section.
Embodiment 1
Carried out using wearing major urban arterial highway super shallow-buried tunnel Curtain Grouting Construction under the conditions of the plenty water weak surrounding rock that borders on the sea as support Research and development;
Urban transportation thoroughfare is worn under certain tunnel, close to viaduct pier, earth's surface vehicle flowrate is larger, pipeline is intensive, totally 6 class 20 Remaining bar, there are some unknown pipelines;
It is shallower (5.4~14.3m) that section buried depth is worn under this, vault scope stratum is mainly miscellaneous fill, mud, residual soil, complete Strong weathered granite, and penetrated with seawater, self-stable ability is poor, day maximum flooding quantity 1700m3, whole tunnel be located at ordinary water level with Under;
Whole grouting process is as follows:
1. cloth hole:The ㎡ of excavated section 58.99, using upper half section note tunneling boring slurry, wherein injected hole 120, upper part 37, center section 53, lower part 30, slip casting length 20m, 15m is excavated, reserve 5m sealing batholites, outside excavation contour line By 3m fixing collar, dilation angle 1m;
2. work:The people of rig hand 3, the people of Cementer 6, totally 9 people, 8 hours one class, uninterrupted operation;
3. expect:75% common dual slurry (1:1:1, waterglass 38Be ' initial set 40~50s, final set 5min), 25% ultra-fine water Slurry liquid;The setting time of hot weather dual slurry can effectively be controlled by mixing a certain amount of disodium hydrogen phosphate;
4. machine:A kind of small-sized multifunctional drill, double-fluid grouting machine, high shear agitation machine, full-automatic grouting automatic recorder;
5. slip casting process:Once drill at a slow speed 20m, quick insertion Grouting Pipe, aperture anchoring closure, complete opening once grouting;
6. punching according to " inner ring, gets on, get off behind first outer ring, symmetrical, is constructed with hole is jumped between sequence ", reduce as far as possible Disturbance to stratum;
7. wall for grouting uses 80cm thickness C25 in-network processings, if compound steel muscle net, and set Φ more than 22 thick tendons skeleton with Bow member firm welding;
8. setting Φ 75mm drillings, Φ 25mm self-control PVC Grouting Pipes are sent into, spacing 1m opens a pair of device to hole (aperture 8mm), adopted Wrapped up with rubber strip+plastic adhesive tape, Grouting Pipe front end is existed using the tapered point of 20mm wire leading pipes contracting point with Grouting Pipe screwed connection Together, end is reserved screw thread and is connected with slip casting pump line;
9. grouting pressure, lower half control of section is within 2.5Mpa, and for upper half control of section within 1.2Mpa, arch is close Pipeline Region control is within 0.8Mpa;
10. single hole slip casting ending standard:Grouting amount, grouting pressure dual control, porosity control is 10%, per linear meter(lin.m.) about 0.3m3 Slurries, the porosity of total slurry amount ≯ 15%.
Embodiment described above is only that the preferred embodiment of the present invention is described, and not the scope of the present invention is carried out Limit, on the premise of design spirit of the present invention is not departed from, those of ordinary skill in the art make to technical scheme Various modifications and improvement, all should fall into claims of the present invention determination protection domain in.

Claims (4)

1. a kind of complete opening once quick grouting construction method, it is characterised in that comprise the following steps:
A, cloth hole
Excavated section, using upper half section note tunneling boring slurry, beat injected hole several, slip casting hole length 20m, excavate 15m, it is reserved 5m presses 3m fixing collar, dilation angle 1m outside as sealing batholite, excavation contour line;
Wherein punch according to " inner ring, gets on, get off behind first outer ring, symmetrical, is constructed with hole is jumped between sequence ", as far as possible reduction pair The disturbance on stratum;
Wall for grouting uses 80cm thickness C25 in-network processings, if compound steel muscle net, and set more than Φ 22mm thick tendons skeleton and bow member Firm welding;
B, Grouting Pipe is made
The pvc pipe being fixedly connected by more piece by straight joint forms the main body of Grouting Pipe, is provided with each pvc pipe pair Hole, each device to hole are wrapped up with rubber strip, and tapered the first sharp wire leading pipe of Grouting Pipe one end connection contracting point, the other end stays silk Detain for being connected with slip casting pump line;
The long 4m of pvc pipe is wherein often saved, totally 5 section, one group of device to hole is set per spacing 1m;
C, dispensing
75% common dual slurry (1:1:1, waterglass 38Be ' initial set 40~50s, final set 5min), 25% superfine cement slurries;
D, slip casting
In each injected hole that one end quick insertion of first wire leading pipe of each Grouting Pipe one end is accomplished fluently, aperture uses Anchor Agent anchor Sealing is blocked up, and Grouting Pipe other end screwed connection slip casting pump line starts slip casting, and slurries break through rubber strip, are overflowed from injected hole, real Existing complete opening once grouting;
Wherein:Once drill at a slow speed 20m, quick insertion Grouting Pipe;The grouting pressure of lower half section is controlled within 2.5Mpa, on The grouting pressure of half section is controlled within 1.2Mpa, and grouting pressure of the arch close to pipeline region is controlled within 0.8Mpa;
Single hole slip casting ending standard:Grouting amount, grouting pressure dual control, porosity control is 10%, per linear meter(lin.m.) about 0.3m3Slurries, always The porosity of slurry amount ≯ 15%.
2. complete opening according to claim 1 once quick grouting construction method, it is characterised in that:The diameter of the injected hole For 75mm, a diameter of 25mm of the Grouting Pipe, the aperture of device to hole is 8mm, and first wire leading pipe is contracted sharp by 20mm wire leading pipes Tapered point.
3. complete opening according to claim 1 once quick grouting construction method, it is characterised in that:Mixed in the blending process The setting time of hot weather dual slurry can effectively be controlled by entering a certain amount of disodium hydrogen phosphate.
4. complete opening according to claim 1 once quick grouting construction method, it is characterised in that:The section upper half section The upper average injected hole set per square meter is 4.
CN201710973943.6A 2017-10-19 2017-10-19 Full-hole one-time rapid grouting construction method Active CN107762534B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710973943.6A CN107762534B (en) 2017-10-19 2017-10-19 Full-hole one-time rapid grouting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710973943.6A CN107762534B (en) 2017-10-19 2017-10-19 Full-hole one-time rapid grouting construction method

Publications (2)

Publication Number Publication Date
CN107762534A true CN107762534A (en) 2018-03-06
CN107762534B CN107762534B (en) 2020-08-11

Family

ID=61268876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710973943.6A Active CN107762534B (en) 2017-10-19 2017-10-19 Full-hole one-time rapid grouting construction method

Country Status (1)

Country Link
CN (1) CN107762534B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505633A (en) * 2019-01-15 2019-03-22 北京市市政工程研究院 Lining cutting behind guide pipe grouting for water blocking device and construction method for shaly formation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4041665A (en) * 1975-11-22 1977-08-16 Vredestein N.V. Injection sealable waterstop and method of installing same
CN101832142A (en) * 2010-02-11 2010-09-15 中铁十二局集团有限公司 Tunnel information tracing accurate grouting method
CN102128038A (en) * 2011-01-26 2011-07-20 北京中铁瑞威基础工程有限公司 Quick construction method for tunnel pipe shed
CN106638644A (en) * 2016-12-29 2017-05-10 中国葛洲坝集团基础工程有限公司 Deep sand-gravel stratum grouting device and method for carrying out comprehensive grouting by using same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4041665A (en) * 1975-11-22 1977-08-16 Vredestein N.V. Injection sealable waterstop and method of installing same
CN101832142A (en) * 2010-02-11 2010-09-15 中铁十二局集团有限公司 Tunnel information tracing accurate grouting method
CN102128038A (en) * 2011-01-26 2011-07-20 北京中铁瑞威基础工程有限公司 Quick construction method for tunnel pipe shed
CN106638644A (en) * 2016-12-29 2017-05-10 中国葛洲坝集团基础工程有限公司 Deep sand-gravel stratum grouting device and method for carrying out comprehensive grouting by using same

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘召臣: "水平袖阀管深孔注浆在地铁穿越风险源中的应用", 《山西建筑》 *
王彩凤: "某输水隧洞阻水超前预注浆施工技术分析", 《河南科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505633A (en) * 2019-01-15 2019-03-22 北京市市政工程研究院 Lining cutting behind guide pipe grouting for water blocking device and construction method for shaly formation
CN109505633B (en) * 2019-01-15 2024-03-29 北京市市政工程研究院 Lining back guide pipe grouting water plugging device for muddy stratum and construction method

Also Published As

Publication number Publication date
CN107762534B (en) 2020-08-11

Similar Documents

Publication Publication Date Title
CN104594348B (en) Enlarged footing bellows anchor pole and construction method thereof
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN104846810B (en) Self-circulating posterior grouting bored pile construction method
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN107165652A (en) A kind of tunnel monoblock type collapse after construction method
CN204703160U (en) Two anchoring section prestressed anchor Cable Structure
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN108678130A (en) A kind of non-digging drag pipe construction method
CN106640120A (en) Ground-surface fixed-point deep hole layered grouting construction method
CN105926624B (en) Inverse-stopping type set hole grouting device and its construction method
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN106120801A (en) In water-rich sand layer, pipeline crosses the construction method at foundation ditch
CN104847365B (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel construction method
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN109208651A (en) Underground engineering super-long structural body deformation joint waterproof/drainage structure construction method and structure
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN106013078B (en) Construction method of strong permeable stratum reinforcing curtain structure
CN109488371A (en) A kind of full packet waterproof station waterproof system and dynamic setting restricted discharge method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN113153379B (en) Tunnel waterproof and drainage system and construction process
CN103031847A (en) Reducing overlap joint combined type orifice pipe grouting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant