CN107724612A - A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling - Google Patents

A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling Download PDF

Info

Publication number
CN107724612A
CN107724612A CN201710851680.1A CN201710851680A CN107724612A CN 107724612 A CN107724612 A CN 107724612A CN 201710851680 A CN201710851680 A CN 201710851680A CN 107724612 A CN107724612 A CN 107724612A
Authority
CN
China
Prior art keywords
guard rail
rail support
guardrail
welded
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710851680.1A
Other languages
Chinese (zh)
Inventor
朱然
叶志强
吴晓芳
金显利
施佳俊
杜跃跃
胡宗铅
朱海明
叶志乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Yuzhou Construction Co Ltd
Original Assignee
Wenzhou Yuzhou Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Yuzhou Construction Co Ltd filed Critical Wenzhou Yuzhou Construction Co Ltd
Priority to CN201710851680.1A priority Critical patent/CN107724612A/en
Publication of CN107724612A publication Critical patent/CN107724612A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Abstract

The invention discloses a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling,Including guard rail support,Weld bottom plate,Mounting bracket and cultivation pot,Guard rail support is drum structure,Guard rail support bottom is provided with welding bottom plate,Guard rail support bottom is welded with some mounting blocks,Welding bottom plate and guard rail support are welded to connect by mounting blocks,Both ends are equipped with mounting seat on the upside of guard rail support,Dismounting redesign is carried out to existing balcony according to decoration style,Integral frame need not be dismantled and damage its unitary construction,It is simple and convenient,And design can bring up the region of plant on guardrail,Meet the aesthetic requirement of house owner,And some green vegetables can be planted,Health environment-friendly,Bring one brush green to surrounding environment,In addition,Design a rotatable placement plate in guardrail bottom,It is available for house owner to shine footwear or some small articles,Greatly save the space of balcony,And the daylighting outside balcony is better,Bring to life and greatly facilitate.

Description

A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling
Technical field
The present invention relates to a kind of balcony guardrail, more particularly, to a kind of novel green balcony guardrail for being easily installed and dismantling And its installation method.
Background technology
Building construction refers to build the buildings such as house on the soil for completing infrastructure construction, including residential building, work Industry factory building, business premises, office building and other single purpose buildings, common building of the balcony guardrail as residential quarter, to remaining whole Individual house it is attractive in appearance while also play safe effect
Balcony guardrail is balcony to outer peripheral beautification and protective equipment, by welding or is assembled by alloy pipe.It is common 0.5 meter away from ground or so of low windowsill, if being close to interior wall and increasing by 0.4 meter of guardrail or fence and reach the protection of code requirement certainly arrange Apply.0.5 meter away from ground or so of common low windowsill, if be close to, interior wall increases by 0.4 meter of guardrail or fence reaches code requirement certainly Safeguard procedures.If windowsill table top is too big, such as bay window, child often on windowsill look into the distance by station, and user is also necessary Stand to window is opened on windowsill, at this moment, the guardrail being attached on windowsill should highly reach 0.9 meter of guardrails clear height in itself should not be low In 1.05 meters.On the middle and senior level, high residential building guardrail clear height is not lower than 1.1 meters.Require 0.9 meter higher than windowsill guardrail.
With the increasingly popularization that diversification is built, people are not only satisfied with the demand for security of building construction, to aesthetic And the requirement of green grade also more and more higher, existing balcony guardrail, structure function is single, enters to existing guardrail style Row seems particularly difficult when replacing, and designs a kind of balcony guardrail for being easily installed and dismantling, can be according to decoration style to existing Balcony carry out dismounting redesign, it is simple and convenient, and design can bring up the region of plant on guardrail, meet the aesthetic need of house owner Ask, and some green vegetables can be planted, health environment-friendly, bring one brush green to surrounding environment, in addition, guardrail bottom design one Individual rotatable placement plate, it is available for house owner to shine footwear or some small articles, greatlys save the space of balcony, and adopting outside balcony Light effect more preferably, brings to life and greatly facilitated.
The content of the invention
The technical problem to be solved in the present invention is on the basis of building construction application, is provided for balcony guardrail and its installation A kind of miscellaneous function, a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling is designed, on solving State problem.
To achieve the above object, the present invention provides following technical scheme:
A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling of the present invention, including guard rail support, welding Bottom plate, mounting bracket and cultivation pot, the guard rail support are drum structure, and the guard rail support bottom is provided with welding bottom plate, institute State guard rail support bottom and be welded with some mounting blocks, the welding bottom plate and guard rail support are welded to connect by mounting blocks, described Both ends are equipped with mounting seat on the upside of guard rail support, and both ends also are provided with mounting seat on the downside of the guard rail support, described to weld on bottom plate Rotary shaft is installed, described rotary shaft one end is connected with placement plate, some mounting brackets, the peace are provided with the upside of the placement plate Support both ends are filled through guard rail support to its both sides, the mounting bracket both ends are mounted on decorative nut cap, the installation branch External screw thread is equipped with the outside of frame both ends, is equipped with internal thread on the inside of the decorative nut cap, the decorative nut cap and mounting bracket are Threaded connection, the mounting bracket upside are provided with some cultivation pots being uniformly arranged, and cultivation pot both sides upper end, which is provided with, to be used for The decorative panel of decoration function, guard rail support side outer end are provided with spiral expanding bar, and the spiral expanding bar side is fixed and set There is bearing pin, the guard rail support inside lower end offers neck.
Preferably, the mounting seat is welded with installation plate away from guard rail support one end, is fixed in the mounting seat Provided with block.
Preferably, the rotating shaft terminal is equipped with the limited block for limiting rotary shaft position.
Preferably, the placement plate surrounding is vertically welded with fixed dam.
Preferably, each mounting bracket is to be arranged in parallel.
Preferably, the spiral expanding bar is fixedly connected with guard rail support by bearing pin.
Preferably, the spiral expanding bar side and neck are to be connected together.
Preferably, including following installation method and application method:
A is just installed:Guard rail support with I-shape construction is welded on the metope on balcony by installing plate, and will weldering Connect bottom plate and be welded in guard rail support bottom, wherein mounting blocks further ensure guard rail support and weld the steadiness of bottom plate, complete Into the installation of preliminary integral support;
The installation of b mounting brackets:Mounting bracket is placed horizontally inside guard rail support and run through by the slotted eye of guard rail support In its both sides, decorative nut cap is tightened in mounting bracket end positions, its soundness is checked after installing;
C integral installations:Cultivation pot is fixed and is welded in mounting bracket upper end, and welds decorative panel and is welded in its two side position;
D application methods:The balcony is being carried out in use, cultivation pot is used to cultivate some green plantss or vegetables, decorative panel Different patterns can be selected according to layout of houses, when needing to shine footwear or other articles, plate will be placed and rotated to balcony Position, it would be desirable to which the article of drying, which is positioned over, to be placed on plate, rotating screw expansion link, its one end is connected in neck, realized The temporary transient enclosing of guardrail bottom, to ensure security, when needing to reinstall guardrail, mounting bracket is removed, carried out It is overall to conceive again without carrying out whole dismountings to whole framework.
Compared with prior art, the beneficial effects of the invention are as follows:The novel green balcony shield that this kind is easily installed and dismantled Column and its installation method, structure design is completely compact, designs a kind of balcony guardrail for being easily installed and dismantling, can be according to finishing Style carries out dismounting redesign to existing balcony, it is not necessary to and integral frame is dismantled and damages its unitary construction, letter It is single convenient, and design can bring up the region of plant on guardrail, meet the aesthetic requirement of house owner, and can plant some green vegetables Dish, health environment-friendly, bring one brush green to surrounding environment, in addition, a rotatable placement plate is designed in guardrail bottom, can pay rent Main solarization footwear or some small articles, the space of balcony is greatlyd save, and the daylighting outside balcony is better, is brought greatly to life Big facility, the present invention is simple in construction and reasonable in design, more hommization, is adapted to promote the use of.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Apply example to be used to explain the present invention together, be not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the agent structure schematic diagram of the present invention;
In figure:1st, guard rail support;2nd, bottom plate is welded;3rd, mounting bracket;4th, cultivation pot;5th, decorative panel;6th, mounting seat;7th, block; The 8th, plate is installed;9th, decorative nut cap;10th, mounting blocks;11st, bearing pin;12nd, spiral expanding bar;13rd, neck;14th, plate is placed;15th, it is solid Determine baffle plate;16th, rotary shaft;17th, limited block.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments, is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme:A kind of novel green balcony guardrail for being easily installed and dismantling And its installation method, including guard rail support 1, welding bottom plate 2, mounting bracket 3 and cultivation pot 4, guard rail support 1 are drum structure, The bottom of guard rail support 1 is provided with welding bottom plate 2, and the bottom of guard rail support 1 is welded with some mounting blocks 10, welds bottom plate 2 and guardrail branch Frame 1 is welded to connect by mounting blocks 10, and the upside both ends of guard rail support 1 are equipped with mounting seat 6, and the downside both ends of guard rail support 1 are also set There is mounting seat 6, weld and rotary shaft 16 is installed on bottom plate 2, the one end of rotary shaft 16, which is connected with, places plate 14, places the upside of plate 14 and sets There are some mounting brackets 3, the both ends of mounting bracket 3 are mounted on filling through guard rail support 1 to its both sides, the both ends of mounting bracket 3 Nut 9 is adornd, external screw thread is equipped with the outside of the both ends of mounting bracket 3, the inner side of decorative nut cap 9 is equipped with internal thread, decorative nut cap 9 and peace Support 3 is filled as threaded connection, the upside of mounting bracket 3 is provided with some cultivation pots 4 being uniformly arranged, and the both sides upper end of cultivation pot 4 is provided with For the decorative panel 5 of decoration function, the side outer end of guard rail support 1 is provided with spiral expanding bar 12, and the side of spiral expanding bar 12 is fixed Provided with bearing pin 11, the inside lower end of guard rail support 1 offers neck 13.
In the above-described embodiments, mounting seat 6 is welded with away from the one end of guard rail support 1 installs plate 8, solid in mounting seat 6 Surely it is provided with block 7.
In the above-described embodiments, the both ends of rotary shaft 16 are equipped with the limited block 17 for limiting rotary shaft position.
In the above-described embodiments, place the surrounding of plate 14 and be vertically welded with fixed dam 15.
In the above-described embodiments, each mounting bracket 3 is to be arranged in parallel.
In the above-described embodiments, spiral expanding bar 12 is fixedly connected with guard rail support 1 by bearing pin 11.
In the above-described embodiments, the side of spiral expanding bar 12 and neck 13 are to be connected together.
In the above-described embodiments, including following installation method and application method:
A is just installed:Guard rail support 1 with I-shape construction is welded on the metope on balcony by installing plate 8, and will Welding bottom plate 2 is welded in the bottom of guard rail support 1, and wherein mounting blocks 10 further ensure guard rail support 1 and weld the steady of bottom plate 2 Solidity, complete the installation of preliminary integral support;
The installation of b mounting brackets:Mounting bracket 3 is placed horizontally at the inside of guard rail support 1 and passed through by the slotted eye of guard rail support 1 Its both sides is through at, decorative nut cap 9 is tightened in the end positions of mounting bracket 3, its soundness is checked after installing;
C integral installations:Cultivation pot 4 is fixed and is welded in the upper end of mounting bracket 3, and welds decorative panel 5 and is welded in its two side position;
D application methods:The balcony is being carried out in use, cultivation pot 4 is used to cultivate some green plantss or vegetables, decorative panel 5 can select different patterns according to layout of houses, when needing to shine footwear or other articles, will place plate 14 and rotate to outside balcony Side position, it would be desirable to which the article of drying, which is positioned over, to be placed on plate 14, rotating screw expansion link 12, its one end is connected in into neck 13 It is interior, the temporary transient enclosing of guardrail bottom is realized, to ensure security, when needing to reinstall guardrail, removes installation branch Frame 3, carry out entirety and conceive again without carrying out whole dismountings to whole framework.
Compared with prior art, the beneficial effects of the invention are as follows:A kind of balcony guardrail for being easily installed and dismantling is designed, can To carry out dismounting redesign to existing balcony according to decoration style, it is not necessary to integral frame is dismantled and to damage its whole Body constructs, simple and convenient, and design can bring up the region of plant on guardrail, meet the aesthetic requirement of house owner, and can plant one A little green vegetables, health environment-friendly, bring one brush green to surrounding environment, in addition, a rotatable placement is designed in guardrail bottom Plate 14, it is available for house owner to shine footwear or some small articles, greatlys save the space of balcony, and the daylighting outside balcony is better, Bring to life and greatly facilitate, the present invention is simple in construction and reasonable in design, more hommization, is adapted to promote the use of.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic, Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's Within protection domain.

Claims (8)

1. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling, including guard rail support(1), welding bottom Plate(2), mounting bracket(3)And cultivation pot(4), it is characterised in that the guard rail support(1)For drum structure, the guardrail branch Frame(1)Bottom is provided with welding bottom plate(2), the guard rail support(1)Bottom is welded with some mounting blocks(10), the welding bottom plate (2)And guard rail support(1)Pass through mounting blocks(10)It is welded to connect, the guard rail support(1)Upside both ends are equipped with mounting seat (6), the guard rail support(1)Downside both ends also are provided with mounting seat(6), the welding bottom plate(2)On rotary shaft is installed(16), The rotary shaft(16)One end is connected with placement plate(14), the placement plate(14)Upside is provided with some mounting brackets(3), it is described Mounting bracket(3)Guard rail support is run through at both ends(1)To its both sides, the mounting bracket(3)Both ends are mounted on decorative nut cap (9), the mounting bracket(3)External screw thread, the decorative nut cap are equipped with the outside of both ends(9)Inner side is equipped with internal thread, described Decorative nut cap(9)And mounting bracket(3)For threaded connection, the mounting bracket(3)Upside is provided with some cultivation being uniformly arranged Basin(4), the cultivation pot(4)Both sides upper end is provided with the decorative panel for decoration function(5), the guard rail support(1)Outside side End is provided with spiral expanding bar(12), the spiral expanding bar(12)Side is fixed with bearing pin(11), the guard rail support(1)It is interior Side lower end offers neck(13).
2. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, the mounting seat(6)Away from guard rail support(1)One end is welded with installation plate(8), the mounting seat(6)On it is solid Surely it is provided with block(7).
3. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, the rotary shaft(16)Both ends are equipped with the limited block for limiting rotary shaft position(17).
4. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, the placement plate(14)Surrounding is vertically welded with fixed dam(15).
5. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, each mounting bracket(3)It is to be arranged in parallel.
6. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, the spiral expanding bar(12)And guard rail support(1)Pass through bearing pin(11)It is fixedly connected.
7. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, the spiral expanding bar(12)Side and neck(13)To be connected together.
8. a kind of novel green balcony guardrail and its installation method for being easily installed and dismantling according to claim 1, it is special Sign is, including following installation method and application method:
A is just installed:By the guard rail support with I-shape construction(1)By installing plate(8)It is welded on the metope on balcony, And bottom plate will be welded(2)It is welded in guard rail support(1)Bottom, wherein mounting blocks(10)Further ensure guard rail support(1)With Weld bottom plate(2)Steadiness, complete the installation of preliminary integral support;
The installation of b mounting brackets:By mounting bracket(3)It is placed horizontally at guard rail support(1)Inside simultaneously passes through guard rail support(1)'s Slotted eye is through its both sides, by decorative nut cap(9)Tighten in mounting bracket(3)End positions, check that it is firm after installing Degree;
C integral installations:By cultivation pot(4)Fixation is welded in mounting bracket(3)Upper end, and weld decorative panel(5)Be welded in its two Side position;
D application methods:Carried out to the balcony in use, cultivation pot(4)For cultivating some green plantss or vegetables, decoration Plate(5)Different patterns can be selected according to layout of houses, when needing to shine footwear or other articles, plate will be placed(14)Rotation is extremely Balcony outer fix, it would be desirable to which the article of drying is positioned over placement plate(14)On, rotating screw expansion link(12), by its one end card It is connected to neck(13)It is interior, the temporary transient enclosing of guardrail bottom is realized, to ensure security, is needing to reinstall guardrail When, remove mounting bracket(3), carry out entirety and conceive again without carrying out whole dismountings to whole framework.
CN201710851680.1A 2017-09-20 2017-09-20 A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling Pending CN107724612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710851680.1A CN107724612A (en) 2017-09-20 2017-09-20 A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710851680.1A CN107724612A (en) 2017-09-20 2017-09-20 A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling

Publications (1)

Publication Number Publication Date
CN107724612A true CN107724612A (en) 2018-02-23

Family

ID=61207646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710851680.1A Pending CN107724612A (en) 2017-09-20 2017-09-20 A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling

Country Status (1)

Country Link
CN (1) CN107724612A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2542716Y (en) * 2002-04-28 2003-04-02 郭德平 Green protection fence
CN201053171Y (en) * 2007-04-29 2008-04-30 廖信传 Modified structure for handrail column
CN101298797A (en) * 2008-06-20 2008-11-05 吴选勤 Method for mounting connecting components
KR20110090042A (en) * 2010-02-02 2011-08-10 문근술 A ladder for fire escape
CN102767266A (en) * 2012-07-12 2012-11-07 临朐县煜昕铁艺制品有限公司 Balcony guardrail
CN204691123U (en) * 2015-06-26 2015-10-07 龙泉市欧源市政园林养护有限公司 Balcony greening fence
CN204920045U (en) * 2015-08-18 2015-12-30 南通市达欣工程股份有限公司 Balcony guardrail
CN205884117U (en) * 2016-06-27 2017-01-18 深圳市华田园林绿化有限公司 Balcony afforestation rail
CN206289898U (en) * 2016-12-09 2017-06-30 郭双龙 A kind of Multifunctional balcony protective fence

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2542716Y (en) * 2002-04-28 2003-04-02 郭德平 Green protection fence
CN201053171Y (en) * 2007-04-29 2008-04-30 廖信传 Modified structure for handrail column
CN101298797A (en) * 2008-06-20 2008-11-05 吴选勤 Method for mounting connecting components
KR20110090042A (en) * 2010-02-02 2011-08-10 문근술 A ladder for fire escape
CN102767266A (en) * 2012-07-12 2012-11-07 临朐县煜昕铁艺制品有限公司 Balcony guardrail
CN204691123U (en) * 2015-06-26 2015-10-07 龙泉市欧源市政园林养护有限公司 Balcony greening fence
CN204920045U (en) * 2015-08-18 2015-12-30 南通市达欣工程股份有限公司 Balcony guardrail
CN205884117U (en) * 2016-06-27 2017-01-18 深圳市华田园林绿化有限公司 Balcony afforestation rail
CN206289898U (en) * 2016-12-09 2017-06-30 郭双龙 A kind of Multifunctional balcony protective fence

Similar Documents

Publication Publication Date Title
JP2007274948A (en) System and method for greening wall surface
CN201874296U (en) Power ensured emergency tent
CN107724612A (en) A kind of novel green balcony guardrail and its installation method for being easily installed and dismantling
CN209653266U (en) A kind of balcony guardrail
CN207848614U (en) A kind of line holder of the municipal construction based on screw thread lifting
CN212054092U (en) Fender is enclosed with monitoring formula to building engineering construction
CN211422077U (en) Protective net for constructional engineering
CN206319509U (en) A kind of balcony guardrail with rotatable flower trough
CN205455001U (en) Snake gourd shed frame
CN211900057U (en) Building engineering faces limit protection support
CN204475718U (en) A kind of balcony guardrail
CN209653102U (en) A kind of novel domestic balcony guardrail
CN206667795U (en) A kind of construction engineering protective net
CN206429001U (en) A kind of multipurpose outward flange single tube tower apparatus
CN206449538U (en) Square lamp structural system
CN203226071U (en) Vine-like plant guide frame
CN110707624A (en) Novel controllable easy-to-lock temporary cable support
CN206158343U (en) Modular protection rail
CN201040938Y (en) Antenna concealed type iron tower
CN207619892U (en) A kind of dust-proof fence of road construction assembly type
CN211059781U (en) Electric installation safety device in highway tunnel
CN211900012U (en) Multi-angle guardrail for operation and maintenance of solar power station
CN217872153U (en) Insulating telescopic security fence
CN210289211U (en) A buffering atress regularization protection canopy for container room
CN216476520U (en) Building engineering strutting arrangement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223