CN107762021A - The curtain skeleton attachment structure of transom is filled afterwards - Google Patents

The curtain skeleton attachment structure of transom is filled afterwards Download PDF

Info

Publication number
CN107762021A
CN107762021A CN201711022279.3A CN201711022279A CN107762021A CN 107762021 A CN107762021 A CN 107762021A CN 201711022279 A CN201711022279 A CN 201711022279A CN 107762021 A CN107762021 A CN 107762021A
Authority
CN
China
Prior art keywords
transom
holding part
attachment structure
inner chamber
curtain skeleton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711022279.3A
Other languages
Chinese (zh)
Inventor
李�杰
谢斌泉
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Goldwell New Materials Technology Co Ltd
Original Assignee
Hunan Goldwell New Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Goldwell New Materials Technology Co Ltd filed Critical Hunan Goldwell New Materials Technology Co Ltd
Priority to CN201711022279.3A priority Critical patent/CN107762021A/en
Publication of CN107762021A publication Critical patent/CN107762021A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Abstract

The curtain skeleton attachment structure of dress transom after a kind of, including two centre keels and the rear transom loaded between two centre keels, transom is the tubulose section bar that circumferential ring closes, at least a centre keel is provided with holding part, holding part is located in transom inner chamber and holding transom, the end of transom is provided with the first gap inserted for holding part in transom inner chamber, and curtain skeleton attachment structure also includes being used to make transom keep relatively-stationary positioning component with holding part.The curtain skeleton attachment structure have the advantages that it is simple in construction, be easy to make, cost is low, simple installation, shear resistance and stable connection are good.

Description

The curtain skeleton attachment structure of transom is filled afterwards
Technical field
The present invention relates to construction engineering technical field, and in particular to the curtain skeleton attachment structure of dress transom after a kind of.
Background technology
At present, two ways is predominantly spliced and welded in the connection of horizontal, vertical keel in the curtain wall of in the market.Wherein, splice It is divided into two kinds again:One kind is subdivision mounting means successively, i.e., first installs first centre keel, then in first centre keel Transom and centre keel are alternately installed in side successively, until completing the installation of whole curtain wall;Another kind be transom after fill mode, All centre keels of curtain wall first are installed according to the size of space of setting, then the transom between adjacent centre keel is installed.On The drawbacks of former mounting means stated, is, once error or other factors occur needs to change dragon after curtain wall installation , it is necessary to which the later all keel in the replacing position are disassembled during bone, otherwise keel can not be taken out, and subdivision is successively Easily there is accumulated error in installation, and larger deviation, example easily occurs in the split dimension between the centre keel for causing finally to install Such as, the curtain wall installed from left to right has 50 separations, if the length of every transom reduces 3mm, each split dimension(It is adjacent Spacing between centre keel)Also 3mm is reduced, last error accumulation can be up to 150mm.And latter mounting means due to be by Transom between centre keel is installed again, only needing accordingly to dismount when changing any of which keel needs after centre keel whole installation The keel to be changed, and this kind of mounting means is not in accumulated error.
However, the curtain wall technology filled after existing transom is ripe not enough, following many defects be present:
1st, the bonding strength of transom and centre keel is poor, or even can not meet curtain wall intensity requirement, especially the connection of transom When stress point is concentrated on single-sided side walls, shearing resistance and the anti-twisting property of transom can be substantially reduced, bonding strength is caused and consolidates Property decline, or even the intensity requirement of curtain wall can not be met.
2nd, the connector between keel and screw are difficult to hide, connector and screw largely it is exposed outside, not only influence The installation of curtain wall panel, make curtain wall install after outward appearance it is not succinct exquisite enough, and get rusty easily, reduce curtain wall service life.
The content of the invention
The technical problem to be solved in the present invention is to overcome the shortcomings of the prior art, there is provided one kind is simple in construction, is easy to Make, the curtain skeleton attachment structure for the rear dress transom that cost is low, simple installation, shear resistance and stable connection are good.
In order to solve the above technical problems, the present invention uses following technical scheme:
The curtain skeleton attachment structure of dress transom after a kind of, including two centre keels and the rear horizontal stroke loaded between two centre keels Keel, the transom are the tubulose section bar that circumferential ring closes, and an at least centre keel is provided with holding part, the holding part In transom inner chamber and holding transom, the end of the transom is provided with to be inserted in transom inner chamber for holding part First gap, the curtain skeleton attachment structure also include being used to make transom keep relatively-stationary positioning group with holding part Part.
Above-mentioned curtain skeleton attachment structure, it is preferred that the holding part coordinates with transom inner chamber prevents transom Moved up and down relative to holding part.
Above-mentioned curtain skeleton attachment structure, it is preferred that the holding part and the side side wall of transom inner chamber offset.
Above-mentioned curtain skeleton attachment structure, it is preferred that be also equipped with being located in transom inner chamber on the centre keel Limiting component, the limiting component and holding part coordinate with transom inner chamber jointly prevents transom relative on holding part Lower movement.
Above-mentioned curtain skeleton attachment structure, it is preferred that the end of the transom is provided with inserts horizontal dragon for positioning element The second gap in bone cavity.
Above-mentioned curtain skeleton attachment structure, it is preferred that the width of first gap and the second gap is respectively less than horizontal dragon The vertical height of bone cavity.
Above-mentioned curtain skeleton attachment structure, it is preferred that the holding part is provided with and is engaged with transom internal face And the holding face of holding transom, the holding face are horizontal plane.
Above-mentioned curtain skeleton attachment structure, it is preferred that the positioning component includes the connector outside transom, The centre keel is connected by the first fastener with connector, and the transom is connected by the second fastener with connector.
Above-mentioned curtain skeleton attachment structure, it is preferred that the outer wall of the transom is provided with groove, the connector, First fastener and the second fastener are contained in the groove.
Above-mentioned curtain skeleton attachment structure, it is preferred that the positioning component is to be directly connected to fasten holding part and horizontal stroke 3rd fastener of keel;Or the positioning component is fixed centre keel and the pad of transom.
Compared with prior art, the advantage of the invention is that:In the curtain skeleton attachment structure that transom is filled after the present invention, Due to centre keel be provided be located at transom inner chamber in and holding transom holding part, be greatly improved shear resistance and Greatly improve the bonding strength and steadiness of transom.Meanwhile strengthen shearing resistance component and be located in transom inner chamber, anti-performance of getting rusty It is good, the installation of curtain wall panel is not interfered with, beneficial to the succinct intricacies and service life after raising curtain wall installation.The curtain skeleton connects Binding structure have it is simple in construction, be easy to make, the advantages of cost is low, simple installation.
Brief description of the drawings
Fig. 1 is the main structure diagram of the curtain skeleton attachment structure of rear dress transom in embodiment 1.
Fig. 2 is the main structure diagram that transom is connected with centre keel in embodiment 1.
Fig. 3 is the side cross section structure diagram that transom is connected with centre keel in embodiment 1.
Fig. 4 is that holding part is connected to the side structure schematic view on centre keel in embodiment 1.
Fig. 5 is the side cross section structure diagram that transom is connected with centre keel in embodiment 2.
Fig. 6 is the side cross section structure diagram that transom is connected with centre keel in embodiment 3.
Fig. 7 is the side cross section structure diagram that transom is connected with centre keel in embodiment 4.
Fig. 8 is the side cross section structure diagram in first state when transom is installed in embodiment 4.
Fig. 9 is the side cross section structure diagram in the second state when transom is installed in embodiment 4.
Figure 10 is the side cross section structure diagram in third state when transom is installed in embodiment 4.
Figure 11 is the side cross section structure diagram that transom is connected with centre keel in embodiment 5.
Figure 12 is the dimensional structure diagram that transom is in decomposing state with centre keel in embodiment 5.
Figure 13 is the side cross section structure diagram that transom is connected with centre keel in embodiment 6.
Figure 14 is the dimensional structure diagram that transom is in decomposing state with centre keel in embodiment 6.
Figure 15 is the side cross section structure diagram that transom is connected with centre keel in embodiment 7.
Figure 16 is the dimensional structure diagram of transom in embodiment 7.
Figure 17 is the side cross section structure diagram in first state when transom is installed in embodiment 7.
Figure 18 is the side cross section structure diagram in the second state when transom is installed in embodiment 7.
Figure 19 is the side cross section structure diagram in third state when transom is installed in embodiment 7.
Figure 20 is the side cross section structure diagram that transom is connected with centre keel in embodiment 8.
Figure 21 is the dimensional structure diagram of transom in embodiment 8.
Figure 22 is the side cross section structure diagram in first state when transom is installed in embodiment 8.
Figure 23 is the side cross section structure diagram in the second state when transom is installed in embodiment 8.
Figure 24 is the side cross section structure diagram in third state when transom is installed in embodiment 8
Marginal data:
1st, centre keel;2nd, transom;21st, the first gap;22nd, the second gap;23rd, groove;3rd, holding part;4th, position part;5、 Connector;6th, the first fastener;7th, the second fastener;8th, the 3rd fastener.
Embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
Embodiment 1:
As shown in Figures 1 to 4, the curtain skeleton attachment structure of the rear dress transom of the present embodiment, including two centre keels 1 are with after Loaded on the transom 2 between two centre keels 1, transom 2 is the tubulose section bar that circumferential ring closes, and each centre keel 1 is provided with holding Part 3, holding part 3 is located in the inner chamber of transom 2 and holding transom 2, and the end of transom 2 is provided with puts for holding part 3 Enter the first gap 21 in the inner chamber of transom 2, curtain skeleton attachment structure also includes being used to make transom 2 protect with holding part 3 Relatively-stationary positioning component is held, makes transom 2 keep fixing relative to holding part 3 by positioning component, makes holding part 3 Transom 2 is not fallen out, realizes the solid and reliable installation of transom 2.The curtain skeleton attachment structure can realize transom 2 Dress and individually dismounting afterwards, in rear dress transom 2, between transom 2 is inserted into two centre keels 1, make the holding on two centre keels 1 Part 3 inserts holding transom 2 in the inner chamber of transom 2 by the first gap 21 of transom 2, then makes horizontal dragon using positioning component Bone 2 keeps being relatively fixed with holding part 3;When needing to dismantle transom 2, the effect of positioning component, mobile horizontal dragon are released Bone 2 makes the holding part 3 on two centre keels 1 deviate from the inner chamber of transom 2, you can pulls down transom 2.
In the curtain skeleton attachment structure, it is located in the inner chamber of transom 2 simultaneously holding transom 2 because centre keel 1 is provided with Holding part 3, be greatly improved shear resistance and greatly improve the bonding strength and steadiness of transom 2.Meanwhile strengthen Shearing resistance component is located in the inner chamber of transom 2, and anti-performance of getting rusty is good, does not interfere with the installation of curtain wall panel, is installed beneficial to curtain wall is improved Succinct intricacies and service life afterwards.The curtain skeleton attachment structure have it is simple in construction, be easy to make, cost it is low, installation The advantages of easy.
In the present embodiment, holding part 3 be provided with the internal face of transom 2 be engaged and holding transom 2 holding face, Holding face is horizontal plane, makes the stress of transom 2 more preferable, and more preferable limitation transom 2 can be coordinated to rotate with positioning component, energy Enough improve the steadiness after transom 2 is installed.
In the present embodiment, positioning component includes the connector 5 outside transom 2, and centre keel 1 passes through the first fastener 6 are connected with connector 5, and transom 2 is connected by the second fastener 7 with connector 5, and its simple installation, stable connection are good, the One fastener 6 and the second fastener 7 preferably use screw.
In the present embodiment, the outer wall of transom 2 is provided with groove 23, connector 5, the first fastener 6 and the second fastener 7 It is contained in groove 23, connector 5, the first fastener 6 and the second fastener 7 be not exposed, does not interfere with the peace of curtain wall panel Dress, and anti-ability of getting rusty is good, can improve the succinct intricacies and service life after curtain wall installation.
In the present embodiment, the width of the first gap 21 is less than the vertical height of the inner chamber of transom 2, reduction that so can be maximum In influence of the upper shed of transom 2 to the intensity of transom 2, the bulk strength of raising curtain skeleton structure.Preferably, holding part 3 be horizontally extending strip piece, allows the width of the first gap 21 as small as possible, is further reduced to transom 2 The influence of intensity;Holding part 3 is removably mounted on centre keel 1 by screw, is made and is dismounted to facilitate;Holding Side side wall of the part 3 also with the inner chamber of transom 2 offsets, and installation that can be to transom 2 carries out lateral register, and improves horizontal dragon Steadiness after the installation of bone 2.
Embodiment 2:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 1, is in place of main difference, As shown in figure 5, in the present embodiment, the limiting component 4 being located in the inner chamber of transom 2, limiting component 4 are also equipped with centre keel 1 Offset with the bottom wall of the inner chamber of transom 2, to prevent transom 2 from being moved up and down relative to holding part 3, can strengthen to transom The positioning of 2 vertical directions, improve the steadiness after transom 2 is installed.
In the present embodiment, the end of transom 2 is provided with the second gap 22 inserted for positioning element 4 in the inner chamber of transom 2. Preferably, the second gap 22 and the first gap 21 are located at the same side of transom 2, and the second gap 22 and the first gap 21 Vertical spacing is equal to the vertical spacing of holding part 3 and limiting component 4, and translation transom 2 can make holding part 3 and limiting component 4 enter in the inner chamber of transom 2 simultaneously, can so simplify installation, improve installation effectiveness.
In the present embodiment, the width of the first gap 21 and the second gap 22 is respectively less than the vertical height of the inner chamber of transom 2, with Maximum reduction is in influence of the upper shed of transom 2 to the intensity of transom 2, the bulk strength of raising curtain skeleton structure.
In the present embodiment, it is preferred that limiting component 4 and the wall surface of the inner chamber of transom 2 are engaged, can be with holding part Part 3 coordinates more preferable limitation transom 2 to rotate, and further improves the steadiness after transom 2 is installed;Limiting component 4 passes through spiral shell Nail is removably mounted on centre keel 1, is made and is dismounted to facilitate.Side of the limiting component 4 also with the inner chamber of transom 2 Side wall offsets, and installation that can be to transom 2 carries out lateral register, further improves the steadiness after transom 2 is installed.
Embodiment 3:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 2, is in place of main difference, As shown in fig. 6, in the present embodiment, transom 2 is not provided with groove 23, and transom 2 is boss pipe, the oriented side of boss pipe The boss of stretching, facilitate holding that curtain wall panel is installed.
Embodiment 4:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 1, is in place of main difference, As shown in fig. 7, in the present embodiment, holding part 3 is also offseted with the bottom wall of the inner chamber of transom 2 to prevent transom 2 relative to support Hold part 3 to move up and down, the positioning to the vertical direction of transom 2 can be strengthened, improve the steadiness after transom 2 is installed, and Holding part 3 realizes holding and vertical spacing simultaneously as an integrated member, and its cost is low, is easy to fabrication and installation.
In the present embodiment, holding part 3 be vertically extending arrangement strip piece, its upper and lower ends respectively with transom 2 The roof and bottom wall of chamber offset, when mounted, horizontal because the width of the first gap 21 is less than the vertical height of the inner chamber of transom 2 Keel 2 make holding part 3 be fitted into the inner chamber of transom 2 with the aggregate motion for translating and rotating, and comprise the concrete steps that, first make transom The 2 face holding part 3 of the first gap 21(First state shown in Figure 8), transom 2 is prolonged along holding part 3 Stretching direction translational motion makes holding part 3 insert in the inner chamber of transom 2(Second state shown in Figure 9), it is rotated further by horizontal dragon Bone 2 adjusts holding part 3 relative to the inner chamber rotational angle of transom 2(Referring to Figure 10 third state), make the upper of holding part 3 Lower both ends offset with the roof and bottom wall of the inner chamber of transom 2 respectively(Referring to Fig. 7), that is, complete holding part 3 and the phase of transom 2 Installation is positioned.
In the present embodiment, it is preferred that for the first gap 21 in groove 23, its aesthetic property is good, can preferably avoid water Into the inner chamber of transom 2.
Embodiment 5:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 1, is in place of main difference, As is illustrated by figs. 11 and 12, in the present embodiment, positioning component is to be directly connected to fasten holding part 3 and the 3rd of transom 2 the tight Firmware 8, number of fitting parts can be so reduced, reduces cost and installation difficulty.
The transom 2 of the present embodiment is boss pipe, the boss that the oriented side of boss pipe is stretched out, facilitates holding to install curtain wall Plate.The holding part 3 of the present embodiment bends shaping using sheet material and obtained, beneficial to reduction manufacture difficulty and cost.
In other embodiments, positioning component can also be fixed centre keel 1 and the pad of transom 2, pass through spot welding Transom 2 and centre keel 1 are connected, so that transom 2 keeps being relatively fixed with holding part 3.
Embodiment 6:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 3, is in place of main difference, As shown in Figure 13 and Figure 14, in the present embodiment, holding part 3 and limiting component 4 connect as one part, so convenient to make and pacify Dress.And positioning component is to be directly connected to fasten holding part 3 and the 3rd fastener 8 of transom 2.Preferably, the He of holding part 3 The integral piece that limiting component 4 connects into bends shaping using sheet material and obtained, beneficial to reduction manufacture difficulty and cost.
Embodiment 7:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 2, is in place of main difference, As shown in Figure 15 and Figure 16, in the present embodiment, holding part 3 and limiting component 4 are rod member, and is only set in transom 2 One gap 21, the width of the first gap 21 are less than the vertical height of the inner chamber of transom 2.When mounted, transom 2 is to translate and revolve The aggregate motion turned makes holding part 3 be fitted into the inner chamber of transom 2, comprises the concrete steps that, first makes the first gap 21 of transom 2 just To holding part 3(First state shown in Figure 17), then make transom 2 along the bearing of trend translational motion of holding part 3 Holding part 3 and limiting component 4 is inserted successively in the inner chamber of transom 2, be rotated further by transom 2 and adjust holding part 3 and spacing Part 4 is relative to the inner chamber rotational angle of transom 2(Referring to Figure 18 the second state), distinguish holding part 3 and limiting component 4 Offseted with the roof and bottom wall of the inner chamber of transom 2(Referring to Figure 19), that is, complete holding part 3 and limiting component 4 and transom 2 It is mounted opposite positioning.First gap 21 of the present embodiment is located in groove 23.
Embodiment 8:
The curtain skeleton attachment structure of the rear dress transom of the present embodiment is substantially the same manner as Example 2, is in place of main difference, As shown in Figure 20 and Figure 21, in the present embodiment, holding part 3 is the strip piece that a relative vertical direction is in tilted layout, and holding The side side wall of the lower end of part 3 and the inner chamber of transom 2 offsets, and the holding part 3 and the side side wall of the inner chamber of transom 2 offset Roof for position farther away from the inner chamber of transom 2, it is more beneficial for installation positioning and improves the steadiness after transom 2 is installed.
In the present embodiment, the first gap 21 is equal with the width of holding part 3, and when mounted, transom 2 is to translate and revolve The aggregate motion turned makes holding part 3 be fitted into the inner chamber of transom 2, comprises the concrete steps that, first makes the first gap 21 of transom 2 just To holding part 3(The first state of ginseng as shown in Figure 22), then make transom 2 along the bearing of trend translational motion of holding part 3 Holding part 3 is inserted in the inner chamber of transom 2, be rotated further by transom 2 and adjust holding part 3 relative to the rotation of the inner chamber of transom 2 Angle(Referring to Figure 23 the second state), the roof and side wall that make holding part 3 and the inner chamber of transom 2 offset(Referring to Figure 24), That completes holding part 3 and transom 2 is mounted opposite positioning.First gap 21 of the present embodiment is located in groove 23.
Described above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example.To those of ordinary skill in the art, the improvement and change resulting in the case where not departing from the technology of the present invention concept thereof Change and also should be regarded as protection scope of the present invention.

Claims (10)

1. the curtain skeleton attachment structure of dress transom after a kind of, including two centre keels(1)Two centre keels are loaded on after(1) Between transom(2), the transom(2)The tubulose section bar closed for circumferential ring, it is characterised in that:An at least centre keel (1)It is provided with holding part(3), the holding part(3)Positioned at transom(2)In inner chamber and holding transom(2), the horizontal stroke Keel(2)End be provided with supply holding part(3)Insert transom(2)The first gap in inner chamber(21), the curtain skeleton Attachment structure also includes being used to make transom(2)With holding part(3)Keep relatively-stationary positioning component.
2. curtain skeleton attachment structure according to claim 1, it is characterised in that:The holding part(3)With transom (2)Inner chamber, which coordinates, prevents transom(2)Relative to holding part(3)Move up and down.
3. curtain skeleton attachment structure according to claim 1, it is characterised in that:The holding part(3)With transom (2)The side side wall of inner chamber offsets.
4. curtain skeleton attachment structure according to claim 1, it is characterised in that:The centre keel(1)On be also equipped with Positioned at transom(2)Limiting component in inner chamber(4), the limiting component(4)With holding part(3)Jointly and transom(2) Inner chamber, which coordinates, prevents transom(2)Relative to holding part(3)Move up and down.
5. curtain skeleton attachment structure according to claim 4, it is characterised in that:The transom(2)End be provided with For positioning element(4)Insert transom(2)The second gap in inner chamber(22).
6. curtain skeleton attachment structure according to claim 5, it is characterised in that:First gap(21)Slitted with second Mouthful(22)Width be respectively less than transom(2)The vertical height of inner chamber.
7. curtain skeleton attachment structure according to claim 1, it is characterised in that:The holding part(3)Provided with horizontal stroke Keel(2)Internal face is engaged and holding transom(2)Holding face, the holding face is horizontal plane.
8. curtain skeleton attachment structure according to any one of claim 1 to 7, it is characterised in that:The positioning component Including positioned at transom(2)Outside connector(5), the centre keel(1)Pass through the first fastener(6)With connector(5)Phase Even, the transom(2)Pass through the second fastener(7)With connector(5)It is connected.
9. curtain skeleton attachment structure according to claim 8, it is characterised in that:The transom(2)Outer wall on set It is fluted(23), the connector(5), the first fastener(6)With the second fastener(7)It is contained in the groove(23)In.
10. curtain skeleton attachment structure according to any one of claim 1 to 7, it is characterised in that:The positioning component To be directly connected to fasten holding part(3)And transom(2)The 3rd fastener(8);Or the positioning component is fixed perpendicular Keel(1)And transom(2)Pad.
CN201711022279.3A 2017-10-27 2017-10-27 The curtain skeleton attachment structure of transom is filled afterwards Pending CN107762021A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711022279.3A CN107762021A (en) 2017-10-27 2017-10-27 The curtain skeleton attachment structure of transom is filled afterwards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711022279.3A CN107762021A (en) 2017-10-27 2017-10-27 The curtain skeleton attachment structure of transom is filled afterwards

Publications (1)

Publication Number Publication Date
CN107762021A true CN107762021A (en) 2018-03-06

Family

ID=61271446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711022279.3A Pending CN107762021A (en) 2017-10-27 2017-10-27 The curtain skeleton attachment structure of transom is filled afterwards

Country Status (1)

Country Link
CN (1) CN107762021A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1548200A2 (en) * 2003-12-23 2005-06-29 Raico Bautechnik GmbH Mullion and transom facade
CN101059005A (en) * 2006-04-18 2007-10-24 王广武 Curtain wall
CN204152037U (en) * 2014-07-18 2015-02-11 深圳市瑞华建设股份有限公司 A kind ofly the frame curtain wall of unordered installation can close chamber grid system
CN204662735U (en) * 2015-06-08 2015-09-23 广东高登铝业有限公司 A kind of column of curtain wall and beam connecting structure
CA2934748A1 (en) * 2015-07-03 2017-01-03 Sing Tan Andy Luk Architectural decoration panel dry-hang structure free in mounting-dismounting and flexible in size combination
CN207597662U (en) * 2017-10-27 2018-07-10 湖南省金为新材料科技有限公司 The curtain skeleton connection structure of transom is filled afterwards

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1548200A2 (en) * 2003-12-23 2005-06-29 Raico Bautechnik GmbH Mullion and transom facade
CN101059005A (en) * 2006-04-18 2007-10-24 王广武 Curtain wall
CN204152037U (en) * 2014-07-18 2015-02-11 深圳市瑞华建设股份有限公司 A kind ofly the frame curtain wall of unordered installation can close chamber grid system
CN204662735U (en) * 2015-06-08 2015-09-23 广东高登铝业有限公司 A kind of column of curtain wall and beam connecting structure
CA2934748A1 (en) * 2015-07-03 2017-01-03 Sing Tan Andy Luk Architectural decoration panel dry-hang structure free in mounting-dismounting and flexible in size combination
CN207597662U (en) * 2017-10-27 2018-07-10 湖南省金为新材料科技有限公司 The curtain skeleton connection structure of transom is filled afterwards

Similar Documents

Publication Publication Date Title
CN105083139B (en) A kind of automobile and its roof-rack
CN207597662U (en) The curtain skeleton connection structure of transom is filled afterwards
CN107762021A (en) The curtain skeleton attachment structure of transom is filled afterwards
CN207122079U (en) A kind of dry-hanging fitting
CN211257466U (en) Wind-resistant building curtain wall
CN205131467U (en) A car shed structure for carrying passenger electric tricycle
CN110616843B (en) Full-built-in top plate for integral bathroom and mounting method thereof
CN204919883U (en) Novel gate -type frame steel construction building external wall structure
CN207776109U (en) A kind of collapsible light steel building structure
CN207597665U (en) A kind of curtain skeleton connection structure filled after transom
CN208917884U (en) Post-cast strip piece connected support structure
EP2134907B1 (en) External wall unit
CN207524906U (en) A kind of back cover structure of electri forklift
CN207314601U (en) Curtain wall installing structure
CN108125535B (en) Modular curtain box and installation method
CN210485150U (en) Multi-display composite support for software development
CN200948950Y (en) Container inner wall plate corner connection structure
CN206752783U (en) Curtain skeleton attachment structure
CN206928481U (en) The keel connecting structure of curtain wall
CN106948531B (en) Curtain skeleton internal connecting type bigeminy connection structure
CN218843467U (en) Building curtain wall convenient to leveling
CN201951578U (en) Stiffening beam limiting and mounting structure for automobile instrument board
CN218061539U (en) Assembled building connecting assembly convenient and fast to install
CN107630518A (en) For the curtain skeleton attachment structure filled after transom
CN102849115B (en) Body in white pretectum assembly and commercial vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination