CN209309208U - A kind of para-seismic support that mechanical and electric equipment installation is firm - Google Patents

A kind of para-seismic support that mechanical and electric equipment installation is firm Download PDF

Info

Publication number
CN209309208U
CN209309208U CN201822260146.6U CN201822260146U CN209309208U CN 209309208 U CN209309208 U CN 209309208U CN 201822260146 U CN201822260146 U CN 201822260146U CN 209309208 U CN209309208 U CN 209309208U
Authority
CN
China
Prior art keywords
tank body
mounting portion
elastic component
inner tank
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822260146.6U
Other languages
Chinese (zh)
Inventor
王新宇
马久
张帆
阳维果
戴俊
季纯静
曾锃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Delt Technology Co Ltd
Original Assignee
Sichuan Delt Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Delt Technology Co Ltd filed Critical Sichuan Delt Technology Co Ltd
Priority to CN201822260146.6U priority Critical patent/CN209309208U/en
Application granted granted Critical
Publication of CN209309208U publication Critical patent/CN209309208U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

The utility model relates to the para-seismic supports that a kind of mechanical and electric equipment installation consolidates, including mobile mounting portion, side mounting portion, fixed installation portion and connector;Side mounting portion for connecting wall is arranged two groups;Mobile mounting portion for installing electromechanical equipment is arranged between two groups of side mounting portions, and the side mounting portion of two sides is flexibly connected by connector;The lower section of mobile mounting portion is arranged in fixed installation portion for collecting apparatus connecting line, and both ends are separately connected the side mounting portion of two sides.The utility model is flexible by the first elastic component; buffer flowing generates friction; the contracting of air bag drum generates external force from all directions and resists and buffer; second elastic component and third elastic component, which stretch, further enhances anti seismic efficiency; reach multi-angle damping; anti seismic efficiency is good, guarantees the firm installation of electromechanical equipment, protects equipment safety.

Description

A kind of para-seismic support that mechanical and electric equipment installation is firm
Technical field
The utility model relates to the antidetonation branch that suspension and support equipment technical field more particularly to a kind of mechanical and electric equipment installation are firm Frame.
Background technique
Electromechanical equipment refers generally to mechanical, electric appliance and electric automatization equipment, refer under construction more remove geotechnique, carpenter, reinforcing bar, The general designation of machinery, pipe-line equipment except muddy water, with the continuous improvement of people's living standards, people are in daily life to machine The demand of electric equipment is more and more, has become in for people's lives from the vehicles to various household electrical appliance, computer, printer etc. Indispensable electronic product, electromechanical equipment are easy to happen and drop under the shock effect that external force generates, and cause equipment impaired, Even result in the secondary injuries such as fire, electric leakage, it is therefore desirable to carry out firm installation, by para-seismic support to avoid unexpected hair Raw, existing para-seismic support damping modes are single, and damping effect is general, cannot achieve the purpose that protect electromechanical equipment.
Utility model content
In view of this, providing a kind of mechanical and electric equipment installation the purpose of the utility model is to overcome the deficiencies in the prior art Firm para-seismic support, single to solve existing para-seismic support damping modes existing in the prior art, damping effect is general, It cannot achieve the purpose that the technical issues of protecting electromechanical equipment, the utility model proposes the antidetonations that a kind of mechanical and electric equipment installation consolidates Bracket, flexible by the first elastic component, buffer flowing generates friction, and the contracting of air bag drum supports external force generation from all directions Anti- and buffering, the second elastic component and third elastic component, which stretch, further enhances anti seismic efficiency, reaches multi-angle damping, anti seismic efficiency It is good, guarantee the firm installation of electromechanical equipment, protects equipment safety, to solve the problems mentioned in the above background technology.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of para-seismic support that mechanical and electric equipment installation is firm, including mobile mounting portion, side mounting portion, fixed installation portion are provided And connector;Side mounting portion for connecting wall is arranged two groups;Mobile mounting portion for installing electromechanical equipment is arranged two Between group side mounting portion, and pass through the side mounting portion of connector flexible connection two sides;Fixed peace for collecting apparatus connecting line The lower section of mobile mounting portion is arranged in dress portion, and both ends are separately connected the side mounting portion of two sides;Mobile mounting portion include inner tank body, Outer tank body, dampening assembly and fixation kit;Outer tank body for placing the inner tank body of electromechanical equipment and for placing inner tank body is equal It is provided with notch upward;Inner tank body is arranged in outer tank body, and the two is connected by dampening assembly;For fixing electromechanical equipment Fixation kit multiple groups are set, and be mounted in inner tank body;Dampening assembly includes placement plate, lower decoupling rod, mobile bar, side damping Bar, piston, the first elastic component and air bag;Placement plate is arranged inside inner tank body, and the lower end of placement plate connects lower decoupling rod vertically; Centered on the following decoupling rod in the lower end of placement plate, symmetrical activity connects multiple groups mobile bar;Mobile bar other end flexible connection level is set The side decoupling rod set;Inner tank body respective side decoupling rod and lower decoupling rod position are provided with multiple groups opening;The corresponding lower damping of outer tank body Bar and side decoupling rod position are provided with multiple groups reservoir;Reservoir is provided with buffer;Lower decoupling rod and side decoupling rod, which pass through, to be opened Mouthful and extend in the reservoir of corresponding position and connect with piston;The cell wall close sliding contact of piston and reservoir;First Elastic component is arranged inside reservoir, and the first elastic component connects piston close to one end of inner tank body, and the other end connects reservoir Cell wall;Multiple groups fluid-through tube road is provided on the outside of reservoir;Fluid-through tube road is connected to reservoir;It is mounted on outer tank body inner wall Multiple groups are arranged in air bag, and air bag is corresponded and is connected to fluid-through tube road.
The working principle of the technical scheme is as follows electromechanical equipment is placed in the placement plate inside inner tank body first, by turning Dynamic handle, so that sucker is mobile towards equipment, and finally firmly adsorbs equipment outer wall, electromechanical equipment is fastened and fixed, is avoided Electromechanical equipment is detached from bracket under external force, drops from eminence, causes equipment damage, then construction personnel can be according to reality The height for needing to adjust electromechanical equipment is installed on border, then by fixed anchor bolt effect, so that bracket is secured with wall connecting, is not necessarily to Welding and drilling, can be completed bracket installation, electric equipment during the work time by external force when, placement plate moves up and down, Lower decoupling rod is driven to move up and down, mobile bar push side decoupling rod moves left and right, so that piston pushes buffer in fluid-through tube road It inside flows, is finally passed in and out in air bag back and forth, air bag is caused to heave and shrink, the first elastic component is flexible in this process, delays Fliud flushing flowing generate friction, air bag drum contracting all can from all directions to external force generate resist and buffering, the second elastic component and Third elastic component stretches with the movement of placement plate, and further damping vibration enhances the anti seismic efficiency of this bracket, reaches more The damping of angle, anti seismic efficiency is good, guarantees the firm installation of electromechanical equipment, protects equipment safety, after the completion of mechanical and electric equipment installation, It will be wrapped on wrapping post with the connecting line that coordinative composition of equipments uses, storage arrangement carried out to connecting line, avoids connecting line from eminence It hangs, causes safety accident.
Based on the above technical solution, the utility model can also do following improvement.
Further, dampening assembly further includes the second elastic component and third elastic component;Second elastic component is socketed in lower decoupling rod On, the second elastic component upper end connects placement plate, and lower end connects the interior bottom end of inner tank body;Multiple groups, third bullet is arranged in third elastic component Property part upper end connect placement plate, lower end connect inner tank body interior bottom end.
Further, fixation kit includes threaded rod, handle and sucker;It is provided on the cell wall of inner tank body and is matched with threaded rod Threaded hole;Threaded rod is threadedly coupled by threaded hole with inner tank body;Sucker is rotatablely connected threaded rod close to the one of electromechanical equipment End;The other end of handle connection screw thread bar.
Further, side mounting portion includes connecting rod and fixed anchor bolt;Fixed anchor bolt is mounted on the top of connecting rod;Connecting rod On be provided with mounting hole.
Further, mobile mounting portion further includes sliding sleeve;Sliding sleeve is arranged two groups, is separately connected the two sides of outer tank body, and slide Connect connecting rod;Connector is fixing bolt;Sliding sleeve is connect by fixing bolt and mounting hole cooperation with connecting rod.
Further, fixed installation portion includes mounting plate and wrapping post;Mounting plate is separately connected the connecting rod of two sides, wrapping post Multiple groups are set, and equidistant installation is on a mounting board.
Compared with prior art, the utility model has the beneficial effect that
Electromechanical equipment is placed in the placement plate inside inner tank body by the utility model, by swing handle, so that sucker court It is mobile to equipment, and equipment outer wall is firmly finally adsorbed, electromechanical equipment is fastened and fixed, and avoids electromechanical equipment in outer masterpiece It with lower disengaging bracket, is dropped from eminence, causes equipment damage, then by fixed anchor bolt effect, so that bracket and wall connecting Securely, without welding and drilling, can be completed bracket installation, electric equipment during the work time by external force when, placement plate It moves up and down, lower decoupling rod is driven to move up and down, mobile bar push side decoupling rod moves left and right, so that piston pushes buffer to exist Fluid-through tube flows back and forth in road, finally passes in and out in air bag, causes air bag to heave and shrink, in this process the first elastic component Flexible, buffer flowing, which generates, to rub, and the contracting of air bag drum can all generate external force from all directions and resist and buffer, the second bullet Property part and third elastic component stretch with the movement of placement plate, and further damping vibration enhances the anti seismic efficiency of this bracket, Reach the damping of multi-angle, anti seismic efficiency is good, guarantees the firm installation of electromechanical equipment, protects equipment safety.
In the utility model, since sliding sleeve is connect by fixing bolt and mounting hole cooperation with connecting rod, construction personnel is The height that electromechanical equipment can be needed to adjust according to actual installation, so that equipment is more convenient to use;After the completion of mechanical and electric equipment installation, It will be wrapped on wrapping post with the connecting line that coordinative composition of equipments uses, storage arrangement carried out to connecting line, avoids connecting line from eminence It hangs, causes safety accident.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the planar structure schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of dampening assembly in the utility model;
Fig. 3 is the structural schematic diagram of fixation kit in the utility model.
Wherein, the above drawings include the following reference numerals:
1-mobile mounting portion;2-side mounting portions;3-fixed installation portions;4-connectors;5-inner tank bodys;6-outer grooves Body;7-sliding sleeves;8-dampening assemblies;9-placement plates;10-lower decoupling rods;11-mobile bars;12-side decoupling rods;13-is living Plug;14-the first elastic component;15-fluid-through tube roads;16-air bags;17-the second elastic component;18-third elastic components;Gu 19- Determine component;20-threaded rods;21-handles;22-suckers;23-mounting plates;24-wrapping posts;25-connecting rods;26-is fixed Anchor bolt;27-mounting holes;28-reservoirs.
Specific embodiment
To keep the purpose of this utility model, technical solution and advantage clearer, below by the technology to the utility model Scheme is described in detail.Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than comprehensively Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work Obtained all other embodiment is put, the range that the utility model is protected is belonged to.
Embodiment 1:
A kind of firm para-seismic support of mechanical and electric equipment installation that the present embodiment proposes, as shown in Figure 1 to Figure 3, including movement Mounting portion 1, side mounting portion 2, fixed installation portion 3 and connector 4;Side mounting portion 2 for connecting wall is arranged two groups;For pacifying The mobile mounting portion 1 for electric equipment of installing is arranged between two groups of side mounting portions 2, and the side of two sides is flexibly connected by connector 4 Mounting portion 2;The lower section of mobile mounting portion 1 is arranged in fixed installation portion 3 for collecting apparatus connecting line, and both ends are separately connected The side mounting portion 2 of two sides;Mobile mounting portion 1 includes inner tank body 5, outer tank body 6, dampening assembly 8 and fixation kit 19;For placing The inner tank body 5 of electromechanical equipment and outer tank body 6 for placing inner tank body 5 are provided with notch upward;Inner tank body 5 is arranged outside In groove body 6, and the two is connected by dampening assembly 8;Multiple groups are arranged in fixation kit 19 for fixing electromechanical equipment, and are mounted on In inner tank body 5;Dampening assembly 8 includes placement plate 9, lower decoupling rod 10, mobile bar 11, side decoupling rod 12, the 13, first elasticity of piston Part 14 and air bag 16;Placement plate 9 is arranged inside inner tank body 5, and the lower end of placement plate 9 connects lower decoupling rod 10 vertically;Placement plate 9 The following decoupling rod 10 in lower end centered on, symmetrical activity even multiple groups mobile bar 11;11 other end flexible connection level of mobile bar is set The side decoupling rod 12 set;5 respective side decoupling rod 12 of inner tank body and lower 10 position of decoupling rod are provided with multiple groups opening;Outer tank body 6 is right Decoupling rod 10 and 12 position of side decoupling rod should be descended to be provided with multiple groups reservoir 28;Reservoir 28 is provided with buffer;Lower decoupling rod 10 and side decoupling rod 12 pass through opening and extend in the reservoir 28 of corresponding position and connect with piston 13;Piston 13 and liquid storage The cell wall close sliding contact of slot 28;First elastic component 14 is arranged inside reservoir 28, and the first elastic component 14 is close to inner tank body 5 One end connect piston 13, the other end connect reservoir 28 cell wall;The outside of reservoir 28 is provided with multiple groups fluid-through tube road 15; Fluid-through tube road 15 is connected to reservoir 28;Multiple groups, air bag 16 and fluid-through tube road is arranged in the air bag 16 being mounted on 6 inner wall of outer tank body 15 correspond and are connected to.
When using this bracket, electromechanical equipment is placed in the placement plate 9 inside inner tank body 5 first, passes through fixation kit 19 Equipment is fixed, bracket is mounted on wall followed by side mounting portion 2, electromechanical equipment is during the work time by outer Masterpiece used time, placement plate 9 move up and down, and drive lower decoupling rod 10 to move up and down, 11 push side decoupling rod 12 or so of mobile bar moves It is dynamic, so that piston 13 pushes buffer to flow back and forth in fluid-through tube road 15, is finally passed in and out in air bag 16, lead to air bag 16 It heaves and shrinks, the first elastic component 14 is flexible in this process, and buffer flowing generates friction, and the contracting of the drum of air bag 16 all can be from each A direction, which generates external force, to be resisted and buffers, and the damping of multi-angle is reached, and anti seismic efficiency is good, guarantees the firm of electromechanical equipment Equipment safety is protected in installation.
In specific embodiment, dampening assembly 8 further includes the second elastic component 17 and third elastic component 18;Second elastic component 17 It is socketed on lower decoupling rod 10,17 upper end of the second elastic component connects placement plate 9, and lower end connects the interior bottom end of inner tank body 5;Third bullet Property part 18 be arranged multiple groups, 18 upper end of third elastic component connect placement plate 9, lower end connect inner tank body 5 interior bottom end.
When external force generates vibration, the second elastic component 17 and third elastic component 18 stretch with the movement of placement plate 9, into The damping vibration of one step enhances the anti seismic efficiency of this bracket.
Embodiment 2:
The present embodiment on the basis of the above embodiments, further defines the structure of fixation kit, as shown in Fig. 2, Fixation kit 19 includes threaded rod 20, handle 21 and sucker 22;It is provided on the cell wall of inner tank body 5 and the matched spiral shell of threaded rod 20 Pit;Threaded rod 20 is threadedly coupled by threaded hole with inner tank body 5;Sucker 22 is rotatablely connected threaded rod 20 close to electromechanical equipment One end;The other end of 21 connection screw thread bar 20 of handle.
When electromechanical equipment is installed, by swing handle 21, so that sucker 22 is mobile towards equipment, and finally firmly adsorb Equipment outer wall, electromechanical equipment are fastened and fixed, and are avoided electromechanical equipment and are detached from bracket under external force, drop from eminence, make Forming apparatus damage.
Embodiment 3:
The present embodiment on the basis of the above embodiments, further defines side mounting portion 2 comprising 25 He of connecting rod Fixed anchor bolt 26;Fixed anchor bolt 26 is mounted on the top of connecting rod 25;Mounting hole 27 is provided in connecting rod 25.
It when mounting bracket, is acted on by fixed anchor bolt 26, so that bracket is secured with wall connecting, without welding and is drilled, Install it is simple and convenient, it is quick detachable.
Embodiment 4:
The present embodiment on the basis of the above embodiments, further defines mobile mounting portion 1, the mobile mounting portion 1 further includes sliding sleeve 7;Sliding sleeve 7 is arranged two groups, is separately connected the two sides of outer tank body 6, and the connecting rod 25 that is slidably connected;Connector 4 is Fixing bolt;Sliding sleeve 7 is connect by fixing bolt and the cooperation of mounting hole 27 with connecting rod 25.
Before carrying out bracket installation, since sliding sleeve 7 is connect by fixing bolt and the cooperation of mounting hole 27 with connecting rod 25, Construction personnel can need to adjust the height of electromechanical equipment according to actual installation, so that equipment is more convenient to use.
Embodiment 5:
The present embodiment on the basis of the above embodiments, further wrap by fixed installation portion 3, the fixed installation portion 3 Include mounting plate 23 and wrapping post 24;Mounting plate 23 is separately connected the connecting rod 25 of two sides, and multiple groups are arranged in wrapping post 24, and equidistant It is mounted on mounting plate 23.
After the completion of mechanical and electric equipment installation, it will be wrapped on wrapping post 24 with the connecting line that coordinative composition of equipments uses, to connecting line Storage arrangement is carried out, connecting line is avoided to hang from eminence, causes safety accident.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in variation Or replacement, it should be covered within the scope of the utility model.

Claims (6)

1. a kind of firm para-seismic support of mechanical and electric equipment installation, which is characterized in that including mobile mounting portion (1), side mounting portion (2), fixed installation portion (3) and connector (4);
Side mounting portion (2) for connecting wall is arranged two groups;Mobile mounting portion (1) for installing electromechanical equipment is arranged two Between group side mounting portion (2), and pass through the side mounting portion (2) of connector (4) flexible connection two sides;For collecting apparatus connecting line Fixed installation portion (3) setting in the lower section of mobile mounting portion (1), and both ends are separately connected the side mounting portion (2) of two sides;
Mobile mounting portion (1) includes inner tank body (5), outer tank body (6), dampening assembly (8) and fixation kit (19);For placing machine The inner tank body (5) of electric equipment and the outer tank body (6) for placing inner tank body (5) are provided with notch upward;Inner tank body (5) is set It sets in outer tank body (6), and the two is connected by dampening assembly (8);Fixation kit (19) for fixing electromechanical equipment is arranged Multiple groups, and be mounted on inner tank body (5);
Dampening assembly (8) includes placement plate (9), lower decoupling rod (10), mobile bar (11), side decoupling rod (12), piston (13), One elastic component (14) and air bag (16);Placement plate (9) setting is internal in inner tank body (5), under the lower end of placement plate (9) connects vertically Decoupling rod (10);Centered on the following decoupling rod in lower end (10) of placement plate (9), symmetrical activity is even multiple groups mobile bar (11);It is mobile Bar (11) other end is flexibly connected horizontally disposed side decoupling rod (12);Inner tank body (5) respective side decoupling rod (12) and lower damping Bar (10) position is provided with multiple groups opening;Corresponding lower decoupling rod (10) and side decoupling rod (12) position of outer tank body (6) is provided with more Group reservoir (28);Reservoir (28) is provided with buffer;Lower decoupling rod (10) and side decoupling rod (12) pass through opening and extend It is connect in the reservoir (28) of corresponding position and with piston (13);The cell wall of piston (13) and reservoir (28), which closely slides, to be connect Touching;First elastic component (14) setting is internal in reservoir (28), and the first elastic component (14) is connected close to the one end of inner tank body (5) and lived It fills in (13), the other end connects the cell wall of reservoir (28);Multiple groups fluid-through tube road (15) is provided on the outside of reservoir (28);Logical liquid Pipeline (15) is connected to reservoir (28);Air bag (16) the setting multiple groups being mounted on outer tank body (6) inner wall, air bag (16) and logical Liquid pipe road (15) is corresponded and is connected to.
2. a kind of firm para-seismic support of mechanical and electric equipment installation according to claim 1, which is characterized in that dampening assembly It (8) further include the second elastic component (17) and third elastic component (18);Second elastic component (17) is socketed on lower decoupling rod (10), the Two elastic components (17) upper end connects placement plate (9), and lower end connects the interior bottom end of inner tank body (5);Third elastic component (18) setting is more Group, third elastic component (18) upper end connect placement plate (9), and lower end connects the interior bottom end of inner tank body (5).
3. a kind of firm para-seismic support of mechanical and electric equipment installation according to claim 1, which is characterized in that fixation kit It (19) include threaded rod (20), handle (21) and sucker (22);It is provided on the cell wall of inner tank body (5) and is matched with threaded rod (20) Threaded hole;Threaded rod (20) is threadedly coupled by threaded hole with inner tank body (5);Sucker (22) rotation connection threaded rod (20) is leaned on One end of nearly electromechanical equipment;The other end of handle (21) connection screw thread bar (20).
4. a kind of firm para-seismic support of mechanical and electric equipment installation according to claim 1, which is characterized in that side mounting portion It (2) include connecting rod (25) and fixation anchor bolt (26);Fixed anchor bolt (26) are mounted on the top of connecting rod (25);Connecting rod (25) On be provided with mounting hole (27).
5. a kind of firm para-seismic support of mechanical and electric equipment installation according to claim 4, which is characterized in that mobile mounting portion It (1) further include sliding sleeve (7);Sliding sleeve (7) is arranged two groups, is separately connected the two sides of outer tank body (6), and the connecting rod that is slidably connected (25);Connector (4) is fixing bolt;Sliding sleeve (7) is connect by fixing bolt and mounting hole (27) cooperation with connecting rod (25).
6. a kind of firm para-seismic support of mechanical and electric equipment installation according to claim 1, which is characterized in that fixed installation portion It (3) include mounting plate (23) and wrapping post (24);Mounting plate (23) is separately connected the connecting rod (25) of two sides, and wrapping post (24) is set Multiple groups are set, and equidistant are mounted on mounting plate (23).
CN201822260146.6U 2018-12-29 2018-12-29 A kind of para-seismic support that mechanical and electric equipment installation is firm Active CN209309208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822260146.6U CN209309208U (en) 2018-12-29 2018-12-29 A kind of para-seismic support that mechanical and electric equipment installation is firm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822260146.6U CN209309208U (en) 2018-12-29 2018-12-29 A kind of para-seismic support that mechanical and electric equipment installation is firm

Publications (1)

Publication Number Publication Date
CN209309208U true CN209309208U (en) 2019-08-27

Family

ID=67679993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822260146.6U Active CN209309208U (en) 2018-12-29 2018-12-29 A kind of para-seismic support that mechanical and electric equipment installation is firm

Country Status (1)

Country Link
CN (1) CN209309208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113606470A (en) * 2021-08-12 2021-11-05 江苏搏超智能科技有限公司 Anti-vibration interference filtering device of steel structure weighing and batching system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113606470A (en) * 2021-08-12 2021-11-05 江苏搏超智能科技有限公司 Anti-vibration interference filtering device of steel structure weighing and batching system

Similar Documents

Publication Publication Date Title
CN206513088U (en) A kind of elastic damping shock absorber
CN209309208U (en) A kind of para-seismic support that mechanical and electric equipment installation is firm
CN205581756U (en) Desktop computer mainframe box damper
CN108167532A (en) A kind of good locking pipe-hanger support of stability
CN216976004U (en) High-strength assembly type damping support hanger
CN204879068U (en) A three -dimensional spring pipeline gallows
CN206816745U (en) A kind of plant equipment damping device
CN104964097A (en) Three-way spring pipe supporting and hanging bracket
CN114060615A (en) Underground utility tunnel bears shock-absorbing capacity reinforcing antidetonation system
CN207762182U (en) A kind of winning equipment installation damper
CN204459693U (en) A kind of suspension type liquid vibration proof mechanism
CN207569355U (en) A kind of novel architecture tubulose suspension and support
CN207213588U (en) Building interior electromechanical equipment para-seismic support
CN106051310A (en) Shock-absorbing support-hanger resistant to strain force
CN206513759U (en) The front damper of automobile
CN205745090U (en) A kind of carrying axle amortisseur
CN212718376U (en) Height-adjustable's antidetonation gallows
CN210919585U (en) Water purifier booster pump damper
CN212361046U (en) Anti-seismic support for constructional engineering
CN108071744A (en) A kind of good utility pipes suspension and support of stability
CN209228934U (en) Shock-proof machine frame
CN112664716A (en) Anti-seismic pipeline support capable of fixing pipelines with different diameters
CN209261899U (en) A kind of mining pump bearing bracket that anti seismic efficiency is good
CN201814396U (en) Water pump damping device and water boiler and coffee machine adopting water pump damping device
CN215763014U (en) Antidetonation case that subway station was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant