CN107727308A - Steel pipe column is split up failure internal pressure multiparty control automatic alarm system - Google Patents

Steel pipe column is split up failure internal pressure multiparty control automatic alarm system Download PDF

Info

Publication number
CN107727308A
CN107727308A CN201710978278.XA CN201710978278A CN107727308A CN 107727308 A CN107727308 A CN 107727308A CN 201710978278 A CN201710978278 A CN 201710978278A CN 107727308 A CN107727308 A CN 107727308A
Authority
CN
China
Prior art keywords
steel pipe
pressure
pipe column
capital
away
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710978278.XA
Other languages
Chinese (zh)
Other versions
CN107727308B (en
Inventor
金生吉
陈华
杨崇宪
闫常山
赵凌宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang University of Technology
Original Assignee
Shenyang University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang University of Technology filed Critical Shenyang University of Technology
Priority to CN201710978278.XA priority Critical patent/CN107727308B/en
Publication of CN107727308A publication Critical patent/CN107727308A/en
Application granted granted Critical
Publication of CN107727308B publication Critical patent/CN107727308B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L19/00Details of, or accessories for, apparatus for measuring steady or quasi-steady pressure of a fluent medium insofar as such details or accessories are not special to particular types of pressure gauges
    • G01L19/08Means for indicating or recording, e.g. for remote indication
    • G01L19/12Alarms or signals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes

Abstract

The present invention relates to the automatic alarm system to prevent from steel pipe column to be split up losing bearing capacity to research and develop, when particularly in tunnel or system of deep foundation pit support using steel pipe column as the main member of Bracing Systems, the steel duct Stress control automatic alarm system researched and developed for situation about being ftractureed inside northern China winter low temperature steel pipe column containing soil by frost heave.Steel pipe column along its length on place one group and can sense steel duct pressure size, send warning sound automatically immediately when pressure reaches a threshold value, and be equipped with the warning system that colour lamplight is shown, realize automatic immediate warning function.Thus corresponding prediction scheme measure is taken, so as to avoid the engineering accident caused by steel pipe column bursting by freezing caused by internal pressure cataclysm from occurring.

Description

Steel pipe column is split up failure internal pressure multiparty control automatic alarm system
Technical field
The present invention relates to the automatic alarm system to prevent from steel pipe column to be split up losing bearing capacity to research and develop, particularly tunnel or When in system of deep foundation pit support using steel pipe column as the main member of Bracing Systems, for northern China winter low temperature steel pipe The steel duct Stress control automatic alarm system that situation about being ftractureed inside post containing soil by frost heave is researched and developed.
Background technology
Steel pipe column is that city open cut or half lid excavation construction tunnel and Bridge Piers or deep foundation pit of tall buildings are a kind of common The important component of supporting structure system.The composition of this Bracing Systems generally includes:Pass through drilling before excavation of foundation pit Steel pipe column (or lattice column), the horizontal steel pipe horizontal support going along with sb. to guard him campshed, provide vertical supporting power of construction casting, will go along with sb. to guard him The Guan Liang of the common stress of stake top portion consolidation one, the steel that the trestle plate in constructing operation face is provided, stress is supported for bracing members both ends Purlin, steel pipe column bottom pile foundation, for the bracing members support parallel to binder direction, the concrete parallel to Guan Liang direction in place Binder.
This system of deep foundation pit support resistance to overturning is good, using quite varied in Practical Project.In whole prop In system, the effect of steel pipe column is that upper end provides fulcrum for the horizontal concrete support of top horizontal, bears lid excavation construction or half lid The vertical load to be got off at the top of excavation construction foundation ditch by concrete support transmission.Pipe column lower end is implanted into ground, the part and coagulation Steel reinforcement cage inside native stake welds together.During erection of steel pipe column, the construction method of use is before lifting, by steel pipe column with mixing The steel reinforcement cage of solidifying native stake welds together implantation and bored in advance in the stake holes dug, then injects and mix into lower concrete pile cages Solidifying soil, until being poured into predetermined design.This construction method, during pouring concrete pile will certainly by the water in stake holes and Mud is headed into steel pipe column, makes to be full of mud in steel pipe column.In northern China, after excavation of foundation pit, run into winter, steel pipe Mud in post certainly will will cause freezing up, steel pipe column is born huge internal expansion power, this expansive force is enough to make steel pipe column It is split up, causes steel pipe columns bearing capacity to lose, can finally cause support system structural instability.Steel pipe column is split up the situation of failure in north Happened occasionally on square base pit engineering.
For such case, during foundation ditch winter construction, prevent the measure that steel pipe column bursting by freezing is taken from including increase foundation ditch Insulation, except being punched on steel pipe post jamb, by the moisture in steel pipe column, discharge is outer as far as possible, also to carry out heating in foundation ditch, Every steel pipe column is heated if necessary.Heating can cause steel pipe column bursting by freezing not in time, and excessively heating can improve construction cost, Cause energy waste.Therefore in time grasp steel pipe column internal pressure, reach be split up before realize automatic alarm, so as to take heating Etc. safeguard measure, avoid steel pipe column from being split up caused steel pipe columns bearing capacity and lose, so as to ensure that the stabilization of support system structure Property.Such as certain quick main line in city north and south does not exclude steel pipe column internal moisture in time in city tunnel winter construction, and to steel Tubing string heats not in time, causes in tunnel 73 steel pipe columns are different degrees of to be split up, steel pipe walls are complete from the top to bottom for 24 steel pipe columns Standard-sized sheet splits, and causes to cause steel pipe columns bearing capacity to be lost, is forced in beside every steel pipe column being split up and augments a steel pipe column, and Wrap up electric blanket on the shaft that more than 200 steel pipe column 10 is grown heat within 24 hours, it is ensured that steel pipe column is no longer by bursting by freezing, to ensure The stabilization of original support system in tunnel foundation ditch.The increased construction cost of this measure is only taken to be up to more than 1,000 ten thousand yuan.
In using steel pipe column as the tunnel of main vertical applied force component or system of deep foundation pit support, for steel pipe column in the winter Occur that bursting by freezing is dangerous in season construction and situation about can not find in time, take place one in steel pipe column different parts can be real-time Monitor that steel pipe column internal pressure changes, warning sound sent automatically immediately when steel pipe column internal pressure reaches a threshold value, And the warning system that colour lamplight is shown is equipped with, it is possible thereby to corresponding prediction scheme measure be taken in time, so as to avoid engineering accident Generation.
The content of the invention
Goal of the invention:
In order to solve above-mentioned technical problem, a kind of steel pipe column internal pressure control automatic alarm system is invented.Adopt Pressure change can be real-time monitored by taking inside steel pipe column diverse location to place one, when sensing that pressure change reaches certain Send warning sound during limit value automatically immediately, and be equipped with the warning system that colour lamplight is shown.
Technical scheme:
A kind of steel pipe column is split up failure internal pressure multiparty control automatic alarm system, it is characterised in that:
Formed including steel pipe column, pressure switch and alarm three parts;
The steel pipe column upper end provides fulcrum, lower end implantation ground, with coagulation for the horizontal concrete support of top horizontal Steel reinforcement cage inside native stake welds together;
The alarm includes:
Contact plate is fulcrum into lever construction using support column;Wherein one end of contact plate is another by spring connect base There is electromagnet between end and base, have space between electromagnet and contact plate;
The electromagnet and pressure switch and electromagnet ring current composition closed-loop path;
Contact on contact plate is normally closed with green light binding post and ring current and green light is formed loop;
In the state of electromagnet is powered absorption contact plate, contact contacts with red light binding post, makes red light, PLC groups, electric bell And ring current forms closed-loop path;
The pressure switch is composed in parallel by three pressure control switch;Wherein, first pressure controlling switch is arranged on steel Tubing string top;Second pressure controlling switch is arranged in the middle part of steel pipe column;3rd pressure control switch is arranged on steel pipe column bottom.
Described steel pipe column is split up failure internal pressure multiparty control automatic alarm system, it is characterised in that:Each pressure The structure of power controlling switch is separated between two panels bearing plate by pressure-bearing spring, and contact is relatively set with the inside of two panels bearing plate With pressure switch binding post.
Steel pipe column is split up failure internal pressure multiparty control automatic alarm system, it is characterised in that:The PLC groups are by three groups PLC is formed;Wherein PLC1 is connected with first pressure controlling switch;Wherein PLC2 is connected with second pressure controlling switch;Wherein PLC3 is connected with the 3rd pressure control switch;Different alarm modes is set in three groups of described PLC.
Described steel pipe column is split up failure internal pressure multiparty control automatic alarm system, it is characterised in that:Described three Installation site of the pressure control switch on steel pipe column be:
When steel pipe column length L is less than 9m, first pressure controlling switch is away from capital distance L1=L/3, second pressure control are opened Close away from capital distance L2=3L/5;3rd pressure control switch is away from capital distance L3=4/5L;
As steel pipe column length L=9m, first pressure controlling switch is away from capital distance L1=2.5m, second pressure controlling switch Away from capital distance L2=5.5m;3rd pressure control switch is away from capital distance L3=7.5m;
As steel pipe column length L=9~12m, first pressure controlling switch is away from capital distance L1=2.5~3.5m, the second pressure Power controlling switch is away from capital distance L2=5.5~7.0m;3rd pressure control switch is away from capital distance L3=7.5~10m;
As steel pipe column length L=12m, first pressure controlling switch is away from capital distance L1=3.5m, second pressure control are opened Close away from capital distance L2=7m;3rd pressure control switch is away from capital distance L3=10m;
As steel pipe column length L=12~16m, first pressure controlling switch is away from capital distance L1=3.5~6.0m, the second pressure Power controlling switch is away from capital distance L2=7.0~9.5m;3rd pressure control switch is away from capital distance L3=10.0~12.5m;
As steel pipe column length L=16m, first pressure controlling switch is away from capital distance L1=6m, second pressure controlling switch Away from capital distance L2=9.5m;3rd pressure control switch is away from capital distance L3=12.5m;
As steel pipe column length L=16~20m, first pressure controlling switch is away from capital distance L1=6.0~6.5m, the second pressure Power controlling switch is away from capital distance L2=9.5~11.5m;3rd pressure control switch is away from capital distance L3=12.5~15.5m;
As steel pipe column length L=20m, first pressure controlling switch is away from capital distance L1=6.5m, second pressure control are opened Close away from capital distance L2=11.5m;3rd pressure control switch is away from capital distance L3=15.5m.
When steel pipe column length L is more than 20m, first pressure controlling switch is away from capital distance L1=L/3, second pressure control are opened Close away from capital distance L2=3L/5;3rd pressure control switch is away from capital distance L3=4/5L.
Advantage and effect:
The effect and advantage of the present invention is realized to prevent from steel pipe column to be split up losing bearing capacity and automatic alarm system, from It is dynamic accurate, without artificial on duty.
1) amount of design pressure switch according to steel pipe column material and design size, can numerically be carried out in steel pipe column internal pressure Journey scope, determine the upper and lower bound limit value of alarm pressure value.
2) same warning system can realize the pressure protection to steel pipe column multiple spot, cost-effective, increase the benefit;
3) realize automatic unattended and there is instantaneity warning function.
Thus corresponding prediction scheme measure is taken in time, avoids being split up because of steel pipe column, the engineering accident caused by Occur.
Brief description of the drawings:
Fig. 1 alarm schematic diagrames;
Fig. 2 is pressure control switch structural representation;
Fig. 3 is foundation pit supporting construction and steel pipe column schematic diagram;
It is described to be labeled as:1. first pressure controlling switch, 2. second pressure controlling switches, 3. the 3rd pressure control switch, 4. contact plate, 5. electromagnet, 6. contacts, 7. green light binding posts, 8. red light binding posts, 9. green lights, 10. red lights, 11. alarm electricity Bell, 12. alarm lamp ring currents, 13. electromagnet ring currents, 14. pressure-bearing springs, 15. bearing plates, 16. pressure switch wiring Post, 17. fender posts, 18. Guan Liangs, 19. concrete supports, 20. steel pipe columns, 21. bracing members, 22. steel purlins, 23. floors, 24. Ground.
Embodiment
The system includes three parts, i.e., steel pipe column, warning device in system of deep foundation pit support and on steel pipe column Pressure switch three parts composition.
As shown in Figure 3:
The upper end of steel pipe column 20 is that the horizontal concrete support 19 of top horizontal provides fulcrum, lower end implantation ground 24, with mixing The steel reinforcement cage inside native stake is coagulated to weld together.
The upper, middle and lower of steel pipe column are separately installed with pressure control switch, and the position respectively switched first has to consider steel pipe column length Degree and horizontal bracing members arrangement position, according to horizontal bracing members arrange principle simultaneously refer to engineering experience, steel pipe column length and Sensor mounting location is referring to following table:
1 alarm system pressure switch installation site of table
Above-mentioned pressure control switch links together with alarm, and the structure of alarm is as shown in Figure 1:
Contact plate 4 is fulcrum into lever construction using support column;Wherein one end of contact plate 4 is by spring connect base, separately There is electromagnet 5 between one end and base, have space between electromagnet 5 and contact plate 4;
The electromagnet 5 forms closed-loop path with pressure switch and electromagnet ring current 13;
Contact 6 on contact plate 4 is normally closed with green light binding post 7 and ring current 12 and green light 9 is formed loop;
In the state of electromagnet 5 is powered absorption contact plate 4, contact 6 contacts with red light binding post 8, makes red light 10, PLC Group, electric bell 11 and ring current 12 form closed-loop path;
Three pressure control switch compose in parallel the pressure switch by mentioned earlier;
The structure of each pressure control switch is separated between two panels bearing plate (15) by pressure-bearing spring (14), two panels Contact and pressure switch binding post (16) are relatively set with the inside of bearing plate (15);
PLC groups are provided with the alarm, are made up of three groups of PLC;Wherein PLC1 connects with first pressure controlling switch (1) Connect;Wherein PLC2 is connected with second pressure controlling switch (2);Wherein PLC3 is connected with the 3rd pressure control switch (3);Described Three groups of PLC in different alarm modes, table specific as follows are set:
The warning lamp of table 2 and alarm bell alarm mode are set
Reach alarming value to better discriminate between upper, middle and lower diverse location pressure inside steel pipe column, in warning lamp and alarm bell Configure 3 groups of cyclelogs (PLC) on circuit, it is supporting that three groups of different police instruction red lights and alarm bell are set, in favor of can Accurately distinguish dangerous spot position and warning reason.When steel pipe column upper pressure reaches alarming value, the 1st group of cyclelog PLC1 Work, the first group alarm instruction red light and alarm bell of setting start alarm;Similar, when steel pipe column middle part portion, pressure reaches alarm During value, the 2nd group of cyclelog PLC1 work, the 2nd group alarm instruction red light and alarm bell of setting start alarm;Similar, when When steel pipe column low pressure reaches alarming value, the 3rd group of cyclelog PLC1 work, the 3rd group alarm instruction red light of setting and Alarm bell starts alarm.
When foundation pit construction, pressure is in normal range (NR) at upper, middle and lower three inside steel pipe column, system is in green by 7 Lamp binding post, 9 normal work green lights and 12 ring currents form closed-loop path, and now bracing members are in normal operating conditions, green Lamp lights.When temperature drops to a certain degree in foundation ditch, inside steel pipe column at upper, middle and lower three in pressure any one reach setting During numerical value, the pressure sensitive device where it passes to warning device main body by signal wire, and corresponding switch closes immediately in Fig. 1 Close, 5 work of electromagnet produce magnetic force, and by 6 contact joints and 7 green light wiring post separations, and 8 red light binding posts connect, and make system In closed-loop path is formed by 8 red light binding posts, 9 police instruction red lights, 11 alarm electric bells and 12 ring currents, red light lights together When electric bell sound, send alarm signal.And according to PLC effect so that during the switch alarm of diverse location, send different Sound and light signal.
It is different according to the steel strength of steel pipe column in actual use, different alarming values is set to pressure switch.Such as certain The specification of the steel pipe column of the quick main line Tunnel Design in city north and south is steel pipeSteel strength is designed as 315N/mm2, Thus calculate and refer to engineering experience, obtaining specification general in engineering is The intensity alarming value of steel pipe column be It see the table below respectively:
3 alarm system pressure sensor alarming values of table
By the implementation of the present invention, realize to prevent from steel pipe column to be split up losing bearing capacity and automatic alarm system, automatically Precisely, without artificial on duty.

Claims (4)

1. a kind of steel pipe column is split up failure internal pressure multiparty control automatic alarm system, it is characterised in that:
Formed including steel pipe column (20), pressure switch and alarm three parts;
The steel pipe column upper end is that the horizontal concrete support (19) of top horizontal provides fulcrum, and lower end is implanted into ground (24), with Steel reinforcement cage inside concrete-pile welds together;
The alarm includes:
Contact plate (4) is fulcrum into lever construction using support column;Wherein one end of contact plate (4) is by spring connect base, separately There is electromagnet (5) between one end and base, have space between electromagnet (5) and contact plate (4);The electromagnet (5) and pressure Switch and electromagnet ring current (13) composition closed-loop path;
Contact (6) on contact plate (4) is normally closed with green light binding post (7) and forms back ring current (12) and green light (9) Road;
In the state of electromagnet (5) is powered absorption contact plate (4), contact (6) contacts with red light binding post (8), makes red light (10), PLC groups, electric bell (11) and ring current (12) form closed-loop path;
The pressure switch is composed in parallel by three pressure control switch;Wherein, first pressure controlling switch (1) is arranged on steel pipe Post top;Second pressure controlling switch (2) is arranged in the middle part of steel pipe column;3rd pressure control switch (3) is arranged under steel pipe column Portion.
2. steel pipe column according to claim 1 is split up failure internal pressure multiparty control automatic alarm system, its feature exists In:The structure of each pressure control switch is separated between two panels bearing plate (15) by pressure-bearing spring (14), two panels pressure-bearing Contact and pressure switch binding post (16) are relatively set with the inside of plate (15).
3. steel pipe column according to claim 1 is split up failure internal pressure multiparty control automatic alarm system, its feature exists In:The PLC groups are made up of three PLC;Wherein PLC1 is connected with first pressure controlling switch (1);The pressures of wherein PLC2 and second Power controlling switch (2) connects;Wherein PLC3 is connected with the 3rd pressure control switch (3);Set in three groups of described PLC different Alarm mode.
4. steel pipe column according to claim 1 is split up failure internal pressure multiparty control automatic alarm system, its feature exists In:Installation site of three pressure control switch on steel pipe column be:
When steel pipe column length L is less than 9m, first pressure controlling switch (1) is away from capital distance L1=L/3, second pressure controlling switch (2) away from capital distance L2=3L/5;3rd pressure control switch (3) is away from capital distance L3=4/5L;
As steel pipe column length L=9m, first pressure controlling switch (1) is away from capital distance L1=2.5m, second pressure controlling switch (2) away from capital distance L2=5.5m;3rd pressure control switch (3) is away from capital distance L3=7.5m;
As steel pipe column length L=9~12m, first pressure controlling switch (1) is away from capital distance L1=2.5~3.5m, second pressure Controlling switch (2) is away from capital distance L2=5.5~7.0m;3rd pressure control switch is away from (3) capital distance L3=7.5~10m;
As steel pipe column length L=12m, first pressure controlling switch (1) is away from capital distance L1=3.5m, second pressure controlling switch (2) away from capital distance L2=7m;3rd pressure control switch (3) is away from capital distance L3=10m;
As steel pipe column length L=12~16m, first pressure controlling switch (1) is away from capital distance L1=3.5~6.0m, second pressure Controlling switch (2) is away from capital distance L2=7.0~9.5m;3rd pressure control switch (3) is away from capital distance L3=10.0~ 12.5m;
As steel pipe column length L=16m, first pressure controlling switch (1) is away from capital distance L1=6m, second pressure controlling switch (2) Away from capital distance L2=9.5m;3rd pressure control switch (3) is away from capital distance L3=12.5m;
As steel pipe column length L=16~20m, first pressure controlling switch (1) is away from capital distance L1=6.0~6.5m, second pressure Controlling switch (2) is away from capital distance L2=9.5~11.5m;3rd pressure control switch (3) is away from capital distance L3=12.5~ 15.5m;
As steel pipe column length L=20m, first pressure controlling switch (1) is away from capital distance L1=6.5m, second pressure controlling switch (2) away from capital distance L2=11.5m;3rd pressure control switch (3) is away from capital distance L3=15.5m.
When steel pipe column length L is more than 20m, first pressure controlling switch (1) is away from capital distance L1=L/3, second pressure controlling switch (2) away from capital distance L2=3L/5;3rd pressure control switch (3) is away from capital distance L3=4/5L.
CN201710978278.XA 2017-10-18 2017-10-18 Steel pipe column expansion crack failure internal pressure multi-point control automatic alarm system Active CN107727308B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710978278.XA CN107727308B (en) 2017-10-18 2017-10-18 Steel pipe column expansion crack failure internal pressure multi-point control automatic alarm system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710978278.XA CN107727308B (en) 2017-10-18 2017-10-18 Steel pipe column expansion crack failure internal pressure multi-point control automatic alarm system

Publications (2)

Publication Number Publication Date
CN107727308A true CN107727308A (en) 2018-02-23
CN107727308B CN107727308B (en) 2020-03-03

Family

ID=61212026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710978278.XA Active CN107727308B (en) 2017-10-18 2017-10-18 Steel pipe column expansion crack failure internal pressure multi-point control automatic alarm system

Country Status (1)

Country Link
CN (1) CN107727308B (en)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2139305Y (en) * 1992-06-15 1993-07-28 罗强 Pressure switch
CN202137693U (en) * 2011-05-10 2012-02-08 蒋思 Pressure protecting device
CN202274857U (en) * 2011-08-31 2012-06-13 王瑜 Concrete formwork deformation monitoring alarm
CN103207118B (en) * 2012-01-16 2014-12-24 中国石油天然气集团公司 Real-time measuring apparatus and real-time measuring method for large deformation and stress of test tube in steel pipe bending deformation
CN202471335U (en) * 2012-03-14 2012-10-03 中建商品混凝土有限公司 Concrete pump pipe pressure monitoring warning device
CN104422618A (en) * 2013-09-04 2015-03-18 江苏瑞银不锈钢制品有限公司 Protection improvement device for steel pipe water pressure testing machine
CN104019849B (en) * 2014-06-09 2016-06-08 河海大学 Steel penstock and telescopic joint operating parameter automatic monitoring system and monitoring method thereof
CN205375724U (en) * 2016-01-08 2016-07-06 曹清明 Intelligent anti -theft net
CN106370343B (en) * 2016-09-07 2019-04-30 中南大学 Fan characteristic multipoint pressure synchro measure test macro
CN206514987U (en) * 2017-03-10 2017-09-22 刘正茂 A kind of piping lane internal pressure detection means

Also Published As

Publication number Publication date
CN107727308B (en) 2020-03-03

Similar Documents

Publication Publication Date Title
CN206189461U (en) Assembly folding type utility tunnel
CN101701461B (en) Method for constructing energy-saving underground tube structure
CN107386308A (en) A kind of side slope slopes automate precipitation method
CN205975650U (en) Building automation drainage system
CN110055980B (en) Thermoelectric refrigeration slide-resistant pile and construction method
Dannemand Andersen et al. Large thermal energy storage at Marstal district heating
CN105350503B (en) A kind of underground workshop factory becomes access tunnel structure and its construction method
CN104993440A (en) Lightning-protection manual grounding system and construction method by utilizing structure steel bar externally-connected downlead wire
CN107727308A (en) Steel pipe column is split up failure internal pressure multiparty control automatic alarm system
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN107740424A (en) Steel pipe column is split up failure internal pressure and temperature multiparty control automatic alarm system
CN106013200B (en) A kind of prefabricated assembled strip footing and construction technology
CN105421477A (en) Construction method for tower crane foundation
CN206035045U (en) Prefabricated assembled underground granary of endocyst plastics
CN205753309U (en) Prefabricated cable duct
CN201367753Y (en) Heat insulation and fire protection device for closed circular coal yard
CN204000834U (en) A kind of " chimney type " air chimney assembling piling strtucture
CN206035051U (en) Prefabricated caulking strips's in area circular underground granary of double -layer steel plate assembled
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN112761249A (en) Reticulated shell support joint structure and reticulated shell support joint connection construction method
CN103727362A (en) Construction technology used for quickly replacing high-strength placing anchor bolts in concrete
CN207659978U (en) The pre-stressed steel pipe concrete tension binder for preventing cushion cap from shifting
CN112942364A (en) Self-balancing large-span deep foundation pit prestressed beam system
CN206035050U (en) Prefabricated bulkhead underground granary of slot -in type endocyst plastics
CN201460373U (en) Bracing wire bar tower foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant