CN107747649A CN201711137441.6A CN201711137441A CN107747649A CN 107747649 A CN107747649 A CN 107747649A CN 201711137441 A CN201711137441 A CN 201711137441A CN 107747649 A CN107747649 A CN 107747649A
Authority
CN
China
Prior art keywords
tool structure
construction
vertical
construction tool
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711137441.6A
Other languages
Chinese (zh)
Inventor
赵成龙
庄军涛
陈旭峰
黎荣枝
赵小红
雷杰雄
王亮
黄建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201711137441.6A priority Critical patent/CN107747649A/en
Publication of CN107747649A publication Critical patent/CN107747649A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/10Accessories therefor, e.g. anchors for aligning

Abstract

The invention discloses the construction method of a kind of construction tool structure, construction equipment and the construction tool structure, construction tool structure include can in the axial direction adjusting part installation length horizontal frame, it is fixed on the vertical framework of described horizontal frame one end, it is fixed on the baffle plate of the horizontal frame other end, on the horizontal frame can in radial directions adjusting part installation width position limiting structure, on vertical framework can in the vertical direction regulation height support base.The support base, position limiting structure and horizontal frame that the present invention passes through adjustable position, group parts are made to be more easy to match and fix in assembling, effectively reduce assembly difficulty, so as to improve the assembly precision of group parts, and equipped with corresponding scale, realize assembling, check integrated, further guarantee design, the uniformity of construction.

Description

The construction method of construction tool structure, construction equipment and the construction tool structure
Technical field
The present invention relates to electromechanical construction work field, more particularly to a kind of construction tool structure, construction equipment and the construction The construction method of tool structure.
Background technology
With the fast development of electromechanical engineering, among the prefabricated gradual involvement engineering of batch production, parts machining assembling essence Degree directly affects overall assembly precision.And traditional construction mode is mostly that rigging error is corrected in assembling process, assembly precision obtains Less than guarantee, such as during the construction and installation of pipeline, typically according to design drawing artificially substantially to installation dimension with And installation site is estimated, then start to construct so that the precision of the construction and installation overwhelming majority is by the experience of worker and straight Feel, error is easily produced in construction, the size after design size and construction is not consistent, when serious, it is possible to lead Cause will construct again, waste labour's material resources.
Therefore, how to improve assembly precision during construction, make construction size and design size be consistent be industry urgently The technical problem of solution.
The content of the invention
In order to solve drawbacks described above present in prior art, the present invention proposes a kind of construction tool structure, construction equipment And the construction method of the construction tool structure.
The technical solution adopted by the present invention is a kind of construction tool structure, including adjusting part can be pacified in the axial direction The horizontal frame of length is filled, the vertical framework of horizontal frame one end is fixed on, is fixed on the baffle plate of the horizontal frame other end, is located at On horizontal frame can adjusting part installation width in radial directions position limiting structure, can be in vertical side on vertical framework It is adjusted up the support base of height.
Further, horizontal frame includes:The retaining rail being fixedly connected with vertical framework, it can be slided relatively with retaining rail respectively The slip rail of dynamic connection.
Preferably, retaining rail and at least two, rail of slip.
Further, horizontal frame also includes:It is fixed on the retaining rail and slides at least two root supports below rail Rail.
Further, retaining rail is respectively equipped with the first bar hole in axial direction with the part that is connected of rail is slided, and leads to Screw bolt and nut is crossed to fix the retaining rail through first bar hole and slide the relative position of rail.
Preferably, horizontal frame or vertical framework are fixed by screw and ground.
Further, horizontal frame or the vertical framework correspond to component axial direction and are provided with scale.
Preferably, position limiting structure includes at least one position-limiting unit.
Further, position-limiting unit is provided with two, is respectively used for the position-limiting unit for fixing horizontal assembly, and for solid Determine the position-limiting unit of the intermediate module between horizontal assembly, vertical component.
Further, position-limiting unit includes:The base that bottom surface is fixedly connected with horizontal frame, two on base top surface Group chute, it is respectively arranged on two limiting plates of spacing between can adjust in the chute.
Preferably, vertical framework is provided with the second bar hole vertically, and the support base passes through screw bolt and nut It is fixed on second bar hole height adjusting.
In one embodiment, component is pipeline, and horizontal assembly, vertical component are straight tube, and the intermediate module is curved Pipe.
The present invention also proposes a kind of construction equipment, including above-mentioned construction tool structure.
The invention also provides a kind of construction method of above-mentioned construction tool structure, including:
Step 1, horizontal assembly is placed on horizontal frame, it is ensured that horizontal assembly in the axial direction and in the radial direction by Horizontal frame is effectively fixed;
Step 2, the other end that intermediate module is placed on to horizontal assembly, make intermediate module vertical end and horizontal ends by effectively solid It is fixed, then intermediate module horizontal ends and horizontal assembly are welded;
Step 3, by the calibration check weld size on horizontal frame whether with design it is consistent, if there is deviation to adjust in time;
Step 4, the vertical end that vertical component is placed on to intermediate module, regulation support base fixes the vertical component, by centre The vertical end of component and vertical components welding;
Step 5, by the calibration check weld size on vertical framework whether with design it is consistent, if there is deviation to adjust in time.
Further, step 6, regulation support base can also be included, its upper surface is less than the top of vertical component, place Flange, flange and vertical component top are welded, again by each scale terminal check size of components whether with design drawing one Cause.
Compared with prior art, the present invention is being assembled by the support base, position limiting structure and horizontal frame of adjustable position When group parts is more easy to match and is fixed, assembly difficulty is effectively reduced, so as to improve the assembly precision of group parts, and equipped with corresponding Scale, realize assembling, it is check integrated, further ensure design, construction uniformity.
Brief description of the drawings
With reference to embodiment and accompanying drawing, the present invention is described in detail, wherein:
Fig. 1 is the dimensional structure diagram of construction tool structure of the present invention;
Fig. 2 is the structural representation that support base coordinates with vertical framework;
Fig. 3 is the structural representation of position-limiting unit;
Fig. 4 is the schematic perspective view after assembling assembly in the present invention.
Embodiment
As shown in Figures 1 to 4, the present invention proposes a kind of construction tool structure, for coordinating the welding between multicompartment, bag Horizontal frame 1 is included, one end of horizontal frame 1 is fixed with vertical framework 2, and the other end is fixed with baffle plate 3, and horizontal frame 1 is adjustable Length,, can matable assembly installation so as to the distance between regulating fender 3 and vertical framework 2 by adjusting length moving stop 3 When axial direction installation length, be additionally provided with position limiting structure 4 on horizontal frame 1, position limiting structure 4 be vertically arranged can relative component adjust Pitch width is narrow, by adjust width can matable assembly be arranged on horizontal frame 1 on when radial direction installation width so that component It is effectively fixed in construction.In addition, vertical framework 2 is provided with the support base 21 of regulating height, make component in the vertical direction Effectively supported and fixed.
Horizontal frame 1 includes retaining rail 11 and slides rail 12, and slip rail 12 can be relatively fixed rail 11 and slide and fix. Wherein, retaining rail 11 is in I-shaped totally two, and spaced parallel, one end is fixed with vertical framework 2;Rail 12 is slided to insert respectively It in the groove of 11 I-shaped both sides of retaining rail, can be slided along groove, make retaining rail 11 can with sliding the length after rail 12 combines Regulation, the end face for sliding rail 12 are fixed with baffle plate 3, so as to reach the purpose of the adjustable component of horizontal frame 1 installation length, regulation Length afterwards is in 0.8m between 2m.And retaining rail 11 is respectively equipped with the first bar hole 14 with the part that slip rail 12 is connected, First bar hole 14 is axially disposed, by bolt pass through the first bar hole 14 after attaching nut, after adjusting position being fixed Retaining rail 11 and slide rail 12, holding structure is stable and precision.
Horizontal frame 1 can also include the supporting rail 13 for supporting, and retaining rail 11 is fixed with the lower section for sliding rail 12 Two supporting rails 13 parallel with position limiting structure 4.
In the present invention, horizontal frame 1 or vertical framework 2 can all be fixed with screw and bottom surface, such as are arranged on by screw The both ends of supporting rail 13 are connected with smooth ground, horizontal frame 1 is fixed with ground, keep integrally-built stability.
And the surface of horizontal frame 1 or vertical framework 2 is additionally provided with the scale of corresponding component axial direction, can be in construction Realize assembling, check integrated, the further uniformity for ensureing design and construction.
Position limiting structure 4 includes position-limiting unit, and in of the invention, position limiting structure 4 may include two position-limiting units, is respectively used to solid Determine the intermediate module 6 between the horizontal assembly 5 on horizontal level, and the horizontal and vertical component 7 of vertical position.It can also use More position-limiting units, make structure more stable.
Position-limiting unit includes base 41 and two groups of chutes 42, bottom surface be base 41 across in retaining rail 11 with retaining rail 11 is vertical and fixed, position-limiting unit is fixed with horizontal frame 1;It is two groups of chutes 42 on the top surface of base 41, chute 42 is relative Both ends be respectively equipped with limiting plate, relative can be slided between chute 42, to adjust the distance between two pieces of limiting plates, so as to meet DN80~DN350(ND represents inside nominal diameter, is also effective internal diameter, i.e., effective internal diameter is 80-350mm)More specification steel pipes are placed, and are carried High matching efficiency.
Vertical framework 2 is provided with the second bar hole 22 of corresponding support base 21, and bar hole is vertically set, support base 21 are provided with corresponding mounting hole, and the mounting hole on the second bar hole 22 and support base 21 on vertical framework 2 is passed through by bolt Attaching nut makes vertical framework 2 be fixed with support base 21, and unclamping nut can adjust support base 21 along the second bar hole about 22 Just, and adjustable height in 0.8m between 1.5m, and support base 21 can also adjust width, it is ensured that effectively fixed.
In the specific embodiment of the present invention, mounted component is pipeline, such as steel pipe, the steel pipe installed can be Pipe can also be square tube, and wherein horizontal assembly 5, vertical component 7 are straight tube, and intermediate module 6 is bend pipe.
The invention also provides a kind of construction equipment, including above-mentioned construction tool structure.
The invention also provides a kind of construction method of above-mentioned construction tool structure, the use step of a whole set of tool structure is such as Under:Step 1, by 4 screws of two supporting rails 13 on main body frame, it is fixed on firm, smooth ground, by water Flat component 5 is placed on the position limiting structure 4 of horizontal frame 1, the length of regulation horizontal frame 1 in the axial direction, and regulation is spacing The width of structure 4 in radial directions, it is ensured that horizontal assembly 5 is in the axial direction and effectively fixed in the radial direction;Step 2, intermediate module 6 is placed on the one end of horizontal assembly 5 by vertical component 7, the height of regulation support base 21 corresponds to vertical component 7, adjust position limiting structure 4, it is ensured that the horizontal ends and vertical end of intermediate module 6 are effectively fixed, then by the level of intermediate module 6 End and the welding of horizontal assembly 5 form weld seam;Step 3, after the completion of welding, welding chi is checked by the graduated scale on horizontal frame 1 It is very little whether consistent with design size, there is deviation to adjust in time;Step 4, vertical component 7 is placed on to the vertical end of intermediate module 6, Regulation support base 21 fixes vertical component 7, and the vertical end of intermediate module 6 and vertical component 7 are welded and fixed into shape by electric welding machine Into weld seam;Step 5, it is whether consistent with design size by the graduated scale check weld size on vertical framework 2, there is deviation timely Adjustment.Step 6 can also be included, adjust support base 21, its upper surface is less than to the upper surface of vertical component 7, place flange 71, Flange 71 and vertical component 7 are welded by electric welding machine, after the completion of a whole set of components welding, by vertical framework and horizontal frame Scale whether finally check size of components consistent with design drawing.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.

Claims (15)

  1. A kind of 1. construction tool structure, it is characterised in that including can in the axial direction adjusting part installation length horizontal pane Frame, the vertical framework of described horizontal frame one end is fixed on, the baffle plate of the horizontal frame other end is fixed on, located at the water On flat frame can in radial directions adjusting part installation width position limiting structure, can be in vertical direction on vertical framework The support base of upper regulation height.
  2. 2. construction tool structure as claimed in claim 1, it is characterised in that the horizontal frame includes:Consolidate with vertical framework Surely the retaining rail connected, the slip rail that relative can be slidably connected with each retaining rail respectively.
  3. 3. construction tool structure as claimed in claim 2, it is characterised in that the retaining rail and at least two, rail of slip.
  4. 4. construction tool structure as claimed in claim 2, it is characterised in that the horizontal frame also includes:It is fixed on described At least two supporting rails below retaining rail and slip rail.
  5. 5. construction tool structure as claimed in claim 2, it is characterised in that the part that the retaining rail is connected with slip rail The first bar hole in axial direction is respectively equipped with, the retaining rail is fixed through first bar hole by screw bolt and nut With the relative position for sliding rail.
  6. 6. construction tool structure as claimed in claim 1, it is characterised in that the horizontal frame or vertical framework pass through screw Fixed with ground.
  7. 7. construction tool structure as claimed in claim 1, it is characterised in that the horizontal frame or the vertical framework are corresponding Component axial direction is provided with scale.
  8. 8. construction tool structure as claimed in claim 1, it is characterised in that the position limiting structure includes at least one spacing list Member.
  9. 9. construction tool structure as claimed in claim 8, it is characterised in that the position-limiting unit includes:Bottom surface and horizontal pane The base that frame is fixedly connected, two groups of chutes on base top surface, between being respectively arranged between can adjust in the chute Away from two limiting plates.
  10. 10. construction tool structure as claimed in claim 8 or 9, it is characterised in that the position-limiting unit is provided with two, respectively For the position-limiting unit for fixing horizontal assembly, and for fixing the limit of the intermediate module between horizontal assembly, vertical component Bit location.
  11. 11. construction tool structure as claimed in claim 1, it is characterised in that the vertical framework is provided with vertically The second bar hole, the support base is fixed on by screw bolt and nut height adjusting on second bar hole.
  12. 12. construction tool structure as claimed in claim 10, it is characterised in that the component is pipeline, the horizontal assembly, Vertical component is straight tube, and the intermediate module is bend pipe.
  13. A kind of 13. construction equipment, it is characterised in that the construction tool structure including the claims 1 to 11.
  14. 14. a kind of construction method of construction tool structure as claimed in claim 12, including:
    Step 1, horizontal assembly is placed on horizontal frame, it is ensured that horizontal assembly in the axial direction and in the radial direction by Horizontal frame is effectively fixed;
    Step 2, the other end that intermediate module is placed on to horizontal assembly, make intermediate module vertical end and horizontal ends by effectively solid It is fixed, then intermediate module horizontal ends and horizontal assembly are welded;
    Step 3, by the calibration check weld size on horizontal frame whether with design it is consistent, if there is deviation to adjust in time;
    Step 4, the vertical end that vertical component is placed on to intermediate module, regulation support base fixes the vertical component, by centre The vertical end of component and vertical components welding;
    Step 5, by the calibration check weld size on vertical framework whether with design it is consistent, if there is deviation to adjust in time.
  15. 15. construction method as claimed in claim 14, it is characterised in that also including step 6, regulation support base, make its upper table Face is less than the top of vertical component, places flange, flange and vertical component top is welded, again by each scale terminal check Whether size of components is consistent with design drawing.
CN201711137441.6A 2017-11-16 2017-11-16 The construction method of construction tool structure, construction equipment and the construction tool structure Pending CN107747649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711137441.6A CN107747649A (en) 2017-11-16 2017-11-16 The construction method of construction tool structure, construction equipment and the construction tool structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711137441.6A CN107747649A (en) 2017-11-16 2017-11-16 The construction method of construction tool structure, construction equipment and the construction tool structure

Publications (1)

Publication Number Publication Date
CN107747649A true CN107747649A (en) 2018-03-02

Family

ID=61250762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711137441.6A Pending CN107747649A (en) 2017-11-16 2017-11-16 The construction method of construction tool structure, construction equipment and the construction tool structure

Country Status (1)

Country Link
CN (1) CN107747649A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202185702U (en) * 2011-06-27 2012-04-11 平高集团有限公司 Gas circuit connecting pipe welding tool
CN202377722U (en) * 2011-11-28 2012-08-15 江苏中核利柏特股份有限公司 Pipeline assembly welding platform
US20140353281A1 (en) * 2012-04-30 2014-12-04 Condell Engineering Limited Pipe fabrication apparatus with a bed and a support having a backing plate
CN204524692U (en) * 2015-04-09 2015-08-05 烟台中集来福士海洋工程有限公司 Precision controlling frock
CN205465019U (en) * 2015-11-05 2016-08-17 山东豪迈机械制造有限公司 Slow -speed shaft group is to device
CN106736225A (en) * 2016-12-30 2017-05-31 安徽正元机械有限公司 A kind of platform for mammoth pump pipeline processing
CN106984930A (en) * 2017-03-20 2017-07-28 中国能源建设集团天津电力建设有限公司 A kind of elbow pipeline section counterpart mold
CN207500621U (en) * 2017-11-16 2018-06-15 珠海格力电器股份有限公司 A kind of construction tool structure and construction equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202185702U (en) * 2011-06-27 2012-04-11 平高集团有限公司 Gas circuit connecting pipe welding tool
CN202377722U (en) * 2011-11-28 2012-08-15 江苏中核利柏特股份有限公司 Pipeline assembly welding platform
US20140353281A1 (en) * 2012-04-30 2014-12-04 Condell Engineering Limited Pipe fabrication apparatus with a bed and a support having a backing plate
CN204524692U (en) * 2015-04-09 2015-08-05 烟台中集来福士海洋工程有限公司 Precision controlling frock
CN205465019U (en) * 2015-11-05 2016-08-17 山东豪迈机械制造有限公司 Slow -speed shaft group is to device
CN106736225A (en) * 2016-12-30 2017-05-31 安徽正元机械有限公司 A kind of platform for mammoth pump pipeline processing
CN106984930A (en) * 2017-03-20 2017-07-28 中国能源建设集团天津电力建设有限公司 A kind of elbow pipeline section counterpart mold
CN207500621U (en) * 2017-11-16 2018-06-15 珠海格力电器股份有限公司 A kind of construction tool structure and construction equipment

Similar Documents

Publication Publication Date Title
CN105525625A (en) Construction method and device of pre-embedded bolts of fixed steel column base
CN204431472U (en) Make precast beam pedestal
CN206477603U (en) Processing platform for del cross section curve tubular truss
CN206986916U (en) A kind of pre-buried fixing device of foundation bolt
CN203247603U (en) High-position foundation bolt positioning device
CN106671007B (en) A kind of groove type heat collector cantilever beam assembly tool and assemble method
CN105643174A (en) Adjustable pairing jig frame for self-made H-shaped steel
CN107695716A (en) A kind of building pipe cutting fixing device with length fixing function
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN112376606A (en) Equipment foundation bolt mounting die and construction method thereof
CN211102477U (en) Pipeline aligning device
CN203621815U (en) Spiral blade assembling and welding tool
CN111021743A (en) Pipe truss machining jig frame and manufacturing process of pipe truss
CN105880932B (en) A kind of process equipment and processing method of combined shaft frame
CN105317052A (en) Tower crane foundation bolt fixing method
CN109779247A (en) The formwork erection device and construction method of steel column cornerite
CN208004531U (en) A kind of stirring shaft straightener
CN206747477U (en) A kind of steel reinforcement cage colligation platform
CN107747649A (en) The construction method of construction tool structure, construction equipment and the construction tool structure
CN108316653A (en) Top plate fixes the accurate installation pre-buried structure and construction method of wall wire box holder
CN207500621U (en) A kind of construction tool structure and construction equipment
CN209907531U (en) A support for rainwater pipeline construction
CN208262191U (en) A kind of more specification grid steel frame processing unit (plant)s in tunnel
CN204504575U (en) A kind of process equipment of combined shaft frame
JP2013223906A (en) Machine tool and leveling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination