CN107717188B - Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder - Google Patents

Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder Download PDF

Info

Publication number
CN107717188B
CN107717188B CN201711073026.9A CN201711073026A CN107717188B CN 107717188 B CN107717188 B CN 107717188B CN 201711073026 A CN201711073026 A CN 201711073026A CN 107717188 B CN107717188 B CN 107717188B
Authority
CN
China
Prior art keywords
welding
weld seam
vertical plate
plate component
gusset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711073026.9A
Other languages
Chinese (zh)
Other versions
CN107717188A (en
Inventor
陈北平
张志毅
李亚南
齐维闯
田仁勇
商浩
武永寿
卢铁鹏
刘建树
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Qingdao Sifang Co Ltd
Original Assignee
CRRC Qingdao Sifang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Qingdao Sifang Co Ltd filed Critical CRRC Qingdao Sifang Co Ltd
Priority to CN201711073026.9A priority Critical patent/CN107717188B/en
Publication of CN107717188A publication Critical patent/CN107717188A/en
Application granted granted Critical
Publication of CN107717188B publication Critical patent/CN107717188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/18Submerged-arc welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/047Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/02Seam welding; Backing means; Inserts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/24Features related to electrodes
    • B23K9/28Supporting devices for electrodes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/32Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/006Vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Plasma & Fusion (AREA)
  • Optics & Photonics (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention relates to rail vehicle welding fields, disclose muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder, muscle is made of lower cover plate, gusset, vertical plate component and four class component of spring strut in curb girder, muscle structural simulation in curb girder is completed by welding template, the concrete form of template weld seam is determined according to soldering angle and position while welding;The sequencing of welding is vertical plate component and the long weld seam backing welding of lower cover plate, gusset and lower cover plate welding seams, gusset and vertical plate component weld seam, spring strut girth joint, spring strut and the super spy weld seam backing welding of vertical plate component, vertical plate component and the long weld seam cover of lower cover plate weld, spring strut and the super spy weld seam cover weldering of vertical plate component;The welding parameter of backing welding, filling weldering and cover weldering is determined respectively;Control welding quality: including 3 points of control assembly clearance, control pretreatment quality and control weldqualities that cross.The invention also discloses a kind of systems.The present invention is able to ascend muscle welding efficiency in curb girder, effectively control welding deformation.

Description

Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder
Technical field
The present invention relates to rail vehicle automatic welding technique fields, more particularly to muscle two-shipper in a kind of rail vehicle curb girder Cooperate with automatic soldering method.
Background technique
Normalization uses automatic welding in muscle welding in track vehicle side beam, muscle single machine welding in existing curb girder 2h/ group is usually needed, every robot is able to satisfy 2 vehicle production capacities (double shift) daily, with order volume increase and plant area Limitation, it is desirable that the utilization rate that unit plant area is promoted under conditions of original plant area is constant reaches 3 s'/day Production capacity, this requirement carry out raising efficiency under conditions of not increasing robot occupied area, and existing manipulator weldering passes through Double Wire Welding Promotion welding efficiency is fetched, double wire welding is more demanding to side beam structure, welding position, for muscle in EMU curb girder, Due to architectural difference, there are a large amount of girth joints and short weld seam, and welding space is smaller, such as use Double Wire Welding raising efficiency, it is difficult to control Welding quality processed.
Summary of the invention
(1) technical problems to be solved
The technical problem to be solved by the present invention is to how promote muscle welding efficiency in curb girder, welding deformation is effectively controlled.
(2) technical solution
In order to solve the above technical problem, the present invention provides muscle double computer cooperation automatic welding sides in a kind of rail vehicle curb girder Method, muscle is made of lower cover plate, gusset, vertical plate component and four class component of spring strut in curb girder, is had using the weld seam that manipulator welds Vertical plate component and the long weld seam of lower cover plate, gusset and lower cover plate welding seams, gusset and vertical plate component weld seam, spring strut and lower cover plate weld Seam, spring strut and vertical plate component are super to visit weld seam, includes the following steps:
Step 1: determine template weld seam: muscle structural simulation in curb girder completed by welding template, according to soldering angle and Position while welding determines the concrete form of template weld seam;
Step 2: determine welding sequence: the sequencing of welding is vertical plate component and the long weld seam backing welding of lower cover plate, gusset With lower cover plate welding seams, gusset and vertical plate component weld seam, spring strut girth joint, spring strut surpasses with vertical plate component visits weld seam backing welding, Vertical plate component and the long weld seam cover of lower cover plate weld, spring strut and the super spy weld seam cover weldering of vertical plate component;
Step 3: it determines welding parameter: determining welding current, the voltage, welding of backing welding, filling weldering and cover weldering respectively Speed and wire feed rate;
Step 4: control welding quality: including 3 points of control assembly clearance, control pretreatment quality and control weld seams that cross Quality.
Wherein, gusset includes long gusset and short rib, in step 1, the concrete form of template weld seam include: short rib with Girth joint is single layer on the inside of lower cover plate welding seams, short rib and vertical plate component weld seam, long gusset and vertical plate component weld seam, spring strut Single-pass welding, long gusset and lower cover plate welding seams are two layers of twice weld seam, and vertical plate component and the long weld seam of lower cover plate are two layers three welderings The super weld seam of visiting of seam, spring strut and vertical plate component is two layers of six weld seams.
In step 2, according to the sequencing of welding, concrete operation step are as follows:
Vertical plate component and the long weld seam backing welding of lower cover plate: muscle beam body in curb girder is adjusted to horizontal position, manipulator is utilized From the intermediate gusset side of vertical plate component and lower cover plate bottom welding to the left, at the same another manipulator from the same side of intermediate gusset to Right bottom welding then carries out vertical plate component and another road length weld seam backing welding of lower cover plate using same processing mode;
Gusset and lower cover plate welding seams weld: muscle beam body in curb girder is adjusted to ship type welding position, two manipulators by pair Title mode is welded;
Gusset and vertical plate component weld seam weld: adjusting muscle beam body in curb girder to ship type position, two manipulators when welding Using symmetrical, it is symmetrically welded from intermediate synchronized toward both ends;
Spring strut boxing seam welding: adjusting muscle beam body in curb girder to horizontal position when welding, and two manipulators are synchronous to be made Industry completes boxing seam welding;
Spring strut and the super spy weld seam backing welding of vertical plate component: muscle beam body in curb girder is adjusted to horizontal position, two manipulators Symmetrical synchronous welding;
Vertical plate component and the long weld seam cover of lower cover plate weld: welding position and vertical plate component and the long weld seam backing welding one of lower cover plate It causes, the twice weld seam of cover weldering continuously welds;
Spring strut and the super spy weld seam cover weldering of vertical plate component: welding position and the super spy weld seam bottoming of spring strut and vertical plate component Weldering is consistent, the continuous welding of twice weldering of cover weldering.
In step 4, control assembly clearance is specially that control assembly clearance is uniform, and assembly clearance is no more than 2mm.
In step 4, control pretreatment quality includes the pretreatment of gusset chamfering, assembly clearance pretreatment, tack welding and pre- place Manage weld seam processing.
Wherein, gusset chamfering pretreatment specifically includes: welding in advance to 3 intersections, postwelding is by gusset two Side weld polishing, reserves after polishing and is no more than 5mm weld seam.
Wherein, the assembly clearance pretreatment specifically includes: being pre-processed from groove side, polishing after pretreatment welding is in Spill.
Wherein, the tack welding and pretreatment weld seam processing specifically include: all tack welding positions, pretreatment weld seam rise Arc is received at arc, and round and smooth inclined-plane is polished into.
Wherein, 3 points of weldqualities that cross of the control specifically need to handle at receipts arc:
(1) vertical plate component and the long weld seam of lower cover plate, bottom welding increase submerged arc hole, submerged arc setting time;
(2) gusset and lower cover plate welding seams, welding increase submerged arc hole, submerged arc setting time;
(3) vertical plate component and each gusset weld seam, welding increase submerged arc hole, submerged arc setting time;
(4) vertical plate component and the long weld seam of lower cover plate, cover welding increase submerged arc hole, submerged arc setting time, and with pulling back.
The embodiment of the invention also provides muscle double computer cooperation robot welding systems in a kind of rail vehicle curb girder comprising two Six axis welding manipulator of platform and positioner;The six axis welding manipulator is mounted on horizontal beam using projecting mode, And it can be moved axially along horizontal beam;Positioner uses tilt bed, drives version of tendon and muscle in curb girder to turn by the positioner, The six axis welding manipulator, which is matched, is arranged with welding machine, wire feed system and retinue welding fixture.
(3) beneficial effect
Compared with prior art, the invention has the following advantages that
Muscle double computer cooperation automatic soldering method and system in a kind of rail vehicle curb girder provided by the invention, this method pass through Using double computer cooperation welding procedure, in the case where not increasing welding robot occupied area, pass through the reasonable peace of welding procedure Row, the work compound of two group welding manipulators is reduced to 1.2h by the weld interval of muscle in every group of curb girder by 2h, reach 3/ It production capacity (double shift), solves production capacity bottleneck problem, improves the utilization rate of workshop unit area;And using double Machine collaboration is symmetrically welded, and is kept thermal weld stress more reasonable, is effectively reduced welding deformation, reduces subsequent welding adjusting Amount, saves time cost, improves efficiency.The implementation of this method is easily facilitated by the system, operating reliability is high.
Detailed description of the invention
Fig. 1 is muscle structure main view in curb girder in muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder of the present invention Schematic diagram;
Fig. 2 is that muscle structure is overlooked in curb girder in muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder of the present invention Schematic diagram;
Fig. 3 is method neutrality board group part and the long weld seam backing welding schematic diagram of lower cover plate of the invention;
Fig. 4 is that gusset and lower cover plate welding seams weld schematic diagram in method of the invention;
Fig. 5 is that gusset and vertical plate component weld seam weld schematic diagram in method of the invention;
Fig. 6 is spring strut boxing seam welding schematic diagram in method of the invention;
Fig. 7 is spring strut and the super spy weld seam backing welding schematic diagram of vertical plate component in method of the invention;
Fig. 8 is the structural schematic diagram of muscle double computer cooperation robot welding system in a kind of rail vehicle curb girder of the present invention;
In figure: 1: lower cover plate;2: gusset;3: vertical plate component;4: spring strut;5: horizontal beam;6: six axis welding manipulators;7: Positioner;8: welding machine;9: overturning melt pit;1-1,2-1: the manipulator of collaborative work;1-2,2-2: the machinery of collaborative work Hand;1-3,2-3: the manipulator of collaborative work;1-4,2-4: the manipulator of collaborative work.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, concrete condition can be regarded and understand that above-mentioned term exists Concrete meaning in the present invention.
In addition, in the description of the present invention, unless otherwise indicated, " multiple ", " more ", " multiple groups " be meant that two or It is more than two.
The embodiment of the invention provides muscle double computer cooperation automatic soldering methods in a kind of rail vehicle curb girder, with certain type motor-car Illustrate for muscle in group curb girder, as illustrated in fig. 1 and 2, muscle is by lower cover plate, four class structure of gusset, vertical plate component and spring strut in curb girder Part composition has a vertical plate component and the long weld seam of lower cover plate 2 using the weld seam that manipulator welds, gusset and lower cover plate welding seams 8, muscle Plate and vertical plate component weld seam 16, spring strut with lower cover plate welding seams 4, spring strut and vertical plate component is super visits weld seam 4, due to weldering Rifle accessibility and fusion length problem, muscle can not be welding line totally 14 in the curb girder, and specifically, gusset includes long gusset and short muscle Plate, this method may include steps of:
Step 1: determine template weld seam: muscle structural simulation in curb girder completed by welding template, according to soldering angle and Position while welding determines that the concrete form of template weld seam, concrete form include short rib and lower cover plate welding seams, short rib and vertical plate group Girth joint is single layer single-pass welding on the inside of part weld seam, long gusset and vertical plate component weld seam, spring strut, and long gusset and lower cover plate weld Seam is two layers of twice weld seam, and vertical plate component is two layers of three weld seams with the long weld seam of lower cover plate, and spring strut and super visit of vertical plate component are welded Seam is two layers of six weld seams, and the usual bottom is bottoming layer, top layer is cover layer, is located in the middle one or more layers To fill layer, shown in table specific as follows;
Wherein, welding angle Z4.8, expression soldering angle is right angle, and the leg length of right angle two sides is 4.8mm, other welderings The meaning at angle and so on.
Step 2: welding sequence is determined: in order to use double computer cooperation welding to promote welding efficiency to greatest extent, by weld seam Control is welded in the position PB as far as possible, and the sequencing of welding is vertical plate component and the long weld seam backing welding of lower cover plate, gusset and lower cover Plate welding seams play welding angle, gusset and vertical plate component weld seam, spring strut girth joint, spring strut and vertical plate to the continuous twice of z9.6 welding angle The super spy weld seam backing welding of component, vertical plate component and the long weld seam cover of lower cover plate weld, spring strut and the super spy weld seam cover of vertical plate component Weldering;
Step 3: it determines welding parameter: determining welding current, the voltage, welding of backing welding, filling weldering and cover weldering respectively Speed and wire feed rate, shown in table specific as follows;
Step 4: control welding quality: including 3 points of control assembly clearance, control pretreatment quality and control weld seams that cross Quality.
In step 2, according to the sequencing of welding, concrete operation step are as follows:
Vertical plate component and the long weld seam backing welding of lower cover plate: as shown in figure 3, adjusting muscle beam body in curb girder to horizontal position (PB) It sets, using manipulator 1-1 from the intermediate gusset side bottom welding, while another collaborative work to the left of vertical plate component and lower cover plate Manipulator 2-1 from intermediate gusset the same side bottom welding to the right, then use same processing mode, utilize collaborative work Manipulator 1-2,2-2 carry out vertical plate component and another road length weld seam backing welding of lower cover plate;
Gusset and lower cover plate welding seams weld: as shown in figure 4, muscle beam body in curb girder is adjusted to ship type welding position, two Manipulator 1-1,2-1 of collaborative work are welded by symmetric mode, followed by manipulator 1-2,2-2 of collaborative work, association With manipulator 1-3,2-3 of work, manipulator 1-4,2-4 of collaborative work continue to weld other gussets and lower cover plate, until muscle Plate and lower cover plate welding are completed, pay attention to cannot a manipulator welded in welding position, another manipulator, which is shut down, to be waited;
Gusset and vertical plate component weld seam weld: as shown in figure 5, adjusting muscle beam body in curb girder to the position ship type (PA) when welding It sets, ship type position is will to tilt weld seam to be adjusted to side seam position, and manipulator 1-1,2-1 of two collaborative works are using therefrom Between synchronize and be symmetrically welded toward both ends, followed by manipulator 1-2,2-2 of collaborative work, manipulator 1-3,2-3 of collaborative work Continue to weld in the same way;
Spring strut boxing seam welding: as shown in fig. 6, adjusting muscle beam body in curb girder to horizontal position (PB) when welding, two Boxing seam welding is completed in manipulator 1-1,2-1 synchronization job that platform cooperates;
Spring strut and the super spy weld seam backing welding of vertical plate component: as shown in fig. 7, muscle beam body in curb girder is adjusted to horizontal position (PB) It sets, the symmetrical synchronous welding of manipulator 1-1,2-1 of two collaborative works, manipulator 1-2, the 2-2 then to cooperate is symmetrically same The step welding other side;
Vertical plate component and the long weld seam cover of lower cover plate weld: welding position and vertical plate component and the long weld seam backing welding one of lower cover plate It causes, the twice weld seam of cover weldering continuously welds;
Spring strut and the super spy weld seam cover weldering of vertical plate component: welding position and the super spy weld seam bottoming of spring strut and vertical plate component Weldering is consistent, the continuous welding of twice weldering of cover weldering.
It should be noted that manipulator has two altogether, it is classified as manipulator 1-1, the 2-1 to cooperate, is cooperated Manipulator 1-2,2-2, manipulator 1-3,2-3 of collaborative work;Manipulator 1-4,2-4 of collaborative work, be according to work or The sequencing used is distinguished, and it is convenient to be intended merely to description.
In step 4, control assembly clearance is specially to assemble muscle in curb girder by process chart requirement, control assembling Gap is uniform, and assembly clearance is no more than 2mm.
In step 4, control pretreatment quality includes the pretreatment of gusset chamfering, assembly clearance pretreatment, tack welding and pre- place Manage weld seam processing.
Wherein, gusset chamfering pretreatment specifically includes: welding in advance to 3 intersections, postwelding is by gusset two Side weld polishing, reserves after polishing and is no more than 5mm weld seam, can full penetration when guaranteeing manipulator welding.
Wherein, the assembly clearance pretreatment specifically includes: for the assembly clearance problem occurred, in order to avoid weldering is leaked, It is pre-processed, is polished after pretreatment welding concave from groove side.
Wherein, the tack welding and pretreatment weld seam processing specifically include: in order to avoid welding defect, all positioning welding positions It sets, the pretreatment weld seam starting the arc is received at arc, and round and smooth inclined-plane is polished into.
Wherein, 3 points of weldqualities that cross of the control specifically need to handle at receipts arc:
(1) vertical plate component and the long weld seam of lower cover plate, bottom welding increase submerged arc hole, submerged arc 0.5s;
(2) gusset and lower cover plate welding seams, welding increase submerged arc hole, submerged arc 0.7s;
(3) vertical plate component and each gusset weld seam, welding increase submerged arc hole, submerged arc 0.8s;
(4) vertical plate component and the long weld seam of lower cover plate, cover welding increase submerged arc hole, submerged arc 0.8s, and with pulling back.
The embodiment of the invention also provides muscle double computer cooperation robot welding systems in a kind of rail vehicle curb girder comprising two Six axis welding manipulator 6 of platform and positioner 7;The six axis welding manipulator 6 is mounted on horizontal beam using projecting mode On 5, and it can be moved axially along horizontal beam 5;Positioner 7 uses tilt bed, is driven in curb girder by the positioner 7 Version of tendon and muscle turns, and the six axis welding manipulator 6, which is matched, is arranged with welding machine 8, wire feed system and retinue welding fixture, positioner 7 Bottom is set in overturning melt pit 9, to increase overall stability.
As can be seen from the above embodiments, the present invention is by using double computer cooperation welding procedure, two group welding machinery Handball Associations The weld interval of muscle in every group of curb girder is greatly shortened, effectively reduces welding deformation by same operation, is reduced subsequent welding and is adjusted The amount of repairing saves time cost, improves efficiency.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder, muscle is by lower cover plate, gusset, vertical plate component in curb girder It is formed with four class component of spring strut, which is characterized in that there are vertical plate component and the long weld seam of lower cover plate using the weld seam that manipulator welds, Gusset and lower cover plate welding seams, gusset and vertical plate component weld seam, spring strut and lower cover plate welding seams, spring strut and vertical plate component are super to visit weldering Seam, includes the following steps:
Step 1: it determines template weld seam: muscle structural simulation in curb girder being completed by welding template, according to soldering angle and weld seam Position determines the concrete form of template weld seam;
Step 2: determine welding sequence: the sequencing of welding is vertical plate component and the long weld seam backing welding of lower cover plate, and gusset is under Bridge weld seam, gusset and vertical plate component weld seam, spring strut girth joint, spring strut and vertical plate component are super to visit weld seam backing welding, vertical plate Component and the long weld seam cover of lower cover plate weld, spring strut and the super spy weld seam cover weldering of vertical plate component;
Step 3: it determines welding parameter: determining welding current, the voltage, speed of welding of backing welding, filling weldering and cover weldering respectively And wire feed rate;
Step 4: control welding quality: including 3 points of control assembly clearance, control pretreatment quality and control weld seam matter that cross Amount.
2. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 1, which is characterized in that its In, gusset includes long gusset and short rib, in step 1, the concrete form of template weld seam include: short rib and lower cover plate welding seams, Girth joint is single layer single-pass welding on the inside of short rib and vertical plate component weld seam, long gusset and vertical plate component weld seam, spring strut, long Gusset and lower cover plate welding seams are two layers of twice weld seam, and vertical plate component and the long weld seam of lower cover plate are two layers of three weld seams, spring strut with The super weld seam of visiting of vertical plate component is two layers of six weld seams.
3. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 1, which is characterized in that step In two, according to the sequencing of welding, concrete operation step are as follows:
Vertical plate component and the long weld seam backing welding of lower cover plate: muscle beam body in curb girder is adjusted to horizontal position, using manipulator from vertical The intermediate gusset side of board group part and lower cover plate bottom welding to the left, while another manipulator is beaten to the right from intermediate gusset the same side Back welding connects, and then carries out vertical plate component and another road length weld seam backing welding of lower cover plate using same processing mode;
Gusset and lower cover plate welding seams weld: muscle beam body in curb girder being adjusted to ship type welding position, two manipulators are by symmetrical side Formula is welded;
Gusset and vertical plate component weld seam weld: adjusting muscle beam body in curb girder to ship type position when welding, two manipulators use Symmetrically, it is symmetrically welded from intermediate synchronized toward both ends;
Spring strut boxing seam welding: adjusting muscle beam body in curb girder to horizontal position when welding, and two manipulator synchronization jobs are complete It is welded at girth joint;
Spring strut and the super spy weld seam backing welding of vertical plate component: muscle beam body in curb girder is adjusted to horizontal position, two manipulators are symmetrical Synchronous welding;
Vertical plate component is welded with the long weld seam cover of lower cover plate: welding position is consistent with the long weld seam backing welding of lower cover plate with vertical plate component, The twice weld seam of cover weldering continuously welds;
Spring strut and the super spy weld seam cover weldering of vertical plate component: welding position and the super spy weld seam backing welding one of spring strut and vertical plate component It causes, the continuous welding of twice weldering of cover weldering.
4. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 1, which is characterized in that step In four, control assembly clearance is specially that control assembly clearance is uniform, and assembly clearance is no more than 2mm.
5. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 1, which is characterized in that step In four, control pretreatment quality includes the pretreatment of gusset chamfering, assembly clearance pretreatment, tack welding and pretreatment weld seam processing.
6. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 5, which is characterized in that described The pretreatment of gusset chamfering specifically includes: welding in advance to 3 intersections, postwelding is by gusset two sides weld grinding, after polishing It is reserved to be no more than 5mm weld seam.
7. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 5, which is characterized in that described Assembly clearance pretreatment specifically includes: being pre-processed, is polished after pretreatment welding concave from groove side.
8. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 5, which is characterized in that described Tack welding and pretreatment weld seam processing specifically include: all tack welding positions, the pretreatment weld seam starting the arc are received at arc, and circle is polished into Slideway.
9. muscle double computer cooperation automatic soldering method in rail vehicle curb girder according to claim 2, which is characterized in that described 3 points of weldqualities that cross are controlled specifically to need to handle at receipts arc:
(1) vertical plate component and the long weld seam of lower cover plate, bottom welding increase submerged arc hole, submerged arc setting time;
(2) gusset and lower cover plate welding seams, welding increase submerged arc hole, submerged arc setting time;
(3) vertical plate component and each gusset weld seam, welding increase submerged arc hole, submerged arc setting time;
(4) vertical plate component and the long weld seam of lower cover plate, cover welding increase submerged arc hole, submerged arc setting time, and with pulling back.
CN201711073026.9A 2017-11-03 2017-11-03 Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder Active CN107717188B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711073026.9A CN107717188B (en) 2017-11-03 2017-11-03 Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711073026.9A CN107717188B (en) 2017-11-03 2017-11-03 Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder

Publications (2)

Publication Number Publication Date
CN107717188A CN107717188A (en) 2018-02-23
CN107717188B true CN107717188B (en) 2019-11-22

Family

ID=61221544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711073026.9A Active CN107717188B (en) 2017-11-03 2017-11-03 Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder

Country Status (1)

Country Link
CN (1) CN107717188B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110919138A (en) * 2019-12-18 2020-03-27 南京雷尔伟新技术股份有限公司 Full-automatic welding device and process for spring cylinder and brake hanging seat
CN111151905B (en) * 2020-01-02 2021-11-12 中车青岛四方机车车辆股份有限公司 Welding method and welding control system for side beam assembly
CN111590161B (en) * 2020-04-07 2022-02-18 中车青岛四方机车车辆股份有限公司 Automatic welding method for urban rail tubular cross beam and plate-shaped part
CN114952134A (en) * 2022-06-06 2022-08-30 中车唐山机车车辆有限公司 Welding method and device for arc-shaped welding seam at end part of side beam of bogie

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103192159A (en) * 2013-04-23 2013-07-10 中国电子科技集团公司第三十八研究所 Workstation system with welding robots for radar structural parts
CN103370254A (en) * 2011-02-14 2013-10-23 庞巴迪运输有限公司 Longitudinal support for the transition region from a coach body side wall to the coach body roof of a rail vehicle coach body
CN104759890A (en) * 2015-04-16 2015-07-08 南京康尼机电股份有限公司 Automatic production line and method used for welding and milling door frame of railway vehicle
CN104942506A (en) * 2015-06-18 2015-09-30 南车青岛四方机车车辆股份有限公司 Low-floor bogie outside beam assembling and welding tool and assembling and welding method thereof
CN105195864A (en) * 2015-07-17 2015-12-30 江西洪都航空工业集团有限责任公司 Double-robot working station for double-weld-joint arc welding
CN106181152A (en) * 2016-08-29 2016-12-07 中车青岛四方机车车辆股份有限公司 Bogie frame automatic setup system
JP2017019305A (en) * 2015-07-07 2017-01-26 近畿車輌株式会社 Railway vehicle body structure and manufacturing method therefor
CN106513928A (en) * 2016-09-30 2017-03-22 中车青岛四方机车车辆股份有限公司 Welding method of rail vehicle side beam assembly

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103370254A (en) * 2011-02-14 2013-10-23 庞巴迪运输有限公司 Longitudinal support for the transition region from a coach body side wall to the coach body roof of a rail vehicle coach body
CN103192159A (en) * 2013-04-23 2013-07-10 中国电子科技集团公司第三十八研究所 Workstation system with welding robots for radar structural parts
CN104759890A (en) * 2015-04-16 2015-07-08 南京康尼机电股份有限公司 Automatic production line and method used for welding and milling door frame of railway vehicle
CN104942506A (en) * 2015-06-18 2015-09-30 南车青岛四方机车车辆股份有限公司 Low-floor bogie outside beam assembling and welding tool and assembling and welding method thereof
JP2017019305A (en) * 2015-07-07 2017-01-26 近畿車輌株式会社 Railway vehicle body structure and manufacturing method therefor
CN105195864A (en) * 2015-07-17 2015-12-30 江西洪都航空工业集团有限责任公司 Double-robot working station for double-weld-joint arc welding
CN106181152A (en) * 2016-08-29 2016-12-07 中车青岛四方机车车辆股份有限公司 Bogie frame automatic setup system
CN106513928A (en) * 2016-09-30 2017-03-22 中车青岛四方机车车辆股份有限公司 Welding method of rail vehicle side beam assembly

Also Published As

Publication number Publication date
CN107717188A (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN107717188B (en) Muscle double computer cooperation automatic soldering method in a kind of rail vehicle curb girder
CN205733542U (en) A kind of many planes trackless automatic tracking welding connection device
CN102009275B (en) Automatic welding system for rack and base of marine diesel engine
CN106270983B (en) A kind of head cover flexibility stud mounted welder
CN103357986A (en) Welding device
CN206854823U (en) Long-lived Orthotropic Steel Bridge Deck is remained silent the fabricating tools of rib
CN105081595A (en) Fillet weld welding structure for K-type grooves of moderately-thick plate without back chipping and welding technology of fillet weld welding structure
CN102861970A (en) Welding method of orthotropic plate U-shaped rib fillet welding robot and special equipment thereof
CN108526743B (en) Automatic tailor-welding method for connecting rod body of hydraulic support
CN105014193A (en) Special circular seam hardfacing machine
CN107999938B (en) Double-machine cooperative automatic welding method and system for rail vehicle beam
CN105082530A (en) Hot melting welding machine for corrugated pipe joint
CN109514047B (en) Welding process of thick-wall pipe
CN102513676A (en) Automatic spot welding device
CN106493496A (en) A kind of automobile body-in-white fixed-position welding device
CN205032891U (en) Bridge board unit welding production line
CN106944721A (en) The preparation method that double H types section turns box-type section composite steel column
CN108581256A (en) A kind of two phase stainless steel complete penetraction and fusion in welding fillet weld automatic welding method
CN107378203A (en) The welding method of box column
CN204913173U (en) Diaxon positioner
CN103286463B (en) Technological method for automatically welding cones with upper cover plate of side beam of framework
CN106271140A (en) A kind of plasma MAG complex welding method
CN113878310A (en) Fusion penetration welding method for T-shaped joint of thick plate
CN206366785U (en) Railway frog intelligence welding robot
CN206065790U (en) A kind of crawler crane large-sized structural parts positioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant