The content of the invention
The technical problems to be solved by the invention are:In view of the shortcomings of the prior art, there is provided simple in construction, the Neng Goufang of one kind
Just the debris for quickly treating processing inside pipe fitting in batches is cleared up, while the heat-shrink tube that can treat processing pipe fitting in batches enters
Row baking so that realize and be reliably connected between heat-shrink tube rapid desufflation, with pipe fitting body, so as to improve pipe fitting processing efficiency and add
Working medium amount, meet the pipe fitting processing unit of large-scale production demand.
Solves the problems, such as techniques discussed above, the technical scheme that the present invention takes is:
The present invention is a kind of pipe fitting processing unit, and described pipe fitting processing unit includes device frame, described device frame
Limit track is set on frame, in limit track installation can be also set up on device frame along the air blowing part that limit track moves
Impurity collecting part, multiple connecting tubes are set close to impurity collecting part side on air blowing part, impurity collecting part is close to blowing
Gas part side is set to be configured to the one-to-one positioning pipe of connecting tube quantity and position, each pending pipe fitting one end
The structure being sleeved in a connecting tube, each pending pipe fitting other end are configured to the knot being sleeved on a positioning pipe
Structure, described air blowing part connect with compressed air supply part, baking box are also set up on described device frame, baking box is set
The structure that can be moved along device frame upper surface is set to, compressed air supply part and baking box connect with control unit respectively
Connect.
Described device frame includes front beam, rear cross beam, left longeron, right vertical beam, described front beam, rear cross beam, a left side
Longeron, right vertical beam form the framework upper surface of square structure, and described limit track includes spacing left track and spacing right track,
Spacing left track is arranged on left side rail inner face position, and spacing right track is arranged on right vertical beam medial surface position, described air blowing
By multiple left chain wheel active cards in spacing left track, air blowing part opposite side passes through the activity of multiple right pulley for part side
It is installed in spacing right track.
The baking box includes baking box body and baking box base, and multiple left movable pulleies are installed in baking box base side,
Baking box base opposite side installs multiple right movable pulleies, and multiple left movable pulleies are resisted against left longeron upper surface, multiple right movable pulleies
Right vertical beam upper surface is resisted against, described baking box is configured to the structure moved along framework upper surface, and baking box is arranged to
The structure of air blowing part and impurity collecting part top position can be moved to.
The air blowing part includes air blowing cavity and connecting tube, and each connecting tube is connected with air blowing chamber activities respectively, often
One gear is set in individual connecting tube, and the gear per two neighboring connecting tube engages, the gear and motor of outermost connecting tube
Sliding tooth engagement, motor be connected with control unit, air blowing cavity side setting left chain wheel, the right cunning of air blowing cavity opposite side setting
Wheel.
Described compressed air supply part includes air accumulator, delivery pipe, magnetic valve, described delivery pipe one end and air accumulator
Gas outlet is connected, and the delivery pipe other end is connected with air blowing cavity, and magnetic valve is arranged between delivery pipe and air accumulator gas outlet, electricity
Magnet valve is connected with control unit.
The impurity collecting part includes the collection chamber and positioning pipe of hollow structure, and collection chamber side is consolidated with left longeron
Fixed connection, impurity collecting part opposite side are fixedly connected with right vertical beam.
Described pending pipe fitting includes the pipe fitting body of metal material and the heat-shrink tube of plastic material, and shrinkable sleeve is mounted in
On pipe fitting body.
Using technical scheme, following beneficial effect can be obtained:
The pipe fitting processing unit of the present invention, when needs, which treat processing pipe fitting, to be handled, by the pyrocondensation of pending pipe fitting
Pending tube clip is then mounted between air blowing part and impurity collecting part, air blowing part by pipe sleeve on pipe fitting body
It can move, will each pending pipe fitting one end set so as to realize the variation of position between air blowing part and impurity collecting part
Mounted in a connecting tube, each pending pipe fitting other end is sleeved on a positioning pipe, so, the pending pipe fitting of batch is real
Now position.Baking box is then moved, baking box moves along device frame, until baking box is moved to the pending of multiple fixations
Pipe fitting top position, control unit control baking box start, and treat processing pipe fitting and are toasted, heat-shrink tube is now heated, and is heated
After-contraction, it is sleeved on so that heat-shrink tube is securely fixed on pipe fitting body, realizes that pipe fitting body and the reliable of heat-shrink tube connect
Connect.And when pending tube clip is mounted between air blowing part and impurity collecting part, compressed air is controlled by control unit
Supply part starts, and the compressed air of compressed air supply part pumping enters air blowing part, then is blown into pipe fitting by connecting tube
Body, so as to be purged to the impurity accumulated in pipe fitting body, the impurity of purging enters impurity collecting part by positioning pipe,
The cleaning of pending inside pipe fitting impurity is completed, so as to form satisfactory pipe fitting finished product.Said structure, treat processing pipe fitting
Processing fully achieve automatic business processing, operating personnel, which only need to place in pipe fitting processing unit, clamps pending pipe fitting, with
And the pipe fitting finished product machined is removed, labor intensity of operating staff is not only effectively reduced, and pipe fitting treatment effeciency is improved, one
Secondary can handles the processing of tens of pending pipe fittings, meets large-scale production demand.The pipe fitting processing unit of the present invention, knot
Structure is simple, and the debris that can conveniently and efficiently treat processing inside pipe fitting in batches is cleared up, while can be in batches to pending
The heat-shrink tube of pipe fitting is toasted so that is realized and is reliably connected between heat-shrink tube rapid desufflation, with pipe fitting body, so as to improve pipe
Part processing efficiency and crudy, meet large-scale production demand.
Embodiment
Below against accompanying drawing, by the description to embodiment, each structure for example involved to the embodiment of the present invention
The works such as mutual alignment and annexation, the effect of each several part and operation principle between the shape of part, construction, each several part are further
Detailed description:
As shown in accompanying drawing 1, accompanying drawing 2, the present invention is a kind of pipe fitting processing unit, and described pipe fitting processing unit includes device
Framework 1, sets limit track 2 on described device frame 1, the air blowing that installation can move along limit track 2 in limit track 2
Part 3, impurity collecting part 4 is also set up on device frame 1, is set on air blowing part 3 close to the side of impurity collecting part 4 multiple
Connecting tube 5, impurity collecting part 4 are set and the one-to-one positioning pipe of the quantity of connecting tube 5 and position close to the side of air blowing part 3
6, each pending one end of pipe fitting 7 is configured to the structure being sleeved in a connecting tube 5, and each pending pipe fitting 7 is another
End is configured to the structure being sleeved on a positioning pipe 6, and described air blowing part 3 connects with compressed air supply part 8,
Baking box 9 is also set up on described device frame 1, baking box 9 is configured to the structure moved along the upper surface of device frame 1,
Compressed air supply part 8 and baking box 9 are connected with control unit 10 respectively.Said structure, treat processing pipe fitting when needs and enter
During row processing, by the shrinkable sleeve of pending pipe fitting on pipe fitting body, pending tube clip is then mounted in air blowing part
Between impurity collecting part 4, air blowing part can move, and realize the change of position between air blowing part and impurity collecting part
It is dynamic, each pending one end of pipe fitting 7 is sleeved on a connecting tube 5, each pending other end of pipe fitting 7 is sleeved on into one determines
On the pipe 6 of position, so, the pending pipe fitting of batch realizes positioning.Baking box 9 is then moved, baking box moves along device frame, directly
The pending pipe fitting top position of multiple fixations is moved to baking box 9, control unit control baking box starts, and treats processing tube
Part is toasted, and heat-shrink tube is now heated, after-contraction of being heated, so that heat-shrink tube, which is securely fixed, is sleeved on pipe fitting body
On, realize being reliably connected for pipe fitting body and heat-shrink tube.And it is mounted in air blowing part and impurity collecting part in pending tube clip
Between when, control compressed air supply part 8 to start by control unit, the compressed air that compressed air supply part 8 pumps
Pipe fitting body is blown into air blowing part, then by connecting tube, so as to be purged to the impurity accumulated in pipe fitting body, is purged
Impurity impurity collecting part is entered by positioning pipe, so as to complete the cleaning of pending inside pipe fitting impurity, so as to formed symbol
Close desired pipe fitting finished product.Said structure, the processing for treating processing pipe fitting fully achieve automatic business processing, and operating personnel only need
Placed in pipe fitting processing unit and clamp pending pipe fitting, and remove the pipe fitting finished product machined, not only effectively reduce behaviour
Make personnel labor intensity, improve pipe fitting treatment effeciency, a can handles the processing of tens of pending pipe fittings, meets big rule
Mould production requirement.The pipe fitting processing unit of the present invention, it is simple in construction, processing inside pipe fitting can be conveniently and efficiently treated in batches
Debris is cleared up, while the heat-shrink tube that can treat processing pipe fitting in batches is toasted so that heat-shrink tube rapid desufflation, with pipe
Realize and be reliably connected between part body, so as to improve pipe fitting processing efficiency and crudy, meet large-scale production demand.
Described device frame 1 include front beam 11, rear cross beam, left longeron 12, right vertical beam 13, described front beam 11,
Rear cross beam, left longeron 12, right vertical beam 13 form the framework upper surface 14 of square structure, and described limit track 2 includes a spacing left side
Track and spacing right track 16, spacing left track are arranged on the left medial surface position of longeron 12, and spacing right track 16 is arranged on right vertical
The medial surface position of beam 12, the described side of air blowing part 3 are mounted in spacing left track by multiple left chain wheel active cards, air blowing portion
The opposite side of part 3 is by multiple right pulley active cards in spacing right track 16.Said structure, air blowing part can realize with it is miscellaneous
Relative position changes between matter collecting part, so as to meet that different length pending pipe fitting steps up to fix, also allows for
When stepping up to fix pending pipe fitting, air blowing part is first promoted now to be easy to suit agency's processing pipe fitting away from impurity collecting part
Onto connecting tube and positioning pipe, then promoting air blowing part, both coordinate clamps to pipe fitting, air blowing portion close to impurity collecting part
Locking pin is also set up on part, air blowing part and impurity collecting part treat processing pipe fitting be fixedly clamped after, can be with locked air blowing
Part, avoid air blowing part play, reliable clamping.
The baking box 9 includes baking box body 17 and baking box base 18, and a multiple left sides are installed in the side of baking box base 18
Movable pulley 19, the opposite side of baking box base 18 install multiple right movable pulleies 20, and multiple left movable pulleies 19 are resisted against on left longeron 12
Surface, multiple right movable pulleies 20 are resisted against the upper surface of right vertical beam 13, and described baking box 9 is configured to along framework upper surface 14
Mobile structure, baking box 9 are configured to be moved to the structure of air blowing part 3 and the top position of impurity collecting part 4.It is above-mentioned
Structure, baking box body can move relative to device frame, and so, when pending pipe fitting is longer, baking box body can be with
Moved under the drive of baking box base, treat processing pipe fitting different parts and toasted, improve baking quality and efficiency.
The air blowing part 3 includes air blowing cavity 21 and connecting tube 5, and each connecting tube 5 is movable with air blowing cavity 21 respectively
Connect, a gear is set in each connecting tube 5, the gear per two neighboring connecting tube 5 engages, outermost connecting tube 5
Gear is engaged with the sliding tooth of motor, and motor is connected with control unit 10, and the side of air blowing cavity 21 sets left chain wheel, air blowing cavity
21 opposite sides set right pulley.Said structure, in pending pipe fitting baking process, turned by the sliding tooth band moving gear of motor
Dynamic, pinion rotation can drive connecting tube to rotate, and connecting tube, which rotates, drives pending pipe fitting to rotate, so that baking box body is not
Need movement to treat processing pipe fitting to be toasted for one week, so as to improve baking quality, while accelerate heat-shrink tube to shrink.
Described compressed air supply part 8 include air accumulator 22, delivery pipe, magnetic valve 23, described delivery pipe one end with
The gas outlet of air accumulator 22 connects, and the delivery pipe other end connects with air blowing cavity 21, and magnetic valve 23 is arranged on delivery pipe and air accumulator
Between 22 gas outlets, magnetic valve 23 is connected with control unit 10.Said structure, air accumulator provide compressed air to air blowing part,
Magnetic valve can control the break-make of compressed air under control unit control, meet pending inside pipe fitting cleaning treatment demand,
Improve pipe fitting processing quality and efficiency.
The impurity collecting part 4 includes the collection chamber 24 and positioning pipe 6 of hollow structure, the side of collection chamber 24 and a left side
Longeron 12 is fixedly connected, and the opposite side of impurity collecting part 4 is fixedly connected with right vertical beam 13.Impurity collecting part is fixedly connected, position
Putting to change, and air blowing part can be with position adjustments, meet demand.
Described pending pipe fitting 7 includes the pipe fitting body of metal material and the heat-shrink tube of plastic material, heat-shrink tube suit
On pipe fitting body.Said structure, caliber inconvenience when pipe fitting body is heated, heat-shrink tube suit front tube footpath is larger, caliber after being heated
Reduce, be reliably sleeved on pipe fitting body, formed and connect reliable pipe fitting finished product.
The pipe fitting processing unit of the present invention, when needs, which treat processing pipe fitting, to be handled, by the pyrocondensation of pending pipe fitting
Pending tube clip is then mounted between air blowing part and impurity collecting part, air blowing part by pipe sleeve on pipe fitting body
It can move, will each pending pipe fitting one end set so as to realize the variation of position between air blowing part and impurity collecting part
Mounted in a connecting tube, each pending pipe fitting other end is sleeved on a positioning pipe, so, the pending pipe fitting of batch is real
Now position.Baking box is then moved, baking box moves along device frame, until baking box is moved to the pending of multiple fixations
Pipe fitting top position, control unit control baking box start, and treat processing pipe fitting and are toasted, heat-shrink tube is now heated, and is heated
After-contraction, it is sleeved on so that heat-shrink tube is securely fixed on pipe fitting body, realizes that pipe fitting body and the reliable of heat-shrink tube connect
Connect.And when pending tube clip is mounted between air blowing part and impurity collecting part, compressed air is controlled by control unit
Supply part starts, and the compressed air of compressed air supply part pumping enters air blowing part, then is blown into pipe fitting by connecting tube
Body, so as to be purged to the impurity accumulated in pipe fitting body, the impurity of purging enters impurity collecting part by positioning pipe,
The cleaning of pending inside pipe fitting impurity is completed, so as to form satisfactory pipe fitting finished product.Said structure, treat processing pipe fitting
Processing fully achieve automatic business processing, operating personnel, which only need to place in pipe fitting processing unit, clamps pending pipe fitting, with
And the pipe fitting finished product machined is removed, labor intensity of operating staff is not only effectively reduced, and pipe fitting treatment effeciency is improved, one
Secondary can handles the processing of tens of pending pipe fittings, meets large-scale production demand.The pipe fitting processing unit of the present invention, knot
Structure is simple, and the debris that can conveniently and efficiently treat processing inside pipe fitting in batches is cleared up, while can be in batches to pending
The heat-shrink tube of pipe fitting is toasted so that is realized and is reliably connected between heat-shrink tube rapid desufflation, with pipe fitting body, so as to improve pipe
Part processing efficiency and crudy, meet large-scale production demand.
Exemplary description is carried out to the present invention above in conjunction with accompanying drawing, it is clear that concrete implementation of the present invention is not by above-mentioned
The limitation of mode, if the various improvement of inventive concept and technical scheme of the present invention progress are employed, or it is not improved by this
The design of invention and technical scheme directly apply to other occasions, within the scope of the present invention.