CN106640120B8 - Layered grouting construction method for fixed-point deep holes on earth surface - Google Patents
Layered grouting construction method for fixed-point deep holes on earth surface Download PDFInfo
- Publication number
- CN106640120B8 CN106640120B8 CN201610930439.3A CN201610930439A CN106640120B8 CN 106640120 B8 CN106640120 B8 CN 106640120B8 CN 201610930439 A CN201610930439 A CN 201610930439A CN 106640120 B8 CN106640120 B8 CN 106640120B8
- Authority
- CN
- China
- Prior art keywords
- grouting
- section
- sleeve valve
- valve tube
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明公开一种地表定点深孔分层注浆施工方法,包括:自施工区域地表向需要注浆区域的内部垂直钻孔,孔深设定为80~150米。成孔达到设计深度后,将第Ⅰ型袖阀管(100)下入钻孔的末端,再逐节连接第Ⅱ型袖阀管(200)下入钻孔的设计注浆段,然后逐节连接第Ⅲ型袖阀管(300)下入钻孔的非设计注浆段。袖阀管安设完成后,向袖阀管外壁和钻孔内壁之间的空隙注入套壳料进行封孔。封孔完成,待固结后,下入注浆芯管(600)。第一根注浆芯管(600)的末端穿过止浆塞(700)和止浆塞(700)连接,再将其余注浆芯管(600)逐节连接后下入到袖阀管内直至止浆塞(700)下入袖阀管的底部。连接注浆管路至芯管端,准备注浆液,通过注浆芯管(600)开始注浆作业。
The invention discloses a layered grouting construction method for fixed-point deep holes on the ground. After the hole is formed to the design depth, run the Type I sleeve valve tube (100) into the end of the drilled hole, and then connect the Type II sleeve valve tube (200) into the designed grouting section of the drilled hole section by section, and then section by section. Connect the non-design grouting section of the type III sleeve valve pipe (300) into the drilled hole. After the sleeve valve tube is installed, inject the casing material into the gap between the outer wall of the sleeve valve tube and the inner wall of the drilled hole to seal the hole. After the hole sealing is completed, the grouting core pipe ( 600 ) is lowered into after being consolidated. The end of the first grouting core pipe (600) is connected through the grouting stopper (700) and the grouting stopper (700), and then the remaining grouting core pipes (600) are connected section by section and then lowered into the sleeve valve tube until A stopper (700) runs into the bottom of the sleeve valve tube. Connect the grouting pipeline to the end of the core pipe, prepare the grouting liquid, and start the grouting operation through the grouting core pipe (600).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610930439.3A CN106640120B8 (en) | 2016-10-31 | 2016-10-31 | Layered grouting construction method for fixed-point deep holes on earth surface |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610930439.3A CN106640120B8 (en) | 2016-10-31 | 2016-10-31 | Layered grouting construction method for fixed-point deep holes on earth surface |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| CN106640120A CN106640120A (en) | 2017-05-10 |
| CN106640120B CN106640120B (en) | 2021-10-26 |
| CN106640120B8 true CN106640120B8 (en) | 2022-01-07 |
Family
ID=58820943
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610930439.3A Active CN106640120B8 (en) | 2016-10-31 | 2016-10-31 | Layered grouting construction method for fixed-point deep holes on earth surface |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106640120B8 (en) |
Families Citing this family (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107013220A (en) * | 2017-05-16 | 2017-08-04 | 深圳市瑞利源工程技术有限公司 | A kind of tunnel deep hole grouting method, pipe canopy and retrusive Grouting Pipe |
| CN109538240B (en) * | 2018-08-28 | 2022-12-23 | 北京瑞威世纪铁道工程有限公司 | Tunnel construction method for earth surface directional large-diameter deep hole grouting |
| CN109208578A (en) * | 2018-08-28 | 2019-01-15 | 北京瑞威世纪铁道工程有限公司 | Abutment orients grout injection control sedimentation method |
| CN109209448B (en) * | 2018-08-28 | 2024-05-31 | 北京瑞威世纪铁道工程有限公司 | Tunnel earth surface grouting water-blocking construction method |
| CN109354469B (en) * | 2018-08-28 | 2022-10-28 | 北京瑞威世纪铁道工程有限公司 | Cement grouting material |
| CN109882199B (en) * | 2019-01-25 | 2024-08-16 | 北京瑞威世纪铁道工程有限公司 | Rigid sleeve valve tube assembly and method of use thereof |
| CN109736845A (en) * | 2019-01-25 | 2019-05-10 | 北京瑞威世纪铁道工程有限公司 | Disturbance displacement compacting grouting construction method |
| CN110259465A (en) * | 2019-06-28 | 2019-09-20 | 中铁二局集团有限公司 | A kind of method that list shield double mode TBM pre-grouting reinforces fault belt |
| CN110617029B (en) * | 2019-09-16 | 2020-06-30 | 中国矿业大学 | Drilling segmented retreating type grouting method |
| CN110792440B (en) * | 2019-11-07 | 2021-02-05 | 中铁二十局集团有限公司 | Construction method of water-rich loess tunnel penetrating through loess towards valley |
| CN110700842A (en) * | 2019-11-11 | 2020-01-17 | 山东大学 | An advanced grouting reinforcement method suitable for the water-rich sand layer at the shield end |
| CN111852515A (en) * | 2020-08-31 | 2020-10-30 | 中铁十六局集团有限公司 | A comprehensive grouting method for pre-reinforcement of tunnel strata |
| CN112025972A (en) * | 2020-09-17 | 2020-12-04 | 中州装备制造股份有限公司 | Preparation process of building wall |
| CN112878316A (en) * | 2020-12-31 | 2021-06-01 | 北京瑞威世纪铁道工程有限公司 | Method for reinforcing base of rigid sleeve valve pipe pile |
| CN113605898A (en) * | 2021-05-14 | 2021-11-05 | 中铁第一勘察设计院集团有限公司 | Directional area control grouting construction method for surface ultra-deep hole |
| CN113585267B (en) * | 2021-07-23 | 2023-02-14 | 中国水利水电第十六工程局有限公司 | Sleeve valve grouting process |
| CN113882356A (en) * | 2021-10-14 | 2022-01-04 | 中铁隆工程集团有限公司 | Ground grouting reinforcement construction process |
| CN114737997A (en) * | 2022-04-11 | 2022-07-12 | 北京市市政四建设工程有限责任公司 | Accurate grouting water plugging method suitable for fine sand and silty clay stratum |
| CN114991774B (en) * | 2022-06-20 | 2025-01-14 | 北京中煤矿山工程有限公司 | Ground segmented descending grouting method for broken andesitic basalt strata |
| CN115450217B (en) * | 2022-09-06 | 2024-05-28 | 中国水电基础局有限公司 | A grouting method for opening a hole in a pre-buried pipe at an orifice and breaking the wall for grouting |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201129184Y (en) * | 2007-12-29 | 2008-10-08 | 中铁隧道集团有限公司 | One-way step-back grouting device with small conduit outer valve |
| CN102444118A (en) * | 2010-10-15 | 2012-05-09 | 中铁五局(集团)有限公司 | Sleeve valve pipe grouting reinforcement construction method |
| CN104389314B (en) * | 2014-12-10 | 2016-07-20 | 山东大学 | A kind of shallow clay grouting and reinforcing device and method |
| CN105714764A (en) * | 2015-12-08 | 2016-06-29 | 中国铁建大桥工程局集团有限公司 | Tunnel ground deep-hole sleeve valve tube grouting construction method |
| CN106013078B (en) * | 2016-07-11 | 2018-07-24 | 中建市政工程有限公司 | A construction method for strengthening curtain structure in highly permeable ground |
-
2016
- 2016-10-31 CN CN201610930439.3A patent/CN106640120B8/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN106640120A (en) | 2017-05-10 |
| CN106640120B (en) | 2021-10-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106640120B8 (en) | Layered grouting construction method for fixed-point deep holes on earth surface | |
| MX2021000511A (en) | Swellable metal packer with porous external sleeve. | |
| CN207437007U (en) | Hydraulic delay switch DP formula sliding sleeve | |
| CN104762972A (en) | Sectioned grouting pipe and construction method thereof for soft soil stratum reinforcement | |
| MY187465A (en) | Well system with degradable plug | |
| CN201460803U (en) | Self-expanding packer when meeting oil and water | |
| MY192204A (en) | A method of plugging and abandoning a well | |
| IN2014CN00686A (en) | ||
| CN209083252U (en) | A kind of brill downhole explosion and water filling or fracturing integrated hole packer | |
| CN105507939B (en) | A kind of slip casting displaced type drilling solidification sealing and method of the gas without pipe extraction | |
| CN104389587A (en) | Quick measurement method of coal seam gas pressure | |
| CN105822252B (en) | Cementing String Combination and Cementing Method | |
| CN106837411A (en) | The arrangement and method of a kind of buried shield tunnel filling and injecting slurry | |
| CN104100249B (en) | Casing slide for unlimited number of fracturing | |
| CN202531133U (en) | Two-end water plugging process pipe string for oil well sealing middle layer | |
| CN105569041B (en) | Borehole wall-protection method in the deep sand-pebble layer in karst area | |
| CN204000881U (en) | Deep alluvion foundation mesohigh sprays the dado structure of slip casting pore-forming | |
| CN203239310U (en) | Casing slide for unlimited number of fracturing | |
| WO2015022552A3 (en) | Improved filling mechanism for a morphable sleeve | |
| CN204532233U (en) | Cementing string combination | |
| MX2018012634A (en) | Combined casing fill-up and drill pipe flowback tool and method. | |
| CN106285666B (en) | A method for monitoring the mechanical parameters of shallow soil layers in permafrost regions with natural gas hydrate boreholes | |
| BR112018010816A2 (en) | downhole apparatus, and method for expanding downhole tubular members | |
| RU151647U1 (en) | PACKER | |
| CN204252862U (en) | Casing protection device and cased well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20211021 Address after: 101499 room 409, 4th floor, South, 113 Kaifang Road, Huairou District, Beijing Applicant after: BEIJING RUIWEI CENTURY RAILWAY ENGINEERING Co.,Ltd. Address before: 100086 room 103, building 9, West District, 56 Zhichun Road, Haidian District, Beijing Applicant before: Peng Feng |
|
| TA01 | Transfer of patent application right | ||
| CI03 | Correction of invention patent |
Correction item: Patentee|Address Correct: Beijing Ruiwei century Railway Engineering Co., Ltd.|101499 room 409, 4th floor, South, 113 Kaifang Road, Huairou District, Beijing False: Peng Feng|100086 room 103, building 9, West District, 56 Zhichun Road, Haidian District, Beijing Number: 44-01 Page: The title page Volume: 37 Correction item: Patentee|Address Correct: Beijing Ruiwei century Railway Engineering Co., Ltd.|101499 room 409, 4th floor, South, 113 Kaifang Road, Huairou District, Beijing False: Peng Feng|100086 room 103, building 9, West District, 56 Zhichun Road, Haidian District, Beijing Number: 44-01 Volume: 37 |
|
| CI03 | Correction of invention patent |