CN107724579B - Large area moulding aluminium trellis system construction method - Google Patents

Large area moulding aluminium trellis system construction method Download PDF

Info

Publication number
CN107724579B
CN107724579B CN201711019946.2A CN201711019946A CN107724579B CN 107724579 B CN107724579 B CN 107724579B CN 201711019946 A CN201711019946 A CN 201711019946A CN 107724579 B CN107724579 B CN 107724579B
Authority
CN
China
Prior art keywords
grid
type
plate
square steel
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711019946.2A
Other languages
Chinese (zh)
Other versions
CN107724579A (en
Inventor
连珍
王辉平
张斌
刘淳
陈莹
吴晓峰
廖燕飞
王金明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201711019946.2A priority Critical patent/CN107724579B/en
Publication of CN107724579A publication Critical patent/CN107724579A/en
Application granted granted Critical
Publication of CN107724579B publication Critical patent/CN107724579B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

It is low for aerated blocks metope bulk density, internal voids are big, the problem of being not used to the fixed installation of large area moulding aluminium grid metope facing component, it is low for grid positioning accuracy simultaneously, the problem of location difficulty, the invention discloses large area moulding aluminium trellis system construction methods, using support frame, carry on the back aluminium sheet back frame frame, carry on the back aluminium sheet, π type fixing piece and grid, by π type fixing piece being fixed on corresponding vertical supporting square steel and π type fixing piece is located at same level height, therefore each π type fixing piece need to be only installed in same horizontal line, without carrying out horizontal alignment when grid is installed, ensure that the horizontal control of grid installation site, play a dual role of being connected and fixed grid and being accurately positioned, to improve the installation accuracy of decorative cover, mounting stability and installation effectiveness.Grid uses trapezoidal design, allows the center of gravity of grid closer to fixed position, improves the connection reliability between π type fixing piece and grid, improves bearing capacity and security performance.

Description

Large area moulding aluminium trellis system construction method
Technical field
The present invention relates to building decoration engineering construction field more particularly to a kind of large area moulding aluminium trellis system construction parties Method.
Background technique
Currently, being the wall that aerated blocks are built for metope large area in building decoration engineering construction field, decoration is completed Face can not directly be fixed with aerated blocks, and traditional method grid installation site accuracy is difficult to ensure, for leaving the height on ground The grid installation of layer metope, accurate positionin is more difficult, and time-consuming and laborious, locating effect is not high.
Therefore, how one kind is provided and can effectively fix decorative cover on the outside of aerated blocks wall and can be realized grid and prepares to determine Position, the firm large area moulding aluminium trellis system construction method installed, it has also become construction circle needs further improvement and optimization Technical problem.
Summary of the invention
The purpose of the present invention is to provide a kind of large area moulding aluminium trellis system construction methods, can be outside aerated blocks wall The effectively fixed large area moulding aluminium grille decorative metope in side, and can be realized grid and prepare positioning and firm installation, improve decoration Face installation accuracy, mounting stability and installation effectiveness.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of large area moulding aluminium trellis system construction method, the aerated blocks wall be located at neighbouring floor beam and In the space that adjacent formation column surrounds, described method includes following steps:
Step 1 installs the L-type built-in fitting in each support frame, so that L-type built-in fitting is embedded in neighbouring floor beam in advance On, the L-type built-in fitting includes two horizontal connecting plates connected vertically and vertical connecting plate, the horizontal connecting plate with it is described Vertical connecting plate passes through expansion bolt respectively and is fixed on corresponding floor beam;
Step 2 installs two horizontal support bars and vertical supporting square steel in each support frame, so that horizontal support bar One end is fixed on corresponding L-type built-in fitting, and the vertical supporting square steel fixing clamp is set between two horizontal support bars;
Step 3, installation back aluminium sheet back frame frame, so that back aluminium sheet back frame frame is fixed on the horizontal support bar;
Step 4, installation back aluminium sheet, so that the back aluminium sheet is fixedly connected on the outer surface of the back aluminium sheet back frame frame, and The vertical supporting square steel is located at the outside of the back aluminium sheet;
Step 5 installs π type grate fixing part, and the π type fixing piece is fixed on corresponding vertical supporting square steel and π type Fixing piece is located at same level height, and the π type fixing piece is equipped with several bolts hole for stationary grizzly along short transverse;
Step 6 installs grid, and the grid is fixed on the π type fixing piece by the first bolt lateral separation, institute The cross section for stating grid is in a rectangular trapezoid, the grid include the sequentially connected big bottom plate of head and the tail, right angle waist panel, platter and Oblique waist plate is equipped with internal partition in the grid at big bottom plate, and the internal partition is parallel with the big bottom plate, the outsole Plate is longitudinally equipped with installation notch along itself, and the installation notch are located at the middle part of the big bottom plate, and the big bottom plate is vertically arranged, The right angle waist panel is located at the top of the oblique waist plate, and the head of first bolt is located at the internal partition and the big bottom plate Between, the screw rod of first bolt is successively from the installation notch of big bottom plate and pair on the vertical side plate of corresponding π type fixing piece It answers and stretches out in bolt hole and locked by nut.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, vertical supporting square steel interval is set It is placed in the outside of constructional column, the back aluminium sheet back frame frame includes several parallel lateral square steel and several parallel vertical sides Steel, the transverse direction square steel are mutually perpendicular to the vertical square steel.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, each support frame further includes two openings First C-type steel directed downwardly, one end of first C-type steel are respectively and fixedly connected on the vertical connecting plate of corresponding L-type built-in fitting, institute The lateral square steel difference fixing clamp for being located at the top and bottom in back aluminium sheet back frame frame is stated set on corresponding horizontal support bar Between the other end of the first C-type steel, a side of the first C-type steel is fixedly connected with corresponding vertical square steel.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, each support frame further includes several opens One end of second C-type steel of mouth down, second C-type steel is fixed on corresponding constructional column by rectangular built-in fitting, described Short transverse arranged for interval of second C-type steel along the back aluminium sheet back frame frame, the upper surface of the other end of second C-type steel It is fixedly connected with corresponding lateral square steel, a side of the other end of second C-type steel is fixed with corresponding vertical square steel Connection, the rectangular built-in fitting are embedded on corresponding constructional column in advance in step 1.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, the back aluminium sheet includes several units Plate, each cell board are connect by L shape corner brace with lateral square steel, and the cell board includes vertical aluminium sheet and is vertically connected at described The level board of the upper and lower ends of vertical aluminium sheet, the corner brace between adjacent cells plate shift to install.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, the cross section of the π type fixing piece is in π type, the π type fixing piece include a grid fixed plate and a pair of parallel vertical side plate, the grid fixed plate and institute State that vertical side plate is perpendicular, the vertical supporting square steel is inserted between two vertical side plates of the π type fixing piece and passes through Third is bolted.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, the grid of the π type fixing piece is fixed Short transverse spaced set on plate along grid fixed plate has several bolts hole to for stationary grizzly.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, the cross section of the grid is rectangular Trapezoidal
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, the grid includes that head and the tail successively connect Big bottom plate, right angle waist panel, platter and the oblique waist plate connect, is equipped with internal partition in the grid at big bottom plate, it is described in Partition is parallel with the big bottom plate, and the big bottom plate is located at described along installation notch, the installation notch itself are longitudinally equipped with The middle part of big bottom plate, the big bottom plate is vertically arranged, and the right angle waist panel is located at the top of the oblique waist plate, first bolt Head between the internal partition and the big bottom plate, the screw rod of first bolt is successively from the installation notch of big bottom plate It stretches out with the correspondence bolt hole on the vertical side plate of corresponding π type fixing piece and is locked by nut.
It preferably, further include step 7 in above-mentioned large area moulding aluminium trellis system construction method, installation is upper and lower Decorative aluminum plate, the areas outside between adjacent level support rod and adjacent level support rod in sustained height are equipped with one Molding decorative aluminum plate is equipped with support bar between the decorative aluminum plate and corresponding horizontal support bar.
By techniques disclosed above scheme it is found that compared with prior art, beneficial effects of the present invention are as follows:
Large area moulding aluminium trellis system construction method provided by the invention, structure is simple, power transmission is reliable, by will be described π type fixing piece is fixed on corresponding vertical supporting square steel and π type fixing piece is located at same level height, i.e., by by the π Type fixing piece is fixed on corresponding vertical supporting square steel with identical height, therefore, only need to be when π type fixing piece is installed, school Quasi- π type fixing piece elevation is height, so that each π type fixing piece is in the same horizontal line, the both ends of the grid pass through first When bolt lateral separation is fixed on corresponding institute π type fixing piece, no longer need to carry out secondary levels calibration, thus the present invention uses The horizontal control of grid installation site can be effectively ensured in special π type fixing piece, primary positioning, play solid to grid connection Double action fixed and being accurately positioned, to improve decorative cover installation accuracy, mounting stability and installation effectiveness.
Large area moulding aluminium trellis system construction method provided by the invention, the cross section of the grid is in a rectangular trapezoid, The grid includes the sequentially connected big bottom plate of head and the tail, right angle waist panel, platter and oblique waist plate, close outsole in the grid Internal partition is equipped at plate, the internal partition is parallel with the big bottom plate, and the big bottom plate is longitudinally equipped with installation notch along itself, The installation notch are located at the middle part of the big bottom plate, and the big bottom plate is vertically arranged, and the right angle waist panel is located at the oblique waist The top of plate, the head of first bolt is between the internal partition and the big bottom plate, the screw rod of first bolt It is successively stretched out from the installation notch of big bottom plate and the correspondence bolt hole on the vertical side plate of corresponding π type fixing piece and passes through nut Locking.Grid uses trapezoidal design, and the head of first bolt is between the internal partition and the big bottom plate, described The screw rod of first bolt successively from the installation notch of big bottom plate in the correspondence bolt hole on the vertical side plate of corresponding π type fixing piece It stretches out and is locked by nut, allow the center of gravity of grid closer to fixed position, improve between π type fixing piece and grid Connection reliability, improve bearing capacity and security performance.In addition, the right angle waist panel is located at the top of the oblique waist plate, i.e., it is terraced Shape right angle faces upward, and inclined-plane is downward, when seeing from the bottom up, is capable of increasing vision area.
Large area moulding aluminium trellis system construction method provided by the invention, since each support frame includes that two pieces of L-types are pre- Embedded part, two horizontal support bars and a vertical supporting square steel, two L-type built-in fittings up and down it is corresponding be embedded in advance it is neighbouring On floor beam, one end of the horizontal support bar is fixed on corresponding L-type built-in fitting, the fixed sandwiched of the vertical supporting square steel Between two horizontal support bars, the L-type built-in fitting includes two horizontal connecting plates connected vertically and vertically connect Plate, the horizontal connecting plate pass through expansion bolt with the vertical connecting plate respectively and are fixed on corresponding floor beam, so as to So that the L-type built-in fitting being fixedly connected with horizontal support bar, can bear to be parallel to aerating metope from horizontal support bar, Vertical supporting square steel back aluminium sheet back frame frame, is carried on the back the gravity of aluminium sheet, π type fixing piece and grid, and can be born perpendicular to wall The pulling force effect in face, structure is simple, power transmission is reliable, and large area moulding aluminium trellis system construction method is firmly secured to by realization to be added The outside of air parcel wall.
Large area moulding aluminium trellis system construction method provided by the invention, by will be located in the back aluminium sheet back frame frame The lateral square steel of the top and bottom distinguish fixing clamp be set to corresponding horizontal support bar and the first C-type steel the other end it Between, it can to stablize the lateral square steel installation for being located at the top and bottom in the back aluminium sheet back frame frame, the first c-type One side of steel is fixedly connected with corresponding vertical square steel, it is ensured that vertical square steel installation is stablized, so that entire support frame It is mounted so as to stronger, the load of frame easy to support and back aluminium sheet thereon is by horizontal support bar and the first C-type steel through L-type Built-in fitting is timely transmitted to floor beam.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of aerated blocks wall.
Fig. 2 is the structural schematic diagram that support frame is installed on floor beam in one embodiment of the invention.
Fig. 3 is the structural schematic diagram that single support frame is installed on floor beam in one embodiment of the invention.
Fig. 4 is the scheme of installation of L-type built-in fitting in support frame in one embodiment of the invention.
Fig. 5 is the scheme of installation of horizontal support bar in support frame in one embodiment of the invention.
Fig. 6 is the scheme of installation that aluminium sheet back frame frame is carried on the back in one embodiment of the invention.
Fig. 7 is the lower part scheme of installation that aluminium sheet back frame frame is carried on the back in one embodiment of the invention.
Fig. 8 is the top scheme of installation that aluminium sheet back frame frame is carried on the back in one embodiment of the invention.
Fig. 9 is the middle part scheme of installation that aluminium sheet back frame frame is carried on the back in one embodiment of the invention.
Figure 10 is the scheme of installation that aluminium sheet is carried on the back in one embodiment of the invention.
Figure 11 is the connection schematic diagram that the cell board being located above in aluminium sheet and lateral square steel are carried on the back in one embodiment of the invention.
Figure 12 is the connection schematic diagram of one embodiment of the invention adjacent cells plate and lateral square steel.
Figure 13 is the connection schematic diagram of π type fixing piece and vertical supporting square steel in one embodiment of the invention.
Figure 14 is that the assembly of grid and π type fixing piece in one embodiment of the invention is illustrated to be intended to.
Figure 15 is the connection schematic diagram of grid and π type fixing piece in one embodiment of the invention.
Figure 16 is the scheme of installation of adjacent grid in one embodiment of the invention.
Figure 17 be one embodiment of the invention in all grids be installed after structural schematic diagram.
Figure 18 is the schematic side view of grid in one embodiment of the invention.
Figure 19 is the schematic perspective view of grid in one embodiment of the invention.
Figure 20 is one of the structural schematic diagram that support bar is installed on support frame top in one embodiment of the invention.
Figure 21 is the second structural representation that support bar is installed on support frame top in one embodiment of the invention.
Figure 22 is the structural schematic diagram that decorative aluminum plate is installed on support frame top in one embodiment of the invention.
Figure 23 is one of the structural schematic diagram that support bar is installed on support frame lower part in one embodiment of the invention.
Figure 24 is the second structural representation that support bar is installed on support frame lower part in one embodiment of the invention.
Figure 25 is the structural schematic diagram that decorative aluminum plate is installed on support frame lower part in one embodiment of the invention.
Figure 26 is the structural schematic diagram for the grille decorative plane system that one embodiment of the invention construction is completed.
In figure: 1- aerated blocks, 2- floor beam, 3- constructional column, 4- π type fixing piece, 41- grid fixed plate, the vertical side 42- Plate, 5- grid, the big bottom plate of 51-, the right angle 52- waist panel, 53- platter, 54- oblique waist plate, 55- internal partition, 56- stiffened panel, 6-L type Built-in fitting, 7- horizontal support bar, 8- vertical supporting square steel, 9- expansion bolt, 10- transverse direction square steel, the vertical square steel of 11-, 12- first Curved L shape corner brace, 18- under the upper curved L shape corner brace of C-type steel, the second C-type steel of 13-, the rectangular built-in fitting of 14-, 15- cell board, 16-, 17- First bolt, the second bolt of 19-, 20- third bolt, 21- decorative aluminum plate, 22- support bar.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and right Claim, advantages and features of the invention will become apparent from.This hair will be described in detail by cited embodiment combination attached drawing below Bright technology contents and feature.Need in addition it illustrate, attached drawing is all made of very simplified form and uses non-accurate ratio Example, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For sake of convenience, "upper" described below, "lower" is consistent with the upper and lower direction of attached drawing, but this can't be the limitation of technical solution of the present invention.
Fig. 1 to Figure 26 is please referred to, a kind of large area moulding aluminium trellis system construction method is present embodiments provided, it is described to add Air parcel wall is located in the space that neighbouring floor beam 2 and adjacent formation column 3 surround, and described method includes following steps:
Step 1 asks emphasis refering to Fig. 2~Fig. 5, installs the L-type built-in fitting 6 in each support frame, so that L-type built-in fitting 6 is pre- It is embedded on neighbouring floor beam 2, the L-type built-in fitting 6 includes two horizontal connecting plates connected vertically and vertically connect Plate, the horizontal connecting plate pass through expansion bolt 9 with the vertical connecting plate respectively and are fixed on corresponding floor beam 2.This reality It applies in example, L-type built-in fitting 6 uses 8mm thick steel plate, is connected by six expansion bolts 9 and floor beam 2, wherein two expanding screws The horizontal connecting plate of L-type built-in fitting 6 is fixedly connected by bolt 9 with the horizontal plane of floor beam 2, and four expansion bolts 9 are by L-type built-in fitting 6 vertical connecting plate is fixedly connected with the facade of floor beam 2, so that the L-type built-in fitting being fixedly connected with horizontal support bar 7 6, it can bear to be parallel to the horizontal support bar 7 from subsequent installation of aerating metope, vertical supporting square steel 8, back aluminium sheet back frame Frame, the gravity for carrying on the back aluminium sheet, π type fixing piece 4 and grid 5, and the pulling force effect perpendicular to metope can be born.
Step 2 installs two horizontal support bars 7 and vertical supporting square steel 8 in each support frame, so that horizontal support bar 7 One end be fixed on corresponding L-type built-in fitting 6,8 fixing clamp of vertical supporting square steel be set to two horizontal support bars 7 Between, so as to realize the firm support to vertical supporting square steel 8.Wherein the horizontal support bar 7 uses 12# I-steel.
Step 3 asks emphasis refering to Fig. 6~Fig. 7, installation back aluminium sheet back frame frame so that back aluminium sheet back frame frame be fixed on it is described On horizontal support bar 7.
Step 4 asks emphasis refering to fig. 10, installation back aluminium sheet, so that the back aluminium sheet is fixedly connected on the back aluminium sheet and carries on the back The outer surface of frame, and the vertical supporting square steel 8 is located at the outside of the back aluminium sheet.
Step 5, asks emphasis 3 and Figure 14 refering to fig. 1, installs 5 fixing piece of π type grid, and the π type fixing piece 4 is fixed on pair On the vertical supporting square steel 8 answered and π type fixing piece 4 is located at same level height, and the π type fixing piece 4 is equipped with along short transverse Several bolts hole for stationary grizzly 5.
Step 6 asks emphasis refering to fig. 15, installs grid, described in the grid is fixed on by the first bolt lateral separation On π type fixing piece, the cross section of the grid 5 is in a rectangular trapezoid, the grid 5 include the sequentially connected big bottom plate 51 of head and the tail, Right angle waist panel 52, platter 53 and oblique waist plate 54, the width of the big bottom plate 51 is greater than the width of the platter 53, described Internal partition 55 is equipped in grid 5 at big bottom plate 51, the internal partition 55 is parallel with the big bottom plate 51, the big bottom plate 51 along installation notch itself are longitudinally equipped with, and the installation notch are located at the middle part of the big bottom plate 51, and the big bottom plate 51 is vertical Setting, the right angle waist panel 52 are located at the top of the oblique waist plate 54, and the head of first bolt 18 is located at the internal partition Between 55 and the big bottom plate 51, the screw rod of first bolt 18 is successively solid with corresponding π type from the installation notch of big bottom plate 51 Determine to stretch out in the correspondence bolt hole on the vertical side plate 42 of part 4 and lock by nut.Grid 5 uses trapezoidal design, so that lattice The center of gravity of grid 5 can improve 4 dative of π type fixing piece closer to fixed position (link position of grid 5 and π type fixing piece 4) Connection reliability between grid 5 improves bearing capacity and security performance.In addition, the right angle waist panel 52 is located at the oblique waist plate 54 Top, i.e., trapezoidal right angle faces upward, and inclined-plane is downward, when seeing from the bottom up, is capable of increasing vision area.
The π type fixing piece 4 by being fixed on corresponding vertical supporting square steel 8 and π type fixing piece 4 is located at by the present invention Same level height, i.e., by the way that the π type fixing piece 4 to be fixed on corresponding vertical supporting square steel 8 with identical height, only Need to be when π type fixing piece 4 to be installed, calibration 4 elevation of π type fixing piece is height, so that each π type fixing piece 4 is in same horizontal line On, when the both ends of the grid 5 are fixed on corresponding institute π type fixing piece 4 by 18 lateral separation of the first bolt, without carrying out Secondary levels calibration, successively, using special π type fixing piece 4, can be effectively ensured 5 installation site of grid by once positioning Horizontal control, play a dual role of being connected and fixed and be accurately positioned.
Preferably, in above-mentioned large area moulding aluminium trellis system construction method, the interval of vertical supporting square steel 8 is set Be placed in the outside of constructional column 3, the back aluminium sheet back frame frame include several parallel lateral square steel 10 with it is several parallel vertical Square steel 11, the transverse direction square steel 10 are mutually perpendicular to the vertical square steel 11.The lateral square steel 10 that is arranged in a crisscross manner and vertical Square steel 11 can make up the more stable back aluminium sheet back frame frame of a structure.
Preferably, ask emphasis refering to Fig. 7 and Fig. 8, in above-mentioned large area moulding aluminium trellis system construction method, each Support frame further includes two downward opening first C-type steels 12, and one end of first C-type steel 12 is respectively and fixedly connected in corresponding L-type On the vertical connecting plate of built-in fitting 6, the top is located in the back aluminium sheet back frame frame and the lateral square steel 10 of bottom is distinguished Fixing clamp be set between corresponding horizontal support bar 7 and the other end of the first C-type steel 12, a side of the first C-type steel 12 with Corresponding vertical square steel 11 is fixedly connected.By the way that the transverse direction side of the top and bottom will be located in the back aluminium sheet back frame frame Steel 10 is distinguished fixing clamp and is set between corresponding horizontal support bar 7 and the other end of the first C-type steel 12, can make the back The lateral square steel 10 for being located at the top and bottom in aluminium sheet back frame frame, which is installed, to be stablized, a side of the first C-type steel 12 with Corresponding vertical square steel 11 is fixedly connected, and can vertically the installation of square steel 11 be stablized, so that entire support frame is mounted so as to more Securely, the load of frame easy to support and back aluminium sheet thereon is by horizontal support bar 7 and the first C-type steel 12 through L-type built-in fitting 6 It is timely transmitted to floor beam 2.
Preferably, ask emphasis refering to Fig. 9, in above-mentioned large area moulding aluminium trellis system construction method, each support Frame further includes several downward opening second C-type steels 13, and one end of second C-type steel 13 is fixed on by rectangular built-in fitting 14 On corresponding constructional column 3, second C-type steel 13 along the back aluminium sheet back frame frame short transverse arranged for interval, described the The upper surface of the other end of two C-type steels 13 is fixedly connected with corresponding lateral square steel 10, the other end of second C-type steel 13 One side is fixedly connected with corresponding vertical square steel 11, and the rectangular built-in fitting 14 is embedded in corresponding construction in advance in step 1 On column 3, so that support frame and the thereon load of back aluminium sheet disperse transmitting, the stress at reduction four angles of support frame is mentioned The stability of high whole system.
Preferably, emphasis 1 and Figure 12 refering to fig. 1 is asked, in above-mentioned large area moulding aluminium trellis system construction method, institute Stating back aluminium sheet includes several cell boards 15, and each cell board 15 passes through the upper curved L shape corner brace 16 curved L shape corner brace under shifted to install 17 connect with lateral square steel 10 via the second bolt 19, and the cell board 15 includes vertical aluminium sheet and is vertically connected at described vertical The level board of the upper and lower ends of aluminium sheet, upper and lower curved L shape corner brace 16,17 include transverse plate and vertical plate, the transverse plate welding In on the outer surface of the correspondence level board of corresponding cell board 15, the vertical plate and lateral square steel 10 open up corresponding bolt Hole enables vertical plate and lateral square steel 10 to connect by the second bolt 19.It so, it is possible to realize between adjacent cells plate 15 Reliable and smooth connection.
Preferably, emphasis 3 and Figure 14 refering to fig. 1 is asked, in above-mentioned large area moulding aluminium trellis system construction method, institute The cross section of π type fixing piece 4 is stated in π type, the π type fixing piece 4 includes a grid fixed plate 41 and a pair of parallel perpendicular To side plate 42, the grid fixed plate 41 and the vertical side plate 42 are perpendicular, and the vertical supporting square steel 8 is inserted in the π It is connected between the vertical side plate 42 of two of type fixing piece 4 and by third bolt 20.The grid fixed plate of the π type fixing piece 4 Short transverse spaced set on 41 along grid fixed plate 41 has several bolts hole to for stationary grizzly 5.
Preferably, ask emphasis refering to Figure 20~Figure 26, in above-mentioned large area moulding aluminium trellis system construction method,
In order to guarantee that grid 5 itself has enough intensity, it is preferred that applied in above-mentioned large area moulding aluminium trellis system Further include step 7 in work method, upper and lower decorative aluminum plate 21 is installed, adjacent level support rod 7 and phase in sustained height Areas outside between adjacent horizontal support bar 7 is equipped with integrally formed decorative aluminum plate 21, the decorative aluminum plate 21 and corresponding water Support bar 22 is equipped between flat support rod 7.
In conclusion large area moulding aluminium trellis system construction method provided by the invention, structure is simple, power transmission is reliable, Can on the outside of aerated blocks wall effectively fixed large area moulding aluminium grille decorative metope, and can be realized grid and prepare positioning and steady Guan County's dress, improves decorative cover installation accuracy, mounting stability and installation effectiveness.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (7)

1. a kind of large area moulding aluminium trellis system construction method, aerated blocks wall is located at neighbouring floor beam and adjacent structure It makes in the space that column surrounds, which is characterized in that described method includes following steps:
Step 1 installs the L-type built-in fitting in each support frame, so that L-type built-in fitting is embedded in advance on neighbouring floor beam, institute Stating L-type built-in fitting includes two horizontal connecting plates connected vertically and vertical connecting plate, the horizontal connecting plate and described vertical Connecting plate passes through expansion bolt respectively and is fixed on corresponding floor beam;
Step 2 installs two horizontal support bars and vertical supporting square steel in each support frame, so that one end of horizontal support bar It is fixed on corresponding L-type built-in fitting, the vertical supporting square steel fixing clamp is set between two horizontal support bars;
Step 3, installation back aluminium sheet back frame frame, so that back aluminium sheet back frame frame is fixed on the horizontal support bar;
Step 4, installation back aluminium sheet, so that the back aluminium sheet is fixedly connected on the outer surface of the back aluminium sheet back frame frame, and described Vertical supporting square steel is located at the outside of the back aluminium sheet;
Step 5 installs π type grate fixing part, and the π type fixing piece is fixed on corresponding vertical supporting square steel and π type is fixed Part is located at same level height, and the π type fixing piece is equipped with several bolts hole for stationary grizzly along short transverse;
Step 6 installs grid, and the grid is fixed on the π type fixing piece by the first bolt lateral separation, the lattice The cross section of grid is in a rectangular trapezoid, and the grid includes the sequentially connected big bottom plate of head and the tail, right angle waist panel, platter and oblique waist Plate is equipped with internal partition in the grid at big bottom plate, and the internal partition is parallel with the big bottom plate, the big bottom plate edge Itself is longitudinally equipped with installation notch, and the installation notch are located at the middle part of the big bottom plate, and the big bottom plate is vertically arranged, described Right angle waist panel is located at the top of the oblique waist plate, the head of first bolt be located at the internal partition and the big bottom plate it Between, the screw rod of first bolt is successively from the installation notch of big bottom plate and the correspondence on the vertical side plate of corresponding π type fixing piece It stretches out in bolt hole and is locked by nut;
Each support frame further includes two downward opening first C-type steels, and one end of first C-type steel is respectively and fixedly connected in corresponding On the vertical connecting plate of L-type built-in fitting, the lateral square steel difference of the top and bottom is located in the back aluminium sheet back frame frame Fixing clamp be set between corresponding horizontal support bar and the other end of the first C-type steel, a side of the first C-type steel with it is corresponding Vertical square steel is fixedly connected.
2. large area moulding aluminium trellis system construction method as described in claim 1, which is characterized in that the vertical supporting side Steel is arranged at intervals at the outside of constructional column, the back aluminium sheet back frame frame include several parallel lateral square steel with it is several parallel Vertical square steel, the transverse direction square steel are mutually perpendicular to the vertical square steel.
3. large area moulding aluminium trellis system construction method as described in claim 1, which is characterized in that each support frame also wraps Several downward opening second C-type steels are included, corresponding constructional column is fixed on by rectangular built-in fitting in one end of second C-type steel On, short transverse arranged for interval of second C-type steel along the back aluminium sheet back frame frame, the other end of second C-type steel Upper surface be fixedly connected with corresponding lateral square steel, a side of the other end of second C-type steel with it is corresponding vertically Square steel is fixedly connected, and the rectangular built-in fitting is embedded on corresponding constructional column in advance in step 1.
4. large area moulding aluminium trellis system construction method as described in claim 1, which is characterized in that the back aluminium sheet includes Several cell boards, each cell board pass through the upper curved L shape corner brace that shifts to install and under curved L shape corner brace with transverse direction square steel via second It being bolted, the cell board includes the level board of vertical aluminium sheet with the upper and lower ends for being vertically connected at the vertical aluminium sheet, upper, Under curved L shape corner brace include transverse plate and vertical plate, the transverse plate is welded in the outer of the correspondence level board of corresponding cell board On surface, the vertical plate and lateral square steel open up corresponding bolt hole, enable vertical plate and lateral square steel by the Two are bolted.
5. large area moulding aluminium trellis system construction method as described in claim 1, which is characterized in that the π type fixing piece Cross section be in π type, the π type fixing piece includes a grid fixed plate and a pair of parallel vertical side plate, the grid Fixed plate and the vertical side plate are perpendicular, and the vertical supporting square steel is inserted in two vertical side plates of the π type fixing piece Between and be bolted by third.
6. large area moulding aluminium trellis system construction method as claimed in claim 5, which is characterized in that the π type fixing piece Grid fixed plate on along the short transverse spaced set of grid fixed plate have several bolts hole to for stationary grizzly.
7. large area moulding aluminium trellis system construction method as described in claim 1, which is characterized in that it further include step 7, Upper and lower decorative aluminum plate is installed, outside the region between adjacent level support rod and adjacent level support rod in sustained height Side is equipped with integrally formed decorative aluminum plate, and support bar is equipped between the decorative aluminum plate and corresponding horizontal support bar.
CN201711019946.2A 2017-10-27 2017-10-27 Large area moulding aluminium trellis system construction method Active CN107724579B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711019946.2A CN107724579B (en) 2017-10-27 2017-10-27 Large area moulding aluminium trellis system construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711019946.2A CN107724579B (en) 2017-10-27 2017-10-27 Large area moulding aluminium trellis system construction method

Publications (2)

Publication Number Publication Date
CN107724579A CN107724579A (en) 2018-02-23
CN107724579B true CN107724579B (en) 2019-10-18

Family

ID=61201793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711019946.2A Active CN107724579B (en) 2017-10-27 2017-10-27 Large area moulding aluminium trellis system construction method

Country Status (1)

Country Link
CN (1) CN107724579B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108747959B (en) * 2018-06-29 2023-08-29 宁波新州焊接设备有限公司 Locking mechanism for butt joint and compaction of net sheets

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
水平格栅设计实例;邓艳琴;《门窗》;20140831(第8期);第52-55页 *

Also Published As

Publication number Publication date
CN107724579A (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN103206014B (en) Multi-high-rise assembled steel structure frame supporting system capable of realizing rigid connection of joints
CN106812214B (en) A kind of assembling type steel structure beam column node connection device
JP3171824U (en) Solar panel mount
JP5912098B2 (en) Solar power panel
CN107724579B (en) Large area moulding aluminium trellis system construction method
US5174081A (en) Building element for erecting buildings, parts of buildings or the like
CN107905476B (en) Grille decorative surface construction method suitable for high-rise aerated blocks wall
JP5912099B2 (en) Solar power panel
CN207499219U (en) Large area moulding aluminium grille decorative wall surface connecting system
CN107724580A (en) Large area moulding aluminium grille decorative wall surface connecting system
CN212742919U (en) Assembled movable board house
CN213969668U (en) Welding platform tool for modular building unit frame
CN207499218U (en) Large area moulding aluminium trellis system
CN102832277B (en) Support and support group of solar cell panel
JP2016116264A (en) Photovoltaic power generation panel pedestal
CN216196589U (en) Cast-in-place concrete structure construction composite shuttering
CN211007050U (en) Assembled light steel assembly house
CN103771231A (en) Lower beam stabilizing device for elevator opened in 90-degree right angle cut-through manner
CN207776108U (en) A kind of dismountable light steel building structure
CN212427543U (en) Container module with edge connecting node and container module building
JP5684619B2 (en) Solar cell module installation stand
CN220285017U (en) Steel frame with stiffening nodes of box column root raw floor slab
CN212772816U (en) Reinforced steel structure mounted in multiple ways
CN115110676B (en) Hanging frame supporting glass curtain wall system uniformly stressed and construction method thereof
CN202839657U (en) Support of solar cell panel and support set of solar cell panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant