CN107717792A - A kind of clamping processing unit (plant) of non-ferrous alloy pipe - Google Patents
A kind of clamping processing unit (plant) of non-ferrous alloy pipe Download PDFInfo
- Publication number
- CN107717792A CN107717792A CN201711182490.1A CN201711182490A CN107717792A CN 107717792 A CN107717792 A CN 107717792A CN 201711182490 A CN201711182490 A CN 201711182490A CN 107717792 A CN107717792 A CN 107717792A
- Authority
- CN
- China
- Prior art keywords
- spring
- ferrous alloy
- fixedly connected
- alloy pipe
- plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B11/00—Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Clamps And Clips (AREA)
Abstract
The invention discloses a kind of clamping processing unit (plant) of non-ferrous alloy pipe, it is related to coloured technical field of alloy.The clamping processing unit (plant) of the non-ferrous alloy pipe, including base, two risers are fixedly connected with the top of the base, the left and right sides of the riser offers through hole, the inside of the through hole is socketed with pull bar, one end of the pull bar is through through hole and extends to outside it, and one end of the pull bar is fixedly connected with limiting plate, and the limiting plate is flexibly connected by the first spring with the side of riser.The clamping processing unit (plant) of the non-ferrous alloy pipe, by the way that there is provided riser, through hole, pull bar, limiting plate, the first spring, spacing shell, internal thread groove and the first chute, pull out two limiting plates, limiting plate drives pull bar movement, pull bar drives spacing shell in the internal slide of the first chute, first spring is stretched by the pulling force of limiting plate, and the bottom of non-ferrous alloy pipe is placed between two spacing shells.
Description
Technical field
The present invention relates to non-ferrous alloy technology field, specially a kind of clamping processing unit (plant) of non-ferrous alloy pipe.
Background technology
Non-ferrous alloy pipe it is widely used, be mainly used in the industries such as automobile, building materials, household electrical appliances, electric power, 3C, machine-building,
In recent years, the fast-developing situation of the industry such as automobile, building materials, household electrical appliances, electric power, 3C, machine-building presentation, and non-ferrous alloy system
The development for making industry relies on the pulling of downstream industry, and with the development of downstream industry, non-ferrous alloy manufacturing also obtains
To fast development.
It is required for being fixed when being processed non-ferrous alloy pipe, manpower can be saved, also can
Processing staff is facilitated to operate, but the specification of in general non-ferrous alloy pipe is a lot, clamping processing unit (plant) clamping is unstable, causes to add
The quality of non-ferrous alloy pipe can be influenceed when work.
The content of the invention
(1) technical problem solved
In view of the shortcomings of the prior art, the invention provides a kind of clamping processing unit (plant) of non-ferrous alloy pipe, solves folder
Hold the problem of unstable.
(2) technical scheme
To realize object above, the present invention is achieved by the following technical programs:A kind of clamping of non-ferrous alloy pipe adds
Frock is put, including base, is fixedly connected with two risers at the top of the base, and the left and right sides of the riser offers logical
Hole, the inside of the through hole are socketed with pull bar, and one end of the pull bar through through hole and is extended to outside it, the one of the pull bar
End is fixedly connected with limiting plate, and the limiting plate is flexibly connected by the first spring with the side of riser, and two pull bars are relative
One end be fixedly connected with limited location shell, internal thread groove is offered on the inwall of the spacing shell, the spacing shell
Bottom offers the first chute through base upper surface and extended to inside it, the upper surface of the base and is located at spacing shell
Rear be fixedly connected with fixed column, the inside of the fixed column opens up fluted, and the top and bottom of the groove inner wall lead to
Cross fix bar to be fixedly connected, the side surface winding of the fix bar is provided with second spring, the side surface socket of the fix bar
There is the collar, the bottom of the collar is flexibly connected by second spring with the bottom of groove inner wall, and the side surface of the collar is consolidated
Surely connecting rod is connected with, the side surface of the groove offers the second chute, and the second chute is run through simultaneously in one end of the connecting rod
Extend to outside it, the other end of the connecting rod is fixedly connected with movable block, and the front of the movable block is fixedly connected with rubber
Rubber cushion, is fixedly connected with two the first fixed blocks at the top of the movable block, the front of the movable block and positioned at rubber blanket
The one end of the left and right sides respectively with two activity folders is flexibly connected, and the front of two activity folders has been fixedly connected with the second fixation
Block, is connected with two hooks on first fixed block and the second fixed block respectively, and the relative one end of two hooks respectively with
The side connection of two fixed plates, the relative side of two fixed plates are flexibly connected by the 3rd spring, the activity folder
Side be fixedly connected with anti-skidding bed course.
Preferably, one end of first spring and the side of riser are welded, the other end of first spring with it is spacing
The side welding of plate.
Preferably, the diameter of the spacing shell is equal with the width of the first chute, and the surface of spacing shell and first
The inwall overlap joint of chute.
Preferably, the second spring and the collar are socketed in the inside of groove, the inwall of the collar and fix bar
Side surface overlaps.
Preferably, the top of the second spring and the bottom of the collar are welded, in the bottom and groove of the second spring
The bottom welding of wall.
Preferably, the both ends of the 3rd spring relative with two fixed plates side welding respectively, the 3rd spring
Quantity be two.
(3) beneficial effect
Compared with prior art, beneficial effects of the present invention are as follows:
1st, the clamping processing unit (plant) of non-ferrous alloy pipe of the present invention, by the way that there is provided riser, through hole, pull bar, limiting plate, first
Spring, spacing shell, internal thread groove and the first chute, pull out two limiting plates, and limiting plate drives pull bar movement, pull bar band
Spacing shell is moved in the internal slide of the first chute, the first spring is stretched by the pulling force of limiting plate, by non-ferrous alloy pipe
Bottom is placed between two spacing shells, and the first spring in extended state pulls limit in the presence of elastic force after loosing one's grip
Position plate, limiting plate pushing drawing rod drive the movement of spacing shell, so as to the clamping tightly by the bottom of non-ferrous alloy pipe, have prevented
Color compo pipe loosens, and facilitates staff to its working process.
2nd, the clamping processing unit (plant) of non-ferrous alloy pipe of the present invention, by there is provided connecting rod, movable block, the first fixed block,
Movable folder, the second fixed block, hook, fixed plate and the 3rd spring, pull out two activity folders, and activity entrainment dynamic second is fixed
Block rotates around the side of movable block, and the second fixed block drives the fixed plate movement of hook one end, so as to allow two fixed plates one
The 3rd spring of stretching is played, between non-ferrous alloy pipe is placed on into two activity folders, the pulling force of the aft hook loosed one's grip in second spring
In the presence of, the tight top by color compo pipe of movable block and movable clamping is clamped, and can adapt to different size and size has
Color compo pipe, manpower is not needed to help when clamping, it is simple to operate, improve the processing efficiency of staff.
Brief description of the drawings
Fig. 1 is the side schematic view of fixed column cross-section structure of the present invention;
Fig. 2 is the front schematic view of base cross-section structure of the present invention;
Fig. 3 is the enlarged diagram of structure at A in Fig. 1 of the present invention;
Fig. 4 is the movable clamping structure top view of the present invention.
In figure:1 base, 2 risers, 3 through holes, 4 pull bars, 5 limiting plates, 6 first springs, 7 spacing shells, 8 internal thread grooves, 9
Chute, 10 fixed columns, 11 grooves, 12 fix bars, 13 second springs, 14 collars, 15 connecting rods, 16 second chutes, 17 movable blocks,
18 rubber blankets, 19 first fixed blocks, 20 movable folders, 21 second fixed blocks, 22 hooks, 23 fixed plates, 24 the 3rd springs.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Fig. 1-4 are referred to, the present invention provides a kind of technical scheme:A kind of clamping processing unit (plant) of non-ferrous alloy pipe, including
Base 1, the top of base 1 are fixedly connected with two risers 2, and the left and right sides of riser 2 offers through hole 3, the inside of through hole 3
Pull bar 4 is socketed with, one end of pull bar 4 through through hole 3 and is extended to outside it, and one end of pull bar 4 is fixedly connected with limiting plate 5,
Limiting plate 5 is flexibly connected by the first spring 6 with the side of riser 2, and one end of the first spring 6 is welded with the side of riser 2, the
The other end of one spring 6 welds with the side of limiting plate 5, and two relative one end of pull bar 4 are fixedly connected with limited location shell
7, offer internal thread groove 8 on the inwall of spacing shell 7, by there is provided internal thread groove 8, increase spacing shell 7 with it is coloured
The frictional force of compo pipe, prevent non-ferrous alloy pipe from coming off, the bottom of spacing shell 7 offers the first cunning through the upper surface of base 1
Groove 9 is simultaneously extended to inside it, and the diameter of spacing shell 7 is equal with the width of the first chute 9, and the surface of spacing shell 7 and the
The inwall overlap joint of one chute 9, can only horizontally slip by the way that there is provided the first chute 9, spacing shell 7 in the inside of the first chute 9,
Avoid clamping it is unstable when coloured compo pipe, influence processing quality, by there is provided riser 2, through hole 3, pull bar 4, limit
Position plate 5, the first spring 6, spacing shell 7, the chute 9 of internal thread groove 8 and first, pull out two limiting plates 5, the band of limiting plate 5
Dynamic pull bar 4 moves, and pull bar 4 drives spacing shell 7 in the internal slide of the first chute 9, drawing of first spring 6 by limiting plate 5
Power and stretch, between the bottom of non-ferrous alloy pipe is placed on into two spacing shells 7, loose one's grip after be in extended state first
Spring 6 pulls limiting plate 5 in the presence of elastic force, and the pushing drawing rod 4 of limiting plate 5 drives spacing shell 7 to move, so as to by coloured conjunction
The bottom of golden pipe clamping tightly, prevent non-ferrous alloy pipe from loosening, facilitate staff to its working process, base 1 it is upper
Surface and fixed column 10 is fixedly connected with positioned at the rear of spacing shell 7, the inside of fixed column 10 opens up fluted 11, groove 11
The top and bottom of inwall are fixedly connected by fix bar 12, and the side surface winding of fix bar 12 is provided with second spring 13, Gu
The side surface of fixed pole 12 is socketed with the collar 14, and the bottom of the collar 14 is connected by the activity of the bottom of second spring 13 and the inwall of groove 11
Connecing, the top of second spring 13 is welded with the bottom of the collar 14, and the bottom of second spring 13 is welded with the bottom of the inwall of groove 11,
Second spring 13 and the collar 14 are socketed in the inside of groove 11, and the inwall of the collar 14 overlaps with the side surface of fix bar 12, set
The side surface of ring 14 is fixedly connected with connecting rod 15, by the way that there is provided fix bar 12, second spring 13, the collar 14 and connecting rod
15, apply downward pressure to connecting rod 15, connecting rod 15 drives the collar 14 to move down, and the collar 14 declines along fix bar 12
While compress second spring 13, if external force disappear after, in compressive state second spring 13 in the presence of elastic force to
The upper promotion collar 14, the collar 14 move up and drive connecting rod 15 to return to original place so that the position of connecting rod 15 can basis
The length of non-ferrous alloy pipe is adjusted, and adapts to the non-ferrous alloy pipe of all size, and the side surface of groove 11 offers the second cunning
Groove 16, one end of connecting rod 15 through the second chute 16 and are extended to outside it, and the other end of connecting rod 15 is fixedly connected with work
Motion block 17, the front of movable block 17 are fixedly connected with rubber blanket 18, and guarantor can be played by the way that there is provided rubber blanket 18, rubber blanket 18
The effect of non-ferrous alloy pipe is protected, and increases the frictional force between movable block 17 and non-ferrous alloy pipe, the top of movable block 17 is consolidated
Surely be connected with two the first fixed blocks 19, the front of movable block 17 and positioned at the left and right sides of rubber blanket 18 respectively with two activities
One end of folder 20 is flexibly connected, and the front of two activity folders 20 has been fixedly connected with the second fixed block 21, the first fixed block 19
Be connected with respectively on the second fixed block 21 two hook 22, and two hook 22 relative one end respectively with two fixed plates 23
Side connection, the relative side of two fixed plates 23 is flexibly connected by the 3rd spring 24, the both ends difference of the 3rd spring 24
The side welding relative with two fixed plates 23, to be pressed from both sides by the way that there is provided connecting rod 15, movable block 17, the first fixed block 19, activity
20th, the second fixed block 21, hook 22, the spring 24 of fixed plate 23 and the 3rd, pull out two activity folders 20, and activity folder 20 drives
Second fixed block 21 rotates around the side of movable block 17, and the second fixed block 21 drives the fixed plate 23 of 22 one end of hook to move,
So as to allow two fixed plates 23 to stretch the 3rd spring 24 together, between non-ferrous alloy pipe is placed on into two activity folders 20, loose one's grip
Aft hook 22 in the presence of the pulling force of second spring 13, movable block 17 and activity folder 20 top by color compo pipe tightly
Clamp, can adapt to different size and the non-ferrous alloy pipe of size, do not need manpower to help when clamping, side simple to operate
Just, the processing efficiency of staff is improved, the quantity of the 3rd spring 24 is two, and the side of activity folder 20 is fixedly connected with anti-
Skidding layer, by the way that there is provided anti-skidding bed course, the frictional force between increase activity folder 20 and non-ferrous alloy pipe so that clamping is more steady
When.
During work, two limiting plates 5 are pulled out, limiting plate 5 drives pull bar 4 to move, and pull bar 4 drives spacing shell 7 to exist
The internal slide of first chute 9, the first spring 6 are stretched by the pulling force of limiting plate 5, the bottom of non-ferrous alloy pipe are placed on
Between two spacing shells 7, the first spring 6 in extended state pulls limiting plate 5 in the presence of elastic force after loosing one's grip, and limits
The position pushing drawing rod 4 of plate 5 drives spacing shell 7 to move, so as to the clamping tightly by the bottom of non-ferrous alloy pipe, according to coloured conjunction
The length of golden pipe determines the height of movable block 17, presses down on movable block 17, then pulls out two activity folders 20, activity folder
20 drive the second fixed block 21 to be rotated around the side of movable block 17, and the second fixed block 21 drives the fixed plate 23 of 22 one end of hook
It is mobile, so as to allow two fixed plates 23 to stretch the 3rd spring 24 together, between non-ferrous alloy pipe is placed on into two activity folders 20,
The aft hook 22 loosed one's grip in the presence of the pulling force of second spring 13, movable block 17 and activity folder 20 tightly by color compo pipe
Clamp on top.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of clamping processing unit (plant) of non-ferrous alloy pipe, including base (1), it is characterised in that:The top of the base (1) is consolidated
Surely two risers (2) are connected with, the left and right sides of the riser (2) offers through hole (3), the internal sleeve of the through hole (3)
Pull bar (4) is connected to, one end of the pull bar (4) through through hole (3) and is extended to outside it, and one end of the pull bar (4) is fixed
Limiting plate (5) is connected with, the limiting plate (5) is flexibly connected by the first spring (6) with the side of riser (2), and two drawings
The relative one end of bar (4) is fixedly connected with limited location shell (7), and internal thread groove is offered on the inwall of the spacing shell (7)
(8), the bottom of the spacing shell (7) offers the first chute (9) and extended to inside it, institute through base (1) upper surface
State the upper surface of base (1) and be fixedly connected with fixed column (10) positioned at the rear of spacing shell (7), the fixed column (10)
Inside is opened up fluted (11), and the top and bottom of groove (11) inwall are fixedly connected by fix bar (12), described solid
The side surface winding of fixed pole (12) is provided with second spring (13), and the side surface of the fix bar (12) is socketed with the collar (14),
The bottom of the collar (14) is flexibly connected by second spring (13) with the bottom of groove (11) inwall, the collar (14)
Side surface is fixedly connected with connecting rod (15), and the side surface of the groove (11) offers the second chute (16), the connecting rod
(15) one end is through the second chute (16) and extends to outside it, and the other end of the connecting rod (15) is fixedly connected with activity
Block (17), the front of the movable block (17) are fixedly connected with rubber blanket (18), are fixedly connected at the top of the movable block (17)
Have two the first fixed blocks (19), the front of the movable block (17) and positioned at the left and right sides of rubber blanket (18) respectively with two
One end of activity folder (20) is flexibly connected, and the front of two activity folders (20) has been fixedly connected with the second fixed block (21), institute
State and be connected with two hooks (22) on the first fixed block (19) and the second fixed block (21) respectively, and two hooks (22) are relative
Side of the one end respectively with two fixed plates (23) is connected, and two relative sides of the fixed plate (23) pass through the 3rd spring
(24) it is flexibly connected, the side of the activity folder (20) is fixedly connected with anti-skidding bed course.
A kind of 2. clamping processing unit (plant) of non-ferrous alloy pipe according to claim 1, it is characterised in that:First spring
(6) one end and the side of riser (2) are welded, and the other end of first spring (6) welds with the side of limiting plate (5).
A kind of 3. clamping processing unit (plant) of non-ferrous alloy pipe according to claim 1, it is characterised in that:The spacing shell
(7) diameter is equal with the width of the first chute (9), and the surface of spacing shell (7) and the inwall of the first chute (9) overlap.
A kind of 4. clamping processing unit (plant) of non-ferrous alloy pipe according to claim 1, it is characterised in that:The second spring
(13) and the collar (14) is socketed in the inside of groove (11), and the inwall of the collar (14) and the side surface of fix bar (12) are taken
Connect.
A kind of 5. clamping processing unit (plant) of non-ferrous alloy pipe according to claim 1, it is characterised in that:The second spring
(13) top and the bottom of the collar (14) are welded, and the bottom of the second spring (13) is welded with the bottom of groove (11) inwall
Connect.
A kind of 6. clamping processing unit (plant) of non-ferrous alloy pipe according to claim 1, it is characterised in that:3rd spring
(24) relative with two fixed plates (23) the side welding respectively of both ends, the quantity of the 3rd spring (24) is two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711182490.1A CN107717792B (en) | 2017-11-23 | 2017-11-23 | Clamping and processing device for nonferrous alloy pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711182490.1A CN107717792B (en) | 2017-11-23 | 2017-11-23 | Clamping and processing device for nonferrous alloy pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107717792A true CN107717792A (en) | 2018-02-23 |
CN107717792B CN107717792B (en) | 2023-08-18 |
Family
ID=61218955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711182490.1A Active CN107717792B (en) | 2017-11-23 | 2017-11-23 | Clamping and processing device for nonferrous alloy pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107717792B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108859152A (en) * | 2018-07-28 | 2018-11-23 | 芜湖市崇兴乐塑胶有限公司 | A kind of installation equipment of plastic product |
CN110754729A (en) * | 2019-08-28 | 2020-02-07 | 南京医科大学第二附属医院 | PSG electrode positioning helmet |
CN111687760A (en) * | 2019-03-14 | 2020-09-22 | 南京汽枪厂有限公司 | Adjustable air gun barrel clamp |
CN111706767A (en) * | 2020-05-26 | 2020-09-25 | 南京后马种植专业合作社 | Bird repelling device |
CN111906281A (en) * | 2020-08-21 | 2020-11-10 | 来安县山关轨道装备有限公司 | Water jet cutter unloader of coupler seat |
CN112122053A (en) * | 2020-08-11 | 2020-12-25 | 王海山 | Effectual alloy pipe surface corrosion prevention device |
CN112815149A (en) * | 2021-02-01 | 2021-05-18 | 昆山市优捷科自动化设备有限公司 | Circular tube guide device |
CN112893270A (en) * | 2021-02-05 | 2021-06-04 | 王丽 | Soil cleaning equipment based on plant collection for biology |
CN114034410A (en) * | 2021-10-22 | 2022-02-11 | 南京铂航电子科技有限公司 | Safety monitoring device based on electric power automation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104676122A (en) * | 2015-02-17 | 2015-06-03 | 沈阳工业大学 | Three-direction impact-resistant support and hanger |
CN205765088U (en) * | 2016-07-05 | 2016-12-07 | 郑利萍 | A kind of adjustable panel clamping device |
CN106624553A (en) * | 2016-12-20 | 2017-05-10 | 重庆欣铼电子产品有限公司 | Welding tool for computer mainboard |
CN206241891U (en) * | 2016-12-14 | 2017-06-13 | 焦作大学 | A kind of molecular biology experiment clamp device |
CN107350830A (en) * | 2017-07-25 | 2017-11-17 | 江苏万达新能源科技股份有限公司 | A kind of clamping device of electrokinetic cell aluminum hull processing |
-
2017
- 2017-11-23 CN CN201711182490.1A patent/CN107717792B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104676122A (en) * | 2015-02-17 | 2015-06-03 | 沈阳工业大学 | Three-direction impact-resistant support and hanger |
CN205765088U (en) * | 2016-07-05 | 2016-12-07 | 郑利萍 | A kind of adjustable panel clamping device |
CN206241891U (en) * | 2016-12-14 | 2017-06-13 | 焦作大学 | A kind of molecular biology experiment clamp device |
CN106624553A (en) * | 2016-12-20 | 2017-05-10 | 重庆欣铼电子产品有限公司 | Welding tool for computer mainboard |
CN107350830A (en) * | 2017-07-25 | 2017-11-17 | 江苏万达新能源科技股份有限公司 | A kind of clamping device of electrokinetic cell aluminum hull processing |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108859152A (en) * | 2018-07-28 | 2018-11-23 | 芜湖市崇兴乐塑胶有限公司 | A kind of installation equipment of plastic product |
CN111687760A (en) * | 2019-03-14 | 2020-09-22 | 南京汽枪厂有限公司 | Adjustable air gun barrel clamp |
CN110754729A (en) * | 2019-08-28 | 2020-02-07 | 南京医科大学第二附属医院 | PSG electrode positioning helmet |
CN111706767A (en) * | 2020-05-26 | 2020-09-25 | 南京后马种植专业合作社 | Bird repelling device |
CN112122053A (en) * | 2020-08-11 | 2020-12-25 | 王海山 | Effectual alloy pipe surface corrosion prevention device |
CN111906281A (en) * | 2020-08-21 | 2020-11-10 | 来安县山关轨道装备有限公司 | Water jet cutter unloader of coupler seat |
CN112815149A (en) * | 2021-02-01 | 2021-05-18 | 昆山市优捷科自动化设备有限公司 | Circular tube guide device |
CN112893270A (en) * | 2021-02-05 | 2021-06-04 | 王丽 | Soil cleaning equipment based on plant collection for biology |
CN112893270B (en) * | 2021-02-05 | 2022-09-20 | 云阳县规划和自然资源局 | Soil cleaning equipment based on plant collection for biology |
CN114034410A (en) * | 2021-10-22 | 2022-02-11 | 南京铂航电子科技有限公司 | Safety monitoring device based on electric power automation |
Also Published As
Publication number | Publication date |
---|---|
CN107717792B (en) | 2023-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107717792A (en) | A kind of clamping processing unit (plant) of non-ferrous alloy pipe | |
CN207509732U (en) | A kind of pvc pipe production reducing pipe-expanding machine | |
CN207465058U (en) | A kind of clamping processing unit (plant) of non-ferrous alloy pipe | |
CN206230196U (en) | Workpiece clamping device | |
CN106625236A (en) | Special tool for grinding bearing inner ring roller groove | |
CN206536357U (en) | Bearing inner race roller groove polishing special tooling | |
CN206806523U (en) | A kind of wire harness is flexible coupling piece | |
CN204686795U (en) | A kind of jump ring installation station for being arranged in valve courage | |
CN109510100A (en) | A kind of digital control type bracing wire platform for making | |
CN206357087U (en) | One kind clamps Tiao Mi mechanisms | |
CN205770401U (en) | Fire retardant powder filling machine | |
CN207028020U (en) | The material pressing device of front and back end in a kind of carpet cold moudling | |
CN206653251U (en) | Gas cylinder inner surface treatment device | |
CN209071946U (en) | A kind of digital control type bracing wire platform for making | |
CN208908174U (en) | A kind of three-phase reactor press mounting structure | |
CN208179340U (en) | A kind of effective clamping tool of heating | |
CN205519039U (en) | Novel tubular metal resonator that can practice thrift raw and other materials is drawn and is used clamping device | |
CN203456272U (en) | Coil bag compressing machine | |
CN206578406U (en) | A kind of fixing device of tubular object extruding | |
CN206882818U (en) | A kind of camera lens vertical pulling clamp system | |
CN207756758U (en) | A kind of square tube docking mechanism | |
CN208937410U (en) | A kind of screw rod clamping positioning mechanism for extension test | |
CN105108884B (en) | Soft marble forming machine | |
CN203904626U (en) | Knot tying jig for cotton threads | |
CN202754548U (en) | Buffering and delivery device for down filling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |