CN107727064A - A kind of new take-off observation device - Google Patents

A kind of new take-off observation device Download PDF

Info

Publication number
CN107727064A
CN107727064A CN201711097725.7A CN201711097725A CN107727064A CN 107727064 A CN107727064 A CN 107727064A CN 201711097725 A CN201711097725 A CN 201711097725A CN 107727064 A CN107727064 A CN 107727064A
Authority
CN
China
Prior art keywords
built
protecting box
ball
holdfast bar
observation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711097725.7A
Other languages
Chinese (zh)
Inventor
纪贤远
李玉桥
高贯伟
庞占强
谭科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201711097725.7A priority Critical patent/CN107727064A/en
Publication of CN107727064A publication Critical patent/CN107727064A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Building Environments (AREA)

Abstract

The invention provides a kind of new take-off observation device,It by being provided with sliding block accordingly by the upper end of fixed connecting plate based on chute,Sliding block is also equipped with the inwall of the built-in groove,And sliding block is connected with slide,Make this invention when carrying out the assembly and disassembly of the second holdfast bar,Simple and fast,By by two stepped settings of sealing rubber ring,Built-in protecting box is provided with embedded groove accordingly,The fixation projection is harmonious with built-in protecting box,And second holdfast bar and built-in protecting box contact surface on be provided with stopper slot,The stopper slot is internally provided with the second ball and the first ball,Second ball is connected with slide,Make the overall firm installation of this invention stronger,By the way that the first ball is symmetrical arranged based on the second ball,First ball is movably connected in stopper slot by connecting rod,And stopper slot is symmetrical arranged based on the second holdfast bar,The outer surface of second ball is enclosed with elastic rubber layer,Make this invention assembling simple,Connecting is good.

Description

A kind of new take-off observation device
Technical field
The present invention relates to settlement observation correlative technology field, specially a kind of new take-off observation device.
Background technology
In modern urban construction, generally existing narrow field limitation, geologic condition is complicated, and foundation ditch exploitation cutting depth is big Deng construction unfavorable factor, to ensure foundation ditch and safety of surrounding environment, settlement observer is set on road ground and pipeline, entered Row is periodically observed, and to ensure to monitor quality, we are protected by settlement observer by protection device is made, heavy by observing Drop data, road ground and pipe settlement situation of change are obtained by software analysis, reaches monitoring purpose, it is effective to instruct scene Construction operation.In order to accurately reflecting the accurate sedimentation situation of building, it is necessary to be set in the component of building in reality Put equally distributed settlement observation point, and it is most long with settlement observation point device be mostly exposed and separation screw.It is this Mounting means not only influences personnel's walking very much, and also strong influence building is attractive in appearance, and carrying not easy to maintain, and Construction period is easily this it is proposed that a kind of new take-off observation device by artificial destruction.
The content of the invention
It is an object of the invention to provide a kind of new take-off observation device, is asked with solve to propose in above-mentioned background technology Topic.
To achieve the above object, the present invention provides following technical scheme:A kind of new take-off observation device, including building wall Body, built-in protecting box and observation device, the observation device is arranged at the inside of built-in protecting box, and built-in protecting box is arranged at The inside of construction wall, fixed plate is provided with the outer surface of the upper and lower ends of the built-in protecting box, a left side for the fixed plate Side is provided with fastening bolt, and right side is provided with building keel, and one end of the building keel is fixed on construction wall, and the other end is set The upper end of built-in protecting box is placed in, and fastening bolt is threadedly coupled through fixed plate with building keel, outside the fastening bolt End is additionally provided with decorative material, and the upper end of the decorative material is fixed on construction wall, and built-in protecting box is fixed in lower end Upper surface, and the contact surface outer end of decorative material and built-in protecting box has also poured sealant layer, the built-in protecting box Right-hand member on the downside of protecting box side cover is connected with by the first bearing pin, it is convex that the upper surface of the protecting box side cover is provided with fixation Block, lower surface be provided with pull handle, and built-in protecting box is internally provided with fixed connecting plate and holdfast bar, the holdfast bar It is close that rubber is provided with including the first holdfast bar, the second holdfast bar and the second bearing pin, on the outer surface side of the fixed projection Seal, the first holdfast bar are flexibly connected by the first bearing pin with the second holdfast bar, and the first holdfast bar is towards the one of construction wall Observation device is fixed with face, the left end of the second holdfast bar is arranged at construction wall through the left end inwall of built-in protecting box Inside, the construction wall is provided with built-in groove accordingly based on the second holdfast bar, and in the upper and lower ends of the second holdfast bar Portion is provided with chute.
Preferably, the upper end of the fixed connecting plate is provided with sliding block accordingly based on chute, the inwall of the built-in groove On be also equipped with sliding block, and sliding block is connected with slide.
Preferably, the sealing rubber ring is vertically arranged with two along fixed projection, and two sealing rubber rings are in ladder Shape is set, and built-in protecting box is provided with embedded groove accordingly, and the fixation projection is harmonious with built-in protecting box.
Preferably, be provided with stopper slot on the contact surface of the second holdfast bar and built-in protecting box, the stopper slot it is interior Portion is provided with the second ball and the first ball, and the second ball is connected with slide.
Preferably, first ball is symmetrical arranged based on the second ball, and the first ball is flexibly connected by connecting rod In in stopper slot, first ball and the second ball are rolled and connected.
Preferably, the stopper slot is symmetrical arranged based on the second holdfast bar, and the outer surface parcel of the second ball is flexible Rubber layer.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention by being provided with sliding block accordingly by the upper end of fixed connecting plate based on chute, on the inwall of the built-in groove Sliding block is also equipped with, and sliding block is connected with slide, makes this invention when carrying out the assembly and disassembly of the second holdfast bar, simply Fast;
2nd, the present invention, should by the way that two stepped settings of sealing rubber ring, built-in protecting box are provided with into embedded groove accordingly Fixed projection is harmonious with built-in protecting box, and is provided with stopper slot on the second holdfast bar and the contact surface of built-in protecting box, the limit Position groove is internally provided with the second ball and the first ball, and the second ball is connected with slide, makes this invention at work, Overall firm installation is stronger;
3rd, for the present invention by the way that the first ball is symmetrical arranged based on the second ball, the first ball is movably connected on limit by connecting rod In the groove of position, and stopper slot is symmetrical arranged based on the second holdfast bar, and the outer surface of second ball is enclosed with elastic rubber layer, makes this Invention assembling is simple, and connecting is good.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is mplifying structure schematic diagram at A in Fig. 1.
In figure:1 construction wall, 2 decorative materials, 3 sealant layers, 4 fastening bolts, 5 fixed plates, 6 building keels, in 7 Put protecting box, 8 fixed connecting plates, 9 protecting box side covers, 10 pull handles, 11 rubber seal, 12 fixation projections, 13 first pins It is axle, 14 second bearing pins, 15 first holdfast bars, 16 second holdfast bars, groove built in 17,18 observation devices, 19 chutes, 20 spacing Groove, 21 first balls, 22 second balls.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
In the description of the invention, it is to be understood that the orientation of the instruction such as term " upper and lower ", " left and right " and " inside and outside " Or position relationship is based on the orientation or position relationship shown in accompanying drawing 1, is for only for ease of the description present invention and simplifies description, and Be not instruction or imply signified device or particular orientation that structure must have, with specific azimuth configuration and operation, therefore It is not considered as limiting the invention.
As shown in Figure 1-2:A kind of new take-off observation device, including construction wall 1, built-in protecting box 7 and observation dress 18 are put, the observation device 18 is arranged at the inside of built-in protecting box 7, and built-in protecting box 7 is arranged at the inside of construction wall 1, Fixed plate 5 is provided with the outer surface of the upper and lower ends of built-in protecting box 7, the left side of the fixed plate 5 is provided with fastening bolt 4, right side is provided with building keel 6, and one end of the building keel 6 is fixed on construction wall 1, and the other end is arranged at built-in protection The upper end of box 7, and fastening bolt 4 is threadedly coupled through fixed plate 5 with building keel 6, the outer end of fastening bolt 4 is additionally provided with outside Ornament materials 2, the upper end of the decorative material 2 are fixed on construction wall 1, and the upper surface of built-in protecting box 7 is fixed in lower end, And the contact surface outer end of decorative material 2 and built-in protecting box 7 has also poured sealant layer 3, the right-hand member downside of built-in protecting box 7 Protecting box side cover 9 is connected with by the first bearing pin 13, the upper surface of the protecting box side cover 9 is provided with fixed projection 12, under End face is provided with pull handle 10, and built-in protecting box 7 is internally provided with fixed connecting plate 8 and holdfast bar, is fixedly connected The upper end of plate 8 is provided with sliding block accordingly based on chute 19, is also equipped with sliding block on the inwall of the built-in groove 17, and sliding block with Chute 19 is slidably connected, and makes this invention when carrying out the assembly and disassembly of the second holdfast bar 16, simple and fast.
Holdfast bar includes the first holdfast bar 15, the second holdfast bar 16 and the second bearing pin 14, the outer surface of fixed projection 12 Rubber seal 11 is provided with side, sealing rubber ring 11 is vertically arranged with two along fixed projection 2, two caulking gums 11 stepped settings are enclosed, and built-in protecting box 7 is provided with embedded groove accordingly, the fixation projection 12 and the built-in phase of protecting box 7 Close, make this invention at work, overall firm installation is stronger.
First holdfast bar 15 is flexibly connected by the first bearing pin 14 with the second holdfast bar 16, and the first holdfast bar 15 is towards building Observation device 18 is fixed with the one side of walling body 1, the left end of the second holdfast bar 16 is set through the left end inwall of built-in protecting box 7 The inside of construction wall 1 is placed in, the construction wall 1 is based on the second holdfast bar 16 and is provided with built-in groove 17, and second accordingly Chute 19 is provided with inside the upper and lower ends of holdfast bar 16, the second holdfast bar 16 on the contact surface of built-in protecting box 7 with setting Limited location groove 20, the stopper slot 20 are internally provided with the second ball 22 and the first ball 21, and the second ball 22 and chute 19 are slidably connected, and the first ball 21 is symmetrical arranged based on the second ball 22, and the first ball 21 is movably connected on by connecting rod In stopper slot 20, the ball 22 of the first ball 21 and second rolls connection, and stopper slot 20 is symmetrical arranged based on the second holdfast bar 16, And second the outer surface of ball 22 be enclosed with elastic rubber layer, make this invention assembling simple, there is shock-absorbing capacity, connecting is good.
Operation principle:When needing to fix built-in protecting box 7 and construction wall 1, first consolidating the built-in upper end of protecting box 7 Fixed board 5 is bonded with building keel 6, is then threadedly coupled with fastening bolt 4 through fixed plate 5 with building keel 6, then by first The holdfast bar 16 of holdfast bar 15 and second is positioned in built-in protecting box 7, and chute 19 slides with sliding block and the second ball 22 to be connected Connect, the second holdfast bar 16 is harmonious with built-in groove 17, and the first holdfast bar 15 and the second holdfast bar 16 pass through the activity of the second bearing pin 14 Connection, then drive protecting box side cover 9 to be harmonious with built-in protecting box 7 with pull handle 10, the sealing rubber ring on fixed projection 12 11 start to be interference fitted with built-in protecting box 7, finally decorative material 2 are fixed in built-in protecting box 7, sealant layer 3 enters Row sealing, work are completed.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of new take-off observation device, including construction wall(1), built-in protecting box(7)And observation device(18), the sight Survey device(18)It is arranged at built-in protecting box(7)Inside, and built-in protecting box(7)It is arranged at construction wall(1)Inside, its It is characterised by:The built-in protecting box(7)Upper and lower ends outer surface on be provided with fixed plate(5), the fixed plate(5)'s Left side is provided with fastening bolt(4), right side is provided with building keel(6), the building keel(6)One end be fixed on construction wall (1)On, the other end is arranged at built-in protecting box(7)Upper end, and fastening bolt(4)Through fixed plate(5)With building keel(6) Threaded connection, the fastening bolt(4)Outer end be additionally provided with decorative material(2), the decorative material(2)Upper end fix In construction wall(1)On, built-in protecting box is fixed in lower end(7)Upper surface, and decorative material(2)With built-in protecting box (7)Contact surface outer end also poured sealant layer(3), the built-in protecting box(7)Right-hand member on the downside of pass through the first bearing pin (13)It is connected with protecting box side cover(9), the protecting box side cover(9)Upper surface be provided with fixed projection(12), lower surface It is provided with pull handle(10), and built-in protecting box(7)Be internally provided with fixed connecting plate(8)And holdfast bar, the holdfast Bar includes the first holdfast bar(15), the second holdfast bar(16)And second bearing pin(14), the fixed projection(12)Outer surface Rubber seal is provided with side(11), the first holdfast bar(15)Pass through the first bearing pin(14)With the second holdfast bar(16)Activity Connection, and the first holdfast bar(15)Towards construction wall(1)One side on be fixed with observation device(18), the second holdfast bar (16)Left end run through built-in protecting box(7)Left end inwall be arranged at construction wall(1)Inside, the construction wall(1)Base In the second holdfast bar(16)Built-in groove is provided with accordingly(17), and the second holdfast bar(16)Upper and lower ends inside be respectively provided with There is chute(19).
A kind of 2. new take-off observation device according to claim 1, it is characterised in that:The fixed connecting plate(8)'s Upper end is based on chute(19)Sliding block is provided with accordingly, the built-in groove(17)Inwall on be also equipped with sliding block, and sliding block with Chute(19)It is slidably connected.
A kind of 3. new take-off observation device according to claim 1, it is characterised in that:The sealing rubber ring(11)Edge Fixed projection(2)Two are vertically arranged with, two sealing rubber rings(11)Stepped setting, and built-in protecting box(7)Phase That answers is provided with embedded groove, the fixation projection(12)With built-in protecting box(7)It is harmonious.
A kind of 4. new take-off observation device according to claim 1, it is characterised in that:The second holdfast bar(16)With Built-in protecting box(7)Contact surface on be provided with stopper slot(20), the stopper slot(20)Be internally provided with the second ball(22) And first ball(21), and the second ball(22)With chute(19)It is slidably connected.
A kind of 5. new take-off observation device according to claim 1, it is characterised in that:First ball(21)It is based on Second ball(22)It is symmetrical arranged, and the first ball(21)Stopper slot is movably connected on by connecting rod(20)It is interior, first rolling Pearl(21)With the second ball(22)Roll connection.
A kind of 6. new take-off observation device according to right asks 1, it is characterised in that:The stopper slot(20)Based on second Holdfast bar(16)It is symmetrical arranged, and the second ball(22)Outer surface be enclosed with elastic rubber layer.
CN201711097725.7A 2017-11-09 2017-11-09 A kind of new take-off observation device Pending CN107727064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711097725.7A CN107727064A (en) 2017-11-09 2017-11-09 A kind of new take-off observation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711097725.7A CN107727064A (en) 2017-11-09 2017-11-09 A kind of new take-off observation device

Publications (1)

Publication Number Publication Date
CN107727064A true CN107727064A (en) 2018-02-23

Family

ID=61214885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711097725.7A Pending CN107727064A (en) 2017-11-09 2017-11-09 A kind of new take-off observation device

Country Status (1)

Country Link
CN (1) CN107727064A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111174754A (en) * 2019-12-30 2020-05-19 陕西建工第九建设集团有限公司 Building settlement device observation point

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200344721Y1 (en) * 2003-12-24 2004-03-19 한국가스기술공업 주식회사 Subsidence Observing bar equipment of pipe secured by concrete encasement under the ground
CN103363955A (en) * 2013-07-31 2013-10-23 陕西建工集团总公司 Construction method for settlement observation points of building
CN203984340U (en) * 2014-07-10 2014-12-03 宏梦新能源发展湖北有限公司 A kind of cover-lifting type sealed solar energy panel junction box
CN204127122U (en) * 2014-10-27 2015-01-28 杭州恩斯克万达电动转向系统有限公司 A kind of low friction ball bearing
TWM501503U (en) * 2015-01-08 2015-05-21 Ja Hui Technology Co Ltd Screw structure with universal balls
CN205079771U (en) * 2015-11-10 2016-03-09 吉林省长春电力勘测设计院有限公司 Disconnect -type settlement observation point
CN206150659U (en) * 2016-10-27 2017-05-10 深圳乐倍丽科技有限公司 Receive umbrella lock structure
CN206171041U (en) * 2016-10-14 2017-05-17 民勤县人民医院 A shock attenuation wheel for medical transportation equipment
CN107225611A (en) * 2017-07-05 2017-10-03 苏州亨达尔工业材料有限公司 A kind of arc plastics board fixer
CN207636060U (en) * 2017-11-09 2018-07-20 中建八局第二建设有限公司 A kind of new take-off observation device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200344721Y1 (en) * 2003-12-24 2004-03-19 한국가스기술공업 주식회사 Subsidence Observing bar equipment of pipe secured by concrete encasement under the ground
CN103363955A (en) * 2013-07-31 2013-10-23 陕西建工集团总公司 Construction method for settlement observation points of building
CN203984340U (en) * 2014-07-10 2014-12-03 宏梦新能源发展湖北有限公司 A kind of cover-lifting type sealed solar energy panel junction box
CN204127122U (en) * 2014-10-27 2015-01-28 杭州恩斯克万达电动转向系统有限公司 A kind of low friction ball bearing
TWM501503U (en) * 2015-01-08 2015-05-21 Ja Hui Technology Co Ltd Screw structure with universal balls
CN205079771U (en) * 2015-11-10 2016-03-09 吉林省长春电力勘测设计院有限公司 Disconnect -type settlement observation point
CN206171041U (en) * 2016-10-14 2017-05-17 民勤县人民医院 A shock attenuation wheel for medical transportation equipment
CN206150659U (en) * 2016-10-27 2017-05-10 深圳乐倍丽科技有限公司 Receive umbrella lock structure
CN107225611A (en) * 2017-07-05 2017-10-03 苏州亨达尔工业材料有限公司 A kind of arc plastics board fixer
CN207636060U (en) * 2017-11-09 2018-07-20 中建八局第二建设有限公司 A kind of new take-off observation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111174754A (en) * 2019-12-30 2020-05-19 陕西建工第九建设集团有限公司 Building settlement device observation point
CN111174754B (en) * 2019-12-30 2021-07-23 陕西建工第九建设集团有限公司 Building settlement device observation point

Similar Documents

Publication Publication Date Title
CN209166407U (en) A kind of surface subsidence deformation monitoring prior-warning device
CN105863734A (en) Device for simulating and monitoring existing tunnel during excavation of double-track tunnel
CN207636060U (en) A kind of new take-off observation device
CN107727064A (en) A kind of new take-off observation device
CN103243646A (en) Earthquake proof PTFE (Poly Tetra Fluoro Ethylene) plate rubber bearing small displacement comb plate extensible device
CN201724934U (en) Facility for field observation of runoff plot
CN104389621A (en) Circumferential intelligentized reinforcement structure and method of shield tunnel
CN101173518A (en) Building pit support method
CN206385578U (en) Pile-soil interface soil particle carefully sees movement measuring device
CN115230975A (en) InSAR technology-based geological disaster early recognition device and use method
CN204315040U (en) Based on the Landslide Forecast System of CORS base station
CN110176176B (en) Multi-bin separated water sac drainage shield tunneling stratum loss simulation device and method
CN104746522B (en) A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system
CN102071696B (en) Steep slope protective soft frame and construction method thereof
CN204457793U (en) The intelligent ruggedized construction of shield tunnel hoop
CN204551489U (en) A kind ofly oblique throwings that regulate of intelligent deformation can support support system for dredging silt matter soil district foundation ditch
CN205636837U (en) Highway foundation ditch settlement observation device
CN206461329U (en) A kind of novel assembled armored concrete cable trench
CN204514744U (en) Soil steams and oozes device
CN111508204A (en) Geological disaster early warning device
CN206279844U (en) A kind of antidetonation formed steel construction
CN204514383U (en) A kind of dam deformation monitoring system based on CORS base station
CN214170192U (en) Civil engineering rail guard
CN206627300U (en) It is a kind of to be used for sand and the Stratified Sampling device of structure interface direct shear test
CN205749564U (en) Hydro-structure body seepage velocity distributed optical fiber sensing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination