CN107762021A - The curtain skeleton attachment structure of transom is filled afterwards - Google Patents
The curtain skeleton attachment structure of transom is filled afterwards Download PDFInfo
- Publication number
- CN107762021A CN107762021A CN201711022279.3A CN201711022279A CN107762021A CN 107762021 A CN107762021 A CN 107762021A CN 201711022279 A CN201711022279 A CN 201711022279A CN 107762021 A CN107762021 A CN 107762021A
- Authority
- CN
- China
- Prior art keywords
- transom
- holding part
- attachment structure
- inner chamber
- curtain skeleton
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 abstract description 24
- 238000010276 construction Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 23
- 210000000988 bone and bone Anatomy 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000010008 shearing Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000007493 shaping process Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The curtain skeleton attachment structure of dress transom after a kind of, including two centre keels and the rear transom loaded between two centre keels, transom is the tubulose section bar that circumferential ring closes, at least a centre keel is provided with holding part, holding part is located in transom inner chamber and holding transom, the end of transom is provided with the first gap inserted for holding part in transom inner chamber, and curtain skeleton attachment structure also includes being used to make transom keep relatively-stationary positioning component with holding part.The curtain skeleton attachment structure have the advantages that it is simple in construction, be easy to make, cost is low, simple installation, shear resistance and stable connection are good.
Description
Technical field
The present invention relates to construction engineering technical field, and in particular to the curtain skeleton attachment structure of dress transom after a kind of.
Background technology
At present, two ways is predominantly spliced and welded in the connection of horizontal, vertical keel in the curtain wall of in the market.Wherein, splice
It is divided into two kinds again:One kind is subdivision mounting means successively, i.e., first installs first centre keel, then in first centre keel
Transom and centre keel are alternately installed in side successively, until completing the installation of whole curtain wall;Another kind be transom after fill mode,
All centre keels of curtain wall first are installed according to the size of space of setting, then the transom between adjacent centre keel is installed.On
The drawbacks of former mounting means stated, is, once error or other factors occur needs to change dragon after curtain wall installation
, it is necessary to which the later all keel in the replacing position are disassembled during bone, otherwise keel can not be taken out, and subdivision is successively
Easily there is accumulated error in installation, and larger deviation, example easily occurs in the split dimension between the centre keel for causing finally to install
Such as, the curtain wall installed from left to right has 50 separations, if the length of every transom reduces 3mm, each split dimension(It is adjacent
Spacing between centre keel)Also 3mm is reduced, last error accumulation can be up to 150mm.And latter mounting means due to be by
Transom between centre keel is installed again, only needing accordingly to dismount when changing any of which keel needs after centre keel whole installation
The keel to be changed, and this kind of mounting means is not in accumulated error.
However, the curtain wall technology filled after existing transom is ripe not enough, following many defects be present:
1st, the bonding strength of transom and centre keel is poor, or even can not meet curtain wall intensity requirement, especially the connection of transom
When stress point is concentrated on single-sided side walls, shearing resistance and the anti-twisting property of transom can be substantially reduced, bonding strength is caused and consolidates
Property decline, or even the intensity requirement of curtain wall can not be met.
2nd, the connector between keel and screw are difficult to hide, connector and screw largely it is exposed outside, not only influence
The installation of curtain wall panel, make curtain wall install after outward appearance it is not succinct exquisite enough, and get rusty easily, reduce curtain wall service life.
The content of the invention
The technical problem to be solved in the present invention is to overcome the shortcomings of the prior art, there is provided one kind is simple in construction, is easy to
Make, the curtain skeleton attachment structure for the rear dress transom that cost is low, simple installation, shear resistance and stable connection are good.
In order to solve the above technical problems, the present invention uses following technical scheme:
The curtain skeleton attachment structure of dress transom after a kind of, including two centre keels and the rear horizontal stroke loaded between two centre keels
Keel, the transom are the tubulose section bar that circumferential ring closes, and an at least centre keel is provided with holding part, the holding part
In transom inner chamber and holding transom, the end of the transom is provided with to be inserted in transom inner chamber for holding part
First gap, the curtain skeleton attachment structure also include being used to make transom keep relatively-stationary positioning group with holding part
Part.
Above-mentioned curtain skeleton attachment structure, it is preferred that the holding part coordinates with transom inner chamber prevents transom
Moved up and down relative to holding part.
Above-mentioned curtain skeleton attachment structure, it is preferred that the holding part and the side side wall of transom inner chamber offset.
Above-mentioned curtain skeleton attachment structure, it is preferred that be also equipped with being located in transom inner chamber on the centre keel
Limiting component, the limiting component and holding part coordinate with transom inner chamber jointly prevents transom relative on holding part
Lower movement.
Above-mentioned curtain skeleton attachment structure, it is preferred that the end of the transom is provided with inserts horizontal dragon for positioning element
The second gap in bone cavity.
Above-mentioned curtain skeleton attachment structure, it is preferred that the width of first gap and the second gap is respectively less than horizontal dragon
The vertical height of bone cavity.
Above-mentioned curtain skeleton attachment structure, it is preferred that the holding part is provided with and is engaged with transom internal face
And the holding face of holding transom, the holding face are horizontal plane.
Above-mentioned curtain skeleton attachment structure, it is preferred that the positioning component includes the connector outside transom,
The centre keel is connected by the first fastener with connector, and the transom is connected by the second fastener with connector.
Above-mentioned curtain skeleton attachment structure, it is preferred that the outer wall of the transom is provided with groove, the connector,
First fastener and the second fastener are contained in the groove.
Above-mentioned curtain skeleton attachment structure, it is preferred that the positioning component is to be directly connected to fasten holding part and horizontal stroke
3rd fastener of keel;Or the positioning component is fixed centre keel and the pad of transom.
Compared with prior art, the advantage of the invention is that:In the curtain skeleton attachment structure that transom is filled after the present invention,
Due to centre keel be provided be located at transom inner chamber in and holding transom holding part, be greatly improved shear resistance and
Greatly improve the bonding strength and steadiness of transom.Meanwhile strengthen shearing resistance component and be located in transom inner chamber, anti-performance of getting rusty
It is good, the installation of curtain wall panel is not interfered with, beneficial to the succinct intricacies and service life after raising curtain wall installation.The curtain skeleton connects
Binding structure have it is simple in construction, be easy to make, the advantages of cost is low, simple installation.
Brief description of the drawings
Fig. 1 is the main structure diagram of the curtain skeleton attachment structure of rear dress transom in embodiment 1.
Fig. 2 is the main structure diagram that transom is connected with centre keel in embodiment 1.
Fig. 3 is the side cross section structure diagram that transom is connected with centre keel in embodiment 1.
Fig. 4 is that holding part is connected to the side structure schematic view on centre keel in embodiment 1.
Fig. 5 is the side cross section structure diagram that transom is connected with centre keel in embodiment 2.
Fig. 6 is the side cross section structure diagram that transom is connected with centre keel in embodiment 3.
Fig. 7 is the side cross section structure diagram that transom is connected with centre keel in embodiment 4.
Fig. 8 is the side cross section structure diagram in first state when transom is installed in embodiment 4.
Fig. 9 is the side cross section structure diagram in the second state when transom is installed in embodiment 4.
Figure 10 is the side cross section structure diagram in third state when transom is installed in embodiment 4.
Figure 11 is the side cross section structure diagram that transom is connected with centre keel in embodiment 5.
Figure 12 is the dimensional structure diagram that transom is in decomposing state with centre keel in embodiment 5.
Figure 13 is the side cross section structure diagram that transom is connected with centre keel in embodiment 6.
Figure 14 is the dimensional structure diagram that transom is in decomposing state with centre keel in embodiment 6.
Figure 15 is the side cross section structure diagram that transom is connected with centre keel in embodiment 7.
Figure 16 is the dimensional structure diagram of transom in embodiment 7.
Figure 17 is the side cross section structure diagram in first state when transom is installed in embodiment 7.
Figure 18 is the side cross section structure diagram in the second state when transom is installed in embodiment 7.
Figure 19 is the side cross section structure diagram in third state when transom is installed in embodiment 7.
Figure 20 is the side cross section structure diagram that transom is connected with centre keel in embodiment 8.
Figure 21 is the dimensional structure diagram of transom in embodiment 8.
Figure 22 is the side cross section structure diagram in first state when transom is installed in embodiment 8.
Figure 23 is the side cross section structure diagram in the second state when transom is installed in embodiment 8.
Figure 24 is the side cross section structure diagram in third state when transom is installed in embodiment 8
Marginal data:
1st, centre keel;2nd, transom;21st, the first gap;22nd, the second gap;23rd, groove;3rd, holding part;4th, position part;5、
Connector;6th, the first fastener;7th, the second fastener;8th, the 3rd fastener.
Embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
Embodiment 1:
As shown in Figures 1 to 4, the curtain skeleton attachment structure of the rear dress transom of the present embodiment, including two centre keels 1 are with after
Loaded on the transom 2 between two centre keels 1, transom 2 is the tubulose section bar that circumferential ring closes, and each centre keel 1 is provided with holding
Part 3, holding part 3 is located in the inner chamber of transom 2 and holding transom 2, and the end of transom 2 is provided with puts for holding part 3
Enter the first gap 21 in the inner chamber of transom 2, curtain skeleton attachment structure also includes being used to make transom 2 protect with holding part 3
Relatively-stationary positioning component is held, makes transom 2 keep fixing relative to holding part 3 by positioning component, makes holding part 3
Transom 2 is not fallen out, realizes the solid and reliable installation of transom 2.The curtain skeleton attachment structure can realize transom 2
Dress and individually dismounting afterwards, in rear dress transom 2, between transom 2 is inserted into two centre keels 1, make the holding on two centre keels 1
Part 3 inserts holding transom 2 in the inner chamber of transom 2 by the first gap 21 of transom 2, then makes horizontal dragon using positioning component
Bone 2 keeps being relatively fixed with holding part 3;When needing to dismantle transom 2, the effect of positioning component, mobile horizontal dragon are released
Bone 2 makes the holding part 3 on two centre keels 1 deviate from the inner chamber of transom 2, you can pulls down transom 2.
In the curtain skeleton attachment structure, it is located in the inner chamber of transom 2 simultaneously holding transom 2 because centre keel 1 is provided with
Holding part 3, be greatly improved shear resistance and greatly improve the bonding strength and steadiness of transom 2.Meanwhile strengthen
Shearing resistance component is located in the inner chamber of transom 2, and anti-performance of getting rusty is good, does not interfere with the installation of curtain wall panel, is installed beneficial to curtain wall is improved
Succinct intricacies and service life afterwards.The curtain skeleton attachment structure have it is simple in construction, be easy to make, cost it is low, installation
The advantages of easy.
In the present embodiment, holding part 3 be provided with the internal face of transom 2 be engaged and holding transom 2 holding face,
Holding face is horizontal plane, makes the stress of transom 2 more preferable, and more preferable limitation transom 2 can be coordinated to rotate with positioning component, energy
Enough improve the steadiness after transom 2 is installed.
In the present embodiment, positioning component includes the connector 5 outside transom 2, and centre keel 1 passes through the first fastener
6 are connected with connector 5, and transom 2 is connected by the second fastener 7 with connector 5, and its simple installation, stable connection are good, the
One fastener 6 and the second fastener 7 preferably use screw.
In the present embodiment, the outer wall of transom 2 is provided with groove 23, connector 5, the first fastener 6 and the second fastener 7
It is contained in groove 23, connector 5, the first fastener 6 and the second fastener 7 be not exposed, does not interfere with the peace of curtain wall panel
Dress, and anti-ability of getting rusty is good, can improve the succinct intricacies and service life after curtain wall installation.
In the present embodiment, the width of the first gap 21 is less than the vertical height of the inner chamber of transom 2, reduction that so can be maximum
In influence of the upper shed of transom 2 to the intensity of transom 2, the bulk strength of raising curtain skeleton structure.Preferably, holding part
3 be horizontally extending strip piece, allows the width of the first gap 21 as small as possible, is further reduced to transom 2
The influence of intensity;Holding part 3 is removably mounted on centre keel 1 by screw, is made and is dismounted to facilitate;Holding
Side side wall of the part 3 also with the inner chamber of transom 2 offsets, and installation that can be to transom 2 carries out lateral register, and improves horizontal dragon
Steadiness after the installation of bone 2.
Embodiment 2:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 1, is in place of main difference,
As shown in figure 5, in the present embodiment, the limiting component 4 being located in the inner chamber of transom 2, limiting component 4 are also equipped with centre keel 1
Offset with the bottom wall of the inner chamber of transom 2, to prevent transom 2 from being moved up and down relative to holding part 3, can strengthen to transom
The positioning of 2 vertical directions, improve the steadiness after transom 2 is installed.
In the present embodiment, the end of transom 2 is provided with the second gap 22 inserted for positioning element 4 in the inner chamber of transom 2.
Preferably, the second gap 22 and the first gap 21 are located at the same side of transom 2, and the second gap 22 and the first gap 21
Vertical spacing is equal to the vertical spacing of holding part 3 and limiting component 4, and translation transom 2 can make holding part 3 and limiting component
4 enter in the inner chamber of transom 2 simultaneously, can so simplify installation, improve installation effectiveness.
In the present embodiment, the width of the first gap 21 and the second gap 22 is respectively less than the vertical height of the inner chamber of transom 2, with
Maximum reduction is in influence of the upper shed of transom 2 to the intensity of transom 2, the bulk strength of raising curtain skeleton structure.
In the present embodiment, it is preferred that limiting component 4 and the wall surface of the inner chamber of transom 2 are engaged, can be with holding part
Part 3 coordinates more preferable limitation transom 2 to rotate, and further improves the steadiness after transom 2 is installed;Limiting component 4 passes through spiral shell
Nail is removably mounted on centre keel 1, is made and is dismounted to facilitate.Side of the limiting component 4 also with the inner chamber of transom 2
Side wall offsets, and installation that can be to transom 2 carries out lateral register, further improves the steadiness after transom 2 is installed.
Embodiment 3:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 2, is in place of main difference,
As shown in fig. 6, in the present embodiment, transom 2 is not provided with groove 23, and transom 2 is boss pipe, the oriented side of boss pipe
The boss of stretching, facilitate holding that curtain wall panel is installed.
Embodiment 4:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 1, is in place of main difference,
As shown in fig. 7, in the present embodiment, holding part 3 is also offseted with the bottom wall of the inner chamber of transom 2 to prevent transom 2 relative to support
Hold part 3 to move up and down, the positioning to the vertical direction of transom 2 can be strengthened, improve the steadiness after transom 2 is installed, and
Holding part 3 realizes holding and vertical spacing simultaneously as an integrated member, and its cost is low, is easy to fabrication and installation.
In the present embodiment, holding part 3 be vertically extending arrangement strip piece, its upper and lower ends respectively with transom 2
The roof and bottom wall of chamber offset, when mounted, horizontal because the width of the first gap 21 is less than the vertical height of the inner chamber of transom 2
Keel 2 make holding part 3 be fitted into the inner chamber of transom 2 with the aggregate motion for translating and rotating, and comprise the concrete steps that, first make transom
The 2 face holding part 3 of the first gap 21(First state shown in Figure 8), transom 2 is prolonged along holding part 3
Stretching direction translational motion makes holding part 3 insert in the inner chamber of transom 2(Second state shown in Figure 9), it is rotated further by horizontal dragon
Bone 2 adjusts holding part 3 relative to the inner chamber rotational angle of transom 2(Referring to Figure 10 third state), make the upper of holding part 3
Lower both ends offset with the roof and bottom wall of the inner chamber of transom 2 respectively(Referring to Fig. 7), that is, complete holding part 3 and the phase of transom 2
Installation is positioned.
In the present embodiment, it is preferred that for the first gap 21 in groove 23, its aesthetic property is good, can preferably avoid water
Into the inner chamber of transom 2.
Embodiment 5:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 1, is in place of main difference,
As is illustrated by figs. 11 and 12, in the present embodiment, positioning component is to be directly connected to fasten holding part 3 and the 3rd of transom 2 the tight
Firmware 8, number of fitting parts can be so reduced, reduces cost and installation difficulty.
The transom 2 of the present embodiment is boss pipe, the boss that the oriented side of boss pipe is stretched out, facilitates holding to install curtain wall
Plate.The holding part 3 of the present embodiment bends shaping using sheet material and obtained, beneficial to reduction manufacture difficulty and cost.
In other embodiments, positioning component can also be fixed centre keel 1 and the pad of transom 2, pass through spot welding
Transom 2 and centre keel 1 are connected, so that transom 2 keeps being relatively fixed with holding part 3.
Embodiment 6:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 3, is in place of main difference,
As shown in Figure 13 and Figure 14, in the present embodiment, holding part 3 and limiting component 4 connect as one part, so convenient to make and pacify
Dress.And positioning component is to be directly connected to fasten holding part 3 and the 3rd fastener 8 of transom 2.Preferably, the He of holding part 3
The integral piece that limiting component 4 connects into bends shaping using sheet material and obtained, beneficial to reduction manufacture difficulty and cost.
Embodiment 7:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 2, is in place of main difference,
As shown in Figure 15 and Figure 16, in the present embodiment, holding part 3 and limiting component 4 are rod member, and is only set in transom 2
One gap 21, the width of the first gap 21 are less than the vertical height of the inner chamber of transom 2.When mounted, transom 2 is to translate and revolve
The aggregate motion turned makes holding part 3 be fitted into the inner chamber of transom 2, comprises the concrete steps that, first makes the first gap 21 of transom 2 just
To holding part 3(First state shown in Figure 17), then make transom 2 along the bearing of trend translational motion of holding part 3
Holding part 3 and limiting component 4 is inserted successively in the inner chamber of transom 2, be rotated further by transom 2 and adjust holding part 3 and spacing
Part 4 is relative to the inner chamber rotational angle of transom 2(Referring to Figure 18 the second state), distinguish holding part 3 and limiting component 4
Offseted with the roof and bottom wall of the inner chamber of transom 2(Referring to Figure 19), that is, complete holding part 3 and limiting component 4 and transom 2
It is mounted opposite positioning.First gap 21 of the present embodiment is located in groove 23.
Embodiment 8:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 2, is in place of main difference,
As shown in Figure 20 and Figure 21, in the present embodiment, holding part 3 is the strip piece that a relative vertical direction is in tilted layout, and holding
The side side wall of the lower end of part 3 and the inner chamber of transom 2 offsets, and the holding part 3 and the side side wall of the inner chamber of transom 2 offset
Roof for position farther away from the inner chamber of transom 2, it is more beneficial for installation positioning and improves the steadiness after transom 2 is installed.
In the present embodiment, the first gap 21 is equal with the width of holding part 3, and when mounted, transom 2 is to translate and revolve
The aggregate motion turned makes holding part 3 be fitted into the inner chamber of transom 2, comprises the concrete steps that, first makes the first gap 21 of transom 2 just
To holding part 3(The first state of ginseng as shown in Figure 22), then make transom 2 along the bearing of trend translational motion of holding part 3
Holding part 3 is inserted in the inner chamber of transom 2, be rotated further by transom 2 and adjust holding part 3 relative to the rotation of the inner chamber of transom 2
Angle(Referring to Figure 23 the second state), the roof and side wall that make holding part 3 and the inner chamber of transom 2 offset(Referring to Figure 24),
That completes holding part 3 and transom 2 is mounted opposite positioning.First gap 21 of the present embodiment is located in groove 23.
Described above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation
Example.To those of ordinary skill in the art, the improvement and change resulting in the case where not departing from the technology of the present invention concept thereof
Change and also should be regarded as protection scope of the present invention.
Claims (10)
1. the curtain skeleton attachment structure of dress transom after a kind of, including two centre keels(1)Two centre keels are loaded on after(1)
Between transom(2), the transom(2)The tubulose section bar closed for circumferential ring, it is characterised in that:An at least centre keel
(1)It is provided with holding part(3), the holding part(3)Positioned at transom(2)In inner chamber and holding transom(2), the horizontal stroke
Keel(2)End be provided with supply holding part(3)Insert transom(2)The first gap in inner chamber(21), the curtain skeleton
Attachment structure also includes being used to make transom(2)With holding part(3)Keep relatively-stationary positioning component.
2. curtain skeleton attachment structure according to claim 1, it is characterised in that:The holding part(3)With transom
(2)Inner chamber, which coordinates, prevents transom(2)Relative to holding part(3)Move up and down.
3. curtain skeleton attachment structure according to claim 1, it is characterised in that:The holding part(3)With transom
(2)The side side wall of inner chamber offsets.
4. curtain skeleton attachment structure according to claim 1, it is characterised in that:The centre keel(1)On be also equipped with
Positioned at transom(2)Limiting component in inner chamber(4), the limiting component(4)With holding part(3)Jointly and transom(2)
Inner chamber, which coordinates, prevents transom(2)Relative to holding part(3)Move up and down.
5. curtain skeleton attachment structure according to claim 4, it is characterised in that:The transom(2)End be provided with
For positioning element(4)Insert transom(2)The second gap in inner chamber(22).
6. curtain skeleton attachment structure according to claim 5, it is characterised in that:First gap(21)Slitted with second
Mouthful(22)Width be respectively less than transom(2)The vertical height of inner chamber.
7. curtain skeleton attachment structure according to claim 1, it is characterised in that:The holding part(3)Provided with horizontal stroke
Keel(2)Internal face is engaged and holding transom(2)Holding face, the holding face is horizontal plane.
8. curtain skeleton attachment structure according to any one of claim 1 to 7, it is characterised in that:The positioning component
Including positioned at transom(2)Outside connector(5), the centre keel(1)Pass through the first fastener(6)With connector(5)Phase
Even, the transom(2)Pass through the second fastener(7)With connector(5)It is connected.
9. curtain skeleton attachment structure according to claim 8, it is characterised in that:The transom(2)Outer wall on set
It is fluted(23), the connector(5), the first fastener(6)With the second fastener(7)It is contained in the groove(23)In.
10. curtain skeleton attachment structure according to any one of claim 1 to 7, it is characterised in that:The positioning component
To be directly connected to fasten holding part(3)And transom(2)The 3rd fastener(8);Or the positioning component is fixed perpendicular
Keel(1)And transom(2)Pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711022279.3A CN107762021A (en) | 2017-10-27 | 2017-10-27 | The curtain skeleton attachment structure of transom is filled afterwards |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711022279.3A CN107762021A (en) | 2017-10-27 | 2017-10-27 | The curtain skeleton attachment structure of transom is filled afterwards |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107762021A true CN107762021A (en) | 2018-03-06 |
Family
ID=61271446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711022279.3A Pending CN107762021A (en) | 2017-10-27 | 2017-10-27 | The curtain skeleton attachment structure of transom is filled afterwards |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107762021A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1548200A2 (en) * | 2003-12-23 | 2005-06-29 | Raico Bautechnik GmbH | Mullion and transom facade |
CN101059005A (en) * | 2006-04-18 | 2007-10-24 | 王广武 | Curtain wall |
CN201305939Y (en) * | 2008-11-27 | 2009-09-09 | 河南津大幕墙有限公司 | Connecting structure of cross beam and upright post of curtain wall |
CN204152037U (en) * | 2014-07-18 | 2015-02-11 | 深圳市瑞华建设股份有限公司 | A kind ofly the frame curtain wall of unordered installation can close chamber grid system |
CN204662735U (en) * | 2015-06-08 | 2015-09-23 | 广东高登铝业有限公司 | A kind of column of curtain wall and beam connecting structure |
CA2934748A1 (en) * | 2015-07-03 | 2017-01-03 | Sing Tan Andy Luk | Architectural decoration panel dry-hang structure free in mounting-dismounting and flexible in size combination |
CN207597662U (en) * | 2017-10-27 | 2018-07-10 | 湖南省金为新材料科技有限公司 | The curtain skeleton connection structure of transom is filled afterwards |
-
2017
- 2017-10-27 CN CN201711022279.3A patent/CN107762021A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1548200A2 (en) * | 2003-12-23 | 2005-06-29 | Raico Bautechnik GmbH | Mullion and transom facade |
CN101059005A (en) * | 2006-04-18 | 2007-10-24 | 王广武 | Curtain wall |
CN201305939Y (en) * | 2008-11-27 | 2009-09-09 | 河南津大幕墙有限公司 | Connecting structure of cross beam and upright post of curtain wall |
CN204152037U (en) * | 2014-07-18 | 2015-02-11 | 深圳市瑞华建设股份有限公司 | A kind ofly the frame curtain wall of unordered installation can close chamber grid system |
CN204662735U (en) * | 2015-06-08 | 2015-09-23 | 广东高登铝业有限公司 | A kind of column of curtain wall and beam connecting structure |
CA2934748A1 (en) * | 2015-07-03 | 2017-01-03 | Sing Tan Andy Luk | Architectural decoration panel dry-hang structure free in mounting-dismounting and flexible in size combination |
CN207597662U (en) * | 2017-10-27 | 2018-07-10 | 湖南省金为新材料科技有限公司 | The curtain skeleton connection structure of transom is filled afterwards |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105083139B (en) | A kind of automobile and its roof-rack | |
CN109958215A (en) | Large complicated carved curtain wall construction and its construction method | |
CN207597662U (en) | The curtain skeleton connection structure of transom is filled afterwards | |
CN107762021A (en) | The curtain skeleton attachment structure of transom is filled afterwards | |
CN207122079U (en) | A kind of dry-hanging fitting | |
CN211257466U (en) | Wind-resistant building curtain wall | |
CN108125535B (en) | Modular curtain box and installation method | |
CN101197101A (en) | Face frame opening structure of indicating device | |
CN207597664U (en) | A kind of curtain skeleton connection structure for being filled after transom | |
CN207419801U (en) | The curtain skeleton connection structure filled after transom | |
CN200948950Y (en) | Container inner wall plate corner connection structure | |
CN108382951A (en) | The derrick geometry of elevator | |
CN110616843B (en) | Full-built-in top plate for integral bathroom and mounting method thereof | |
CN207776109U (en) | A kind of collapsible light steel building structure | |
CN102849115B (en) | Body in white pretectum assembly and commercial vehicle | |
CN207597665U (en) | A kind of curtain skeleton connection structure filled after transom | |
WO2020134002A1 (en) | Door cover plate for side wall of train, and train | |
CN208379869U (en) | A kind of cylindrical stone curtain wall | |
CN208917884U (en) | Post-cast strip piece connected support structure | |
CN107816156A (en) | Transom rear-loading type curtain skeleton attachment structure | |
EP2134907B1 (en) | External wall unit | |
CN207524906U (en) | A kind of back cover structure of electri forklift | |
CN206752783U (en) | Curtain skeleton attachment structure | |
CN106948531B (en) | Curtain skeleton internal connecting type bigeminy connection structure | |
CN218843467U (en) | Building curtain wall convenient to leveling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |