CN107738095A - Flange gasket centering device and method - Google Patents

Flange gasket centering device and method Download PDF

Info

Publication number
CN107738095A
CN107738095A CN201711064707.9A CN201711064707A CN107738095A CN 107738095 A CN107738095 A CN 107738095A CN 201711064707 A CN201711064707 A CN 201711064707A CN 107738095 A CN107738095 A CN 107738095A
Authority
CN
China
Prior art keywords
noose
free end
pad
flange
flange gasket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711064707.9A
Other languages
Chinese (zh)
Inventor
张予杰
卢庆庆
段华庭
王辉
冯鹏刚
吕杰
纪杨
樊滔
周继兵
邬东辉
王鹏升
吴焕
薛江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201711064707.9A priority Critical patent/CN107738095A/en
Publication of CN107738095A publication Critical patent/CN107738095A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/10Aligning parts to be fitted together

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Gasket Seals (AREA)

Abstract

The invention provides a flange gasket centering device and a method, which comprises a rope set unit, wherein the rope set unit comprises a first rope sleeve and a second rope sleeve, a connecting part is arranged between one end of the first rope sleeve and one end of the second rope sleeve, the other end of the first rope sleeve is a first free end, and the other end of the second rope sleeve is a second free end; the first cable sleeve and the second cable sleeve are identical in structure, and the cross sections of the connecting part, the first free end and the second free end are identical in area; the center of connecting portion is provided with central sign, first free end and second free end are protruding outside the ring flange in gasket installation. The flange gasket centering device can ensure that the gasket is centered with a flange surface when being installed, and has the advantages of simple and convenient operation method, low cost, portability, easy carrying and repeated use.

Description

Flange gasket centralising device and method
Technical field
The present invention relates to flange interconnection technique field, it is more particularly related to a kind of flange gasket centralising device And method.
Background technology
Flange is called ring flange or bead, is generally used between pipeline, the connection between pipeline and valve, is set on flange Perforation, flange is fastened by bolts when installing is close to two flanges., must be when pipeline is installed by the form of flange The contact surface of two flanges installs a pad, to ensure the sealing of flange face and pressure-bearing.Pad needs when mounted and flange face Centering is installed, if pad installation misaligns, can cause pad unbalance stress, flange face sealing failure, occur being situated between in pipeline Situations such as matter leaks, gasket seal is type of attachment the most frequently used in petrochemical equipment pipeline, once flange face sealing loses Effect, it will cause oil and gas leakage, there is the potential safety hazards such as explosive combustion.
Due to pad external diameter and the cause not of uniform size of bolt hole inner ring, in order to ensure that pad centering is installed, prior art is padding When piece is installed, pad is first pressed into flange disk interface, then by screwdriver, steel wire etc., inserted by bottom or sidepiece Enter to withstand flange face, fastening bolt after flange aligns, but due to two flanges close to when, space is small, extract out screwdriver, steel During silk instrument, flange face easily shifts, it is impossible to ensure pad precise alignment, and operationally typically need more people coordinate, operation Complexity, installation effectiveness are low.
The content of the invention
The present invention provides a kind of flange gasket centralising device and method, and the flange gasket centralising device is simple in construction, makes Cost is low, and operating method is simply, conveniently.
The present invention is achieved by the following technical solutions:
One aspect of the present invention provides a kind of flange gasket centralising device, including a rope group unit, the rope group unit include Connecting portion is provided between one end of first noose and the second noose, one end of first noose and second noose, institute The other end for stating the first noose is the first free end, and the other end of second noose is the second free end;First noose It is identical with the second noose structure, the face of the cross section of the connecting portion, first free end and second free end Product is identical;The connecting portion is provided centrally with center identification, using the center identification as hand-held point in pad installation process, So that first noose entangles the side of the pad, second noose entangles the opposite side of the pad, the center Mark, the first free end and the second free end are protruded from outside ring flange in pad installation process.This programme uses a rope group Unit is the centering installation that pad can be achieved, low manufacture cost simple in construction, light, portable and reusable;Padding The first noose and the second noose are entangled into pad to be installed respectively in piece installation process, residence is held for one and states in rope group unit The heart identifies, and another holds residence and states the first free end and the second free end, adjust the pad to be installed to ring flange pair In, connecting bolt, after the pretightning force grip gasket of bolt, the hand for holding first free end and the second free end is unclamped, Shake the hand for holding center identification, you can the rope group unit is taken out, it is simple, convenient.
Further, the size of first noose matches with the diameter of pad;
The size of first noose increases with the increase of the washer diameter;
The size of first noose reduces with the reduction of the washer diameter.
Further, the length of first free end and the second free end is all higher than the maximum gauge of flange.It can be seen that will The length of first free end and the second free end is set greater than the maximum gauge of flange, and person easy to operation grasps force.
Further, first free end is identical with the length of second free end.It can pass through in installation process Determine pad whether install by centering with reference to whether the end of the first free end and the second free end aligns, centering installation realization side Method is simple, conveniently, so as to improve the installation effectiveness of pad.
Further, it is provided with the first free end between multiple first size marks, the multiple first size mark etc. Away from setting;Multiple second sizings, the multiple second sizing spaced set are provided with second free end; Spacing between two neighboring first size mark is identical with the spacing between two neighboring second sizing.In installation pad When, the interval between two flanges is smaller, certain error may be produced only according to Visual Observations Observations pad, by two groups of rope group units Upper setting sizing, it can conveniently and efficiently ensure the precise alignment of pad.
Further, the spacing between two neighboring first size mark is between 1-5cm.Can basis in practical operation The size of pad and ring flange diameter selects the first size mark of different spacing.
Further, the sizing is knot either colour code or the knot with colour code.Size mark Know and be easy to identify using colour code, the centering of the faster adjusting gasket of energy, in order to further improve identification, the size mark The knot with colour code can also be used by knowing.
Further, the rope group unit is flexible strand.Rope group unit can be ensured to bear certain strength and not broken.
Further, first noose and the second noose are elastic threads.Relaxed state is changed into from tensioned state in noose Afterwards can be towards the periphery movement of pad, so as to be more convenient when taking out rope group.
Another aspect of the present invention provides a kind of flange gasket centering method, and this method is filled using above-mentioned flange gasket centering Put, the flange gasket centering method includes:
First noose and the second noose are entangled into pad to be installed respectively, the pad to be installed is positioned over flange In card;
One is held the center identification that rope group unit is stated in residence, and another holds residence and states the first free end and second freely End, adjust the pad to be installed to ring flange centering;
Connecting bolt, after the pretightning force grip gasket of bolt, first free end and the second free end are held in release Hand, shake and hold the hand of center identification, take out the rope group unit.
Flange gasket centralising device provided by the invention includes a rope group unit, and rope group unit includes the first noose and second Be provided with connecting portion between one end of noose, one end of first noose and second noose, first noose it is another One end is the first free end, and the other end of second noose is the second free end, and the first noose and the second noose structure are identical, Connecting portion is provided centrally with center identification, and the flange gasket centralising device can ensure when pad is installed and flange face centering, Flange gasket centralising device is simple in construction, low manufacture cost, light, portable and reusable.
Flange gasket centering method provided by the invention distinguishes the first noose and the second noose in pad installation process Entangle pad to be installed, one is held the center identification that rope group unit is stated in residence, another hold residence state the first free end and Second free end, adjust the pad to be installed to ring flange centering, connecting bolt, treat the pretightning force grip gasket of bolt Afterwards, the hand for holding first free end and the second free end is unclamped, shakes the hand for holding center identification, you can take out the rope Group unit, it is simple, convenient.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can be with root Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is flange gasket centralising device structural representation provided in an embodiment of the present invention;
Fig. 2 is multiple flange gasket centralising device structural representations provided in an embodiment of the present invention;
Fig. 3 is the vertically-mounted front view of flange gasket centralising device pad provided in an embodiment of the present invention;
Fig. 4 is the vertically-mounted side view of flange gasket centralising device pad provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Pad be by can produce be plastically deformed and with some strength material made of annulus, flange gasket is as one Kind of sealing connecting element, plays vital effect in pipe-line system, its quality with flange contact facings sealing, directly Connect the safety for affecting pipe-line system operation.Pad needs to install with flange face centering when mounted, if pad installation is not right In, pad unbalance stress, flange face sealing failure can be caused.The present invention loses for existing pad when being installed with flange centering Lose the problem of rate is high, installation effectiveness is low and design a kind of flange gasket centralising device.
In the description of the invention, it is to be understood that the orientation or position relationship of the instruction such as term " on ", " under " are base In orientation shown in the drawings or position relationship, description description of the invention and simplified, rather than instruction or hint are for only for ease of Signified device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this The limitation of invention.In addition, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or implying relatively heavy The property wanted or the implicit quantity for indicating indicated technical characteristic.In the description of the invention, " multiple " are meant that at least two It is individual, such as two, three etc., unless otherwise specifically defined.
In the description of the invention, unless otherwise clearly defined and limited, term " installation ", " connection ", " fixation " etc. It should be interpreted broadly, such as can be fixedly connected or be detachably connected, or be integrally formed;Can mechanically connect, Can also electrically connect or can communicate with one another;Can be joined directly together, can also be indirectly connected by intermediary, can be with Make the connection of two element internals or the interaction relationship of two elements.For the ordinary skill in the art, may be used To understand the concrete meaning of above-mentioned term in the present invention as the case may be.
The part term in the application is explained below, so as to skilled artisan understands that.
Pad, it is the mechanical seal between two objects, generally to prevent from being under pressure between two objects, burn into Expanded with heat and contract with cold naturally with pipeline leakage.Because machining surface can not possibly be perfect, scrambling can be filled up using pad. Pad is generally made up of flaky material, such as packing paper, rubber, silicon rubber, metal, cork, felt, neoprene, nitrile rubber, glass Glass fiber or plastic polymer (such as polytetrafluoroethylene (PTFE)).
Flange, flange flange disk or bead are called, are the part being connected with each other between axle and axle, the present invention refers to for pipe end Between connection.
Flange connects, and is two pipelines, pipe fitting or equipment, is first individually fixed on a ring flange, two ring flanges Between, plus pad, tightened together with bolt and complete connection.
Technical scheme is described in detail with specifically embodiment below.For same or analogous concept Or process may repeat no more in certain embodiments.Below in conjunction with accompanying drawing, embodiments of the present invention are described.
Embodiment one:
Fig. 1 is flange gasket centralising device structural representation provided in an embodiment of the present invention, is referred to shown in Fig. 1, this hair Bright flange gasket centralising device includes a rope group unit 1, and the rope group unit includes the first noose 11 and the second noose 12, institute State and connecting portion 13 be provided between one end of the first noose 11 and one end of second noose 12, first noose 11 it is another One end is the first free end 14, and the other end of second noose 12 is the second free end 15;First noose 11 and described The structure of second noose 12 is identical, the cross section of the connecting portion 13, first free end 14 and second free end 15 Area is identical;The connecting portion 13 is provided centrally with center identification 16, with the center identification 16 in pad installation process To hold point so that first noose 11 entangles the side of the pad 2, and second noose 12 entangles the pad 2 Opposite side, the center identification 16, the first free end 14 and the second free end 15 protrude from ring flange in the installation process of pad 2 Outside 3.
The material of the rope of heretofore described rope group unit 1 is not particularly limited.
Heretofore described first noose 11 is identical with the structure of the second noose 12, first noose 11 and described Two nooses 12, first noose 11 in pad installation process entangles the side of the pad 2, and the second noose 12 entangles the pad 2 Opposite side, the size of the first noose 11 and second noose 12 determines according to the size of installation pad 2, when the chi of pad 2 After very little determination, the size of the first noose 11 and second noose 12 can ensure when the first noose 11 entangles the pad 2 Side, the pad 2 can be tightened when the second noose 12 entangles the opposite side of the pad 2 on ring flange 3, work as pad Piece is tightened when on ring flange 3, and the vertical range at noose to the edge of pad 2 is the smaller the better, and the present invention is to first noose 11 and the specific size of second noose 12 be not particularly limited.
First noose 11 of the present invention and second noose 12 can be and connecting portion 13, the first free end 14, Two free ends 15 be integrally formed or post production process in the two of the connecting portion 13 is fixed on by external part End, can also be that separating two strands at the both ends of connecting portion 13 in manufacturing process is made.For example, when rope group unit is plastic cement During material, the first noose 11 and second noose 12 can be can with connecting portion 13, the first free end 14, the second free end 15 Making is integrally formed by mould;Rope group unit 1 can be also made using a rope strand, and the first noose 11 and the second noose 12 are logical Cross and separate two strands respectively at the both ends of connecting portion 13 and be fabricated to, the present invention is not particularly limited to the production method of rope group unit. The connecting portion 13, first free end 14 are identical with the area of the cross section of second free end 15, can ensure to restrict Group unit 1 is uniformly not easy to be pulled off in tensioned state lower stress.
The centrally disposed center identification 16 of connecting portion 13 of the present invention can be knot or colour code, center identification 16 For the hand-held point in the installation process of pad 2, distance and center of the center identification 16 to first noose 11 in installation process The distance of mark 16 to second noose 12 is identical, and pad holding in installation process, which is stopped, is held a little, and another is held Firmly the first free end 14 and the second free end 15, in order to be easy to both hands to exert a force in installation process, the center identification 16, first is certainly Protruded from by the free end 15 of end 14 and second in the installation process of pad 2 outside ring flange 3.The present invention is to connecting portion 13, first The specific length of the free end 15 of free end 14 and second is not particularly limited.
Flange gasket centralising device provided by the invention includes a rope group unit, and rope group unit includes the first noose and second Be provided with connecting portion between one end of noose, one end of first noose and second noose, first noose it is another One end is the first free end, and the other end of second noose is the second free end, and the first noose and the second noose structure are identical, Connecting portion is provided centrally with center identification, and flange gasket centralising device is simple in construction, low manufacture cost, it is light, portable and It is and reusable;The flange gasket centralising device can ensure when pad is installed and flange face precise alignment;Installed in pad During the first noose and the second noose entangled into pad to be installed respectively, one is held the center mark that rope group unit is stated in residence Know, another holds residence and states the first free end and the second free end, adjusts the pad to be installed and arrives and ring flange centering, company Connecting bolt, after the pretightning force grip gasket of bolt, the hand for holding first free end and the second free end is unclamped, shake is held The firmly hand of center identification, you can the rope group unit is taken out, it is simple, convenient.
Specifically, Fig. 2 is multiple flange gasket centralising device structural representations provided in an embodiment of the present invention;Refer to figure Shown in 2, the size of first noose 11 and second noose 12 matches with the diameter of pad 2.The flange gasket Piece centralising device passes through the first noose 11 and the upper and lower surface of the setting-up piece 2 of second noose 12, the first noose when in use 11 and second noose 12 be inserted in the distance of pad 4 and can ensure pad 2 in the surface fixation of flange 3, first The size of noose 11 and second noose 12 changes according to the size variation of the diameter of pad 2, in order to ensure that pad 2 can be consolidated Fixed firm, the size of the first noose 11 and second noose 12 increases, the first noose 11 with the increase of the diameter of pad 2 Reduce with the size of second noose 12 with the reduction of the diameter of pad 2.
Further, the flange gasket centralising device ensures that locates pad 2 in installation bolt pretension all the time In tensioned state, the length of 14 and second free end of the first free end 15 should be greater than the maximum gauge of flange 3, with this identical It is that the distance of the noose of center identification 16 to the first 11 and the distance of the noose of center identification 16 to the second 12 are also greater than flange 5 Maximum gauge, can so ensure that the both hands of operator catch center identification 16, the first free end 14 and the second free end 15 Apply pulling force.
Further, first free end 14 is identical with the length of the second free end 15.Padded when in the installation process of pad 2 Piece 2 is located at the centre position of flange, and center identification 16 is the hand-held point of a hand, and the first free end 14 and the second free end 15 are The gripping point of another hand, when in installation process can by reference to the end of the first free end 14 and the second free end 15 whether Align to determine pad 2 whether install by centering, centering installation implementation method simply, conveniently, is imitated so as to improve the installation of pad 2 Rate.
In order to improve the precision for using flange gasket centralising device installation pad 2, further, the center identification 16 and first are provided with multiple first sizes marks 17, the multiple first chi between noose 11 and first free end 14 17 spaced sets of very little mark;It is provided between the noose 12 of center identification 16 and second and on second free end 15 more Individual second sizing 18, the multiple spaced set of second sizing 18;Between two neighboring first size mark 17 Spacing it is identical with the spacing between two neighboring second sizing 18.When pad is installed, pad 2 is placed in the first noose 11 After in second noose 12, a hand catches center identification 16, and another hand catches the first free end 14 and second free End 15, pad 2 is positioned on flange 3, and the free end 14 of connecting portion 13 first and the second free end 15 are tightened in 3 liang of flange End, and at the maximum gauge of flange 3.After center identification 16 is fixed as hand-held point, observation first size mark 17 and the Two sizings 18, when connecting portion 13 is located at the first size mark 17 and the second sizing of the maximum gauge opening position of flange 3 18 identify for corresponding identical, and the second size in the first size mark 17 and the second free end 15 on the first free end 14 It is when corresponding to identical mark to identify 18 position at flange maximum gauge, you can pad 2 and the precise alignment of flange 3 are determined, When installing pad 2, the interval between two flanges 3 is smaller, and certain error may be produced only according to Visual Observations Observations pad, by Sizing is set on two groups of rope group units, can conveniently and efficiently ensure the precise alignment of pad 2.
Further, the spacing between first size mark 17 and the second sizing 18 is between 1-5cm. When the spacing of knot or colour code is smaller, when two rope group units are under tensioned state, the first size mark 17 and the Two sizings, 18 corresponding position is when being adjusted to identical colour code, it may be determined that pad 2 and the precise alignment of flange 3, when When the spacing of knot or colour code is larger, the chi on connecting portion 13, the first free end 14 and the second free end 15 may be referred to Position and the distance of hithermost knot or colour code of the very little mark at flange maximum gauge are adjusted.
Alternatively, the sizing is knot either colour code or the knot with colour code, when size mark Know for knot when first size mark 17 and 18 corresponding position of the second sizing be identical knot, in order to prevent Knot loosens when rope group unit shakes, and knot should be solid, in order to ensure quickly to pad 2 to apply in connecting bolt pretension Pretightning force, the size of the knot should be smaller.When sizing is colour code, the colour code may be selected what is easily distinguished The color easy to identify such as red, black, blueness, sizing be easy to identify using colour code, can faster adjusting gasket 2 Centering.In order to further improve identification, the sizing can also use the knot with colour code.
Further, the first noose 11 and the second noose 12 are flexible strand because noose in the installation process of pad 2 After the upper and lower surface for entangling pad 2, to tighten in the both ends of flange 3, the first noose 11 and the second noose 12 need to bear certain Strength and it is not broken, the material of noose can have certain elasticity, being capable of direction after noose is changed into relaxed state from tensioned state The periphery of pad 2 is mobile, so as to be more convenient when taking out rope group;First free end 14 and the second free end 15 are also flexible strand, And can bear to make to be applied to the power of tightening on rope group unit during 2 centering of pad, the connecting portion 13, first of rope group unit is freely The free end 15 of end 14 and second is preferably nonelastic rope.
Embodiment two:
The flange gasket centralising device of the present embodiment includes a rope group unit 1, and the rope group unit includes the first noose 11 With the second noose 12, connecting portion 13, institute are provided between one end of first noose 11 and one end of second noose 12 The other end for stating the first noose 11 is the first free end 14, and the other end of second noose 12 is the second free end 15;It is described First noose 11 is identical with the structure of the second noose 12, and the connecting portion 13, first free end 14 and described second are certainly Area by the cross section at end 15 is identical;The connecting portion 13 is provided centrally with center identification 16, in pad installation process It is hand-held point with the center identification 16 so that first noose 11 entangles the side of the pad 2, second noose 12 The opposite side of the pad 2 is entangled, the center identification 16, the first free end 14 and the second free end 15 were installed in pad 2 Protruded from journey outside ring flange 3.
Fig. 3 is the vertically-mounted front view of flange gasket centralising device pad provided in an embodiment of the present invention, and Fig. 4 is the present invention The vertically-mounted side view of flange gasket centralising device pad that embodiment provides.Refer to shown in Fig. 3, Fig. 4, using above-mentioned flange The application method of pad centralising device is as follows:
S101,12 sets of 11 and second rope of the first noose entangled into pad 2 to be installed respectively, by the pad to be installed 2 are positioned on flange surface.
Specifically, the size for the pad 2 installed as needed, rope of the selection with suitable first noose and the second noose Group unit, the side of pad 2 is entangled with the first noose 11, the second noose 12 entangles the opposite side of the pad 2, and operator is on the other hand Center identification is caught, residence is held for one and states the first free end and the second free end, the pad 2 to be installed is positioned over flange On the face of disk 3.
S102, a holding residence state the center identification 16 of rope group unit, and another holds residence and states the first free end 14 With the second free end 15, adjust the pad 2 to be installed and arrive and the centering of ring flange 3.
S103, connecting bolt, after the pretightning force grip gasket of bolt, first free end 14 and second is held in release The hand of free end 15, the hand for holding center identification 16 is shaken, takes out the rope group unit.
Flange gasket centering method provided by the invention distinguishes the first noose and the second noose in pad installation process Entangle pad to be installed, one is held the center identification that rope group unit is stated in residence, another hold residence state the first free end and Second free end, adjust the pad to be installed to ring flange centering, connecting bolt, treat the pretightning force grip gasket of bolt Afterwards, the hand for holding first free end and the second free end is unclamped, shakes the hand for holding center identification, you can take out the rope Group unit, it is simple, convenient.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

  1. A kind of 1. flange gasket centralising device, it is characterised in that
    Including a rope group unit, the rope group unit includes the first noose and the second noose, one end of first noose and institute State and connecting portion is provided between one end of the second noose, the other end of first noose is the first free end, second rope The other end of set is the second free end;
    First noose is identical with the second noose structure, and the connecting portion, first free end and described second are certainly The area of cross section by holding is identical;
    The connecting portion is provided centrally with center identification, using the center identification as hand-held point in pad installation process, makes The side that first noose entangles the pad is obtained, second noose entangles the opposite side of the pad, the center mark Know, the first free end and the second free end are protruded from outside ring flange in pad installation process.
  2. 2. flange gasket centralising device according to claim 1, it is characterised in that the size of first noose with The diameter matching of pad;
    The size of first noose increases with the increase of the washer diameter;
    The size of first noose reduces with the reduction of the washer diameter.
  3. 3. flange gasket centralising device according to claim 1, it is characterised in that first free end and second is freely The length at end is all higher than the maximum gauge of flange.
  4. 4. flange gasket centralising device according to claim 1, it is characterised in that first free end and described second The length of free end is identical.
  5. 5. flange gasket centralising device according to claim 1, it is characterised in that
    Multiple first size marks are provided between the center identification and the first noose and on first free end, it is described more Individual first size identifies spaced set;
    Multiple second sizings are provided between the center identification and the second noose and on second free end, it is described more Individual second sizing spaced set;
    Spacing between two neighboring first size mark is identical with the spacing between two neighboring second sizing.
  6. 6. flange gasket centralising device according to claim 5, it is characterised in that between two neighboring first size mark Spacing between 1-5cm.
  7. 7. flange gasket centralising device according to claim 5, it is characterised in that the first size mark and the second chi It is very little to be identified as knot either colour code or the knot with colour code.
  8. 8. according to the flange gasket centralising device described in claim any one of 1-7, it is characterised in that the rope group unit is soft Property rope.
  9. 9. according to the flange gasket centralising device described in claim any one of 1-7, it is characterised in that first noose and Two nooses are elastic threads.
  10. 10. a kind of flange gasket centering method, it is characterised in that using the flange gasket pair described in claim any one of 1-9 Middle device, the flange gasket centering method include:
    First noose and the second noose are entangled into pad to be installed respectively, the pad to be installed is positioned over flange surface On;
    One is held the center identification that rope group unit is stated in residence, and another holds residence and states the first free end and the second free end, Adjust the pad to be installed to ring flange centering;
    Connecting bolt, after the pretightning force grip gasket of bolt, the hand for holding first free end and the second free end is unclamped, The hand for holding center identification is shaken, takes out the rope group unit.
CN201711064707.9A 2017-11-02 2017-11-02 Flange gasket centering device and method Pending CN107738095A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711064707.9A CN107738095A (en) 2017-11-02 2017-11-02 Flange gasket centering device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711064707.9A CN107738095A (en) 2017-11-02 2017-11-02 Flange gasket centering device and method

Publications (1)

Publication Number Publication Date
CN107738095A true CN107738095A (en) 2018-02-27

Family

ID=61233218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711064707.9A Pending CN107738095A (en) 2017-11-02 2017-11-02 Flange gasket centering device and method

Country Status (1)

Country Link
CN (1) CN107738095A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115302239A (en) * 2022-10-11 2022-11-08 江苏科翔制泵有限公司 Sealing gasket mounting equipment for water pump flange

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090217506A1 (en) * 2005-11-24 2009-09-03 Heiko Schmidt Method for Introducing and Anchoring at Least One Connecting Element Into and in a Workpiece and Device for Carrying Out Said Method
CN203641726U (en) * 2013-12-31 2014-06-11 新疆现代石油化工股份有限公司 Loose flange pipe connecting device
CN204187181U (en) * 2014-10-24 2015-03-04 中国石油化工股份有限公司 Automatic-positioning type flange gasket
CN204400429U (en) * 2014-12-26 2015-06-17 南车眉山车辆有限公司 The suspender of door in a kind of New Type of Railway Freight Cars
CN105438965A (en) * 2016-01-26 2016-03-30 哈尔滨达城绿色建筑技术开发股份有限公司 Two-point centering hoisting device and method of integrated mode brickwork wall piece
CN105773389A (en) * 2016-05-09 2016-07-20 郑州大学 Derusting and lining pouring integrated machine for interior of centrifugal pipe
CN207093988U (en) * 2017-07-06 2018-03-13 中国石油天然气股份有限公司 Flange gasket centering device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090217506A1 (en) * 2005-11-24 2009-09-03 Heiko Schmidt Method for Introducing and Anchoring at Least One Connecting Element Into and in a Workpiece and Device for Carrying Out Said Method
CN203641726U (en) * 2013-12-31 2014-06-11 新疆现代石油化工股份有限公司 Loose flange pipe connecting device
CN204187181U (en) * 2014-10-24 2015-03-04 中国石油化工股份有限公司 Automatic-positioning type flange gasket
CN204400429U (en) * 2014-12-26 2015-06-17 南车眉山车辆有限公司 The suspender of door in a kind of New Type of Railway Freight Cars
CN105438965A (en) * 2016-01-26 2016-03-30 哈尔滨达城绿色建筑技术开发股份有限公司 Two-point centering hoisting device and method of integrated mode brickwork wall piece
CN105773389A (en) * 2016-05-09 2016-07-20 郑州大学 Derusting and lining pouring integrated machine for interior of centrifugal pipe
CN207093988U (en) * 2017-07-06 2018-03-13 中国石油天然气股份有限公司 Flange gasket centering device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115302239A (en) * 2022-10-11 2022-11-08 江苏科翔制泵有限公司 Sealing gasket mounting equipment for water pump flange

Similar Documents

Publication Publication Date Title
CN108351059B (en) Sliding cable safety device for pipes or similar equipment subjected to pressure and corresponding installation equipment comprising such a safety device
CN201568653U (en) Sea transport pipe
CN107738095A (en) Flange gasket centering device and method
JP6757315B2 (en) High torque polymer fittings
CN102507312B (en) Umbilical cable tensile testing fixture and its mounting method
CN207093988U (en) Flange gasket centering device
KR20100003809A (en) Clamp for pipe socket
GB2600608A (en) Coupling device for use in a mooring system for floating structures
US20150159789A1 (en) Component Connector for Connecting Cylindrical Components
GB126655A (en) Improvements in and connected with Pipe and Cylinder Flange Joints.
EP2941331B1 (en) Improved apparatus and method for insertion of gaskets
JP2017103936A (en) Insulator chain lifting device
CN105712173B (en) A kind of multi-joint packing tank moduleization lifting and transport bracing means
CN105299323B (en) A kind of pipe clamp being fixedly mounted for high-pressure hose
CN201639212U (en) Dentiform liner hoop with fastener
RU2447350C1 (en) Device to join flexible pipes
US7275463B2 (en) Tong with a continuous composite belt and methods for making and using same
CN104961044B (en) Method for installing or removing high voltage bushing by using C-shaped hoseclamp cross binding strap
CN205321433U (en) Wave spring key -ring
CN108843112A (en) It is a kind of for connecting the connector of cord holder and distaff
CN208830817U (en) It is a kind of for connecting the connector of cord holder and distaff
KR20100012948U (en) A valve union
CN206036403U (en) Clamping hoop
CN216666127U (en) Rubber ring convenient to fix
CN220564102U (en) Flexible annular fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180227

WD01 Invention patent application deemed withdrawn after publication