CN106013078B - A kind of construction method of highly permeable stratum consolidation curtain structure - Google Patents

A kind of construction method of highly permeable stratum consolidation curtain structure Download PDF

Info

Publication number
CN106013078B
CN106013078B CN201610540372.2A CN201610540372A CN106013078B CN 106013078 B CN106013078 B CN 106013078B CN 201610540372 A CN201610540372 A CN 201610540372A CN 106013078 B CN106013078 B CN 106013078B
Authority
CN
China
Prior art keywords
slip casting
ground
mini
wall
valve tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610540372.2A
Other languages
Chinese (zh)
Other versions
CN106013078A (en
Inventor
李江波
李金强
王强伟
李新
丁训秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201610540372.2A priority Critical patent/CN106013078B/en
Publication of CN106013078A publication Critical patent/CN106013078A/en
Application granted granted Critical
Publication of CN106013078B publication Critical patent/CN106013078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Abstract

The invention belongs to a kind of construction methods of highly permeable stratum consolidation curtain structure, include the following steps.Ground-connecting-wall is prepared, is excavated downwards along setting-out line road with excavator, ground-connecting-wall ditch is formed, casting concrete wall forms the ground-connecting-wall flushed with ground in ground-connecting-wall ditch, and the thickness of ground-connecting-wall is 500~600mm, and depth is 22~25m;Installation mini-valve tube is inserted into mini-valve tube in hole immediately after sleeve shell material replacement completion, and the length for often saving mini-valve tube is 4m;First slip casting section slip casting prepares grout material by design requirement, carries out slip casting after sleeve shell material reaches scheduled intensity.The present invention has method and structure novel simple, and working procedure is few, and range of grouting is controllable, and work efficiency is high, and construction cost is low, safe, and speed of application is fast, the advantage that grouting consolidation effect is good and energy conservation and environmental protection is good.

Description

A kind of construction method of highly permeable stratum consolidation curtain structure
Technical field
The present invention relates to a kind of construction methods of highly permeable stratum consolidation curtain structure.
Background technology
Currently, as stratum consolidation handles the increasingly mature of construction technology, with outstanding safety, high efficiency and can By the geology improved effect of property, it has been widely used in city underground, municipal road constructing tunnel.In particular, being to pass through Rivers subaqueous tunnel construction in, shield machine export & import end reinforce in, stratum consolidation handle construction technology be even more it is wide General application.
In shield machine export & import, geology reinforcing body effect, the good situations of sealing performance state of construction ground end are Determine the key link of shield machine export & import and tunnel safety.In the case that therefore, in construction ground end, reinforcing body fails, Or in highly permeable stratum, especially in subaqueous tunnel construction, how safely and reliably to make shield machine export & import, how to ensure The construction quality of end reinforcing body makes the consolidation effect of construction ground end and sealing performance reach best, is one and needs depth It solves the problems, such as.This is not exclusively to the safety to shield machine, and ensures molded tunnel safety, surrounding enviroment and constructor The needs of member's personal safety.
Have in the prior art to stratum reinforcement measure:The side such as sleeve valve barrel grouting, high-pressure rotary jet grouting pile slip casting, cement mixing pile Method.High pressure jet grouting and cement mixing pile driving construction are limited by place and geology, poor to sand-pebble layer adaptability.
Sleeve valve barrel grouting can realize delamination pour slurry, and grouting pressure can in real time be adjusted according to monitoring data.But mini-valve tube is noted Slurry is also poor in rich water circle gravel pebble layer adaptability.
In short, slip casting can be caused in highly permeable stratum, rich water and highly permeable grittiness justify gravel pebble layer with the prior art Grouting amount is excessive in construction(Number of dropouts), situations such as slip casting range of scatter is uncontrollable and cementing effect is bad, seriously affect slip casting Consolidation effect.
Invention content
The object of the present invention is to provide a kind of construction methods of highly permeable stratum consolidation curtain structure, have method and structure Novel simple, working procedure is few, and range of grouting is controllable, and work efficiency is high, and construction cost is low, safe, and speed of application is fast, note The slurry advantage that consolidation effect is good and energy conservation and environmental protection is good.
For this purpose, the construction method of the present invention includes the following steps:
(1)The range for delimiting the construction ground on highly permeable stratum to be reinforced, is used in combination white line to mark setting-out line road.
(2)Prepare ground-connecting-wall.It is excavated downwards along setting-out line road with excavator, forms ground-connecting-wall ditch.In ground-connecting-wall Casting concrete wall forms the ground-connecting-wall flushed with ground in ditch.The thickness of ground-connecting-wall is 500~600mm, and depth is 22~25m.
(3)The measurement and positioning in construction ground.Using live datum mark with total powerstation by design requirement spacing carry out cloth hole and Determine that drilling depth, tissue related personnel's device to hole position are measured and checked, confirm errorless.First from close to ground-connecting-wall periphery cloth Hole, the two row cloth holes close to ground-connecting-wall periphery are the blossom type of 0.5m × 0.5m spacing, and the cloth hole of remaining construction ground is 1m × 1m The blossom type of spacing.
(4)Drilling machine is in place and drills.It is required that drilling machine is placed steady, secured and keeps horizontal, drilling machine must be vertical, and controls After confirmation is errorless, drilling construction, drilling diameter 100 are carried out according to cloth hole according to the hole position measured by leading truck verticality < 0.5% ~150 millimeters.
(5)Inject sleeve shell material.After pore-forming, sleeve shell material is replaced by mud in hole by drilling rod immediately.Method is will be by following The pipe of ring mud is connected on squash type slip casting machine, and under the action of grouting pressure, mud in hole is replaced as sheath body by drilling rod Material.Sleeve shell material enters foot of hole under pressure, by drilling rod, and with the entrance of sleeve shell material, mud is from ground hole in hole Mouth cements out, and when finding in the mud of discharge containing sleeve shell material, stops displacement.
(6)Mini-valve tube is installed.After sleeve shell material replacement completion, mini-valve tube is inserted into hole immediately, often saves the length of mini-valve tube Degree is 4m.The PVC casing connections that two adjacent sections mini-valve tube is 20cm with length when being inserted into.It will be tucked inside the sleeve valve using U-PVC adhesives Pipe and casing cement, and first segment mini-valve tube installs plug.Again to injected clear water in pipe, to prevent the curvature of mini-valve tube, under The mini-valve tube in portion should ensure that the center of mini-valve tube and drill center overlap, and mini-valve tube bassets 20cm, then is entangled firm with pullover, prevents Only sundries enters in pipe.
(8)First slip casting section slip casting.After sleeve shell material reaches scheduled intensity, grout material is prepared by design requirement, is carried out Slip casting.Grouting mode takes retrusive segmenting slip casting technique, i.e., carries out slip casting from bottom to top by bottom hole in slip casting band, notes every time Slurry segment length 0.30m~0.40m above carries grouting pressure pipe after having noted the first slip casting section.Carry out the slip casting of the second slip casting section.Slip casting When in the process if you need to suspend slip casting, it is necessary to first take out cement mortar pipe and be put into scuttlebutt, and simultaneously promote grouting pressure pipe 0.4m stops slip casting after noting clear water into hole, had not only kept pipeline unimpeded so again, but also ensures that slip casting is not influenced by water filling.Slip casting Slip casting work sheet, the slip casting working condition of injected hole and grouting with plunger activity duration are performed in the process, during slip casting, Grout injection control, final grouting pressure 1.5MPa are carried out by grouting pressure standard.When grouting pressure reaches design final pressure, the duration is many In 10 minutes, you can terminate slip casting, cleaned to mini-valve tube with clear water at the end of sleeve valve barrel grouting, in case secondary grouting.
(9)Second slip casting section slip casting.If after the first slip casting section slip casting, meets design requirement after testing, then stop constructing.It is no Then, it repeats the first slip casting section slip casting and carries out the second slip casting section slip casting until meeting design requirement.
Said structure design realizes the purpose of the present invention.
The present invention has method and structure novel simple, and working procedure is few, and range of grouting is controllable, and work efficiency is high, construction At low cost, safe, speed of application is fast, the advantage that grouting consolidation effect is good and energy conservation and environmental protection is good.
The present invention is equipped with ground-connecting-wall water-stop curtain in reinforcing body range outer periphery, by mini-valve tube group to sandy gravel highly permeable Stratum carries out grouting and reinforcing.So that ground-connecting-wall is completed impermeable role, grouting and reinforcing is carried out using mini-valve tube group within the scope of reinforcing body Stratum.This used leading sealing of ground-connecting-wall Grouting Consolidation method again, have mortar depositing construction is efficient, construction quality is high, The advantages that material is not lost in and is environmentally protective.
The present invention compared with prior art caused by advantageous effect:
(1)The present invention carries out 28 days intensity detections by detection hole to reinforcing body, is revolved in traditional sleeve valve barrel grouting, high pressure In the strengthening stratum that the methods of spray stake slip casting, cement mixing pile cannot construct, when being unsatisfactory for design strength and sealing requirement, this hair It is bright it is equal can be reinforced, and reach design requirement.
(2)Internal slip casting is carried out using ground-connecting-wall water-stop curtain, with mortar depositing construction is efficient, quality is high, material does not flow The advantages that mistake, construction cost is low and environmentally protective.
Specific implementation mode
A kind of construction method of highly permeable stratum consolidation curtain structure, includes the following steps:
Include the following steps:
(1)Delimit the range of the construction ground on highly permeable stratum to be reinforced.It is used in combination white line to mark setting-out line road.
(2)Prepare ground-connecting-wall.It is excavated downwards along setting-out line road with excavator, forms ground-connecting-wall ditch.In ground-connecting-wall Casting concrete wall forms the ground-connecting-wall flushed with ground in ditch.The concrete absolute altitude of the concrete walls is C20.
The thickness of ground-connecting-wall is 500~600mm, and depth is that 22~25m or depth can be depending on design requirements.The ground Even the depth of wall is greater than or equal to depth of pore forming.
The construction ground is in the range of ground-connecting-wall or ground-connecting-wall surrounds the range of construction ground.
(3)The measurement and positioning in construction ground.Using live datum mark with total powerstation by design requirement spacing carry out cloth hole and Determine drilling depth.Tissue related personnel's device to hole position measures and checks, and confirms errorless.First from close to ground-connecting-wall periphery cloth Hole, the two row cloth holes close to ground-connecting-wall periphery are the blossom type of 0.5m × 0.5m spacing, and the cloth hole of remaining construction ground is 1m × 1m The blossom type of spacing;Or the two row cloth holes on the close ground-connecting-wall periphery are pitch-row 1.5m, array pitch 1.5m, cloth triangular in shape It sets.The cloth hole of remaining construction ground is pitch-row 1m, and array pitch 1m is triangularly arranged.
(4)Drilling machine is in place and drills.It is required that drilling machine is placed steady, secured and keeps horizontal, drilling machine must be vertical, and controls Leading truck verticality < 0.5%.According to the hole position measured, after confirmation is errorless, drilling construction, drilling diameter 100 are carried out according to cloth hole ~150 millimeters or depending on sets requirement.
(5)Inject sleeve shell material.Sleeve shell material is replaced by mud in hole by drilling rod immediately after pore-forming.Method is will to pass through cycle The pipe of mud is connected on squash type slip casting machine, and under the action of grouting pressure, mud in hole is replaced as sleeve shell material by drilling rod. Sleeve shell material enters foot of hole under pressure, by drilling rod, and with the entrance of sleeve shell material, mud is set from ground aperture in hole It swaps out and, when finding in the mud of discharge containing sleeve shell material, stop displacement.
The raw material weight proportioning of soup processed of the sleeve shell material is cement:Swelled ground:Water=1:1.5:2.
(6)Mini-valve tube is installed.After sleeve shell material replacement completion, mini-valve tube is inserted into hole immediately.Often save the length of mini-valve tube Degree is 4m.When being inserted into, the PVC casing connections that two adjacent sections mini-valve tube is 20cm with length will be tucked inside the sleeve valve using U-PVC adhesives Pipe and casing cement, and first segment mini-valve tube installs plug (forming ball-valve structure).Again to injected clear water in pipe, to prevent sleeve valve The curvature of pipe.The mini-valve tube of lower part should ensure that the center of mini-valve tube and drill center overlap.Mini-valve tube bassets 20cm, then It is entangled firm with pullover, prevents sundries from entering in pipe.
(8)First slip casting section slip casting.After sleeve shell material reaches scheduled intensity, grout material is prepared by design requirement, is carried out Slip casting (for traditional grouting mode, i.e., tripping in slurry casting machine in mini-valve tube, the centre about 20cm long grooved bores of slurry casting machine, on it under Stop grouting plug is respectively carried, the slurry casting machine in grouting pressure pipe and mini-valve tube is attached).Grouting mode takes retrusive segmentation note Sizing process.I.e.:Slip casting is carried out by bottom hole from bottom to top in slip casting band.Each slip casting segment length 0.30m~0.40m, has noted first After slip casting section.Grouting pressure pipe is above carried, the slip casting of the second slip casting section is carried out.
When during slip casting if you need to suspend slip casting, it is necessary to first take out cement mortar pipe and be put into scuttlebutt, and simultaneously will note It starches pressure pipe and promotes 0.4m.Stop slip casting again after noting clear water into hole, not only kept pipeline unimpeded in this way, but also ensures that slip casting is not noted Water influences.Slip casting work sheet, the slip casting working condition of injected hole and grouting with plunger activity duration are performed during slip casting, During slip casting, grout injection control, final grouting pressure 1.5MPa are carried out by grouting pressure standard.When grouting pressure reaches design final pressure, Duration is no less than 10 minutes, you can and terminate slip casting, mini-valve tube is cleaned with clear water at the end of sleeve valve barrel grouting, it is standby Secondary grouting.
The mini-valve tube uses the PVC material of Φ 48mm.The grout material is that cement uses 42.5 grades of common silicic acid Salt cement, the water of cement grout:Cement ratio is 1:1, grout spreading range 0.75m, 0.5~1.5MPa of grouting pressure, final pressure For 1.5MPa, flow rate of grouting 30-40L/min.
(9)If second slip casting section slip casting meets design requirement, then stops constructing after testing after the first slip casting section slip casting;It is no It then repeats the first slip casting section slip casting and carries out the second slip casting section slip casting until meeting design requirement.
In no injected hole for implementing slip casting, should take:The mini-valve tube upper end is sealed using quick-hardening cement, is prevented Grout phenomenon is only generated during slip casting.
The present invention's also can be used traditional sleeve valve barrel grouting, therefore be not repeated.
In short, the present invention has method and structure novel simple, working procedure is few, and range of grouting is controllable, and work efficiency is high, Construction cost is low, safe, and speed of application is fast, the advantage that grouting consolidation effect is good and energy conservation and environmental protection is good.It can promote the use of.

Claims (10)

1. a kind of construction method of highly permeable stratum consolidation curtain structure, characterized in that include the following steps:
(1)The range for delimiting the construction ground on highly permeable stratum to be reinforced, is used in combination white line to mark setting-out line road;
(2)Ground-connecting-wall is prepared, is excavated downwards along setting-out line road with excavator, ground-connecting-wall ditch is formed, in ground-connecting-wall ditch Casting concrete wall forms the ground-connecting-wall flushed with ground, and the thickness of ground-connecting-wall is 500~600mm, and depth is 22~25m;
(3)The measurement and positioning in construction ground carries out cloth hole and determination with total powerstation using live datum mark by design requirement spacing Drilling depth, tissue related personnel's device to hole position measure and check, and confirmation is errorless, first from close to ground-connecting-wall periphery cloth hole, lean on The two row cloth holes on nearly ground-connecting-wall periphery are the blossom type of 0.5m × 0.5m spacing, and the cloth hole of remaining construction ground is 1m × 1m spacing Blossom type;
(4)Drilling machine is in place and drills, it is desirable that drilling machine is placed steady, secured and keeps horizontal, and drilling machine must be vertical, and controls guiding Frame verticality < 0.5%, according to measure hole position, confirm it is errorless after, according to cloth hole carry out drilling construction, drilling diameter 100~ 150 millimeters;
(5)Sleeve shell material is injected, sleeve shell material is replaced by mud in hole by drilling rod immediately after pore-forming, method is will to pass through circulating mud Pipe be connected on squash type slip casting machine, under the action of grouting pressure, mud in hole is replaced as by sleeve shell material, sheath body by drilling rod Material under pressure, enters foot of hole, with the entrance of sleeve shell material, mud is displaced from ground aperture in hole by drilling rod Come, when finding in the mud of discharge containing sleeve shell material, stops displacement;
(6)Installation mini-valve tube is inserted into mini-valve tube in hole immediately after sleeve shell material replacement completion, and the length for often saving mini-valve tube is 4m, the PVC casing connections that two adjacent sections mini-valve tube is 20cm with length when being inserted into, using U-PVC adhesives by mini-valve tube and Casing cements, and first segment mini-valve tube installs plug, then to injected clear water in pipe, to prevent the curvature of mini-valve tube, lower part Mini-valve tube should ensure that the center of mini-valve tube and drill center overlap, and mini-valve tube bassets 20cm, then is entangled firm with pullover, prevents miscellaneous Object enters in pipe;
(8)First slip casting section slip casting prepares grout material by design requirement, carries out slip casting after sleeve shell material reaches scheduled intensity, Grouting mode takes retrusive segmenting slip casting technique, i.e., carries out slip casting, each slip casting section from bottom to top by bottom hole in slip casting band Long 0.30m~0.40m after having noted the first slip casting section, above carries grouting pressure pipe, carries out the slip casting of the second slip casting section, slip casting process In if you need to suspend slip casting when, it is necessary to first cement mortar pipe is taken out and is put into scuttlebutt, and simultaneously by grouting pressure pipe promoted 0.4m, Stop slip casting again after noting clear water into hole, not only kept pipeline unimpeded in this way, but also ensure that slip casting is not influenced by water filling, during slip casting Slip casting work sheet, the slip casting working condition of injected hole and grouting with plunger activity duration are performed, during slip casting, by slip casting Pressure criteria carries out grout injection control, and final grouting pressure 1.5MPa, when grouting pressure reaches design final pressure, the duration is no less than 10 points Clock, you can terminate slip casting, mini-valve tube is cleaned with clear water at the end of sleeve valve barrel grouting, in case secondary grouting;
(9)If second slip casting section slip casting meets design requirement, then stops constructing after testing after the first slip casting section slip casting;Otherwise it weighs Multiple first slip casting section slip casting carries out the second slip casting section slip casting until meeting design requirement.
2. according to the method described in claim 1, it is characterized in that:The construction ground be ground-connecting-wall in the range of or ground-connecting-wall Surround the range of construction ground.
3. according to the method described in claim 1, it is characterized in that:The raw material weight proportioning of soup processed of the sleeve shell material is cement:Expansion Soil:Water=1:1.5:2.
4. according to the method described in claim 1, it is characterized in that:The two row cloth holes on the close ground-connecting-wall periphery are pitch-row 1.5m, array pitch 1.5m, is triangularly arranged.
5. according to the method described in claim 1, it is characterized in that:The cloth hole of remaining construction ground be pitch-row 1m, array pitch 1m, It is triangularly arranged.
6. according to the method described in claim 1, it is characterized in that:The depth of the ground-connecting-wall is greater than or equal to depth of pore forming.
7. according to the method described in claim 1, it is characterized in that:The mini-valve tube upper end is sealed using quick-hardening cement, It prevents from generating grout phenomenon during slip casting.
8. according to the method described in claim 1, it is characterized in that:The mini-valve tube uses the PVC material of Φ 48mm.
9. according to the method described in claim 1, it is characterized in that:The grout material is that cement uses 42.5 grades of normal silicates Cement, the water of cement grout:Cement ratio is 1:1, grout spreading range 0.75m, 0.5~1.5MPa of grouting pressure, final pressure are 1.5MPa, flow rate of grouting 30-40L/min.
10. according to the method described in claim 1, it is characterized in that:The concrete absolute altitude of the concrete walls is C20.
CN201610540372.2A 2016-07-11 2016-07-11 A kind of construction method of highly permeable stratum consolidation curtain structure Active CN106013078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610540372.2A CN106013078B (en) 2016-07-11 2016-07-11 A kind of construction method of highly permeable stratum consolidation curtain structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610540372.2A CN106013078B (en) 2016-07-11 2016-07-11 A kind of construction method of highly permeable stratum consolidation curtain structure

Publications (2)

Publication Number Publication Date
CN106013078A CN106013078A (en) 2016-10-12
CN106013078B true CN106013078B (en) 2018-07-24

Family

ID=57108736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610540372.2A Active CN106013078B (en) 2016-07-11 2016-07-11 A kind of construction method of highly permeable stratum consolidation curtain structure

Country Status (1)

Country Link
CN (1) CN106013078B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640120B8 (en) * 2016-10-31 2022-01-07 北京瑞威世纪铁道工程有限公司 Layered grouting construction method for fixed-point deep holes on earth surface
CN111396086A (en) * 2020-03-25 2020-07-10 中铁二十三局集团第四工程有限公司 Sleeve method curtain grouting construction method
CN113136866A (en) * 2021-03-24 2021-07-20 中国建筑第八工程局有限公司 Grouting reinforcement construction method for sleeve valve pipe of soil loose water-rich stratum
CN113738383A (en) * 2021-10-18 2021-12-03 中铁隆工程集团有限公司 Shield end reinforcing method
CN114320371A (en) * 2022-01-05 2022-04-12 中铁二局第一工程有限公司 Construction method for controlling deformation of operation track by isolated grouting

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3773386B2 (en) * 2000-02-22 2006-05-10 株式会社テノックス Construction method of underground continuous wall in boulder intervening ground
CN101343869A (en) * 2008-08-19 2009-01-14 上海建工股份有限公司 Underground continuous wall construction method of city-across pipeline
CN101914917B (en) * 2010-08-10 2012-01-11 中铁一局集团有限公司 Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area
CN104878741B (en) * 2015-05-12 2017-01-18 安徽省建筑科学研究设计院 Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof

Also Published As

Publication number Publication date
CN106013078A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013078B (en) A kind of construction method of highly permeable stratum consolidation curtain structure
CN101638987B (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN108678777B (en) Support method for tunnel fault fracture zone section
CN101994513B (en) Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN106837353A (en) Filling karst constructing tunnel processing method
CN106917409B (en) A kind of rock lid weight consolidation grouting construction method
CN106837351A (en) Tunnel Karst water detects Treatment Methods
CN105041325A (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN111287759B (en) Shallow-buried close-connection underground excavation tunnel construction method
CN105297741B (en) Upper-soft lower-hard ground explosion causes foundation pit enclosure structure to pierce water burst prevention and controls
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN108252719B (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN106246194A (en) The reinforcing Treatment Methods of tunnel roof fall wall caving
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN108333109A (en) A kind of concrete structure internal fissure monitoring device and method
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN110924976A (en) Surrounding rock outer ring grouting reinforcement method
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN108119143A (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN105731978B (en) A kind of grouting serous fluid and grouting method for fine sand layer jacking culvert solidifying of the working face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181203

Address after: 100037 8, 9 and 10 floors of Block B, Zhongjianyi Building, 52 West Fourth Ring South Road, Fengtai District, Beijing

Co-patentee after: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION LIMITED

Patentee after: CHINA CONSTRUCTION MUNICIPAL ENGINEERING CORPORATION LIMITED

Co-patentee after: China State Construction Corp.

Address before: 100037 8, 9 and 10 floors of Block B, Zhongjianyi Building, 52 West Fourth Ring South Road, Fengtai District, Beijing

Co-patentee before: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION LIMITED

Patentee before: CHINA CONSTRUCTION MUNICIPAL ENGINEERING CORPORATION LIMITED