CN107762518A CN201610686331.4A CN201610686331A CN107762518A CN 107762518 A CN107762518 A CN 107762518A CN 201610686331 A CN201610686331 A CN 201610686331A CN 107762518 A CN107762518 A CN 107762518A
Authority
CN
China
Prior art keywords
anchor bolt
steel
reinforced anchor
advance
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610686331.4A
Other languages
Chinese (zh)
Other versions
CN107762518B (en
Inventor
侯建刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN201610686331.4A priority Critical patent/CN107762518B/en
Publication of CN107762518A publication Critical patent/CN107762518A/en
Application granted granted Critical
Publication of CN107762518B publication Critical patent/CN107762518B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/183Supporting means for arch members, not provided for in E21D11/22
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Abstract

The present invention relates to tunnel cantilevered advance anchor bolt drivage method, pre-buried advanced reinforced anchor bolt pipeline, after the I-steel steel arch of face erects, it is embedded according to the pre-buried preset steel pipe of the angle of advanced reinforced anchor bolt as advanced reinforced anchor bolt pipeline, and by preset steel pipe in gunite concrete.Reinforced anchor bolt is squeezed into face by preset steel pipe, for each reinforced anchor bolt all equivalent to the cantilever of afterbody consolidation, whole reinforced anchor bolts insert face as one " the brim of a hat ", form the advance support of a cyclic advance.Preset steel pipe solves first supporting, the problem of beating advanced reinforced anchor bolt afterwards.Worker's operation under supporting, substantially increases security.Backboard closure sand leakage and landslide are put into above reinforced anchor bolt.Backboard can with ring, laterally urge.Therefore sand leakage and landslide can be blocked in time, make what constructing tunnel can guarantee both quality and quantity to smoothly complete, ensured safe construction again.

Description

Tunnel cantilevered advance anchor bolt drivage method
Technical field
The present invention relates to a kind of method for tunnel construction in traffic infrastructure field, more particularly to a kind of tunnel cantilevered Advance anchor bolt drivage method.
Background technology
Various bad geological states are frequently encountered during constructing tunnel, then generate various driving methods, such as Steel tube shed method, advanced tubule method, advance anchor bolt method, Curtain Grouting Method.But its existing advantage of every kind of method has its limitation again. At present, the wall rock geology condition that constructing tunnel runs into is to rush proluvial cobble, severely-weathered silty.Cobble is in loose structure, Basement rock country rock is silty Wei Zhu Clip sandstone, conglomerate, severely-weathered, belongs to ultimate soft rock class.After country rock excavates, vault country rock is without branch Easy slump during shield, roof fall, water burst, sand is gushed, small cave in easily occurs in side wall.Country rock is just caved in by air drill vibrations when ductule is constructed, One sand leakage hole is with regard to that can spill several sides or more than ten side's sandy gravels.Daguanpeng construction caunches difficulty, it is impossible to solves the problems, such as sand leakage, and applies Work speed is slow.Having that this is visible, above-mentioned construction method can not complete the constructing tunnel of above-mentioned geological conditions,
As can be seen here, above-mentioned existing method for tunnel construction can not complete the constructing tunnel of above-mentioned geological conditions, this hair A person of good sense is actively subject to research and innovation, to found a kind of new tunnel cantilevered advance anchor bolt drivage method, can improve general existing Some method for tunnel construction, it is set to have more practicality.
The content of the invention
It is a primary object of the present invention to, the defects of overcoming existing method for tunnel construction to exist, and provide a kind of new Tunnel cantilevered advance anchor bolt drivage method, technical problem to be solved be make its wall rock geology condition be rush proluvial cobble, Severely-weathered silty, the completion that can successfully guarantee both quality and quantity.
Another object of the present invention is to, there is provided a kind of new tunnel cantilevered advance anchor bolt drivage method, it is to be solved Technical problem is to make it ensure not cave in, safe construction, thus more suitable for practicality.
The object of the invention to solve the technical problems is realized using following technical scheme.Itd is proposed according to the present invention A kind of tunnel cantilevered advance anchor bolt drivage method, it is by taking 50 centimetres of a cyclic advance as an example, top bar excavating load, including with Lower step:
Step 1:Vertical I-steel steel arch-shelf, is punched at a certain distance in I-steel steel arch-shelf belly, founds good I-steel steel arch Frame, weld longitudinally connected reinforcing bar and mesh sheet, fixing lock pin.
Step 2:Preset advance anchor bolt pipeline, preset steel pipe one end of the regular length cut is inserted in I-steel steel arch-shelf In the hole of belly, the other end of the preset steel pipe is welded on below the I-steel steel arch-shelf of previous circulation.
Step 3:The full gunite concrete of spray, full gunite concrete will be sprayed between described I-steel steel arch-shelf, become Whole first branch system;
Step 4:Multiple reinforced anchor bolts are squeezed into, each reinforced anchor bolt is squeezed into face by pre-buried preset steel pipe, This step is squeezed into using sledgehammer, and the reinforced anchor bolt is all squeezed into, and when running into cobble stone, boulder and beating motionless, then treats that backboard shifts big ovum onto When before stone, the cobble before reinforced anchor bolt is excavated with drill rod or electric hammer, then reinforced anchor bolt is inserted or squeezed into, the reinforced anchor bolt Afterbody and pre-buried preset steel pipe welding live.
Step 5:Ring Cutting, manually with instrument or digging machine, up annular is opened at the arch springing of I-steel steel arch-shelf side Dig, excavate a cyclic advance, then, dig out reinforced anchor bolt, polylith backboard is put into above those reinforced anchor bolts respectively, Prepare closure sand leakage and landslide;Dig where, just by backboard shift onto where, depending on adjoining rock stability situation, dig one section, in time first spray One layer of 2CM~3CM gunite concrete closing country rock, when running into sand leakage and landslide, shift backboard onto sand leakage landslide position rapidly Put and blocked, same method excavates from the I-steel steel arch-shelf opposite side arch springing position toward vault direction.
Step 6 remaining core soil in advance, Core Soil are both the support of face, are workbench again, its height is with the people that stands above Convenient, the longitudinal long 1M~2M of platform, the laterally wide 2M~4M of platform, side slope is trapezoidal, and unnecessary native slag is removed with excavator.
Step 7:Into next circulation.
Foregoing tunnel cantilevered advance anchor bolt drivage method, it is characterised in that wherein described I-steel steel arch-shelf belly is beaten Diameter 50MM~the 60MM in hole, it is advisable with inserting preset steel pipe, pitch-row 30CM~40CM;The described length of preset steel pipe 3 is 60CM~70CM, depending on I-steel spacing, described reinforced anchor bolt diameter 22MM~32MM, long 1.3~1.5M.
Foregoing tunnel cantilevered advance anchor bolt drivage method, it is characterised in that wherein described backboard is plank or bamboo glue Plate, the long 70CM~80CM of the backboard, wide 10CM~20CM, thick 2CM~3CM.
The present invention has clear advantage and beneficial effect compared with prior art.It at least has following advantages:
1st, cantilevered advance anchor bolt drivage method in tunnel of the present invention, pre-buried advance anchor bolt pipeline, the I-steel steel arch of face Erect it is good after, according to the pre-buried preset steel pipe of the angle of advanced reinforced anchor bolt as advance anchor bolt pipeline, and by preset steel Pipe is embedded in gunite concrete.Reinforced anchor bolt is squeezed into face by preset steel pipe, each reinforced anchor bolt all equivalent to The cantilever of afterbody consolidation, whole reinforced anchor bolts insert face as one " the brim of a hat ", form the advanced of cyclic advance Supporting.Preset steel pipe solves first supporting, the problem of beating advanced reinforced anchor bolt afterwards.Worker's operation under supporting, is greatly improved Security.
2nd, the present invention is put into backboard closure sand leakage and landslide above reinforced anchor bolt.Backboard can with ring, laterally urge.Cause This can block sand leakage and landslide in time, make what constructing tunnel can guarantee both quality and quantity to smoothly complete, ensured safe construction again.
3rd, The present invention reduces the vibrations to country rock.Using manually squeezing into, smaller than air drill vibrations is more, reduces mechanical shake Sandstone slump caused by dynamic, so as to ensure the security of construction.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, and in order to allow the above and other objects, features and advantages of the present invention can Become apparent, below especially exemplified by preferred embodiment, and coordinate accompanying drawing, describe in detail as follows.
Brief description of the drawings
Fig. 1 is present invention construction schematic diagram.
Wherein:
1:Face 2:Reinforced anchor bolt
3:Preset steel pipe 4:Gunite concrete
5:I-steel steel arch-shelf 6:Core Soil
Embodiment
Further to illustrate the present invention to reach the technological means and effect that predetermined goal of the invention is taken, below in conjunction with Accompanying drawing and preferred embodiment, to according to cantilevered advance anchor bolt drivage method proposed by the present invention its specific implementation step, feature and Its effect, describe in detail as after.
Refer to shown in Fig. 1, the cantilevered advance anchor bolt drivage method of present pre-ferred embodiments, its mainly include with its with Exemplified by one 50 centimetres of cyclic advance, top bar excavating load, comprise the following steps:
Step 1:Vertical I-steel steel arch-shelf 5, punches, founds good I-steel steel at a certain distance in the belly of I-steel steel arch-shelf 5 Bow member 5, weld longitudinally connected reinforcing bar and mesh sheet, fixing lock pin.Wherein, diameter 50MM~60MM of punching, pitch-row 30CM~ 40MM
Step 2:Preset advance anchor bolt pipeline, one end of preset steel pipe 3 of the regular length cut is inserted in I-steel steel arch In the hole of the belly of frame 5, the other end of the preset steel pipe 3 is welded on below the I-steel steel arch-shelf 5 of previous circulation.Described is pre- It is 60CM~70CM to put the length of steel pipe 3
Step 3:The full gunite concrete 4 of spray.Full gunite concrete 4 will be sprayed between described I-steel steel arch-shelf 5, become Complete just branch system.
Step 4:Multiple reinforced anchor bolts 2 are squeezed into, each reinforced anchor bolt 2 is squeezed into area by pre-buried preset steel pipe 3 Face 1, this step are squeezed into using sledgehammer, and the reinforced anchor bolt is all squeezed into, and when running into cobble stone, boulder and beating motionless, then treat that backboard is shifted onto When before cobble stone, boulder, the cobble before reinforced anchor bolt 2 is excavated with drill rod or electric hammer, then reinforced anchor bolt 2 is inserted or squeezed into, the steel The afterbody of muscle anchor pole 2 and pre-buried preset steel pipe 3 weld.Wherein described reinforced anchor bolt diameter 22MM~32MM, it is long by 1.3~ 1.5M.Described backboard is plank or bamboo slab rubber, the long 70CM~80CM of the backboard, wide 10CM~20CM, thick 2CM~3CM.
Step 5:Ring Cutting, manually with instrument or digging machine, up annular is opened at the arch springing of the side of I-steel steel arch-shelf 5 Dig, excavate a cyclic advance, then, dig out reinforced anchor bolt 2, polylith backboard is put on those reinforced anchor bolts 2 respectively Face, prepare closure sand leakage and landslide;Dig where, just by backboard shift onto where, depending on adjoining rock stability situation, one section of digging, in time Just one layer of 2CM~3CM of spray gunite concrete closing country rock, when running into sand leakage and landslide, shifts backboard onto sand leakage rapidly and collapses Orientation, which is put, to be blocked, and same method excavates from the opposite side arch springing position of I-steel steel arch-shelf 5 toward vault direction again;
Step 6 remaining core soil in advance 6, Core Soil 6 are both the support of face 1, are workbench again, and its height to stand above People is convenient, and platform longitudinally long 1M~2M, laterally wide 2M~4M, trapezoidal, unnecessary native slag is removed with excavator;
Step 7:Into next circulation.
The operation principle of the present invention is the short advanced protection knot of cantilevered that the reinforced anchor bolt 2 squeezed into is an afterbody consolidation Structure, advanced scope are 50CM~100CM, and reinforced anchor bolt 2 can use reinforcement fabrication.Because the afterbody of reinforced anchor bolt 2 is in preset steel pipe 3 Consolidation, therefore, equivalent to the one cantilever statically determinate structure of reinforced anchor bolt 2, this spacing of I-steel steel arch-shelf 5 in 50CM~60CM, In practice of construction, most of reinforced anchor bolt 2 can hit the person 70CM~100CM of face 1, it is sufficient to carry sand leakage and collapse The load of side, provisional protection effect is played plus backboard leak stopping.
The present invention is applied to sand ovum country rock and the loose structure of non-construction of explosion or the set of tunneling construction of loess country rock.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, the technical spirit according to the present invention Any simple modification, equivalent change and modification made to above example, in the range of still falling within technical solution of the present invention.

Claims (3)

1. a kind of tunnel cantilevered advance anchor bolt drivage method, it is characterised in that it appears on the stage by taking 50 centimetres of a cyclic advance as an example Rank excavating load, comprises the following steps:
Step 1:Vertical I-steel steel arch-shelf (5), in I-steel steel arch-shelf (5), belly punches at a certain distance, founds good I-steel steel Bow member (5), weld longitudinally connected reinforcing bar and mesh sheet, fixing lock pin;
Step 2:Preset advance anchor bolt pipeline, preset steel pipe (3) one end of the regular length cut is inserted in I-steel steel arch-shelf (5) in the hole of belly, the other end of the preset steel pipe (3) is welded on the I-steel steel arch-shelf (5) of previous circulation below;
Step 3:The full gunite concrete (4) of spray, full gunite concrete (4) will be sprayed between described I-steel steel arch-shelf (5), make its into For complete just branch system;
Step 4:Multiple reinforced anchor bolts (2) are squeezed into, each reinforced anchor bolt (2) is squeezed into the palm by pre-buried preset steel pipe (3) Sub- face (1), this step are squeezed into using sledgehammer, and the reinforced anchor bolt (2) is all squeezed into, when running into cobble stone, boulder and beating motionless, then waits to carry on the back When plate is shifted onto before cobble stone, boulder, the cobble before reinforced anchor bolt (2) is excavated with drill rod or electric hammer, then reinforced anchor bolt (2) is inserted Or squeeze into, the afterbody of the reinforced anchor bolt (2) and pre-buried preset steel pipe (3) weld;
Step 5:Ring Cutting, manually with instrument or digging machine at the arch springing of I-steel steel arch-shelf (5) side up Ring Cutting, A cyclic advance is excavated, then, reinforced anchor bolt (2) is dug out, polylith backboard is put on those reinforced anchor bolts (2) respectively Face, prepare closure sand leakage and landslide;Dig where, just by backboard shift onto where, depending on adjoining rock stability situation, one section of digging, in time Just one layer of 2CM~3CM of spray gunite concrete (4) closing country rock, when running into sand leakage and landslide, shifts backboard onto sand leakage rapidly Landslide position is blocked, and same method excavates from I-steel steel arch-shelf (5) the opposite side arch springing position toward vault direction;
Step 6 remaining core soil in advance (6), Core Soil (6) are both the support of face (1), are workbench again, its height is with above The people that stands is convenient, and the longitudinal long 1M~2M of platform, the laterally wide 2M~4M of platform, side slope is trapezoidal, unnecessary native slag excavator Excavate;
Step 7:Into next circulation.
2. cantilevered advance anchor bolt drivage method in tunnel according to claim 1, it is characterised in that wherein described I-steel Diameter 50MM~60MM of steel arch-shelf (5) belly punching, is advisable with inserting preset steel pipe (3), pitch-row 30CM~40CM;Described The preset length of steel pipe 3 is 60CM~70CM, depending on I-steel spacing, described reinforced anchor bolt (2) diameter 22MM~32MM, length 1.3~1.5M.
3. the tunnel cantilevered advance anchor bolt drivage method according to any claim in claim 1 to 2, it is characterised in that Wherein described backboard is plank or bamboo slab rubber, the long 70CM~80CM of the backboard, wide 10CM~20CM, thick 2CM~3CM.
CN201610686331.4A 2016-08-18 2016-08-18 Tunnel cantilevered advance anchor bolt drivage method Active CN107762518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610686331.4A CN107762518B (en) 2016-08-18 2016-08-18 Tunnel cantilevered advance anchor bolt drivage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610686331.4A CN107762518B (en) 2016-08-18 2016-08-18 Tunnel cantilevered advance anchor bolt drivage method

Publications (2)

Publication Number Publication Date
CN107762518A true CN107762518A (en) 2018-03-06
CN107762518B CN107762518B (en) 2019-05-31

Family

ID=61262436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610686331.4A Active CN107762518B (en) 2016-08-18 2016-08-18 Tunnel cantilevered advance anchor bolt drivage method

Country Status (1)

Country Link
CN (1) CN107762518B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943299A (en) * 2021-01-28 2021-06-11 龚伦 Tunnel front edge support construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1585770A (en) * 1976-08-05 1981-03-11 Tsuzuki J Concrete segment
CN103939107A (en) * 2014-04-28 2014-07-23 山东黄金矿业(玲珑)有限公司 Method for forming roadway in inbreak loose rock
CN104018864A (en) * 2014-06-27 2014-09-03 福州市规划设计研究院 Forepoling radial anchor bolt structure and construction method thereof
CN204186394U (en) * 2014-10-15 2015-03-04 中国神华能源股份有限公司 Full section of tunnel pre-reinforcement structure
CN104389609A (en) * 2014-09-24 2015-03-04 中国水利水电第十四工程局有限公司 No-blasting mechanical digging method
CN205477642U (en) * 2016-03-11 2016-08-17 中铁十八局集团有限公司 Grow up and bury blow tunnel solderless supporting construction deeply

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1585770A (en) * 1976-08-05 1981-03-11 Tsuzuki J Concrete segment
CN103939107A (en) * 2014-04-28 2014-07-23 山东黄金矿业(玲珑)有限公司 Method for forming roadway in inbreak loose rock
CN104018864A (en) * 2014-06-27 2014-09-03 福州市规划设计研究院 Forepoling radial anchor bolt structure and construction method thereof
CN104389609A (en) * 2014-09-24 2015-03-04 中国水利水电第十四工程局有限公司 No-blasting mechanical digging method
CN204186394U (en) * 2014-10-15 2015-03-04 中国神华能源股份有限公司 Full section of tunnel pre-reinforcement structure
CN205477642U (en) * 2016-03-11 2016-08-17 中铁十八局集团有限公司 Grow up and bury blow tunnel solderless supporting construction deeply

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943299A (en) * 2021-01-28 2021-06-11 龚伦 Tunnel front edge support construction method

Also Published As

Publication number Publication date
CN107762518B (en) 2019-05-31

Similar Documents

Publication Publication Date Title
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN105257301B (en) A kind of shallow-depth-excavation tunnel weak surrounding rock landslide reinforcing and processing method
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN110318762A (en) Advanced support method in hole at shallow buried covered excavation unsymmetrial loading tunnel roof fall
CN108798702B (en) Supporting method for large-section soft rock large-deformation tunnel
CN109538246A (en) Ledge method tunneling subway station arch springing ruggedized construction and construction method
CN107762529B (en) Lateral Hole and tunnel main tunnel infall construction method based on gib system
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN105888674A (en) Method for reinforcing interlaid rocks of small-distance tunnel under different surrounding rock grades
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN110318772A (en) Canal in Loess Area is greatly across the asymmetric bore tunnel supporting construction of small interval and construction method
CN104533428B (en) A kind of steep cliffs tunnel outlet engineering method
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN108518229A (en) Large deformation weak broken wall rock outsized section tunnel excavation supporting structure and construction method
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN104632249A (en) Tunnel system supporting technology used in loose and soft broken surrounding rock
CN107605509A (en) Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method
CN208236427U (en) Large deformation weak broken wall rock outsized section tunnel excavation supporting structure
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN109057802A (en) Shallow tunnel with big cross-section underpass of freeways construction method
CN104141500A (en) Hardened sand gravel stratum cavern construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant