CN107700877A - Dry and wet zone separates Toilet system - Google Patents
Dry and wet zone separates Toilet system Download PDFInfo
- Publication number
- CN107700877A CN107700877A CN201710960192.4A CN201710960192A CN107700877A CN 107700877 A CN107700877 A CN 107700877A CN 201710960192 A CN201710960192 A CN 201710960192A CN 107700877 A CN107700877 A CN 107700877A
- Authority
- CN
- China
- Prior art keywords
- side wall
- screen
- dry
- fixed
- active screen
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/125—Small buildings, arranged in other buildings
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47K—SANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
- A47K3/00—Baths; Douches; Appurtenances therefor
- A47K3/28—Showers or bathing douches
- A47K3/30—Screens or collapsible cabinets for showers or baths
- A47K3/34—Slidable screens
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
Abstract
The invention discloses a kind of dry and wet zone to separate Toilet system, including toilet, toilet is provided with the dry area being connected and wet area, and the ground level that toilet is located in dry area is more than the ground level that toilet is located in wet area, and the ground in wet area is provided with discharge structure;Toilet includes the first side wall and the second side wall being oppositely arranged;And shower screen device, hanger rail mechanism, the fixed screen for hanging in hanger rail mechanism and being connected with the first side wall and the active screen being slidably arranged in hanger rail mechanism that shower screen device includes being arranged on the first side wall and the second side wall, active screen coordinates with ground clearance, and cooperatively forms water passage between ground and the second side wall, fixed screen.The potential safety hazard that pin is kicked mud sill dash stone and tripped can not only be eliminated, outside ensuring personal safety, floor drain and its connecting pipe that tradition is laid in dry area can be removed again, so as to substantially reduce construction cost, be advantageous to simplify construction procedure simultaneously, improve efficiency of construction.
Description
Technical field
The present invention relates to technical field of building construction, and Toilet system is separated more particularly to a kind of dry and wet zone.
Background technology
At present, set to tackle life staying idle at home difference use demand and improve comfort and experience sense, toilet
Meter and layout more and more using the construction theory of dry, wet area's separation, i.e., shower cabinet (wet area) and wash one's face and rinse one's mouth and defecation between independently
Open, avoid the current of shower cabinet be flowed into wash one's face and rinse one's mouth and defecation between.But existing toilet dry and wet zone way is commonly:It is dry,
Wet area's boundary installation Shower screen and mud sill dash stone, Shower screen can be reciprocatingly slided on mud sill dash stone consequently facilitating pass in and out,
Mud sill dash stone can stop that the water of shower cabinet flows into dry area simultaneously, but be arranged such mode and user's pin easily occur and kick mud sill gear
Water stone and the problem of tripped, larger potential safety hazard be present.In addition, in order to ensure to do, wet area's draining efficiency, can exist respectively
The related drain part such as floor drain and its connecting pipe is set on the ground in dry, wet area, construction construction cost can be greatly increased.
The content of the invention
Based on this, the present invention is necessary to provide a kind of dry and wet zone separation Toilet system, it can be ensured that dry and wet zone draining is just
The laying quantity of floor drain and its connecting pipe is reduced on the premise of often, so as to reduce construction construction cost, is removed on this basis
Mud sill dash stone used in traditional Shower screen, the security hidden trouble that user's pin is kicked and tripped is eliminated, improve toilet system
The safety in utilization and reliability of system.
Its technical scheme is as follows:
A kind of dry and wet zone separates Toilet system, including:
Toilet, the toilet are provided with the dry area that is connected and wet area, and the ground level in the dry area is more than described
Ground level in wet area, and the ground in the wet area is provided with discharge structure;The toilet includes the be oppositely arranged
One side wall and the second side wall;And
Take a shower screen device, and the shower screen device includes the hanger rail being arranged on first side wall and second side wall
The hanger rail is shielded and is slidably arranged in mechanism, the fixation for hanging in the hanger rail mechanism and being connected with first side wall
Active screen in mechanism, the active screen and ground clearance coordinate, and the ground and second side wall, the fixed screen
Between cooperatively form water passage.
When separation Toilet system in dry and wet zone as described above is built, toilet is located at the ground level in dry area first
Change, that is, use in health more than the ground level in wet area, while by the mounting means of the shower screen device of console mode
Between the first side wall and the second side wall on hanger rail mechanism is installed, the fixed screen of installation and active screen respectively in hanger rail mechanism afterwards,
And the active screen after installation is coordinated with ground clearance, while cancel traditional mud sill dash stone, and make ground and the second side
Water passage is cooperatively formed between wall and fixed screen.It so can not only eliminate and be stumbled because user's step kicks mud sill dash stone by mistake
Potential safety hazard, outside ensuring personal safety, the ponding on toilet Gan Qu ground can also be passed through by self gravitation
Aquaporin is smoothly flowed into and is arranged in the discharge structure in wet area, can so remove again tradition be laid in floor drain in dry area and
Its connecting pipe, so as to substantially reduce construction cost, while be advantageous to simplify construction procedure, improve efficiency of construction, lifting
Business economic.
The technical scheme of the application is further described below:
In one of the embodiments, the hanger rail mechanism includes the hanger rail sheet provided with the first assembly side and the second assembly side
Body, it is respectively arranged at first assembly side and the first installed part in second assembly side and the second installed part and interval
The fixture and hanging wheel being arranged on the hanger rail body, first installed part are connected with first side wall, and described second
Installed part is connected with second side wall;The fixed screen is fixedly connected with the fixture, and the active screen is arranged at described
On hanging wheel;Wherein, the active screen is arranged and relative can moved back and forth with the fixed screen parallel interval.It can so realize
The firm installation of hanger rail body, fixed screen and active screen, it is ensured that it is reliable using installation, while ensure that active screen can be consolidated relatively
Surely smooth movement is shielded, it is ensured that the sense of Shower screen usage experience is good, and the installation of above-mentioned each part and attachment structure are simple, beneficial to reduction
Difficulty of construction, lifting construction efficiency.
In one of the embodiments, the hanger rail body is provided with spaced first track and the second track, described
Hanging wheel includes suspension bracket, the installing plate being arranged on the suspension bracket, interval and the first rolling being rotatably arranged on the installing plate
Wheel and the second roller and clamping body of the suspension bracket away from described installing plate one end is arranged at, first roller and described the
Second wheel can roll respectively to be arranged on first track and second track, and the clamping body clamps with the active screen
It is fixed.It so, it is possible uniformly and effectively to share the weight of active screen to the first roller and the first track, the second roller and second
On track, the bearing capacity of single roller and guide rail is reduced, it is ensured that be not in the problem of damaging by pressure;In addition, made using roll mode
Active screen moves, additionally it is possible to reduces mobile frictional resistance, makes the use of Shower screen more laborsaving, smooth, makes beneficial to lifting user
Use experience sense.
In one of the embodiments, first track and second track are all provided with limited location recess, and described first
Roller and second roller are in the spacing recess;
The clamping body includes what first clamping plate, second clamping plate and both ends were connected with first clamping plate and second clamping plate respectively
Locking part, the active screen offers the first mounting hole, when the locking part is arranged in first mounting hole, described first
The both sides of clamping plate and the second clamping plate and the active screen compress.In this way, spacing recess can hanging wheel can by definitive orbit
By movement, prevent from laterally offset occurs when the first roller and the second roller motion and cause to occur active screen with it is fixed shield touch
Hit, problem safe to use be present;In addition the firm installation to active screen can also be realized using said structure, avoids active screen in frequency
It is numerous to occur when moving back and forth stress to loosen and cause to drop and break.
In one of the embodiments, adjustable column is additionally provided with the suspension bracket, the adjustable column is provided with external screw thread, the peace
Loading board offers pilot hole, and the hole wall of the pilot hole is provided with internal thread, and the external screw thread is adapted to the internal thread and spun;Or
The periphery wall of the adjustable column is arranged at intervals with least two card convex bodies along centerline direction, and the hole wall of the pilot hole is arranged with
First neck, first neck and at least two card convex bodies can correspond clamping.So it is easy to pacify in hanger rail body
When dress height determines, its longitudinally mounted position is adjusted flexibly to desired value according to the size of active screen, so as between ground
Gap coordinates to form the water passage of suitable size, it is ensured that the install convenient and use reliability of active screen.
In one of the embodiments, in addition at least one side fixed body, the side fixed body include corner brace part, first
Intermediate plate, double threaded screw and locking member, the corner brace part include offering the fixed plate of through hole and are connected with the fixed plate
Second intermediate plate, the locking member pass through the through hole after fixed with the preset hole on first side wall;The fixed screen is opened
Provided with the second mounting hole, tapped blind hole, the double end are offered on the opposite face of the first intermediate plate and the second intermediate plate
When screw rod is arranged in second mounting hole, the both ends of the double threaded screw are rotatably connected in two tapped blind holes respectively,
The first intermediate plate and the second intermediate plate compress with the fixed screen.It can so realize and one is entered to the sidepiece of fixed screen
Step installation is fixed so that side fixed body can effectively share the weight for the fixed screen that hanger rail mechanism is undertaken, it is ensured that shield to fixed
Firmly while installation, hanger rail mechanism is avoided fatigue fracture occur because shearing stress is excessive with side fixed body, it is ensured that longer
Service life.
In one of the embodiments, in addition to the first magnetic adhesive tape and the second magnetic adhesive tape, the active screen are additionally provided with
First side relative with second side wall, the first magnetic adhesive tape are arranged at first side, second magnetic
Adhesive tape is arranged at second side wall and relative with the first magnetic adhesive tape;The first magnetic adhesive tape and second magnetic
Adhesive tape includes the damping body provided with accommodating cavity and the magnetic absorption member being arranged in the accommodating cavity, and two magnetic absorption members can magnetic
Inhale and fix.In this way, when user drenched with rain using wet area or dry in the air wash when, pulling active screen, first the second side wall is close, and then the
Magnetic absorption member in one magnetic adhesive tape and the second magnetic adhesive tape can mutually magnetic fix, be in close contact active screen and the second side wall with
Fit clearance is eliminated, prevents the water in wet area from oozing out, ensures the health in dry area;In addition, above-mentioned damping body can also play preferably
Cushioning effect, prevent active screen from causing active screen to crash hard rigid shock with the hard of the second side wall Contact, it is ensured that to make
With safe and reliable.
In one of the embodiments, the first magnetic adhesive tape and the second magnetic adhesive tape are also included and subtracted with described
First installation card body of vibration body connection, the first installation card body are provided with the second neck, first side and described in defaulting in
Fixing body on second side wall is arranged in second neck correspondingly;Wherein, the groove width of second neck is by institute
It is in the trend gradually successively decreased to state damping body to the direction of notch.
In one of the embodiments, anticreep clamp, the Anti-release clamp are additionally provided with the inner side cell wall of second neck
The bottom land direction of plate towards second neck is obliquely installed.So it is able to ensure that the first magnetic adhesive tape and the second magnetic adhesive tape difference
Firmly it is installed on the fixing body on the second side and the second side wall of active screen, avoids use for a long time because deformation, aging are led
Cause comes off, and influences service life.
In one of the embodiments, in addition to the first side block glue bar and the second side block glue bar, the active screen is also
Provided with second side relative with first side wall, the fixed screen is provided with the abutting end away from first side wall, described
Assembling gap is cooperatively formed between active screen and the fixed screen;
The first side block glue bar and the second side block glue bar are equipped with the second installation card body and with described second
Body is filled out in the sealing of installation card body connection, and the second installation card body is provided with the 3rd neck, second side and the abutting end
When being arranged in correspondingly in the 3rd neck, two sealings fill out body be filled at the assembling seam with being stacked
In gap.It so, it is possible to prevent the water in wet area from being oozed out in the assembling gap between active screen and fixed screen, influence defending for dry area
Raw and cleaning, and the structure of above-mentioned sealing means is simple, is convenient to mount and dismount, sealing property is good.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the dry and wet zone separation Toilet system described in the embodiment of the present invention;
Fig. 2 is the structural representation of the shower screen device described in the embodiment of the present invention;
Fig. 3 is the cross-sectional view at the B-B shown in Fig. 2;
Fig. 4 is the cross-sectional view at the C-C shown in Fig. 2;
Fig. 5 is the cross-sectional view at the D-D shown in Fig. 2;
Fig. 6 is the structural representation of the second side block glue bar described in the embodiment of the present invention.
Description of reference numerals:
100th, toilet, 110, Gan Qu, 120, wet area, the 130, first side wall, the 140, second side wall, 200, Shower screen dress
Put, 210, hanger rail mechanism, 211, hanger rail body, 211a, the first track, 211b, the second track, the 212, first installed part, 213,
Second installed part, 214, fixture, 215, hanging wheel, 215a, suspension bracket, 215b, installing plate, 215c, the first roller, 215d, second
Roller, 215e, clamping body, 215f, adjustable column, 216, spacing recess, 220, fixed screen, 221, abutting end, 230, active screen,
231st, the first side, the 232, second side, 300, side fixed body, 310, corner brace part, 311, fixed plate, 312, second intermediate plate,
320th, first intermediate plate, 330, locking member, the 400, first magnetic adhesive tape, the 500, second magnetic adhesive tape, 510, damping body, 520, magnetic
Part, the 530, first installation card body, the 531, second neck, 531a, anticreep clamp, the 600, first side block glue bar, the 700, second side
Dash adhesive tape, 710, second installation card body, the 711, the 3rd neck, 720, sealing fill out body.
Embodiment
For the objects, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with accompanying drawing and specific embodiment party
Formula, the present invention is described in further detail.It should be appreciated that embodiment described herein is only solving
The present invention is released, does not limit protection scope of the present invention.
It should be noted that when element is referred to as " being fixedly arranged on ", " being arranged at " or " install in " another element, it can be with
Directly on another element or there may also be element placed in the middle.When an element is considered as " connection " another yuan
Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element
The concrete mode being fixedly connected can be achieved by the prior art, and will not be repeated here, it is preferred to use the fixation side of threaded connection
Formula.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more
The arbitrary and all combination of related Listed Items.
Heretofore described " first ", " second " do not represent specific quantity and order, are only used for the differentiation of title.
As shown in figure 1, a kind of dry and wet zone of the embodiment shown for the present invention separates Toilet system, including:Toilet
100 and shower screen device 200, the toilet 100 be provided with the dry area 110 and wet area 120 that are connected, the toilet 100
It is more than the toilet 100 in the ground level in the dry area 110 and is located at ground level in the wet area 120, and it is described
Ground in wet area 120 is provided with discharge structure;The toilet 100 includes the first side wall 130 and the second side being oppositely arranged
Wall 140;The shower screen device 200 includes the hanger rail mechanism being arranged on first side wall 130 and second side wall 140
210th, fixing for hanging in the hanger rail mechanism 210 and be connected with first side wall 130 is shielded 220 and is slidably arranged at
Active screen 230 in the hanger rail mechanism 210, the active screen 230 coordinates with ground clearance, and the ground and described second
Water passage is cooperatively formed between side wall 140, the fixed screen 220.
When separation Toilet system in dry and wet zone as described above is built, toilet 100 is located at the ground in dry area 110 first
Face is highly more than the ground level in wet area 120, while the mounting means of the shower screen device 200 of console mode is changed,
I.e. using hanger rail mechanism 210 is installed on the first side wall 130 and the second side wall 140 of toilet 100, afterwards in hanger rail mechanism
The fixed screen 220 of installation and active screen 230, and the active screen 230 after installation is coordinated with ground clearance respectively on 210, simultaneously
Cancel traditional mud sill dash stone, and make to cooperatively form water passage between ground and the second side wall 140 and fixed screen 220.Such as
This can be not only eliminated because of the potential safety hazard that user's step kicks mud sill dash stone by mistake and is tripped, and outside ensuring personal safety, defended
Ponding on the ground of Sheng Jian100Gan areas 110 can also smoothly be flowed into by self gravitation by water passage is arranged on wet area 120
In interior discharge structure, the floor drain and its connecting pipe that tradition is laid in dry area 110 can be so removed again, so as to drop significantly
Low construction cost, while be advantageous to simplify construction procedure, improve efficiency of construction, enterprise economy.
In above-mentioned preferred embodiment, to ensure that the ponding on the dry ground of area 110 flows smooth, preferably dry area 110
Ground is arranged to constant slope, and incline direction is towards wet area 120, and ensures that the height on the dry ground of area 110 is higher than the wet ground of area 120
Face height about 20~30mm so that draining is more quick, clean.On this basis, just only need to install on the wet ground of area 120
A set of discharge structure is that the overall draining that dry and wet zone 120 can be achieved needs, and saves the dry draining related facility of area 110 and is constructed into
This.
Specifically, above-mentioned discharge structure includes the guiding gutter being arranged on the wet ground of area 120, guiding gutter is by the ponding of convergence
The floor drain for the below ground that is laid in is directed to, ponding enters the connecting tube connected with it by floor drain, ponding finally is drained into pipe again
Well standpipe.
In addition, above-mentioned hanger rail mechanism 210 and the optional boundary for being arranged on dry area 110 and wet area 120 of Shower screen, and it is excellent
Choosing is using suspension mounting means.Specifically, the upper end of fixed screen 220 hangs with hanger rail mechanism 210 and fixed, in lower end insertion geosyncline
It is fixed;Active screen 230 then can be slidably mounted in hanger rail mechanism 210 and can be slided parallel to fixed screen 220 is relative, and active screen
230 lower end need to be suspended on ground without contacting, and so not only can remove the support that is used for that tradition uses and install Shower screen and gear
The mud sill dash stone of water effect, eliminates the problem of tripping;It can also be cooperatively formed simultaneously with the second side wall 140 and fixed screen 220
The water passage that Shi Gan areas 110 connect with wet area 120, it is ensured that the ponding in dry area 110 is smoothly discharged into the wet floor drain of area 120.
Above-mentioned active screen 230 and fixed screen 220 it is optional be glass, transparent plastic sheet etc., specific in present embodiment, two
Person is clear glass.Certainly, in order to ensure active screen 230 can steadily be moved by both fixed tracks, the above-mentioned system of toilet 100
Also include the guide runner of installation on the ground, and the glass clamp installed in the bottom of active screen 230.Glass clamp passes through groove and work
230 clampings of dynamic screen, guide runner offer the guide groove with the face of active screen 230, and glass clamp can just be inlaid in guide groove and can
Slidably.So under the guide effect of guide groove, moving back and forth for active screen 230 is more steady, smooth.
Please continue to refer to Fig. 2, in one embodiment, the hanger rail mechanism 210 includes being provided with the first assembly side and second
The hanger rail body 211 of assembly side, the first installed part 212 being respectively arranged in first assembly side and second assembly side
With the second installed part 213 and the fixture 214 and hanging wheel 215 that are arranged at intervals on the hanger rail body 211, first peace
Piece installing 212 is connected with first side wall 130, and second installed part 213 is connected with second side wall 140;Specifically, hang
Rail body 211 is that profile is square columns, and both ends pass through respectively using the section bar of injection, stretching extension or Sheet Metal Forming Technology manufacture
The hardware (the first installed part 212 and the second installed part 213) of triangle locks to the first side wall by screw, bolt etc.
130 and second on side wall 140.In addition, specific in present embodiment, the section of hanger rail body 211 is the bar structure of splayed configuration
Part, i.e. hanger rail body 211 are made up of the cylinder of two rectangular cross-sections, and fixture 214 is metal clip slot, and metal clip slot is fixed on
Below one of cylinder, it is locked in the upper end insertion clip slot of fixed screen 220 and by bolt, realizes firmly installation.Enter
One step, the fixed screen 220 is fixedly connected with the fixture 214, and the active screen 230 is arranged on the hanging wheel 215;
Wherein, the active screen 230 is arranged and relative can moved back and forth with 220 parallel intervals of the fixed screen.Slided by hanging wheel 215
Loaded on the movement and assembly and disassembly on hanger rail body 211, being easy to active screen 230.To sum up, it can so realize hanger rail body 211, fix
The firm installation of screen 220 and active screen 230, it is ensured that it is reliable using installation, while ensure that active screen 230 can be relatively fixed screen
220 smooth movements, it is ensured that the sense of Shower screen usage experience is good, and the installation of above-mentioned each part and attachment structure are simple, beneficial to reduction
Difficulty of construction, lifting construction efficiency.
Please continue to refer to Fig. 5, in mode is further carried out, the hanger rail body 211 is provided with spaced first
Track 211a and the second track 211b, specific in present embodiment, the lower end of another rectangular cylinder opens up bar v notch v, position
Plate in this v notch v both sides is the first track 211a and the second track 211b, is thusly-formed the first track 211a and
Two track 211b mode and simple in construction, advantageously reduces manufacturing cost.In addition, the hanging wheel 215 includes suspension bracket 215a, set
Installing plate 215b, interval and the first roller being rotatably arranged on the installing plate 215b being placed on the suspension bracket 215a
215c and the second roller 215d and it is arranged at clamping body 215es of the suspension bracket 215a away from described installing plate 215b one end, institute
Stating the first roller 215c and the second roller 215d can roll be arranged at the first track 211a and second rail respectively
On road 211b, the clamping body 215e grips with the active screen 230.During installation, the first roller 215c and the second roller
215d connections installing plate 215b can be inserted in wherein cavity from the openend of rectangular cylinder, and now the first roller 215c is pressed on just
On first track 211a, the second roller 215d is pressed on the second track 211b just simultaneously, and suspension bracket 215a is then coordinated with gap
Mode be arranged in bar v notch v, and specific in present embodiment, the first roller 215c and the second roller 215d quantity
It it is two, the quantity thus by further increase roller can suitably increase the strong point, improve hanging wheel 215 to active screen 230
Lift reliability.It so, it is possible uniformly and effectively to share the weight of active screen 230 to the first roller 215c and the first track
On 211a, the second roller 215d and the second track 211b, the bearing capacity of single roller and guide rail is reduced, it is ensured that be not in damage by pressure
The problem of;In addition, move active screen 230 using roll mode, additionally it is possible to reduce mobile frictional resistance, make the use of Shower screen
It is more laborsaving, smooth, beneficial to lifting user experience sense.
Further, the first track 211a and the second track 211b is all provided with limited location recess, first rolling
215c and the second roller 215d is taken turns in the spacing recess;Alternatively, spacing recess can make section for half
Circle, V-shape etc., specific in present embodiment, spacing recess is V-shape, can reduce the contact area with roller, and reduction connects
Touch frictional resistance.
Pressed from both sides respectively with first clamping plate and second in addition, the clamping body 215e includes first clamping plate, second clamping plate and both ends
The locking part of plate connection, the active screen 230 offer the first mounting hole, and the locking part is arranged in first mounting hole
When, the both sides of the first clamping plate and the second clamping plate and the active screen 230 compress.In this way, spacing recess can be hung
Wheel 215 presses definitive orbit reliable mobile, prevents that laterally offset occurs and leads when the first roller 215c and the second roller 215d from moving
There is active screen 230 and collided with fixed screen 220 in cause, problem safe to use be present;In addition can also be realized using said structure
Firm installation to active screen 230, active screen 230 is avoided to occur to loosen when frequently moving back and forth stress and cause to drop and fall
It is bad.Further carry out in mode, in order to avoid causing extruding to rupture active screen 230, preferably pressed from both sides in first clamping plate and second
Be sticked protective pad on the opposite plate of plate, and it is plastic pad, foam cushion etc. that protective pad is optional, specific in present embodiment, protective pad
For plastic pad.Thus crimped by plastic pad with active screen 230, change rigid contact is flexible contact, it is ensured that active screen 230 is not
It can be ruptured because by excessive extruding force.
Further, adjustable column 215f is additionally provided with the suspension bracket 215a, the adjustable column 215f is provided with external screw thread, described
Installing plate 215b offers pilot hole, and the hole wall of the pilot hole is provided with internal thread, and the external screw thread is adapted to the internal thread
Spin;Or the periphery wall of the adjustable column 215f is arranged at intervals with least two card convex bodies, the pilot hole along centerline direction
Hole wall be arranged with the first neck, first neck and at least two card convex bodies can correspond clamping.So it is easy to
When the setting height(from bottom) of hanger rail body 211 determines, its longitudinally mounted position is adjusted flexibly to conjunction according to the size of active screen 230
Just when so as to coordinate with ground clearance to form the water passage of suitable size, it is ensured that the install convenient of active screen 230 with
Use reliability.
Please continue to refer to Fig. 2 and Fig. 3, on the basis of above-described embodiment, in addition at least one side fixed body 300,
In the embodiment of this choosing, the quantity of side fixed body 300 is two and longitudinally spaced setting is with the sidepiece with fixed screen 220
Uniformly connection.The side fixed body 300 includes corner brace part, first intermediate plate, double threaded screw and locking member, the corner brace part bag
Include the fixed plate for offering through hole and the second intermediate plate being connected with the fixed plate, the locking member pass through after the through hole with
Preset hole on first side wall 130 is fixed;The fixed screen 220 offers the second mounting hole, the first intermediate plate and institute
State and tapped blind hole is offered on the opposite face of second intermediate plate, when the double threaded screw is arranged in second mounting hole, institute
The both ends for stating double threaded screw are rotatably connected in two tapped blind holes respectively, and the first intermediate plate and the second intermediate plate are and institute
Fixed screen 220 is stated to compress.It can so realize that the further installation of the sidepiece to fixed screen 220 is fixed so that side fixed body 300
The weight for the fixed screen 220 that hanger rail mechanism 210 is undertaken can effectively be shared, it is ensured that while to the firm installation of fixed screen 220,
Hanger rail mechanism 210 is avoided fatigue fracture occur because shearing stress is excessive with side fixed body 300, it is ensured that longer service life.
Please continue to refer to Fig. 2 and Fig. 4, on the basis of any of the above-described embodiment, in addition to the first magnetic adhesive tape 400 and
Two magnetic adhesive tape 500, the active screen 230 are additionally provided with first side 231 relative with second side wall 140, and described first
Magnetic adhesive tape 400 is arranged at first side 231, the second magnetic adhesive tape 500 be arranged at second side wall 140 and with
The first magnetic adhesive tape 400 is relative;The first magnetic adhesive tape 400 and the second magnetic adhesive tape 500 include being provided with holding
The magnetic absorption member 520 put the damping body 510 of chamber and be arranged in the accommodating cavity, two magnetic absorption members 520 can magnetic fix.
In this way, when user drenched with rain using wet area 120 or dry in the air wash when, pull active screen 230 it is close to the second side wall 140, and then
Magnetic absorption member 520 in first magnetic adhesive tape 400 and the second magnetic adhesive tape 500 can mutually magnetic fix, make active screen 230 and second
Side wall 140, which is in close contact, to eliminate fit clearance, prevents the water in wet area 120 from oozing out, and ensures the health in dry area 110;On in addition,
Damping body 510 is stated preferably to make using the good material of deformation and shock-absorbing capacity, such as rubber, and it is preferably that section is the word of class eight
The bar shape of type, it can deform upon so as to play preferable cushioning effect, prevent when being extruded by the shock of the second side wall 140
Active screen 230 causes active screen 230 to crash hard rigid shock with the hard of the Contact of the second side wall 140, it is ensured that uses peace
It is complete reliable.
Further, the first magnetic adhesive tape 400 and the second magnetic adhesive tape 500 also include and the damping body
First installation card body 530 of 510 connections, the first installation card body 530 are provided with the second neck 531, the He of the first side 231
The fixing body defaulted on second side wall 140 is arranged in second neck 531 correspondingly;Wherein, described
The groove width of two draw-in groove 531 is in the trend gradually successively decreased by the damping body 510 to the direction of notch, thus using tapered configuration
Second neck 531 snaps connection with active screen 230, can produce wedging effect, makes the installation of active screen 230 and the first installation card body
530 assemblings are more firm.
Further, anticreep clamp 531a, the anticreep clamp are additionally provided with the inner side cell wall of second neck 531
The bottom land direction of 531a towards second neck 531 is obliquely installed, specific to play incline direction and the installation direction of active screen 230
Conversely, it is thus possible to limit it and moved toward the direction of notch.So it is able to ensure that the first magnetic adhesive tape 400 and the second magnetic adhesive tape
500 are firmly installed on the fixing body on the second side 232 and the second side wall 140 of active screen 230 respectively, avoid making for a long time
Cause to come off with because of deformation, aging, influence service life.In addition, it is located at limit card board on the both sides internal groove side wall of the second neck 531
Convex closure is also provided between bottom land, convex closure also abuts with active screen 230, it is thus possible to increase spacing contact point and further
Limitation active screen 230 separates with the first installation card body 530 of first, second magnetic adhesive tape 500.
Please continue to refer to Fig. 2 and Fig. 6, on the basis of any of the above-described embodiment, in addition to the He of the first side block glue bar 600
Second side block glue bar 700, the active screen 230 is additionally provided with second side 232 relative with first side wall 130, described
Fixed screen 220 is provided with the abutting end 221 away from first side wall 130, between the active screen 230 and the fixed screen 220
Cooperatively form assembling gap;
The first side block glue bar 600 and the second side block glue bar 700 be equipped with the second installation card body 710 and
Body 720 is filled out in the sealing being connected with the described second installation card body 710, and the second installation card body 710 is provided with the 3rd neck 711, institute
State the second side 232 and the abutting end 221 is arranged in the 3rd neck 711 correspondingly, specifically, working as active screen
230 with the second side wall 140 when being close to, the second side 232 and face before and after abutting end 221, and body 720 is filled out in now two sealings
It is filled at being stacked in the assembling gap.It so, it is possible to prevent the water in wet area 120 from active screen 230 with fixing
Oozed out in assembling gap between screen 220, influence health and the cleaning in dry area 110, and the structure of above-mentioned sealing means is simple, dress
Tear open conveniently, sealing property is good.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of dry and wet zone separates Toilet system, it is characterised in that including:
Toilet, the toilet are provided with the dry area that is connected and wet area, and the ground level in the dry area is more than the wet area
Interior ground level, and the ground in the wet area is provided with discharge structure;The toilet includes the first side being oppositely arranged
Wall and the second side wall;And
Take a shower screen device, and the shower screen device includes the rail lifter being arranged on first side wall and second side wall
The rail lifter is shielded and is slidably arranged in structure, the fixation for hanging in the hanger rail mechanism and being connected with first side wall
Active screen on structure, the active screen coordinate with ground clearance, and between the ground and second side wall, the fixed screen
Cooperatively form water passage.
2. dry and wet zone according to claim 1 separates Toilet system, it is characterised in that the hanger rail mechanism includes being provided with
The hanger rail body of first assembly side and the second assembly side, it is respectively arranged in first assembly side and second assembly side
First installed part and the second installed part and the fixture and hanging wheel being arranged at intervals on the hanger rail body, first installation
Part is connected with first side wall, and second installed part is connected with second side wall;The fixed screen and the fixture
It is fixedly connected, the active screen is arranged on the hanging wheel;Wherein, the active screen with it is described it is fixed shield parallel interval arrangement,
And relative it can move back and forth.
3. dry and wet zone according to claim 2 separates Toilet system, it is characterised in that the hanger rail body is provided with interval
The first track and the second track set, the hanging wheel include suspension bracket, the installing plate being arranged on the suspension bracket, interval and can turned
Move the first roller being arranged on the installing plate and the second roller and be arranged at the suspension bracket away from described installing plate one end
Clamping body, first roller and second roller can roll respectively is arranged at first track and second track
On, the clamping body grips with the active screen.
4. dry and wet zone according to claim 3 separates Toilet system, it is characterised in that first track and described the
Two tracks are all provided with limited location recess, and first roller and second roller are in the spacing recess;
The clamping body includes the locking that first clamping plate, second clamping plate and both ends are connected with first clamping plate and second clamping plate respectively
Part, the active screen offers the first mounting hole, when the locking part is arranged in first mounting hole, the first clamping plate
Compressed with the both sides of the second clamping plate and the active screen.
5. dry and wet zone according to claim 3 separates Toilet system, it is characterised in that regulation is additionally provided with the suspension bracket
Post, the adjustable column are provided with external screw thread, and the installing plate offers pilot hole, and the hole wall of the pilot hole is provided with internal thread, institute
State external screw thread and be adapted to the internal thread and spun;
Or the periphery wall of the adjustable column is arranged at intervals with least two card convex bodies, the hole wall of the pilot hole along centerline direction
The first neck is arranged with, first neck and at least two card convex bodies can correspond clamping.
6. dry and wet zone according to claim 1 separates Toilet system, it is characterised in that is also fixed including at least one side
Body, the side fixed body include corner brace part, first intermediate plate, double threaded screw and locking member, and the corner brace part includes offering
The fixed plate of through hole and the second intermediate plate being connected with the fixed plate, the locking member are passed through after the through hole with described first
Preset hole on side wall is fixed;The fixed screen offers the phase of the second mounting hole, the first intermediate plate and the second intermediate plate
Tapped blind hole is offered on opposite, when the double threaded screw is arranged in second mounting hole, the two of the double threaded screw
End is rotatably connected in two tapped blind holes respectively, and the first intermediate plate and the second intermediate plate compress with the fixed screen.
7. dry and wet zone according to claim 1 separates Toilet system, it is characterised in that also including the first magnetic adhesive tape and
Second magnetic adhesive tape, the active screen are additionally provided with first side relative with second side wall, and the first magnetic adhesive tape is set
It is placed in first side, the second magnetic adhesive tape is arranged at second side wall and relative with the first magnetic adhesive tape;
The first magnetic adhesive tape and the second magnetic adhesive tape include the damping body provided with accommodating cavity and are arranged at the accommodating cavity
Interior magnetic absorption member, two magnetic absorption members can magnetic fix.
8. dry and wet zone according to claim 7 separates Toilet system, it is characterised in that the first magnetic adhesive tape and institute
State the second magnetic adhesive tape and also include the first installation card body being connected with the damping body, the first installation card body is provided with second
Neck, first side and the fixing body defaulted on second side wall are arranged in second neck correspondingly
It is interior;Wherein, the groove width of second neck is in the trend gradually successively decreased by the direction of the damping body to notch.
9. dry and wet zone according to claim 8 separates Toilet system, it is characterised in that the inner side slot of second neck
Anticreep clamp is additionally provided with wall, the bottom land direction of the anticreep clamp towards second neck is obliquely installed.
10. dry and wet zone according to claim 1 separates Toilet system, it is characterised in that also including the first side block glue
Bar and the second side block glue bar, the active screen are additionally provided with second side relative with first side wall, and the fixed screen is set
There is the abutting end away from first side wall, assembling gap is cooperatively formed between the active screen and the fixed screen;
The first side block glue bar and the second side block glue bar are equipped with the second installation card body and installed with described second
Body is filled out in the sealing of card body connection, and the second installation card body is provided with the 3rd neck, and second side and the abutting end are one by one
When being accordingly arranged in the 3rd neck, two sealings fill out body be filled at the assembling gap with being stacked
It is interior.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710960192.4A CN107700877A (en) | 2017-10-16 | 2017-10-16 | Dry and wet zone separates Toilet system |
PCT/CN2018/081442 WO2019075998A1 (en) | 2017-10-16 | 2018-03-30 | Bathroom system having separate dry and wet regions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710960192.4A CN107700877A (en) | 2017-10-16 | 2017-10-16 | Dry and wet zone separates Toilet system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107700877A true CN107700877A (en) | 2018-02-16 |
Family
ID=61185172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710960192.4A Pending CN107700877A (en) | 2017-10-16 | 2017-10-16 | Dry and wet zone separates Toilet system |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107700877A (en) |
WO (1) | WO2019075998A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356275A (en) * | 2018-12-20 | 2019-02-19 | 陈燕 | A kind of magnetic suspension floor drain core |
CN109440904A (en) * | 2018-11-09 | 2019-03-08 | 美的置业集团有限公司 | A kind of integral type bathroom drainage mechanism |
WO2019075998A1 (en) * | 2017-10-16 | 2019-04-25 | 增城市碧桂园物业发展有限公司 | Bathroom system having separate dry and wet regions |
CN112145033A (en) * | 2020-09-25 | 2020-12-29 | 佛山市理想卫浴有限公司 | Shower door assembly |
CN114876322A (en) * | 2022-05-16 | 2022-08-09 | 苏州金螳螂建筑装饰股份有限公司 | Assembled design structure of complicated hidden door of open in superelevation |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200958357Y (en) * | 2006-07-05 | 2007-10-10 | 高林 | Magnetic-suction sliding screen |
CN103306588A (en) * | 2013-05-16 | 2013-09-18 | 一禾科技发展(上海)有限公司 | Glass door clamps and mounting method thereof |
CN203400077U (en) * | 2013-04-09 | 2014-01-22 | 株式会社好适特 | Dam and draining structure of unit bathroom |
CN203684888U (en) * | 2013-11-28 | 2014-07-02 | 南京化工职业技术学院 | Maintenance hole structure for hanger rails for sliding door |
CN205277173U (en) * | 2015-12-28 | 2016-06-01 | 江苏言信环境科技有限公司 | Purification moves door |
CN205477126U (en) * | 2016-02-29 | 2016-08-17 | 黎东辉 | Installation component in shower room |
CN205840644U (en) * | 2016-07-05 | 2016-12-28 | 新疆维吾尔自治区第三机床厂 | Suspension type translation door |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19700886A1 (en) * | 1997-01-14 | 1998-07-16 | Dorma Gmbh & Co Kg | Shower partition |
TW433383U (en) * | 2000-01-26 | 2001-05-01 | Lai Chin Ming | Improved structure of magnetic water-proof rod for shower-stall door |
CN203035011U (en) * | 2012-09-04 | 2013-07-03 | 杭州金鹭家私制造有限公司 | Horizontally-moving sliding door structure |
CN202755691U (en) * | 2012-09-24 | 2013-02-27 | 上海朗诗建筑科技有限公司 | Barrier-free shower room |
CN106337488B (en) * | 2016-08-26 | 2019-01-22 | 福州科美节能科技有限公司 | A kind of partition water trap integrated with shower house |
CN206522067U (en) * | 2017-01-09 | 2017-09-26 | 福建西河卫浴科技有限公司 | A kind of shower house is with concealed corner magnetic attracting device |
CN107700877A (en) * | 2017-10-16 | 2018-02-16 | 增城市碧桂园物业发展有限公司 | Dry and wet zone separates Toilet system |
-
2017
- 2017-10-16 CN CN201710960192.4A patent/CN107700877A/en active Pending
-
2018
- 2018-03-30 WO PCT/CN2018/081442 patent/WO2019075998A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200958357Y (en) * | 2006-07-05 | 2007-10-10 | 高林 | Magnetic-suction sliding screen |
CN203400077U (en) * | 2013-04-09 | 2014-01-22 | 株式会社好适特 | Dam and draining structure of unit bathroom |
CN103306588A (en) * | 2013-05-16 | 2013-09-18 | 一禾科技发展(上海)有限公司 | Glass door clamps and mounting method thereof |
CN203684888U (en) * | 2013-11-28 | 2014-07-02 | 南京化工职业技术学院 | Maintenance hole structure for hanger rails for sliding door |
CN205277173U (en) * | 2015-12-28 | 2016-06-01 | 江苏言信环境科技有限公司 | Purification moves door |
CN205477126U (en) * | 2016-02-29 | 2016-08-17 | 黎东辉 | Installation component in shower room |
CN205840644U (en) * | 2016-07-05 | 2016-12-28 | 新疆维吾尔自治区第三机床厂 | Suspension type translation door |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019075998A1 (en) * | 2017-10-16 | 2019-04-25 | 增城市碧桂园物业发展有限公司 | Bathroom system having separate dry and wet regions |
CN109440904A (en) * | 2018-11-09 | 2019-03-08 | 美的置业集团有限公司 | A kind of integral type bathroom drainage mechanism |
CN109356275A (en) * | 2018-12-20 | 2019-02-19 | 陈燕 | A kind of magnetic suspension floor drain core |
CN112145033A (en) * | 2020-09-25 | 2020-12-29 | 佛山市理想卫浴有限公司 | Shower door assembly |
CN114876322A (en) * | 2022-05-16 | 2022-08-09 | 苏州金螳螂建筑装饰股份有限公司 | Assembled design structure of complicated hidden door of open in superelevation |
Also Published As
Publication number | Publication date |
---|---|
WO2019075998A1 (en) | 2019-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107700877A (en) | Dry and wet zone separates Toilet system | |
CN213269262U (en) | Retractable prevents guardrail bar device | |
CN110595883A (en) | Anti-seismic device for testing compressive strength of concrete | |
CN207499511U (en) | Dry and wet zone detaches Toilet system | |
CN108167532A (en) | A kind of good locking pipe-hanger support of stability | |
CN105952978A (en) | Shock absorber of building electromechanical device and pipeline | |
CN106223192B (en) | A kind of highway bridge damped noise reduction device | |
CN108337836A (en) | A kind of underslung damping Electric Appliance Cabinet | |
CN204456898U (en) | A kind of concrete mixer and arm rest supporting device | |
CN209943417U (en) | Bridge lateral anti-seismic support | |
CN215763937U (en) | Novel energy-consumption anti-seismic support and hanger diagonal bracing device | |
CN210978953U (en) | Anti-seismic support and hanger for water supply and drainage pipeline | |
CN206693479U (en) | A kind of ceiling system | |
CN211731797U (en) | Device capable of enabling unmanned aerial vehicle to walk on ground | |
CN109281587B (en) | Translational emergency evacuation automatic door with anti-drop function | |
CN209309208U (en) | A kind of para-seismic support that mechanical and electric equipment installation is firm | |
CN206261227U (en) | The swivel chair of height can be adjusted | |
CN105672513A (en) | Anti-overturning anti-twisting device for structure tuned mass damper | |
CN206221945U (en) | A kind of TV body suspension member with adjustable type | |
CN207177451U (en) | A kind of electric power roll guard pile device | |
CN206138047U (en) | Glass cleaning device outside window | |
CN212614788U (en) | Be used for colliery tunnel supporting device | |
CN208530632U (en) | It is a kind of that there is damping, buffering structure and Portable fixing device for environmental protection equipment | |
CN209925855U (en) | Stay cable composite damping self-resetting energy dissipation pipeline anti-seismic support | |
CN208967227U (en) | A kind of two-way para-seismic support in wall side |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Yang Hongbin Inventor after: Zhao Maoyu Inventor after: Jiao Xin Inventor after: Liu Cantuan Inventor before: Sun Jun Inventor before: Zhao Maoyu Inventor before: Jiao Xin Inventor before: Zhou Zhimin Inventor before: Liu Cantuan |
|
CB03 | Change of inventor or designer information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180216 |
|
RJ01 | Rejection of invention patent application after publication |