CN107725795B CN201710778163.6A CN201710778163A CN107725795B CN 107725795 B CN107725795 B CN 107725795B CN 201710778163 A CN201710778163 A CN 201710778163A CN 107725795 B CN107725795 B CN 107725795B
Authority
CN
China
Prior art keywords
valve seat
injecting glue
valve
seat insert
pratt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710778163.6A
Other languages
Chinese (zh)
Other versions
CN107725795A (en
Inventor
吴奈勋
郑立军
陈宝成
陈明军
姜向平
王欣
张春东
吴唯洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Nuclear Power Operation Management Co Ltd
Third Qinshan Nuclear Power Co Ltd
Original Assignee
CNNC Nuclear Power Operation Management Co Ltd
Third Qinshan Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Nuclear Power Operation Management Co Ltd, Third Qinshan Nuclear Power Co Ltd filed Critical CNNC Nuclear Power Operation Management Co Ltd
Priority to CN201710778163.6A priority Critical patent/CN107725795B/en
Publication of CN107725795A publication Critical patent/CN107725795A/en
Application granted granted Critical
Publication of CN107725795B publication Critical patent/CN107725795B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K1/00Lift valves or globe valves, i.e. cut-off apparatus with closure members having at least a component of their opening and closing motion perpendicular to the closing faces
    • F16K1/16Lift valves or globe valves, i.e. cut-off apparatus with closure members having at least a component of their opening and closing motion perpendicular to the closing faces with pivoted closure-members
    • F16K1/18Lift valves or globe valves, i.e. cut-off apparatus with closure members having at least a component of their opening and closing motion perpendicular to the closing faces with pivoted closure-members with pivoted discs or flaps
    • F16K1/22Lift valves or globe valves, i.e. cut-off apparatus with closure members having at least a component of their opening and closing motion perpendicular to the closing faces with pivoted closure-members with pivoted discs or flaps with axis of rotation crossing the valve member, e.g. butterfly valves
    • F16K1/226Shaping or arrangements of the sealing
    • F16K1/2263Shaping or arrangements of the sealing the sealing being arranged on the valve seat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lift Valve (AREA)

Abstract

The invention belongs to power station operating maintenance technical fields, more particularly to a kind of PRATT large-diameter butterfly valve valve seat insert replacing options, purpose is to research and develop the valve seat insert replacement technology of heavy caliber PRATT butterfly valve, solve the problems, such as that such large-diameter butterfly valve equipment country, three factories can not repair, spare parts purchasing and site examining and repairing cost are saved, work on the spot demand is met.It is characterized by: it includes the steps that clearing up air test, injecting glue and the dress watch before old valve seat, equipped valve seat, injecting glue.It is repaired from PRATT butterfly valve seat sealing ring after replacing technological development success, successively amounts to and successfully repaired about 130 Taiwan Straits water system PRATT large-diameter butterfly valves, save about 50,000,000 yuan of equipment purchase fund or more.

Description

PRATT large-diameter butterfly valve valve seat insert replacing options
Technical field
The invention belongs to power station operating maintenance technical fields, and in particular to a kind of PRATT large-diameter butterfly valve valve seat insert Replacing options.
Background technique
Three factory's sea water service system heavy caliber PRATT butterfly valve of the Qin is the manufacturing of U.S. HENRY PRATT company, dimensions master Have 42 ", 54 ", 90 " and 108 ", two unit equipment total numbers are 72.Because system arrangement, valve structural design, The composite factors such as in-site installation mode and three phases severe briny environment influence, and cause this kind of large-diameter butterfly valve equipment in scene big Part premature failure, scene need timely repair process.
In view of the factors such as site examining and repairing environment and equipment deficiency processing requirement, scene generally all takes directly replacement whole Spare part is come the defect elimination at the scene of completing.For many years, scene is replaced such number of devices to get off and has been increasing.Because of these equipment Purchase cost is very high (every equipment purchase expense is 40 to 2,000,000 yuan or so and differs), needs to implement repair process, extends equipment Service life saves spare parts purchasing expense.
Three factory's sea water service system large-diameter butterfly valves are that the Triton-XR70 series of U.S. Henry Pratt company design is single inclined The heart, line with rubber, soft seal electric butterfly valve (being detailed in Fig. 1), primary structure include valve seat 1, butterfly plate 2, valve rod 3, promote 4 and valve body 5. Such equipment valve seat insert uses E-LOK Seal Design, and rubber valve seat sealing ring is hollow design, and overall structure is semicircle Shape, surface design have multiple tooth seal line.After the sealing ring is installed in the dovetail groove of valve seat, by injection special glue to sealing ring It is fixed, the installation requirement (being detailed in Fig. 2) of the valve seat insert is reached using some technical characterstics after dedicated adhesive curing.
Reparation for such valve, we face the replacement that main difficulty is exactly valve seat insert, and for relevant Special glue ingredient and performance and sealing ring replacement concrete operation method etc., Pratt company implements technology blockage.
To solve three factories to replaced numerous implementable effective reparations of heavy caliber PRATT butterfly valve equipment, scene is saved The cost of overhaul needs to research and develop the valve seat insert replacement technology of such heavy caliber PRATT butterfly valve, thoroughly breaks external producer's technology Block meets three factory's work on the spot demands.
Summary of the invention
The purpose of the present invention is the valve seat inserts of research and development heavy caliber PRATT butterfly valve to replace technology, and solving three factories, such is big The bore butterfly valve equipment country can not repair problem, save spare parts purchasing and site examining and repairing cost, meet work on the spot demand.
The present invention is implemented as follows:
A kind of PRATT large-diameter butterfly valve valve seat insert replacing options, specifically comprise the following steps:
Step 1: old valve seat is cleared up
Step 1.1: horizontal positioned valve body, and make sealing surface of seat one end upward, butterfly plate is opened, old valve seat is removed;
Step 1.2: cleaning scrap rubber and valve seat fragment make valve seat mounting groove keep clean;
Step 1.3: the hole for injecting glue of two injecting glues and tapping are symmetrically bored in valve flange plane;
Step 1.4: with sand paper polishing valve seat mounting groove, so that the inner wall surface layer of slot is exposed matrix and scrub;
Step 2: equipped valve seat
Step 2.1: clamping valve seat insert with rubber pincers, squeeze into valve seat mounting groove, squeeze into valve seat in 180 ° of directions of face Sealing ring, while valve seat insert is beaten with rubber hammer, feed them into predetermined size range;
Step 2.2: valve seat insert is gradually got on a point both sides, is tapped valve seat insert with rubber hammer, is allowed to fully enter Valve seat mounting groove;
Step 2.3: close butterfly plate, adjust the center of butterfly plate so that butterfly plate outer circle between body cavity at a distance from phase Unanimously, while checking whether butterfly plate is completely closely sealed with valve seat;
Step 3: the air test before injecting glue
Step 3.1: connecting test pipeline, adjust test bleed pressure;
Step 3.2: closing a pipe nipple, block a hole for injecting glue, slowly filled from another hole for injecting glue to valve seat mounting groove Gas, while full circumference checks whether gas leakage, adjustment valve seat is gently shaken with rubber hammer, it is ensured that valve base cavity is fully sealed;
Step 3.3: gradually boosting makes valve seat insert sufficiently outwardly against butterfly plate;
Step 4: special glue modulation
Bisphenol-A epoxy type resin glue and complete curing agent are selected, epoxy resin and curing agent carry out 60 DEG C of bakings simultaneously 2.5 hours or more;
To be subject to adequately to stir to exhaust the air in epoxy resin in modulation, after resin glue color is uniform, pour into Injecting glue is carried out in injecting glue tank;
Step 5: injecting glue
Step 5.1: first using compressed air purging valve seat insert inner cavity, keep clean injecting glue again;
Step 5.2: when starting injecting glue, using injecting glue tool, into a hole for injecting glue, injecting glue, initial injection pressure are 0.3MPa keeps injection pressure to stablize, and subsequent injection pressure is in 0.5~0.6MPa, until another hole for injecting glue flows out asphalt mixtures modified by epoxy resin Until rouge;
Step 5.3: after another hole for injecting glue extrusion, confirmation is discharged without air resin glue, closes another hole for injecting glue, delays The slow injection pressure that promoted checks that whether there is or not resin leakages around valve seat insert to 0.7MPa, and confirms that valve seat insert is expanded into Position;
Step 5.4: closing butterfly plate, but retain 2 °~5 ° apertures;
Step 5.5: pressure being unloaded down, 0.3MPa is dropped to and keeps stable, resin glue is allowed slowly to solidify;
Step 5.6: removing relevant injecting glue tool, and continue spontaneous curing at least 12 hours;
Step 6: dress watch
After the work of valve seat insert injecting glue is fully completed, opens butterfly plate and check whether valve seat insert is installed with valve seat completely The fixed bonding of slot, the foreign matter on cleaning removal valve seat insert surface.
The mass ratio of step 4 as described above, curing agent and epoxy resin is 1:6.
Step 5 as described above, injecting glue time are 20 minutes.
Step 5.5 as described above, the setting time of resin glue are 20~24 hours.
The beneficial effects of the present invention are:
It is repaired from PRATT butterfly valve seat sealing ring after replacing technological development success, successively amounts to and successfully repaired about 130 Taiwan Straits water system PRATT large-diameter butterfly valve saves about 50,000,000 yuan of equipment purchase fund or more.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of PRATT large-diameter butterfly valve;
Fig. 2 is the sealing ring mounting structure schematic diagram of PRATT large-diameter butterfly valve.
Wherein: 1. valve seats, 2. butterfly plates, 3. valve rods, 4. promote, 5. valve bodies, 6. valve flanges, 7. hole for injecting glue, 8. valve seats peace Tankage, 9. valve seat inserts.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and examples.
A kind of PRATT large-diameter butterfly valve valve seat insert replacing options, specifically comprise the following steps:
Step 1: old valve seat is cleared up
Step 1.1: horizontal positioned valve body 5, and make sealing surface of seat one end upward, butterfly plate 2 is opened, old valve seat 1 is removed.
Step 1.2: cleaning scrap rubber and valve seat fragment keeps valve seat mounting groove 8 completely, and damage valve seat should be avoided in when work 8 surface of mounting groove.
Step 1.3: the hole for injecting glue 7 of two injecting glues and tapping are symmetrically bored in 6 plane of valve flange.
Step 1.4: with sand paper polishing valve seat mounting groove 8, so that the inner wall surface layer of slot is exposed matrix and scrub.
Step 2: equipped valve seat
Step 2.1: clamping valve seat insert 9 with rubber pincers, squeeze into valve seat mounting groove 8, squeeze into valve in 180 ° of directions of face Seat sealing ring 9, while valve seat insert 9 is beaten with rubber hammer, feed them into predetermined size range;
Step 2.2: valve seat insert 9 is gradually got on point both sides, with rubber hammer tap valve seat insert 9, be allowed to all into Enter valve seat mounting groove 8;
Step 2.3: close butterfly plate 2, adjust butterfly plate 2 center so that between 5 inner cavity of 2 outer circle of butterfly plate and valve body away from From consistent, while checking whether butterfly plate 2 is completely closely sealed with valve seat 1;
Step 3: the air test before injecting glue
Step 3.1: connecting test pipeline, adjust test bleed pressure.
Step 3.2: closing a pipe nipple, block a hole for injecting glue 7, slowly from another hole for injecting glue 7 to valve seat mounting groove 8 Inflation, while full circumference checks whether gas leakage, and adjustment valve seat 1 is gently shaken with rubber hammer, closes gas source when necessary and readjusts Valve seat 1, it is ensured that 1 inner cavity of valve seat is fully sealed.
Step 3.3: gradually boosting makes valve seat insert 9 sufficiently outwardly against butterfly plate.
Step 4: special glue modulation
Select relevant bisphenol-A epoxy type resin glue, i.e. 0164 epoxy resin and complete curing agent, epoxy resin and solid Agent carries out 60 DEG C of bakings 2.5 hours or more simultaneously, and according to current weather conditions, modulates mass ratio appropriate and adjusted With epoxy resin.The mass ratio general control of curing agent and epoxy resin is in 1:6.
To be subject to adequately to stir to exhaust the air in epoxy resin in modulation, after resin glue color is uniform, pour into Injecting glue is carried out in injecting glue tank, the injecting glue time must complete at 20 minutes.
Step 5: injecting glue
Step 5.1: first using 9 inner cavity of compressed air purging valve seat insert, keep clean injecting glue again.
Step 5.2: when starting injecting glue, using injecting glue tool, into a hole for injecting glue 7, injecting glue, initial injection pressure are 0.3MPa keeps injection pressure to stablize, mitigation, unsuitable too fast, and subsequent injection pressure keeps stablizing, air pressure 0.5~ 0.6MPa, until another hole for injecting glue 7 flows out epoxy resin.
Step 5.3: after another hole for injecting glue 7 extrusion, confirmation is discharged without air resin glue, closes another hole for injecting glue 7, It slowly promotes injection pressure and checks that whether there is or not resin leakages around valve seat insert 9 to 0.7MPa, and confirm that valve seat insert 9 is swollen It is swollen in place.
Step 5.4: closing butterfly plate 2, but retain certain aperture.Different according to valve size specification, corresponding butterfly plate is opened Degree is also different, and for the PRATT butterfly valve of theme, 2 aperture general control of butterfly plate at this time is between 2 ° -5 °.
Step 5.5: pressure being unloaded down, 0.3MPa is dropped to and keeps stable, resin glue is allowed slowly to solidify.According at that time Environment temperature is different, and the setting time of resin glue is almost between 20~24 hours.
After step 5.6:24 hours, relevant injecting glue tool is removed, and continues spontaneous curing at least 12 hours.
Step 6: dress watch
After the work of 9 injecting glue of valve seat insert is fully completed, opens butterfly plate 2 and check valve seat insert 9 whether completely and valve seat The fixed bonding of mounting groove 8, the foreign matter on cleaning removal 9 surface of valve seat insert.
The above is only the preferred embodiments of the invention, is illustrated herein: method based on the principle of the invention improve and Structural adjustment all will be regarded as protection scope of the present invention.

Claims (4)

1. a kind of PRATT large-diameter butterfly valve valve seat insert replacing options, specifically comprise the following steps:
Step 1: old valve seat is cleared up
Step 1.1: horizontal positioned valve body (5), and make sealing surface of seat one end upward, it opens butterfly plate (2), removes old valve seat (1);
Step 1.2: cleaning scrap rubber and valve seat (1) fragment make valve seat mounting groove (8) to keep clean;
Step 1.3: the hole for injecting glue (7) of two injecting glues and tapping are symmetrically bored in valve flange (6) plane;
Step 1.4: being polished valve seat mounting groove (8) with sand paper, so that the inner wall surface layer of slot is exposed matrix and scrub;
Step 2: equipped valve seat
Step 2.1: clamping valve seat insert (9) with rubber pincers, squeeze into valve seat mounting groove (8), squeeze into valve in 180 ° of directions of face Seat sealing ring (9), while valve seat insert (9) are beaten with rubber hammer, feed them into predetermined size range;
Step 2.2: valve seat insert (9) are gradually got on point both sides, with rubber hammer tap valve seat insert (9), be allowed to all into Enter valve seat mounting groove (8);
Step 2.3: closing butterfly plate (2), the center of butterfly plate (2) is adjusted, so that between butterfly plate (2) outer circle and valve body (5) inner cavity Distance it is consistent, while check butterfly plate (2) whether with valve seat (1) completely it is closely sealed;
Step 3: the air test before injecting glue
Step 3.1: connecting test pipeline, adjust test bleed pressure;
Step 3.2: closing a pipe nipple, block a hole for injecting glue (7), delay from another hole for injecting glue (7) to valve seat mounting groove (8) Trickle charge gas, while full circumference checks whether gas leakage, adjustment valve seat (1) is gently shaken with rubber hammer, it is ensured that valve seat (1) inner cavity is complete Sealing;
Step 3.3: gradually boosting makes valve seat insert (9) sufficiently outwardly against butterfly plate;
Step 4: special glue modulation
Bisphenol-A epoxy type resin glue and complete curing agent are selected, it is small that epoxy resin and curing agent carry out 60 DEG C of bakings 2.5 simultaneously When more than;
To be subject to adequately to stir to exhaust the air in epoxy resin in modulation, after resin glue color is uniform, pour into injecting glue Injecting glue is carried out in tank;
Step 5: injecting glue
Step 5.1: first using compressed air purging valve seat insert (9) inner cavity, keep clean injecting glue again;
Step 5.2: when starting injecting glue, using injecting glue tool to an interior injecting glue of hole for injecting glue (7), initial injection pressure is 0.3MPa keeps injection pressure to stablize, and subsequent injection pressure is in 0.5~0.6MPa, until another hole for injecting glue (7) flows out epoxy Until resin;
Step 5.3: after resin glue is squeezed out from another hole for injecting glue (7), confirmation is discharged without air, closes another hole for injecting glue (7), It slowly promotes injection pressure and checks that whether there is or not resin leakages around valve seat insert (9) to 0.7MPa, and confirm valve seat insert (9) it expands in place;
Step 5.4: closing butterfly plate (2), but retain 2 °~5 ° apertures;
Step 5.5: pressure being unloaded down, 0.3MPa is dropped to and keeps stable, resin glue is allowed slowly to solidify;
Step 5.6: removing relevant injecting glue tool, and continue spontaneous curing at least 12 hours;
Step 6: dress watch
After the work of valve seat insert (9) injecting glue is fully completed, opens butterfly plate (2) and check valve seat insert (9) whether completely and valve The fixed bonding of seat mounting groove (8), the foreign matter on cleaning removal valve seat insert (9) surface.
2. PRATT large-diameter butterfly valve valve seat insert replacing options according to claim 1, it is characterised in that: described The mass ratio of step 4, curing agent and epoxy resin is 1:6.
3. PRATT large-diameter butterfly valve valve seat insert replacing options according to claim 1, it is characterised in that: described Step 5, injecting glue time are 20 minutes.
4. PRATT large-diameter butterfly valve valve seat insert replacing options according to claim 1, it is characterised in that: described Step 5.5, the setting time of resin glue is 20~24 hours.
CN201710778163.6A 2017-09-01 2017-09-01 PRATT large-diameter butterfly valve valve seat insert replacing options Active CN107725795B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710778163.6A CN107725795B (en) 2017-09-01 2017-09-01 PRATT large-diameter butterfly valve valve seat insert replacing options

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710778163.6A CN107725795B (en) 2017-09-01 2017-09-01 PRATT large-diameter butterfly valve valve seat insert replacing options

Publications (2)

Publication Number Publication Date
CN107725795A CN107725795A (en) 2018-02-23
CN107725795B true CN107725795B (en) 2019-08-13

Family

ID=61204925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710778163.6A Active CN107725795B (en) 2017-09-01 2017-09-01 PRATT large-diameter butterfly valve valve seat insert replacing options

Country Status (1)

Country Link
CN (1) CN107725795B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109079701B (en) * 2018-09-21 2020-06-16 上海沪东造船阀门有限公司 Auxiliary tool for pre-assembling butterfly valve sealing ring and method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5975494A (en) * 1995-10-12 1999-11-02 Orbit Valve Company Replaceable seal members for butterfly valve
CN1409037A (en) * 2001-09-25 2003-04-09 上海冠龙阀门机械有限公司 Composite elastic soft sealing
CN101451626A (en) * 2008-12-30 2009-06-10 广东联塑市政工程管道有限公司 Method for replacing valve sealing filler
CN202100740U (en) * 2011-06-08 2012-01-04 无锡市宝牛阀业有限公司 Three-eccentric sealing butterfly valve
CN202252028U (en) * 2011-09-21 2012-05-30 铁岭方众阀门有限公司 Metal-rubber sealing sub butterfly valve
EP2657582A1 (en) * 2012-04-27 2013-10-30 Metso Automation MAPAG GmbH Shut-off valve with a shut-off disc with a rotating bearing
CN203656229U (en) * 2013-11-15 2014-06-18 浙江时代铸造有限公司 Butterfly plate device for butterfly valve

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5975494A (en) * 1995-10-12 1999-11-02 Orbit Valve Company Replaceable seal members for butterfly valve
CN1409037A (en) * 2001-09-25 2003-04-09 上海冠龙阀门机械有限公司 Composite elastic soft sealing
CN101451626A (en) * 2008-12-30 2009-06-10 广东联塑市政工程管道有限公司 Method for replacing valve sealing filler
CN202100740U (en) * 2011-06-08 2012-01-04 无锡市宝牛阀业有限公司 Three-eccentric sealing butterfly valve
CN202252028U (en) * 2011-09-21 2012-05-30 铁岭方众阀门有限公司 Metal-rubber sealing sub butterfly valve
EP2657582A1 (en) * 2012-04-27 2013-10-30 Metso Automation MAPAG GmbH Shut-off valve with a shut-off disc with a rotating bearing
CN203656229U (en) * 2013-11-15 2014-06-18 浙江时代铸造有限公司 Butterfly plate device for butterfly valve

Also Published As

Publication number Publication date
CN107725795A (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN107725795B (en) PRATT large-diameter butterfly valve valve seat insert replacing options
CN104832745B (en) Arc board-like heavy caliber PE is pipe pressurized to repair structure and its restorative procedure
CN105890845B (en) Pipeline high strength and tightness test tool and method
CN107588280B (en) Natural gas line expansive cylinder stopping transportation pressure method for blocking
CN110657294B (en) Flange air leakage plugging method of gas insulated metal closed electrical equipment
CN210770990U (en) Open-air patching device of small-bore steel pipeline and repair structure
CN104439886A (en) Sticking and reinforcing device and sticking and repairing method for cracks on cast iron outer shell of diffusion pump of vacuum furnace
CN106555914A (en) The large-scale rubber lined pipe renovation technique of nuclear power station
CN102182930B (en) Multi-system pipe network combined step-by-step hydraulic testing method
CN103545731B (en) High voltage electric apparatus band pressure does not have a power failure blocking method
CN204064591U (en) The vertical automatic pressure test device of heat collector runner
CN202746797U (en) Reinforced concrete pipe provided with double rubber ring steel spigot joint
CN215905897U (en) Condensate fine treatment complete resin unloading device
CN105346108A (en) Repairing method for heat insulating layer
CN109274278A (en) A kind of high voltage direct current converter valve screening electrodes mounting base prosthetic device and method
CN218267926U (en) Online pressure repairing device for blast furnace iron-making pressure pipeline
CN110585940A (en) Novel on-site rapid repairing and reconstructing method for stirring blade anticorrosive lining
CN221897388U (en) Connection system for butt joint of new and old pipelines
CN205579138U (en) Structure is repaired to gas chamber leak source
CN108168800A (en) A kind of method for butterfly valve being replaced to carry out pipeline tightness test using polyethylene tube
CN108593448B (en) Synchronous construction method for pressure test, flushing and test run of industrial system
US11725766B2 (en) Systems and methods for repairing piping
CN219082548U (en) Maintenance seal sleeve for oil tank manhole well
CN220072253U (en) Be applied to automatic mechanism and apparatus for producing that glue of battery piece
RU1812127C (en) Method of repairing chemical equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant