CN107730036A - 一种能源供应中的流量延迟时间的获取方法和装置 - Google Patents
一种能源供应中的流量延迟时间的获取方法和装置 Download PDFInfo
- Publication number
- CN107730036A CN107730036A CN201710922484.9A CN201710922484A CN107730036A CN 107730036 A CN107730036 A CN 107730036A CN 201710922484 A CN201710922484 A CN 201710922484A CN 107730036 A CN107730036 A CN 107730036A
- Authority
- CN
- China
- Prior art keywords
- msub
- mrow
- mfrac
- main line
- mtr
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
本发明实施例公开了一种能源供应中的流量延迟时间的获取方法,该方法包括:获取干线各段流量以及各个支线流量的理论值;采用干线各段流量以及各个支线流量的理论值对检测到的干线各段流量以及各个支线流量的实际测量值进行实时校正;根据预先建立的当前管网的流量延迟时间数学模型以及校正后的干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。本发明实施例还公开了一种能源供应中的流量延迟时间的获取装置。通过本发明实施例方案,能够准确获得能源在运行过程中的延迟时间,从而有助于指导能源站优化产能,节省能源。
Description
技术领域
本发明涉及能源供应控制技术,尤指一种能源供应中的流量延迟时间的获取方法和装置。
背景技术
在目前的能源负荷预测中,通常完全忽略能量的动态延迟特性,对能量部署进行静态规划,或者将延迟时间进行常数化,这无疑都是会严重影响能源负荷预测的精确性,无法有效指导能源站优化产能。
发明内容
为了解决上述技术问题,本发明实施例提供了一种能源供应中的流量延迟时间的获取方法和装置,能够准确获得能源在运行过程中的延迟时间,从而有助于指导能源站优化产能,节省能源。
为了达到本发明实施例目的,本发明实施例提供了一种能源供应中的流量延迟时间的获取方法,该方法包括:
获取干线各段流量以及各个支线流量的理论值;
采用干线各段流量以及各个支线流量的理论值对检测到的干线各段流量以及各个支线流量的实际测量值进行实时校正;
根据预先建立的当前管网的流量延迟时间数学模型以及校正后的干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。
可选地,预先建立当前管网的流量延迟时间数学模型包括:
获取当前管网的干线以及各支线的管道长度和横截面积数据;
根据第一等式以及干线以及各支线的管道长度和横截面积数据建立当前管网的各个小区入口处的流量延迟时间数学模型。
可选地,第一等式包括:
其中,τ为流量延迟时间;L为管道长度,F为流量,S为管道横截面积。
可选地,流量延迟时间数学模型包括:
其中,τ1,τ2,……,τi,……,τn为各个小区入口处的流量延迟时间,τi指第i个小区入口处的流量延迟时间;L1,L2,……,Li,……,Ln为干线各段长度,Li指第i段干线的长度;S1,S2,……,Si,……,Sn为干线各段横截面积,Si指第i段干线的横截面积;LR1,LR2,……,LRi,……,LRn为各支线的长度,LRi指第i条支线的长度;SR1,SR2,……,SRi,……,SRn为各支线的横截面积,SRi指第i条支线的横截面积;F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
可选地,获取干线各段流量以及各个支线流量的理论值包括:
41、保持干线出口流量为定值,改变干线出口温度以使干线出口温度的温度波形形成特征波形;
42、检测各个小区入口处的温度变化直至出现特征波形;
43、根据检测到的各个小区入口处的温度变化出现特征波形的时间以及干线出口处形成特征波形的时间计算出当前干线出口流量下干线出口至各个小区入口之间的流量延迟时间;
44、采集流量延迟时间,判断是否已完成预设的x次循环,如果判断结果为否,则返回步骤41,如果判断结果为是,则进入步骤45,其中,x为正整数;
45、判断是否已完成预设的y次循环,如果判断结果为否,则调节干线出口流量,并返回步骤41,如果判断结果为是,则进入步骤46,其中,y为正整数;
46、计算所采集的多个流量延迟时间的平均值,并根据流量延迟时间的平均值以及流量延迟时间数学模型和预先建立的当前管网的流量数学模型组成的方程组求解干线各段流量以及各个支线流量的理论值。
可选地,当前管网的流量数学模型包括:
其中,F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
为了达到本发明实施例目的,本发明实施例还提供了一种能源供应中的流量延迟时间的获取装置,该装置包括:获取模块、校正模块和计算模块;
获取模块,用于获取干线各段流量以及各个支线流量的理论值;
校正模块,用于采用干线各段流量以及各个支线流量的理论值对检测到的干线各段流量以及各个支线流量的实际测量值进行实时校正;
计算模块,用于根据预先建立的当前管网的流量延迟时间数学模型以及校正后的干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。
可选地,该装置还包括:模型建立模块;模型建立模块用于预先建立当前管网的流量延迟时间数学模型;
模型建立模块预先建立当前管网的流量延迟时间数学模型包括:
获取当前管网的干线以及各支线的管道长度和横截面积数据;
根据第一等式以及干线以及各支线的管道长度和横截面积数据建立当前管网的各个小区入口处的流量延迟时间数学模型。
可选地,第一等式包括:
其中,τ为流量延迟时间;L为管道长度,F为流量,S为管道横截面积。
可选地,流量延迟时间数学模型包括:
其中,τ1,τ2,……,τi,……,τn为各个小区入口处的流量延迟时间,τi指第i个小区入口处的流量延迟时间;L1,L2,……,Li,……,Ln为干线各段长度,Li指第i段干线的长度;S1,S2,……,Si,……,Sn为干线各段横截面积,Si指第i段干线的横截面积;LR1,LR2,……,LRi,……,LRn为各支线的长度,LRi指第i条支线的长度;SR1,SR2,……,SRi,……,SRn为各支线的横截面积,SRi指第i条支线的横截面积;F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
可选地,获取模块获取干线各段流量以及各个支线流量的理论值包括:
91、保持干线出口流量为定值,改变干线出口温度以使干线出口温度的温度波形形成特征波形;
92、检测各个小区入口处的温度变化直至出现所述特征波形;
93、根据检测到的各个小区入口处的温度变化出现特征波形的时间以及干线出口处形成特征波形的时间计算出当前干线出口流量下干线出口至各个小区入口之间的流量延迟时间;
94、采集流量延迟时间,判断是否已完成预设的x次循环,如果判断结果为否,则返回步骤91,如果判断结果为是,则进入步骤95,其中,x为正整数;
95、判断是否已完成预设的y次循环,如果判断结果为否,则调节干线出口流量,并返回步骤91,如果判断结果为是,则进入步骤96,其中,y为正整数;
96、计算所采集的多个流量延迟时间的平均值,并根据流量延迟时间的平均值以及流量延迟时间数学模型和预先建立的当前管网的流量数学模型组成的方程组求解干线各段流量以及各个支线流量的理论值。
可选地,当前管网的流量数学模型包括:
其中,F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
本发明实施例包括:获取干线各段流量以及各个支线流量的理论值;采用干线各段流量以及各个支线流量的理论值对检测到的干线各段流量以及各个支线流量的实际测量值进行实时校正;根据预先建立的当前管网的流量延迟时间数学模型以及校正后的干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间;通过本发明实施例方案,能够准确获得能源在运行过程中的延迟时间,从而有助于指导能源站优化产能,节省能源。
本发明实施例的其它特征和优点将在随后的说明书中阐述,并且,部分地从说明书中变得显而易见,或者通过实施本发明实施例而了解。本发明实施例的目的和其他优点可通过在说明书、权利要求书以及附图中所特别指出的结构来实现和获得。
附图说明
附图用来提供对本发明实施例技术方案的进一步理解,并且构成说明书的一部分,与本申请的实施例一起用于解释本发明的技术方案,并不构成对本发明实施例技术方案的限制。
图1为本发明实施例的能源供应中的流量延迟时间的获取方法流程图;
图2为本发明实施例的预先建立当前管网的流量延迟时间数学模型的方法流程图;
图3为本发明实施例的官网结构示意图;
图4为本发明实施例的获取干线各段流量以及各个支线流量的理论值的方法流程图;
图5为本发明实施例的能源供应中的流量延迟时间的获取装置结构示意图;
图6为本发明实施例的能源供应中的流量延迟时间的获取装置组成框图。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚明白,下文中将结合附图对本发明的实施例进行详细说明。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互任意组合。
在附图的流程图示出的步骤可以在诸如一组计算机可执行指令的计算机系统中执行。并且,虽然在流程图中示出了逻辑顺序,但是在某些情况下,可以以不同于此处的顺序执行所示出或描述的步骤。
为了达到本发明实施例目的,本发明实施例提供了一种能源供应中的流量延迟时间的获取方法,如图1所示,该方法包括S101-S103:
S101、获取干线各段流量以及各个支线流量的理论值。
在本发明实施例中,流量延迟时间主要由当前管网的流量、管长以及管内横截面积决定,当流量恒定时,同一管道上两点间的流量延迟时间也是一定的。但由于用于供能的测量冷/热的流量表计与石油化工等工业的流量表计相比通常精度较差,并且受到压力、温度、管阻等多项因素影响,同一管道上的流量通常是有偏差的,又由于成本等原因在现场能源供应中很少进行流量校准,从而使得供应到各个用户或热力站的能量有时间延迟,严重影响能源负荷预测的精确性,并且无法有效指导能源站优化产能。因此有必要首先进行流量校准,以确定供应到各个用户或热力站的流量延迟时间。
在本发明实施例中,为了实现流量校准,可以首先获取干线各段流量以及各个支线流量的理论值。在此之前,可以预先建立当前管网的流量延迟时间数学模型以及当前管网的流量数学模型,以便后续基于该两个数学模型获取干线各段流量以及各个支线流量的理论值。
可选地,如图2所示,预先建立当前管网的流量延迟时间数学模型可以包括S201-S202:
S201、获取当前管网的干线以及各支线的管道长度和横截面积数据。
在本发明实施例中,可以预先从设计图纸上获取或者经过现场测量获取干线以及各支线的管道长度及横截面积数据。如图3所示,其中干线各段长度为(L1,L2,……,Li,……,Ln),横截面积为(S1,S2,……,Si,……,Sn);各支线的长度为(LR1,LR2,……,LRi,……,LRn),各支线的横截面积为(SR1,SR2,……,SRi,……,SRn)。
在本发明实施例中,对于一个固定的管网,由于其结构式固定的,上述管网结构数据均为已知数据。
S202、根据第一等式以及干线以及各支线的管道长度和横截面积数据建立当前管网的各个小区入口处的流量延迟时间数学模型。
可选地,第一等式可以包括:
其中,τ为流量延迟时间(小时,h);L为管道长度(米,m),F为流量(立方米/小时,m3/h),S为管道横截面积(平方米,m2)。
在本发明实施例中,当流量恒定时,同一管道上两点间的流量延迟时间一般通过上述的第一等式计算,基于该计算依据,可以将上述步骤中获取的干线各段的长度和横截面积以及各支线的管道长度和横截面积数据分别代入上述第一等式,以获取各个小区入口处的流量延迟时间数学模型。
可选地,该流量延迟时间数学模型可以包括:
其中,τ1,τ2,……,τi,……,τn为各个小区入口处的流量延迟时间,τi指第i个小区入口处的流量延迟时间;L1,L2,……,Li,……,Ln为干线各段长度,Li指第i段干线的长度;S1,S2,……,Si,……,Sn为干线各段横截面积,Si指第i段干线的横截面积;LR1,LR2,……,LRi,……,LRn为各支线的长度,LRi指第i条支线的长度;SR1,SR2,……,SRi,……,SRn为各支线的横截面积,SRi指第i条支线的横截面积;F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
在本发明实施例中,还可以建立当前管网的流量数学模型。
可选地,当前管网的流量数学模型可以包括:
其中,F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
在本发明实施例中,基于建立的当前管网的流量数学模型以及流量延迟时间数学模型,可以进一步获取干线各段流量以及各个支线流量的理论值。
可选地,入图4所示,获取干线各段流量以及各个支线流量的理论值可以包括S301-S306:
S301、保持干线出口流量为定值,改变干线出口温度以使干线出口温度的温度波形形成特征波形,并记录干线出口处形成特征波形的时间。
在本发明实施例中,预先设置干线出口流量,并保持该干线出口流量不变,调节功能设备出口温度的设定值,以使得干线出口温度的温度波形具有某种特征波形,例如,波峰、波谷、尖峰等。
S302、检测各个小区入口处的温度变化直至出现特征波形。
在本发明实施例中,可以实时或周期性检测小区(或热力站)入口处的温度变化,直至检测出小区入口处的温度变化出现上述步骤中调节获得的特征波形。
S303、根据检测到的各个小区入口处的温度变化出现特征波形的时间以及干线出口处形成特征波形的时间计算出当前干线出口流量下干线出口至各个小区入口之间的流量延迟时间。
在本发明实施例中,将检测到特征波形的时间减去发出该特征波形的时间便可以计算出基于当前干线出口流量的情况下,干线出口至各个小区(或热力站)入口之间的流量延迟时间。
S304、采集流量延迟时间,判断是否已完成预设的x次循环,如果判断结果为否,则返回步骤S301,如果判断结果为是,则进入步骤S305,其中,x为正整数,x是指同一流量下的x次滞后实验。
在本发明实施例中,可以基于某一个干线出口流量进行多次模拟实验,并进行多次数据采集,因此可以预先设置基于某一干线出口流量的基础上,采集流量延迟时间的次数,例如上述的次数x,该次数x可以根据不同的精度要求自行定义,x的次数越多,则采集的实际的流量延迟时间越多,则在进行下述的流量延迟时间的平均值计算时,计算结果越精确。
S305、判断是否已完成预设的y次循环,如果判断结果为否,则调节干线出口流量,并返回步骤S301,如果判断结果为是,则进入步骤S306,其中,y为正整数,y是指y次不同的流量实验。
在本发明实施例中,在进行模拟实验过程中,还可以基于不同的干线出口流量进行数据采集,以进一步增加计算精度。该不同的干线出口流量的设置个数也可以根据不同的精度要求自行定义,并且设置多少个不同的干线出口流量,则需要将上述步骤循环几次,例如上述的次数y,y的次数越多,则采集的实际的流量延迟时间越多,则在进行模型系数计算时,计算结果越精确。
S306、计算所采集的多个流量延迟时间的平均值,并根据流量延迟时间的平均值以及流量延迟时间数学模型和预先建立的当前管网的流量数学模型组成的方程组求解干线各段流量以及各个支线流量的理论值。
在本发明实施例中,通过上述步骤获取模拟出的多个流量延迟时间以后,可以计算其平均值,并将该平均值代入上述的流量延迟时间数学模型和流量数学模型组成的方程组中,上面的方程组中有2n个方程,也有2n个变量,求解以上的方程组,可得出干线各段流量(F1,F2,……,Fi,……,Fn)以及各支线流量(FR1,FR2,……,FRi,……,FRn)的理论值。
在本发明实施例中,需要说明的是,上述的步骤S301-S305可以通过现场实验方式实现,也可以通过实验模拟的方式实现,对于其具体实现形式不做限制。
S102、采用干线各段流量以及各个支线流量的理论值对检测到的干线各段流量以及各个支线流量的实际测量值进行实时校正。
在本发明实施例中,通过上述的步骤获取干线各段流量以及各个支线流量的理论值以后,在能源供应过程中,可以采用该理论值对干线各段流量以及各个支线流量的实际测量值进行实时校正,从而对干线各段流量以及各个支线流量的实际测量值加以补偿。
S103、根据预先建立的当前管网的流量延迟时间数学模型以及校正后的干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。
在本发明实施例中,将经过实时校正的干线各段流量以及各个支线流量的实际测量值代入前述的流量延迟时间数学模型,便可以计算出能源供应过程中各个小区入口处的流量延迟时间。根据计算出的该流量延迟时间可以适时调整能量供应,使得在保证小区或热力站充足的能源供应的基础上,指导能源站优化产能,节省能源。
为了达到本发明实施例目的,本发明实施例还提供了一种能源供应中的流量延迟时间的获取装置1,需要说明的是,上述方法实施例中的任何实施例均适用于本发明的装置实施例中,在此不再一一赘述。如图5、图6所示,该装置包括:获取模块11、校正模块12和计算模块13;
获取模块11,用于获取干线各段流量以及各个支线流量的理论值;
校正模块12,用于采用干线各段流量以及各个支线流量的理论值对检测到的干线各段流量以及各个支线流量的实际测量值进行实时校正;
计算模块13,用于根据预先建立的当前管网的流量延迟时间数学模型以及校正后的干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。
可选地,该装置还包括:模型建立模块14;模型建立模块14用于预先建立当前管网的流量延迟时间数学模型;
模型建立模块14预先建立当前管网的流量延迟时间数学模型包括:
获取当前管网的干线以及各支线的管道长度和横截面积数据;
根据第一等式以及干线以及各支线的管道长度和横截面积数据建立当前管网的各个小区入口处的流量延迟时间数学模型。
可选地,第一等式包括:
其中,τ为流量延迟时间;L为管道长度,F为流量,S为管道横截面积。
可选地,流量延迟时间数学模型包括:
其中,τ1,τ2,……,τi,……,τn为各个小区入口处的流量延迟时间,τi指第i个小区入口处的流量延迟时间;L1,L2,……,Li,……,Ln为干线各段长度,Li指第i段干线的长度;S1,S2,……,Si,……,Sn为干线各段横截面积,Si指第i段干线的横截面积;LR1,LR2,……,LRi,……,LRn为各支线的长度,LRi指第i条支线的长度;SR1,SR2,……,SRi,……,SRn为各支线的横截面积,SRi指第i条支线的横截面积;F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
可选地,获取模块11获取干线各段流量以及各个支线流量的理论值包括:
91、保持干线出口流量为定值,改变干线出口温度以使干线出口温度的温度波形形成特征波形;
92、记录干线出口至任意的第i个支线入口间任意的第j段的流量Fj,以及任意的第i条支线的流量FRi,并检测各个小区入口处的温度变化直至出现所述特征波形;
93、根据检测到的各个小区入口处的温度变化出现特征波形的时间以及干线出口处形成特征波形的时间计算出当前干线出口流量下干线出口至各个小区入口之间的流量延迟时间;
94、采集流量延迟时间,判断是否已完成预设的n次循环,如果判断结果为否,则返回步骤91,如果判断结果为是,则进入步骤95,其中,n为正整数;
95、判断是否已完成预设的m次循环,如果判断结果为否,则调节干线出口流量,并返回步骤91,如果判断结果为是,则进入步骤96,其中,m为正整数;
96、计算所采集的多个流量延迟时间的平均值,并根据流量延迟时间的平均值以及流量延迟时间数学模型和预先建立的当前管网的流量数学模型组成的方程组求解干线各段流量以及各个支线流量的理论值。
可选地,当前管网的流量数学模型包括:
其中,F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
虽然本发明实施例所揭露的实施方式如上,但所述的内容仅为便于理解本发明实施例而采用的实施方式,并非用以限定本发明实施例。任何本发明实施例所属领域内的技术人员,在不脱离本发明实施例所揭露的精神和范围的前提下,可以在实施的形式及细节上进行任何的修改与变化,但本发明实施例的专利保护范围,仍须以所附的权利要求书所界定的范围为准。
Claims (10)
1.一种能源供应中的流量延迟时间的获取方法,其特征在于,所述方法包括:
获取干线各段流量以及各个支线流量的理论值;
采用所述干线各段流量以及各个支线流量的理论值对检测到的所述干线各段流量以及各个支线流量的实际测量值进行实时校正;
根据预先建立的当前管网的流量延迟时间数学模型以及校正后的所述干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。
2.根据权利要求1所述的能源供应中的流量延迟时间的获取方法,其特征在于,所述预先建立当前管网的流量延迟时间数学模型包括:
获取当前管网的干线以及各支线的管道长度和横截面积数据;
根据第一等式以及所述干线以及各支线的管道长度和横截面积数据建立所述当前管网的各个小区入口处的流量延迟时间数学模型。
3.根据权利要求2所述的能源供应中的流量延迟时间的获取方法,其特征在于,所述第一等式包括:
<mrow>
<mi>&tau;</mi>
<mo>=</mo>
<mfrac>
<mi>L</mi>
<mrow>
<mi>F</mi>
<mo>/</mo>
<mi>S</mi>
</mrow>
</mfrac>
</mrow>
其中,τ为流量延迟时间;L为管道长度,F为流量,S为管道横截面积;
所述流量延迟时间数学模型包括:
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mn>1</mn>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mn>2</mn>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>2</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mn>2</mn>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>2</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mo>...</mo>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mi>i</mi>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mi>i</mi>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mi>i</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mi>i</mi>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mi>n</mi>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>2</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mo>...</mo>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mi>n</mi>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mi>n</mi>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mi>n</mi>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mi>n</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mi>n</mi>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mi>n</mi>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
其中,τ1,τ2,……,τi,……,τn为各个小区入口处的流量延迟时间,τi指第i个小区入口处的流量延迟时间;L1,L2,……,Li,……,Ln为干线各段长度,Li指第i段干线的长度;S1,S2,……,Si,……,Sn为干线各段横截面积,Si指第i段干线的横截面积;LR1,LR2,……,LRi,……,LRn为各支线的长度,LRi指第i条支线的长度;SR1,SR2,……,SRi,……,SRn为各支线的横截面积,SRi指第i条支线的横截面积;F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
4.根据权利要求1所述的能源供应中的流量延迟时间的获取方法,其特征在于,所述获取干线各段流量以及各个支线流量的理论值包括:
41、保持干线出口流量为定值,改变干线出口温度以使干线出口温度的温度波形形成特征波形;
42、检测各个小区入口处的温度变化直至出现所述特征波形;
43、根据检测到的各个小区入口处的温度变化出现所述特征波形的时间以及所述干线出口处形成所述特征波形的时间计算出当前干线出口流量下所述干线出口至各个小区入口之间的流量延迟时间;
44、采集所述流量延迟时间,判断是否已完成预设的x次循环,如果判断结果为否,则返回步骤41,如果判断结果为是,则进入步骤45,其中,x为正整数;
45、判断是否已完成预设的y次循环,如果判断结果为否,则调节所述干线出口流量,并返回步骤41,如果判断结果为是,则进入步骤46,其中,y为正整数;
46、计算所采集的多个所述流量延迟时间的平均值,并根据所述流量延迟时间的平均值以及所述流量延迟时间数学模型和预先建立的当前管网的流量数学模型组成的方程组求解所述干线各段流量以及各个支线流量的理论值。
5.根据权利要求4所述的能源供应中的流量延迟时间的获取方法,其特征在于,所述当前管网的流量数学模型包括:
<mrow>
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>=</mo>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>+</mo>
<msub>
<mi>FR</mi>
<mn>1</mn>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>=</mo>
<msub>
<mi>F</mi>
<mn>3</mn>
</msub>
<mo>+</mo>
<msub>
<mi>FR</mi>
<mn>2</mn>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<msub>
<mi>F</mi>
<mrow>
<mi>i</mi>
<mo>+</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>FR</mi>
<mi>i</mi>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mi>n</mi>
</msub>
<mo>=</mo>
<msub>
<mi>FR</mi>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
<mo>.</mo>
</mrow>
6.一种能源供应中的流量延迟时间的获取装置,其特征在于,所述装置包括:获取模块、校正模块和计算模块;
所述获取模块,用于获取干线各段流量以及各个支线流量的理论值;
所述校正模块,用于采用所述干线各段流量以及各个支线流量的理论值对检测到的所述干线各段流量以及各个支线流量的实际测量值进行实时校正;
所述计算模块,用于根据预先建立的当前管网的流量延迟时间数学模型以及校正后的所述干线各段流量以及各个支线流量的实际测量值计算出各个小区入口处的流量延迟时间。
7.根据权利要求6所述的能源供应中的流量延迟时间的获取装置,其特征在于,所述装置还包括:模型建立模块;所述模型建立模块用于预先建立当前管网的流量延迟时间数学模型;
所述模型建立模块预先建立当前管网的流量延迟时间数学模型包括:
获取当前管网的干线以及各支线的管道长度和横截面积数据;
根据第一等式以及所述干线以及各支线的管道长度和横截面积数据建立所述当前管网的各个小区入口处的流量延迟时间数学模型。
8.根据权利要求7所述的能源供应中的流量延迟时间的获取装置,其特征在于,所述第一等式包括:
<mrow>
<mi>&tau;</mi>
<mo>=</mo>
<mfrac>
<mi>L</mi>
<mrow>
<mi>F</mi>
<mo>/</mo>
<mi>S</mi>
</mrow>
</mfrac>
</mrow>
其中,τ为流量延迟时间;L为管道长度,F为流量,S为管道横截面积;
所述流量延迟时间数学模型包括:
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mn>1</mn>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mn>2</mn>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>2</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mn>2</mn>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>2</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mo>...</mo>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mi>i</mi>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mi>i</mi>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mi>i</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mi>i</mi>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>&tau;</mi>
<mi>n</mi>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>1</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>1</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mn>2</mn>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mn>2</mn>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mo>...</mo>
<mo>+</mo>
<mfrac>
<msub>
<mi>L</mi>
<mi>n</mi>
</msub>
<mrow>
<msub>
<mi>F</mi>
<mi>n</mi>
</msub>
<mo>/</mo>
<msub>
<mi>S</mi>
<mi>n</mi>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<msub>
<mi>LR</mi>
<mi>n</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>FR</mi>
<mi>n</mi>
</msub>
<mo>/</mo>
<msub>
<mi>SR</mi>
<mi>n</mi>
</msub>
</mrow>
</mfrac>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
其中,τ1,τ2,……,τi,……,τn为各个小区入口处的流量延迟时间,τi指第i个小区入口处的流量延迟时间;L1,L2,……,Li,……,Ln为干线各段长度,Li指第i段干线的长度;S1,S2,……,Si,……,Sn为干线各段横截面积,Si指第i段干线的横截面积;LR1,LR2,……,LRi,……,LRn为各支线的长度,LRi指第i条支线的长度;SR1,SR2,……,SRi,……,SRn为各支线的横截面积,SRi指第i条支线的横截面积;F1,F2,……,Fi,……,Fn为干线各段流量,Fi指第i段干线的流量;FR1,FR2,……,FRi,……,FRn为各支线的流量,Fi指第i条支线的流量,i和n均为正整数,i≤n。
9.根据权利要求6所述的能源供应中的流量延迟时间的获取装置,其特征在于,所述获取模块获取干线各段流量以及各个支线流量的理论值包括:
91、保持干线出口流量为定值,改变干线出口温度以使干线出口温度的温度波形形成特征波形;
92、检测各个小区入口处的温度变化直至出现所述特征波形;
93、根据检测到的各个小区入口处的温度变化出现所述特征波形的时间以及所述干线出口处形成所述特征波形的时间计算出当前干线出口流量下所述干线出口至各个小区入口之间的流量延迟时间;
94、采集所述流量延迟时间,判断是否已完成预设的x次循环,如果判断结果为否,则返回步骤91,如果判断结果为是,则进入步骤95,其中,x为正整数;
95、判断是否已完成预设的y次循环,如果判断结果为否,则调节所述干线出口流量,并返回步骤91,如果判断结果为是,则进入步骤96,其中,y为正整数;
96、计算所采集的多个所述流量延迟时间的平均值,并根据所述流量延迟时间的平均值以及所述流量延迟时间数学模型和预先建立的当前管网的流量数学模型组成的方程组求解所述干线各段流量以及各个支线流量的理论值。
10.根据权利要求9所述的能源供应中的流量延迟时间的获取装置,其特征在于,所述当前管网的流量数学模型包括:
<mrow>
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mn>1</mn>
</msub>
<mo>=</mo>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>+</mo>
<msub>
<mi>FR</mi>
<mn>1</mn>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mn>2</mn>
</msub>
<mo>=</mo>
<msub>
<mi>F</mi>
<mn>3</mn>
</msub>
<mo>+</mo>
<msub>
<mi>FR</mi>
<mn>2</mn>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<msub>
<mi>F</mi>
<mrow>
<mi>i</mi>
<mo>+</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>FR</mi>
<mi>i</mi>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>...</mo>
<mo>...</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>F</mi>
<mi>n</mi>
</msub>
<mo>=</mo>
<msub>
<mi>FR</mi>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
<mo>.</mo>
</mrow>
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710922484.9A CN107730036B (zh) | 2017-09-30 | 2017-09-30 | 一种能源供应中的流量延迟时间的获取方法和装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710922484.9A CN107730036B (zh) | 2017-09-30 | 2017-09-30 | 一种能源供应中的流量延迟时间的获取方法和装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107730036A true CN107730036A (zh) | 2018-02-23 |
CN107730036B CN107730036B (zh) | 2021-09-28 |
Family
ID=61209669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710922484.9A Active CN107730036B (zh) | 2017-09-30 | 2017-09-30 | 一种能源供应中的流量延迟时间的获取方法和装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107730036B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101014839A (zh) * | 2004-08-24 | 2007-08-08 | 微动公司 | 用于校准流量计的方法和设备 |
CN101392939A (zh) * | 2008-11-18 | 2009-03-25 | 天津大学 | 一种建筑物独立供能温度非线性预测控制方法 |
CN103765114A (zh) * | 2011-04-14 | 2014-04-30 | 贝利莫控股公司 | 自动化的功能诊断 |
JP2014106549A (ja) * | 2012-11-22 | 2014-06-09 | Toshiba Corp | 電力系統監視制御装置 |
CN105910169A (zh) * | 2016-04-27 | 2016-08-31 | 常州英集动力科技有限公司 | 基于机理模型预测控制的城市供热系统热网调节方法及系统 |
-
2017
- 2017-09-30 CN CN201710922484.9A patent/CN107730036B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101014839A (zh) * | 2004-08-24 | 2007-08-08 | 微动公司 | 用于校准流量计的方法和设备 |
CN101392939A (zh) * | 2008-11-18 | 2009-03-25 | 天津大学 | 一种建筑物独立供能温度非线性预测控制方法 |
CN103765114A (zh) * | 2011-04-14 | 2014-04-30 | 贝利莫控股公司 | 自动化的功能诊断 |
JP2014106549A (ja) * | 2012-11-22 | 2014-06-09 | Toshiba Corp | 電力系統監視制御装置 |
CN105910169A (zh) * | 2016-04-27 | 2016-08-31 | 常州英集动力科技有限公司 | 基于机理模型预测控制的城市供热系统热网调节方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN107730036B (zh) | 2021-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102818337B (zh) | 一种基于物联网的地源热泵系统监测装置 | |
CN103136270B (zh) | 一种获得数据插值的方法及系统 | |
CN103761370B (zh) | 一种板带热轧过程表面换热系数的预测方法 | |
CN109255160A (zh) | 基于神经网络的单元延时预测方法和单元延时灵敏度计算方法 | |
CN102652963A (zh) | 一种中厚板轧后超快冷过程温度场的耦合控制方法 | |
CN105427004A (zh) | 一种快速路网交通传感网络的优化布设方法 | |
CN103336891A (zh) | 一种用于配电网状态估计的伪量测生成方法 | |
CN106802992A (zh) | 一种基于油嘴模型的天然气井口流量确定方法 | |
CN107402228A (zh) | 一种核电站换热器换热性能的监测系统及方法 | |
CN109013717B (zh) | 一种热连轧中间坯心部温度计算方法 | |
CN107238391A (zh) | 一种公交出行路线的推荐方法及装置 | |
CN105138036B (zh) | 一种集成电路的温度控制方法及装置 | |
CN106018999A (zh) | 一种用于柔性直流输电系统的能效计量方法 | |
CN107730036A (zh) | 一种能源供应中的流量延迟时间的获取方法和装置 | |
CN106817271A (zh) | 流量图谱的形成方法和装置 | |
CN102722661B (zh) | 一种高速列车通过长大隧道时隧道出口微压波的预测方法 | |
CN104806889A (zh) | 天然气长输管道管输损耗监测方法及装置 | |
CN101633004B (zh) | 厚板轧后控制冷却广义观测器设计方法 | |
CN107766972A (zh) | 一种流量延迟时间的获取方法和装置 | |
CN109992579A (zh) | 一种公路基础设施多源异质数据的数据修复方法及系统 | |
CN110196958A (zh) | 一种判断湿气集输管道加密清管的方法 | |
CN107063370A (zh) | 一种热分布式气体质量流量计的时间响应补偿方法 | |
CN107453348A (zh) | 多电飞机电网频率估计方法及装置、航空电气系统、飞机 | |
CN204064363U (zh) | 一种用于热式气体质量流量计的传感器电路 | |
CN104156572B (zh) | 保守性污染物对流扩散数值模拟方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |