CN107724399A - The method that medium region of FuShui excavates limited location deep pit construction - Google Patents

The method that medium region of FuShui excavates limited location deep pit construction Download PDF

Info

Publication number
CN107724399A
CN107724399A CN201710525706.3A CN201710525706A CN107724399A CN 107724399 A CN107724399 A CN 107724399A CN 201710525706 A CN201710525706 A CN 201710525706A CN 107724399 A CN107724399 A CN 107724399A
Authority
CN
China
Prior art keywords
layer
foundation ditch
stull
fushui
excavates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710525706.3A
Other languages
Chinese (zh)
Inventor
付国刚
袁银书
王丽梅
张振禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201710525706.3A priority Critical patent/CN107724399A/en
Publication of CN107724399A publication Critical patent/CN107724399A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The method that medium region of FuShui excavates limited location deep pit construction, it comprises the following steps:(1) precipitation well point is arranged, draw water lowering of watertable;(2) first layer foundation ditch is excavated, first of horizontal support is set;Then, continue to dig to first layer design of foundation pit depth;(3) horizontal breast boards, vertical back cord and stull are installed, form first layer gib system;(4) next layer of excavation of foundation pit, horizontal breast boards, vertical back cord and stull are installed, form next layer of gib system;(5) according to whole design of foundation pit depth, by being constructed successively to next layer of foundation ditch circulation the step of above-mentioned stage excavation foundation ditch, dig to the designed elevation of whole foundation ditch, form provisional integer support system.Invention increases the stability of support system and foundation ditch;Rolled steel dosage is few, and construction cost is low;Easy for construction, service speed is fast, it is possible to increase speed of application is fast;Pollution of the base to surrounding environment is reduced, there is good environmental benefit;Structures around are influenceed small.

Description

The method that medium region of FuShui excavates limited location deep pit construction
(1) technical field:
It is specifically a kind of to be used for the limited location of medium region of FuShui excavation the present invention relates to Municipal Engineering Construction field The method of deep pit construction.
(2) background technology:
At present, in medium hydrous fluids, fine sand, silty clay geology, especially level of ground water is by the larger excavation of seasonal effect Depth up to 5m-8m, by earth clearance influenceed can not the construction method of deep foundation ditch of slope construction location mainly inserted using large area Beating the forms of construction work such as Larsen steel sheet pile, diaphragm wall coordinates pumping for water pump to excavate.But because level of ground water is by seasonal effect is big, steel The factors such as sheet pile and construction of diaphragm wall complexity so that foundation pit construction operation effect is slow, delays the duration, improves cost. In existing construction method, as taken in a kind of rich water soft clay area deep basal pit covered back-digging construction methods of CN106320377A- It is the mode of covered back-digging, using clay model and stull progress excavation of foundation pit and concreting, such a method construction operation complexity, Difficulty is big, long in time limit, and construction cost is very high.Construction method disclosed by the invention can be realized medium with the cost of minimum Region of FuShui excavates limited location deep pit construction, and construction technology is simple, safety, workable, is easy to quality control System.
(3) content of the invention:
The shortcomings that it is an object of the invention to overcome prior art, there is provided a kind of construction technology is simple, safety, operability By force, it is easy to quality control and method that the low medium region of FuShui of cost excavates limited location deep pit construction.
The present invention, which adopts the following technical scheme that, realizes its goal of the invention.
The method that the medium region of FuShui of the present invention excavates limited location deep pit construction, it comprises the following steps:
(1) precipitation well point is arranged according to design requirement, persistently drawn water lowering of watertable using water pump;
(2) first layer foundation ditch is excavated, is dug to setting first of horizontal support at the design and installation of first of horizontal support;So Afterwards, continue to dig to first layer design of foundation pit depth;
(3) horizontal breast boards, vertical back cord and stull are installed according to designed distance, forms first layer gib body System;
(4) next layer of excavation of foundation pit, dig to next layer of design of foundation pit depth, and install horizontal breast boards, vertical back cord and Stull, form next layer of gib system;
(5) according to whole design of foundation pit depth, by being circulated successively to next layer of foundation ditch the step of above-mentioned stage excavation foundation ditch Construction, digs to the designed elevation of whole foundation ditch, forms provisional integer support system.
The horizontal support, gib system and precipitation well point position, arrangement spacing and all parts material Calculating is designed according to geologic prospect file.
The precipitation well point is arranged in foundation ditch periphery and inside.
When the installation horizontal breast boards of next layer of foundation ditch, vertical back cord and stull, while remove last layer and prop up temporarily The vertical back cord of watch box system and stull.
The vertical back cord of the last layer gib system and stull are moved downward to next layer of gib system, on One layer of gib system sets up the horizontal breast boards of new stull support last layer gib system.
First layer foundation ditch is dug to 0.5m~1.0m below first of horizontal support in the step (2).
The next layer of foundation ditch is dug to 0.5m~1.0m below the stull of last layer gib system.
The foundation ditch of the stage excavation, the depth of next layer of foundation ditch is on the basis of the position of last layer stull.
The horizontal breast boards of the gib system is by between vertical back cord, stull pressure and soil and horizontal breast boards Frictional force is fixed.
Bracket is provided with the vertical back cord, stull is placed on bracket.
The bracket uses triangle voussoir.
In the step (5) after the completion of provisional integer support system, engineering structure construction, completion to be tested, symbol are carried out After closing quality standard, foundation ditch backfill is carried out.
In the foundation ditch backfilling process provisional integer support system, horizontal breast boards and the vertical back of the body are removed according to opposite sequence It is stupefied to be extracted with machinery.
The beneficial effects of the invention are as follows:
(1) by the way of horizontal breast boards coordinates well-points dewatering, persistently drawn water lowering of watertable, increased using water pump Add the internal friction angle of soil layer, improve the physical property of soil layer, reduce the active earth pressure of soil layer, add support system and foundation ditch Stability.
(2) horizontal breast boards need not all arrange that the satisfactory timber of intensity and its may be selected in stull along foundation ditch face His material, rolled steel dosage is few, and construction cost is low.
(3) horizontal breast boards is fixed by the frictional force between vertical back cord, stull pressure and soil and horizontal breast boards, horizontal Breast boards, vertical back cord need not be squeezed into soil, and easy for construction, service speed is fast, it is possible to increase speed of application is fast.
(4) support system entirety stress is more reasonable.
(5) reduce in Excavation Process, pollution of the mud to surrounding environment, there is good environmental benefit.
(6) it is small on the influence of structures around, it is practical.
(4) illustrate:
Fig. 1 is a kind of method that limited location deep pit construction is excavated for medium region of FuShui using the present invention Mixture proportioning in construction;
Fig. 2 is B-B diagrammatic cross-sections shown in Fig. 1;
Fig. 3-1, Fig. 3-2 are the drawing of A shown in Fig. 2.
In figure:1 is horizontal breast boards, and 2 be vertical back cord, and 3 be stull, and 4 be pipe of concrete, and 5 be base, and 6 be well point, 7 For bracket.
(5) embodiment:
The present invention is described in detail with reference to the accompanying drawings and detailed description.
Embodiment:As shown in Fig. 1 to Fig. 3-2, medium region of FuShui of the invention excavates limited location deep pit digging and applied The method of work, it comprises the following steps:
(1) the clear and definite geological conditions of data that report provides is surveyed in base area, carries out the design and dewatering well of horizontal struts system The design of point 6.
(2) surveying and locating goes out excavation of foundation pit sideline and the position of precipitation well point 6, and well point 6 is constructed, and starts to draw water.
(3) well-points dewatering carries out first layer excavation of foundation pit after two weeks, digs to setting first layer stull 3 at 0.3m-0.5m;So After continue to dig in first layer stull 0.5m below 3, horizontal breast boards is installed according to the designed horizontal struts system of step (1) 1st, vertical back cord 2 and stull 3, first layer gib system is formed.
(4) second layer excavation of foundation pit is opened, and digs depth in second layer stull 3 (i.e. the stull 3 of first layer gib system) Following 0.5m, horizontal breast boards 1, vertical back cord 2 and stull 3 are installed also according to the designed horizontal struts system of step (1), Second layer gib system is formed, removes vertical back cord 2 and the stull 3 of first layer gib system.
(5) circulated according to step 4, until digging to designed elevation, form interim type integer support system.
(6) to prevent stull from coming off, 2 pieces of 10 × 10cm angle irons are welded on vertical back cord 2 as bracket 7, by stull 3 It is placed on bracket 7.
(7) after the completion of provisional integer support system, base 5 and pipe of concrete 4 is laid in bottom of foundation ditch, has been inspected, After meeting quality standard, foundation ditch backfill is carried out.
(8) in backfilling process, provisional integer support system, horizontal breast boards and back cord machinery are removed according to opposite sequence Extract, structure integral construction is completed.

Claims (10)

1. the method that medium region of FuShui excavates limited location deep pit construction, it is characterised in that it comprises the following steps:
(1) precipitation well point is arranged according to design requirement, persistently drawn water lowering of watertable using water pump;
(2) first layer foundation ditch is excavated, is dug to setting first of horizontal support at the design and installation of first of horizontal support;Then, Continue to dig to first layer design of foundation pit depth;
(3) horizontal breast boards, vertical back cord and stull are installed according to designed distance, forms first layer gib system;
(4) next layer of excavation of foundation pit, dig to next layer of design of foundation pit depth, and horizontal breast boards, vertical back cord and stull be installed, Form next layer of gib system;
(5) according to whole design of foundation pit depth, applied by being circulated successively to next layer of foundation ditch the step of above-mentioned stage excavation foundation ditch Work, dig to the designed elevation of whole foundation ditch, form provisional integer support system.
2. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist In the material base area of the horizontal support, the position of gib system and precipitation well point, arrangement spacing and all parts Matter reconnoitres file and is designed calculating.
3. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist Foundation ditch periphery and inside are arranged in the precipitation well point.
4. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist When the horizontal breast boards, vertical back cord and stull of next layer of foundation ditch of the installation, while remove last layer gib system Vertical back cord and stull.
5. the method that medium region of FuShui excavates limited location deep pit construction according to claim 4, its feature exist Next layer of gib system, last layer are moved downward in the vertical back cord of the last layer gib system and stull Gib system sets up the horizontal breast boards of new stull support last layer gib system.
6. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist In the step(2)Middle first layer foundation ditch is dug to 0.5m~1.0m below first of horizontal support;
The next layer of foundation ditch is dug to 0.5m~1.0m below the stull of last layer gib system.
7. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist In the gib system horizontal breast boards by the frictional force between vertical back cord, stull pressure and soil and horizontal breast boards It is fixed.
8. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist In being provided with bracket on the vertical back cord, stull is placed on bracket.
9. the method that medium region of FuShui excavates limited location deep pit construction according to claim 8, its feature exist Triangle voussoir is used in the bracket.
10. the method that medium region of FuShui excavates limited location deep pit construction according to claim 1, its feature exist In the step(5)In after the completion of provisional integer support system, carry out engineering structure construction, completion to be tested, meet quality After standard, foundation ditch backfill is carried out;
Provisional integer support system is removed according to opposite sequence in the foundation ditch backfilling process, horizontal breast boards and vertical back cord are used Machinery is extracted.
CN201710525706.3A 2017-06-30 2017-06-30 The method that medium region of FuShui excavates limited location deep pit construction Pending CN107724399A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710525706.3A CN107724399A (en) 2017-06-30 2017-06-30 The method that medium region of FuShui excavates limited location deep pit construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710525706.3A CN107724399A (en) 2017-06-30 2017-06-30 The method that medium region of FuShui excavates limited location deep pit construction

Publications (1)

Publication Number Publication Date
CN107724399A true CN107724399A (en) 2018-02-23

Family

ID=61201290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710525706.3A Pending CN107724399A (en) 2017-06-30 2017-06-30 The method that medium region of FuShui excavates limited location deep pit construction

Country Status (1)

Country Link
CN (1) CN107724399A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714497A (en) * 2019-10-17 2020-01-21 中建八局第一建设有限公司 Underwater pumping excavation system for long-strip-shaped deep foundation pit of water-rich sand layer
CN113047308A (en) * 2021-04-19 2021-06-29 陕西华山建设集团有限公司 Supporting method for horizontal directional drilling working pit under liquid limit silt stratum
CN113960696A (en) * 2021-09-22 2022-01-21 山东大学 Method for burying field bad geologic body by comprehensive geophysical prospecting and test method
CN114061388A (en) * 2021-11-27 2022-02-18 中铁四局集团第五工程有限公司 Construction method for damping blasting of urban underground space

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090002344A (en) * 2007-06-28 2009-01-09 (주)바로건설기술 Land-side protection wall that use ground structure
CN102767186A (en) * 2012-07-16 2012-11-07 中铁隧道集团有限公司 Foundation pit containment structure with prestress ribs on vertical soil-retaining structure and construction method
CN205035812U (en) * 2015-10-09 2016-02-17 绍兴文理学院元培学院 Stull formula bearing structure simply fixes a position
CN106049505A (en) * 2016-07-06 2016-10-26 江苏江中集团有限公司 Construction method for deep foundation pit supporting and protecting system
CN106638612A (en) * 2015-10-28 2017-05-10 上海十三冶建设有限公司 Simple foundation pit supporting system and construction method thereof
JP2017096063A (en) * 2015-11-27 2017-06-01 鹿島建設株式会社 Earth retaining excavation method and skeleton construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090002344A (en) * 2007-06-28 2009-01-09 (주)바로건설기술 Land-side protection wall that use ground structure
CN102767186A (en) * 2012-07-16 2012-11-07 中铁隧道集团有限公司 Foundation pit containment structure with prestress ribs on vertical soil-retaining structure and construction method
CN205035812U (en) * 2015-10-09 2016-02-17 绍兴文理学院元培学院 Stull formula bearing structure simply fixes a position
CN106638612A (en) * 2015-10-28 2017-05-10 上海十三冶建设有限公司 Simple foundation pit supporting system and construction method thereof
JP2017096063A (en) * 2015-11-27 2017-06-01 鹿島建設株式会社 Earth retaining excavation method and skeleton construction method
CN106049505A (en) * 2016-07-06 2016-10-26 江苏江中集团有限公司 Construction method for deep foundation pit supporting and protecting system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714497A (en) * 2019-10-17 2020-01-21 中建八局第一建设有限公司 Underwater pumping excavation system for long-strip-shaped deep foundation pit of water-rich sand layer
CN113047308A (en) * 2021-04-19 2021-06-29 陕西华山建设集团有限公司 Supporting method for horizontal directional drilling working pit under liquid limit silt stratum
CN113960696A (en) * 2021-09-22 2022-01-21 山东大学 Method for burying field bad geologic body by comprehensive geophysical prospecting and test method
CN114061388A (en) * 2021-11-27 2022-02-18 中铁四局集团第五工程有限公司 Construction method for damping blasting of urban underground space

Similar Documents

Publication Publication Date Title
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN107724399A (en) The method that medium region of FuShui excavates limited location deep pit construction
CN102926376B (en) One is reclaimed fields from the sea region soft-soil foundation treatment method
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN108589699A (en) A kind of interpolation H profile steel TRD walls and its construction method
CN108223910A (en) A kind of ductile iron pipe passes through the construction method of aqueous soil layer
CN106759378B (en) Level is to the construction method for drawing anchor cable
CN101824825B (en) Deep foundation pit open cutting construction method
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
CN204825923U (en) Relay formula underground structure
CN108547628B (en) Quick construction method for pipe-jacking working well in upper-soft and lower-hard stratum
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN106120791A (en) Without making vertical supporting system underground structure covered back-digging construction method in advance
CN106836182A (en) A kind of compacted technique of vibroflotation water conservancy diversion
CN104763437A (en) Strong permeable stratum tunnel excavation method
CN103866779A (en) Construction method of water stopping surrounding and protecting structure of soft soil foundation building foundation pit
CN204435321U (en) A kind of steam power station water intaking open channel
CN103774698B (en) Soil engineering drainage-free construction method
JP5519722B2 (en) Ground improvement method
CN205839799U (en) A kind of pipe gallery open-cut props up blocking means
CN106013198A (en) Gap pretreatment construction method for foundation pit support structure
CN105568958A (en) Variable cross-section underground diaphragm wall and construction method
CN206034466U (en) Foundation ditch or basic groove precipitation system for construction
CN105113511A (en) Comprehensive foundation pit support construction method for sandstone combined soil layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223