CN107737500A - Water mist dust-removing equipment - Google Patents

Water mist dust-removing equipment Download PDF

Info

Publication number
CN107737500A
CN107737500A CN201710900643.5A CN201710900643A CN107737500A CN 107737500 A CN107737500 A CN 107737500A CN 201710900643 A CN201710900643 A CN 201710900643A CN 107737500 A CN107737500 A CN 107737500A
Authority
CN
China
Prior art keywords
dedusting
water
dust
dedusting chamber
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710900643.5A
Other languages
Chinese (zh)
Inventor
段贤伍
谢尚臻
孙红兵
王广裕
苏锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI CHENRUIDA AGRICULTURAL EQUIPMENT Co Ltd
Original Assignee
ANHUI CHENRUIDA AGRICULTURAL EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI CHENRUIDA AGRICULTURAL EQUIPMENT Co Ltd filed Critical ANHUI CHENRUIDA AGRICULTURAL EQUIPMENT Co Ltd
Priority to CN201710900643.5A priority Critical patent/CN107737500A/en
Publication of CN107737500A publication Critical patent/CN107737500A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Separation Of Particles Using Liquids (AREA)

Abstract

The invention discloses a kind of water mist dust-removing equipment, belongs to field of dust removal equipment, including dust arrester and water fog generator, and the dust arrester includes the interior dedusting body for setting dedusting chamber;The dedusting chamber is in tower, and bottom has the air inlet entered for gas with dust and the sewage draining exit for sewage discharge, and top has the exhaust outlet for clean gas discharge;The water fog generator, the dedusting intracavitary is arranged at, for producing water smoke and spraying to gas with dust;The sewage outfalls setting is on the side chamber wall of the dedusting chamber;The bottom of chamber wall of the dedusting chamber is to be guide face that minimum point is obliquely installed below the sewage draining exit bottom or the sewage draining exit.Design in technical scheme provided by the invention at the sewage draining exit of dedusting chamber is more reasonable, more convenient to use and simple.

Description

Water mist dust-removing equipment
Technical field
The present invention relates to field of dust removal equipment, and in particular to a kind of water mist dust-removing equipment.
Background technology
In some production fields, often produce and produced in the waste gas with a large amount of dust, such as coal mining processing Mine Dust, caused lime dust and furniture in caused dust, cement production process in grain storage drying process Caused wood chip dirt etc. in production process of plate, if these gases with dust are directly drained into air and can seriously added Acute atmospheric pollution level.In order to purify the gas that these carry a large amount of dust, a kind of tower water mist dust-removing in the prior art be present Equipment, generally comprises a tower dedusting chamber, and dedusting intracavitary arranges one group or multigroup waterfog head, and gas with dust is from dedusting The lower end of chamber enters, upper end discharge, and gas with dust is during dedusting intracavitary is moved from bottom to top, water caused by waterfog head Vapour sprays from top to bottom, and steam and dust and gas form convection current, and the dirt particles in steam and dust and gas during convection current are coagulated Knot forms the tiny globule and fallen, and behind dedusting chamber low side interflow, is discharged by the sewage draining exit for being arranged on dedusting bottom of chamber portion.Above-mentioned mistake Journey realizes carries out dedusting to gas with dust.
However, above-mentioned Water-fog dusting apparatus can consume substantial amounts of water resource to form spraying in the course of the work, make for a long time With substantial amounts of water resource will certainly be consumed.In order to improve the utilization rate of water resource, the China that document number is CN204952532U is specially Sharp document discloses a kind of circulatory system with Water-fog dusting apparatus, includes fixed mount and mist dust remover, the water smoke Deduster includes the dirt pocket on the fixed mount, and the circulatory system also includes sediment structure and the knot that draws water Structure, the mist dust remover also include some water inlet pipes, some waterfog heads and baffle plate;The top of the dirt pocket, which is provided with, to be used The escape pipe of gas after being purified with discharge, bottom is provided with the outlet pipe to effluent sewerage, and is additionally provided with to arrange close to bottom Enter the air inlet pipe of waste gas, the air inlet pipe tilts towards the outlet pipe side;One end of some water inlet pipes is respectively protruding into The dirt pocket, and be separately mounted on the dirt pocket;Some waterfog heads are separately mounted to some water inlet pipes On, to spray water smoke in the dirt pocket;The baffle plate is arranged in the dirt pocket, and is located at the escape pipe and institute Between stating some water inlet pipes, to extend waste gas residence time in dirt pocket;The sediment structure is located at below the dirt pocket, And connected with the escape pipe, to precipitate sewage;The pumping structure connects the sediment structure and some water inlet pipes The other end, the water after precipitation is evacuated in some water inlet pipes.The sediment structure includes the precipitation being sequentially communicated Pond, transition pond and water purifying tank;The pumping structure includes high-pressure hydraulic pump and drinking-water pipe;The sedimentation basin connects with the outlet pipe Logical, the water purifying tank is stretched into described drinking-water pipe one end, and the other end connects with some water inlet pipes;The high-pressure hydraulic pump is arranged on On the drinking-water pipe, the water in the water purifying tank is evacuated in some water inlet pipes.
Above-mentioned technical proposal makes sewage caused by mist dust remover flow into sediment structure by setting a sediment structure In, sewage is separated into sludge and water purification by three precipitation ponds of sediment structure, then again will by water pump and drinking-water pipe Water purification is extracted out and is delivered to again at waterfog head, and so circulation realizes reusing for water resource.
However, the circulatory system with Water-fog dusting apparatus in above-mentioned technical proposal still had in actual use it is scarce Point.For the sewage draining exit of dirt pocket in above-mentioned technical proposal using flared sewage draining exit, sewage draining exit is directly toward lower section, is Make smoothly to flow out after sewage discharges sewage draining exit, whole dedusting chamber can only be raised, sewage draining exit is departed from mounting surface.Or Person is hinged with pipeline at sewage draining exit makes sewage be discharged along pipeline, but even the mode of pipe laying is similarly needed dedusting Chamber raise after could at sewage draining exit pipe laying.Therefore, the design of the water mist dust-removing equipment sewage draining exit in above-mentioned technical proposal It is not reasonable.
The content of the invention
Therefore, the technical problems to be solved by the invention are to overcome setting for water mist dust-removing equipment sewage draining exit in the prior art Irrational problem is counted, more rational water mist dust-removing equipment is designed so as to provide a kind of sewage draining exit.
For this invention provides technical scheme it is as follows:
Water mist dust-removing equipment, including:
Dust arrester, including the interior dedusting body for setting dedusting chamber;The dedusting chamber is in tower, and bottom has ribbon supply dust and gas The air inlet and the sewage draining exit for sewage discharge that body enters, top has the exhaust outlet for clean gas discharge;
Water fog generator, the dedusting intracavitary is arranged at, for producing water smoke and spraying to gas with dust;
The sewage outfalls setting is on the side chamber wall of the dedusting chamber;
The bottom of chamber wall of the dedusting chamber is to be that minimum point is obliquely installed below the sewage draining exit bottom or the sewage draining exit Guide face.
Technical scheme provided by the invention further improvement is that, the guide face is plane.
Technical scheme provided by the invention further improvement is that, the dedusting chamber cross section for circle.
Technical scheme provided by the invention further improvement is that, the dust arrester also includes supporting construction, described Supporting construction is arranged at the bottom of the dedusting body and the dust arrester can be made to be placed directly on loading end.
Technical scheme provided by the invention further improvement is that, the supporting construction is is fixedly installed in the dedusting First seat board of body bottom portion, one side of first seat board away from the dedusting chamber are what directly can be contacted with the loading end Plane.
Technical scheme provided by the invention further improvement is that, the supporting construction is described to be removably installed in The base of dedusting body bottom portion, the base include:
The guide face;
Second seat board, external diameter are more than the external diameter of the dedusting body perisporium bottom, and the one side away from the dedusting chamber is can The plane directly contacted with the loading end;
Attachment structure, the guide face is fixedly connected with close to one end of the dedusting chamber, one end away from the dedusting chamber It is fixedly connected with second bottom plate.
Technical scheme provided by the invention further improvement is that, the attachment structure is periphery and the dedusting intracavitary Wall fits.
Technical scheme provided by the invention further improvement is that, in addition to connect with the sewage draining exit, suitable for dirt Water is purified and the water after purification is returned to the cesspool of the water fog generator, and the cesspool has and the row The water inlet structure of dirty mouth connection, and the water flowing out structure connected with the water entering section of the water fog generator.
Technical scheme provided by the invention further improvement is that, the cesspool is arranged under the dedusting body Side, the loading end are the upper surface of the cesspool.
Technical scheme provided by the invention possesses following advantage:
1st, technical scheme provided by the invention includes the interior dedusting body and water fog generator for setting dedusting chamber, described to remove Dirt chamber is in tower, and bottom has the air inlet entered for gas with dust and the sewage draining exit for sewage discharge, and top has for clean The exhaust outlet of net gas discharge;The water fog generator is arranged at the dedusting intracavitary, and band is arrived for producing water smoke and spraying On dust and gas body;The sewage outfalls setting is on the side chamber wall of the dedusting chamber;The bottom of chamber wall of the dedusting chamber is with the blowdown The guide face being obliquely installed below mouth bottom or the sewage draining exit for minimum point.By by sewage outfalls setting in the side of dedusting chamber Afterwards, sewage is guided to sewage draining exit using guide face, sewage can reserve dedusting chamber from side, rather than be arranged from the bottom of dedusting chamber Go out.The design of such sewage draining exit can make dedusting chamber to raise dedusting chamber in effluent sewerage, make dedusting chamber installation and It is all more convenient to place, and the sewage draining exit for being on the other hand arranged on side is lifted away from peace when installing blow-off line additional without by dedusting chamber Holding position, direct dedusting chamber side access.Therefore, setting at the sewage draining exit of dedusting chamber in technical scheme provided by the invention Meter is more reasonable, more convenient to use and simple.
2nd, guide face is plane in technical scheme provided by the invention, and smooth guide face easily facilitates manufacture and installation, And sewage can be made unobstructedly to be flowed out along guide face during effluent sewerage.
3rd, dedusting chamber cross section described in technical scheme provided by the invention is circle, and cross section is circular dedusting chamber one Aspect is simpler in the fabrication process, it is only necessary to which one block of sheet material encompasses barrel-shaped;Another aspect cross section is circular Dedusting chamber coordinates tilted-putted guide face, can find minimum point in the border of guide face easily, facilitate guide face Use and install.
4th, dust arrester described in technical scheme provided by the invention also includes supporting construction, and the supporting construction is arranged at The bottom of the dedusting body simultaneously can be such that the dust arrester is placed directly on loading end.It can make dedusting using supporting construction Chamber is directly placed on loading end, makes the installation of dedusting chamber and use more convenient.
5th, supporting construction is to be fixedly installed in the dedusting body bottom portion described in the technical scheme that the present invention provided First seat board, one side of first seat board away from the dedusting chamber are the plane that directly can be contacted with the loading end.Utilize First seat board can make the placed side complanation of dedusting chamber, mitigate pressure of the dedusting chamber to loading end, ensure that dedusting chamber can More stable is placed on loading end.
6th, supporting construction described in technical scheme provided by the invention is to be removably installed in the dedusting body bottom portion Base, the base includes guide face, the second seat board and attachment structure.The second seat board external diameter is more than the dedusting body The external diameter of perisporium bottom, the one side away from the dedusting chamber are the plane that directly can be contacted with the loading end;The connection knot Structure is fixedly connected with the guide face close to one end of the dedusting chamber, and one end away from the dedusting chamber is fixedly connected with described second Bottom plate.By the way that supporting construction after demountable structure, can be first placed on and be held by support structure designs when installing dedusting chamber On section, then dedusting chamber is installed on the support structure again, so that the placement of whole cleaner is more convenient;The opposing party Face, because cleaner is frequently necessary to be operated under very high damp condition, corrosion occurs and can hardly be avoided, when generation corrosion When, can be only when wherein a side is damaged after the guide face of cleaner and dedusting chamber are carried out into split-type design A wherein side is changed, can so reduce the maintenance cost and maintenance difficulties of equipment.
7th, attachment structure described in technical scheme provided by the invention is that periphery fits with the dedusting cavity wall.Connection After structure and the fitting of dedusting cavity wall the connection between dedusting chamber and base can be made even closer, and sewage mistake can be avoided More is collected between dedusting cavity wall and base, sewage is smoothly flowed out sewage draining exit.
8th, in technical scheme provided by the invention also include connected with the sewage draining exit, suitable for sewage is purified and incite somebody to action Water after purification returns to the cesspool of the water fog generator, and the cesspool has the water inlet connected with the sewage draining exit Structure, and the water flowing out structure connected with the water entering section of the water fog generator.By designing cesspool, and utilize cesspool pair Used sewage is purified, and is then transmitted back to the sewage after purification in water fog generator again, can realize that water provides The recycling in source, reduce the consumption of water resource.
9th, cesspool described in technical scheme provided by the invention is arranged at below the dedusting body, and the loading end is The upper surface of the cesspool.Water mist dust-removing equipment directly can be directly placed on cesspool by such mounting means, and one Aspect has greatly saved the installing space of equipment in itself, and water mist dust-removing equipment is arranged on cesspool by another convenience also can Shorten the length of flowing water pipeline, make the manufacturing cost of equipment lower.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the stereogram for the water mist dust-removing equipment that the embodiment of the present invention 1 is provided;
Fig. 2 is the front view of dedusting chamber in water mist dust-removing equipment shown in Fig. 1;
Fig. 3 is the stereogram of the one of which embodiment of dedusting chamber shown in Fig. 2, and wherein dedusting body has done broken section;
Fig. 4 is the stereogram of the another embodiment of dedusting chamber shown in Fig. 2, and wherein dedusting body has done broken section;
Description of reference numerals:
1- dedusting bodies, 11- dedusting chambers, 12- sewage draining exits, 13- air inlets, 14- exhaust outlets, 2- water fog generators, 3- Guide face, 4- supporting constructions, the seat boards of 41- first, the seat boards of 42- second, 43- attachment structures, 5- cesspools, 51- filter cotton sections, 52- distance pieces.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify description, rather than instruction or imply signified device or unit must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that instruction or hint relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi Connection inside two units.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
As long as in addition, technical characteristic involved in invention described below different embodiments non-structure each other It is be combined with each other into conflict can.
Embodiment 1:
It is as shown in Figures 1 to 4 embodiments of the invention 1, present embodiments provides a kind of water mist dust-removing equipment, including except Dirt device and water fog generator 2, the dust arrester include the interior dedusting body 1 for setting dedusting chamber 11;The dedusting chamber 11 is in Tower, and bottom has the air inlet 13 entered for gas with dust and the sewage draining exit 12 for sewage discharge, top has for clean The exhaust outlet 14 of gas discharge;The water fog generator 2 is arranged in the dedusting chamber 11, is arrived for producing water smoke and spraying On gas with dust;The sewage draining exit 12 is arranged on the side chamber wall of the dedusting chamber 11;The bottom of chamber wall of the dedusting chamber 11 be with The guide face 3 that the bottom of sewage draining exit 12 or the lower section of the sewage draining exit 12 are obliquely installed for minimum point.
In use, after by the way that sewage draining exit 12 is arranged on into the side of dedusting chamber 11, sewage is guided to row using guide face 3 Dirty mouth 12, sewage can reserve dedusting chamber 11 from side, rather than be discharged from the bottom of dedusting chamber 11.Such sewage draining exit 12 designs Dedusting chamber 11 can be made to raise dedusting chamber 11 in effluent sewerage, make the installation of dedusting chamber 11 and place all more just Profit, the sewage draining exit 12 for being on the other hand arranged on side are lifted away from installation site when installing blow-off line additional without by dedusting chamber 11, The direct side access of dedusting chamber 11.Therefore, setting at the sewage draining exit 12 of dedusting chamber 11 in technical scheme provided by the invention Meter is more reasonable, more convenient to use and simple.
As a kind of embodiment of guide face 3, guide face 3 is plane, and smooth guide face 3 easily facilitates manufacture And installation, and during effluent sewerage sewage can be made unobstructedly to be flowed out along guide face 3.
As a kind of embodiment of dedusting chamber 11, the cross section of dedusting chamber 11 is circle, and cross section is circular Dedusting chamber 11 is on the one hand simpler in the fabrication process, it is only necessary to which one block of sheet material encompasses barrel-shaped;On the other hand it is transversal Face coordinates tilted-putted guide face 3 for circular dedusting chamber 11, can find minimum point in the border of guide face 3 easily, Facilitate using and installing for guide face 3.When the cross section of dedusting chamber 11 is provided in round, namely dedusting chamber 11 is barrel shape, Now the guide face 3 of corresponding plane should be ellipse, so that guide face 3 can completely enclose the dedusting chamber of barrel shape 11。
A kind of as water mist dust-removing equipment improves embodiment, and the dust arrester also includes supporting construction 4, the branch Support structure 4 is arranged at the bottom of the dedusting body 1 and the dust arrester can be made to be placed directly on loading end.Utilize support Structure 4 can be such that dedusting chamber 11 is directly placed on loading end, make the installation of dedusting chamber 11 and use more convenient.
As a kind of embodiment of supporting construction 4, the supporting construction 4 is to be fixedly installed in the dedusting body First seat board 41 of 1 bottom, one side of first seat board 41 away from the dedusting chamber 11 are directly to be connect with the loading end Tactile plane.The placed side complanation of dedusting chamber 11 can be made using the first seat board 41, mitigate dedusting chamber 11 to loading end Pressure, what guarantee dedusting chamber 11 can more be stablized is placed on loading end.
As a kind of variant embodiment of supporting construction 4, the supporting construction 4 is to be removably installed in the dedusting The base of the bottom of body 1, the base include guide face 3, the second seat board 42 and attachment structure 43.The external diameter of second seat board 42 More than the external diameter of the perisporium bottom of dedusting body 1, the one side away from the dedusting chamber 11 is directly to be connect with the loading end Tactile plane;The attachment structure 43 is fixedly connected with the guide face 3 close to one end of the dedusting chamber 11, away from the dedusting One end of chamber 11 is fixedly connected with second bottom plate.
After supporting construction 4 is designed as into demountable structure, except supporting construction 4 has in the first embodiment Outside beneficial effect, the embodiment has been also equipped with other beneficial effect:First, first support can be tied when installing dedusting chamber 11 Structure 4 is placed on loading end, and then dedusting chamber 11 is arranged in supporting construction 4 again, so that the placement of whole cleaner It is more convenient;Secondly as cleaner is frequently necessary to be operated under very high damp condition, it is difficult in institute that corrosion occurs Exempt from, when corrosion occurs, after the guide face 3 of cleaner and dedusting chamber 11 are carried out into split-type design, as a wherein side A wherein side can be only changed when being damaged, can so reduce the maintenance cost and maintenance difficulties of equipment.
A kind of as above-mentioned supporting construction 4 improves embodiment, and the attachment structure 43 is periphery and the dedusting chamber 11 inwalls fit.It can make connection between dedusting chamber 11 and base more after attachment structure 43 and the fitting of the inwall of dedusting chamber 11 Closely, it and can avoid sewage is excessive from being collected between the inwall of dedusting chamber 11 and base, sewage is smoothly flowed out sewage draining exit 12。
A kind of as water mist dust-removing equipment improves embodiment, and the present embodiment further comprises to be connected with the sewage draining exit 12 Lead to, suitable for being purified and returning to the water after purification the cesspool 5 of the water fog generator 2, the sewage to sewage Pond 5 has the water inlet structure connected with the sewage draining exit 12, and the water outlet knot connected with the water entering section of the water fog generator 2 Structure.Used sewage is purified by designing cesspool 5, and using cesspool 5, then by the sewage after purification again It is transmitted back in water fog generator 2, the recycling of water resource can be realized, reduces the consumption of water resource.
In order that cesspool 5 can purify sewage, some sewage water filtration walls are provided with cesspool 5, sewage water filtration wall Upper semisection is the filter cotton section 51 being vertically arranged, and lower semisection is distance piece 52 integrally formed with cesspool 5, and sewage is from sewage mistake During the side of filter wall flows to opposite side, using the filtration of filter cotton section 51, the impurity in sewage is filtered out coming, And the bottom of cesspool 5 is deposited in, the now effect of distance piece 52 is to bear the pressure of impurity, avoids substantial amounts of impurity from accumulating Filter cotton is damaged in the side of filter cotton section 51.
The lower section of dedusting body 1 is arranged at as cesspool 5 described in a kind of improvement embodiment of water mist dust-removing equipment, The loading end is the upper surface of the cesspool 5.Such mounting means directly can directly place water mist dust-removing equipment On cesspool 5, the installing space of equipment in itself is greatly on the one hand saved, water mist dust-removing equipment is arranged on by another convenience Also the length of flowing water pipeline can be shortened on cesspool 5, make the manufacturing cost of equipment lower.
Obviously, above-described embodiment is only intended to clearly illustrate example, and is not the restriction to embodiment.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or Among changing still in the protection domain of the invention.

Claims (9)

1. water mist dust-removing equipment, including:
Dust arrester, including the interior dedusting body (1) for setting dedusting chamber (11);The dedusting chamber (11) is in tower, and bottom has The air inlet (13) and the sewage draining exit (12) for sewage discharge entered for gas with dust, top has the row for clean gas discharge Gas port (14);
Water fog generator (2), it is arranged in the dedusting chamber (11), for producing water smoke and spraying to gas with dust;
Characterized in that,
The sewage draining exit (12) is arranged on the side chamber wall of the dedusting chamber (11);
The bottom of chamber wall of the dedusting chamber (11) is for minimum point with the sewage draining exit (12) bottom or the sewage draining exit (12) lower section The guide face (3) being obliquely installed.
2. water mist dust-removing equipment according to claim 1, it is characterised in that the guide face (3) is plane.
3. water mist dust-removing equipment according to claim 1 or 2, it is characterised in that dedusting chamber (11) cross section is circle Shape.
4. the water mist dust-removing equipment according to any one of claim 1-3, it is characterised in that the dust arrester also includes Supporting construction (4), the supporting construction (4) are arranged at the bottom of the dedusting body (1) and the dust arrester can be made direct It is positioned on loading end.
5. water mist dust-removing equipment according to claim 4, it is characterised in that the supporting construction (4) is to be fixedly installed in The first seat board (41) of dedusting body (1) bottom, one side of first seat board (41) away from the dedusting chamber (11) are The plane that directly can be contacted with the loading end.
6. water mist dust-removing equipment according to claim 4, it is characterised in that the supporting construction (4) is removably to pacify Base loaded on dedusting body (1) bottom, the base include:
The guide face (3);
Second seat board (42), external diameter are more than the external diameter of dedusting body (1) the perisporium bottom, and one away from the dedusting chamber (11) Face is the plane that directly can be contacted with the loading end;
Attachment structure (43), the guide face (3) is fixedly connected with close to one end of the dedusting chamber (11), away from the dedusting chamber (11) one end is fixedly connected with second bottom plate.
7. water mist dust-removing equipment according to claim 6, it is characterised in that the attachment structure (43) be periphery with it is described Dedusting chamber (11) inwall fits.
8. the water mist dust-removing equipment according to any one of claim 4-7, it is characterised in that also include and the sewage draining exit (12) connect, suitable for being purified to sewage and the water after purification being returned to the cesspool of the water fog generator (2) (5), the cesspool (5) has the water inlet structure that is connected with the sewage draining exit (12), and with the water fog generator (2) The water flowing out structure of water entering section connection.
9. water mist dust-removing equipment according to claim 8, it is characterised in that the cesspool (5) is arranged at the dedusting Below body (1), the loading end is the upper surface of the cesspool (5).
CN201710900643.5A 2017-09-28 2017-09-28 Water mist dust-removing equipment Pending CN107737500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710900643.5A CN107737500A (en) 2017-09-28 2017-09-28 Water mist dust-removing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710900643.5A CN107737500A (en) 2017-09-28 2017-09-28 Water mist dust-removing equipment

Publications (1)

Publication Number Publication Date
CN107737500A true CN107737500A (en) 2018-02-27

Family

ID=61236299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710900643.5A Pending CN107737500A (en) 2017-09-28 2017-09-28 Water mist dust-removing equipment

Country Status (1)

Country Link
CN (1) CN107737500A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB481184A (en) * 1935-06-06 1938-03-07 Freyn Engineering Co Method of and apparatus for washing hot gas
CN101417206A (en) * 2008-11-12 2009-04-29 刘昌林 Spraying desulphurization device
CN203235369U (en) * 2013-05-22 2013-10-16 张启磊 Dust removal and exhaust device
CN203694832U (en) * 2014-02-20 2014-07-09 罗翠霞 Ammonia water dust removing circulating device for coke oven chimney
CN203777805U (en) * 2014-04-29 2014-08-20 宁海县嘉和化工有限公司 Multilevel filtering device of liquid storage tank
CN204803149U (en) * 2015-07-27 2015-11-25 天津泛亚科瑞成油田技术有限公司 Petrochemical sewage retrieval and utilization processing apparatus
CN205340567U (en) * 2015-12-03 2016-06-29 杭州正策信息科技有限公司 Industrial flue gas cleaning equipment
CN205412542U (en) * 2016-03-17 2016-08-03 哈尔滨理工大学 Metal dust device is removed to torrent
CN205886469U (en) * 2016-07-31 2017-01-18 郑州碧水环保科技有限公司 Industry flue gas wet process equipment of spraying
CN206304566U (en) * 2016-12-20 2017-07-07 上海盛剑环境系统科技有限公司 Dry exhaust gas treatment device
CN206454486U (en) * 2017-01-10 2017-09-01 新疆华峰环保工程有限公司 A kind of environmentally friendly FGD by spraying mist equipment
CN207576016U (en) * 2017-09-28 2018-07-06 安徽辰瑞达农业设备有限公司 Water mist dust-removing equipment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB481184A (en) * 1935-06-06 1938-03-07 Freyn Engineering Co Method of and apparatus for washing hot gas
CN101417206A (en) * 2008-11-12 2009-04-29 刘昌林 Spraying desulphurization device
CN203235369U (en) * 2013-05-22 2013-10-16 张启磊 Dust removal and exhaust device
CN203694832U (en) * 2014-02-20 2014-07-09 罗翠霞 Ammonia water dust removing circulating device for coke oven chimney
CN203777805U (en) * 2014-04-29 2014-08-20 宁海县嘉和化工有限公司 Multilevel filtering device of liquid storage tank
CN204803149U (en) * 2015-07-27 2015-11-25 天津泛亚科瑞成油田技术有限公司 Petrochemical sewage retrieval and utilization processing apparatus
CN205340567U (en) * 2015-12-03 2016-06-29 杭州正策信息科技有限公司 Industrial flue gas cleaning equipment
CN205412542U (en) * 2016-03-17 2016-08-03 哈尔滨理工大学 Metal dust device is removed to torrent
CN205886469U (en) * 2016-07-31 2017-01-18 郑州碧水环保科技有限公司 Industry flue gas wet process equipment of spraying
CN206304566U (en) * 2016-12-20 2017-07-07 上海盛剑环境系统科技有限公司 Dry exhaust gas treatment device
CN206454486U (en) * 2017-01-10 2017-09-01 新疆华峰环保工程有限公司 A kind of environmentally friendly FGD by spraying mist equipment
CN207576016U (en) * 2017-09-28 2018-07-06 安徽辰瑞达农业设备有限公司 Water mist dust-removing equipment

Similar Documents

Publication Publication Date Title
CN211216039U (en) Industrial waste gas treatment device
CN207576016U (en) Water mist dust-removing equipment
CN104623935B (en) It is equipped with the small-sized rapid filter and its filtering and backwash technique of air-water backwashing system
CN208018273U (en) A kind of slag-soil truck cleaning waste water circulation utilized device
CN107737500A (en) Water mist dust-removing equipment
CN203593679U (en) Magnetized degreaser
CN216367017U (en) Novel integrated water purifying equipment
CN206355686U (en) A kind of superpower purifier
CN108714323A (en) A kind of water process quartz filter
CN215232686U (en) Purification device for improving quality of make-up water of steelmaking softening station
CN212440397U (en) High-efficient combination formula defogging device and defogging clean system
CN211035437U (en) Spiral-flow type fast settling device
CN213506235U (en) Purifier is used in sewage treatment processing
CN103657173A (en) Upward flow filtering device using homogeneous heavy thick filter material
CN210522001U (en) Integrated high-efficiency water purifying equipment
CN208878189U (en) A kind of new and effective paint mist treatment device
CN207462911U (en) A kind of centrifugal dust collection device for food production
CN112619323A (en) Water curtain dust remover of biomass fuel hot blast stove
CN205269154U (en) Sewage treatment device
CN213965964U (en) Desulphurization unit of purification carbon dioxide
CN103252132B (en) A kind of small-sized air-water backwashing filtering ponds
CN220248178U (en) Diesel generator waste gas treatment device
CN214032117U (en) Air conditioner overhauls sewage treatment plant
CN104368179B (en) A kind of high efficiency sewage fibers filter
CN213868189U (en) Rainwater collection device for landscape gardens

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination