多级陡坡条件下高层吊脚楼群施工速度控制方法 Download PDFInfo
- Publication number
- CN107700842A CN107700842A CN201710692639.4A CN201710692639A CN107700842A CN 107700842 A CN107700842 A CN 107700842A CN 201710692639 A CN201710692639 A CN 201710692639A CN 107700842 A CN107700842 A CN 107700842A
- Authority
- CN
- China
- Prior art keywords
- stilts
- house
- slope
- abrupt slope
- rank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明具体是一种多级陡坡条件下高层吊脚楼群施工速度控制方法;包括将吊脚楼位置、楼层信息反映在多级陡坡吊脚楼群的平面布置图上;将应力、应变及位移传感器布置在吊脚楼四周及挡墙上;在平面布置图上沿地势划分不同的阶区;确定多级陡坡吊脚楼整体验算面;给定不同阶区域荷载的初始增量值;验算现有荷载作用下边坡的整体稳定性;计算每相邻两阶上、下距离相近的吊脚楼施工荷载作用下的边坡局部稳定性;现场施工时,根据应力、应变传感器及位移传感器采集的数据,进行实时监控,确保多级陡坡下的吊脚楼群的施工安全。本方法通过监控数据的布设和采集,以及实时统计分析,确保了陡坡条件下吊脚楼主体施工安全。
Description
技术领域
本发明涉及建筑施工领域,具体是一种多级陡坡条件下高层吊脚楼群施工速度控制方法。
背景技术
高层吊脚楼一般为混凝土结构,荷载较大,且按照总体施工顺序在不同坡阶上依次进行施工。但是,不同坡阶上的吊脚楼实际施工时,由于现场道路、环境以及资源储备等原因,经常会造成每个坡阶上的吊脚楼施工速度不均匀,有时候甚至出现坡顶的吊脚楼施工速度快于其下阶的吊脚楼施工速度,这样就导致顶部施工荷载过高,给边坡带来安全隐患。设计院也并未考虑由于现场施工速度变化引起的荷载变化,为此,须限定各坡阶上吊脚楼的整体施工速度,避免局部荷载过高对边坡带来的危险。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种安全、实时的多级陡坡条件下高层吊脚楼群施工速度控制方法。
本发明的目的可以通过以下技术方案来实现:
一种多级陡坡条件下高层吊脚楼群施工速度控制方法,包括:
步骤1、通过现场实地考察,将吊脚楼位置、楼层信息反映在多级陡坡吊脚楼群的平面布置图上;
步骤2、将应力、应变及位移传感器布置在吊脚楼四周及挡墙上;
步骤3、在平面布置图上沿地势划分不同的阶区;
步骤4、确定多级陡坡吊脚楼整体验算面;
步骤5、给定不同阶区域荷载的初始增量值;
步骤6、将每一阶区域等效荷载施加在整体验算面上;
步骤7、根据边坡稳定性计算公式,验算现有荷载作用下边坡的整体稳定性;
步骤8、计算每相邻两阶上、下距离相近的吊脚楼施工荷载作用下的边坡局部稳定性,作为整体稳定性的补充;
步骤9、若整体稳定性及局部稳定性都满足,减少不同阶区域荷载增量值的范围;
步骤10、重新进行边坡整体稳定性及局部稳定性计算;
步骤11、计算至不能通过时,获得本多级陡坡条件下不同阶区域荷载的最大增量值,以控制每阶区域的施工速度;
步骤12、现场施工时,根据应力、应变传感器及位移传感器采集的数据,进行实时监控,确保多级陡坡下的吊脚楼群的施工安全。
所述的多级陡坡条件下高层吊脚楼群施工速度控制方法,步骤3中,将标高相近的坡阶定义为一阶,从地势低洼地至地势较高低分别依次命名排序并分别统计每一阶区域吊脚楼数量、楼层信息;
所述的一种多级陡坡条件下高层吊脚楼群施工速度控制方法,步骤4中,通过不同阶区域吊脚楼的分布情况,确定该阶区荷载中心;
所述的多级陡坡条件下高层吊脚楼群施工速度控制方法,步骤5中,按阶区数量n,从每阶区域初始差值100%/n开始计算;其中,n为整数,且n≥1。
所述的多级陡坡条件下高层吊脚楼群施工速度控制方法,其特征在于,步骤9中,每阶区域初始差值100%/n计算完毕后,依次变为100%/n-5%、100%/n-10%、100%/n-15%……等荷载增量值。
由于不同坡阶上的吊脚楼的施工速度决定了其荷载及其荷载增加值对边坡的影响程度,本方法通过相邻阶区吊脚楼荷载增量值的逐步减少,验算边坡整体稳定性,获得相邻阶区吊脚楼荷载的最大增量值,从而确定多级陡坡上不同吊脚楼的施工速度变化率,平衡整个陡坡区域内荷载分布;此外,监控数据的布设和采集,以及实时统计分析,更加确保了陡坡条件下吊脚楼主体施工安全。
附图说明
附图1为本发明的方法流程图。
具体实施方式
以下通过具体实施例进一步说明本发明。
如图1所示,一种多级陡坡条件下高层吊脚楼群施工速度控制方法,包括:
步骤1、通过现场实地考察,将吊脚楼位置、楼层等信息反映在多级陡坡吊脚楼群的平面布置图上;
步骤2、将应力、应变及位移传感器布置在吊脚楼四周及挡墙上;
步骤3、在平面布置图上沿地势划分不同的阶区;将标高相近(高差<3m)的坡阶定义为一阶,从地势低洼地至地势较高低分别命名为一阶区域、二阶区域等,并分别统计每一阶区域吊脚楼数量、楼层等信息;
步骤4、确定多级陡坡吊脚楼整体验算面:通过不同阶区域吊脚楼的分布情况,确定该阶区荷载中心,如该项目沿地势有4个阶区,最低第一阶区域有3栋建筑A、B、C,最高第四阶区域有2栋建筑F、G;则连接最高阶区荷载中心(F和G中心线)与最低阶区荷载中心B,即得到多级陡坡吊脚楼整体验算面;
步骤5、给定不同阶区域荷载的初始增量值;如以上阶区数量为4,从每阶区域初始差值100%/4=25%开始计算;则从下部至上部每阶区域荷载值分别为100%、75%、50%、25%;
步骤6、将每一阶区域等效荷载施加在整体验算面上;
步骤7、根据边坡稳定性计算公式,验算现有荷载作用下边坡的整体稳定性;
步骤8、计算每相邻两阶上、下距离相近的吊脚楼施工荷载作用下的边坡局部稳定性,作为整体稳定性的补充;
步骤9、若整体稳定性及局部稳定性都满足,减少不同阶区域荷载增量值的范围;每阶区域初始差值25%计算完毕后,依次变为25%-5%、25%-10%、25%-15%、25%-20%等荷载增量值,以改为20%的增量值为例,则从下部至上部每阶区域荷载值分别为100%、80%、60%、40%;
步骤10、重新进行边坡整体稳定性及局部稳定性计算;
步骤11、计算至不能通过时,获得本多级陡坡条件下不同阶区域荷载的最大增量值,以控制每阶区域的施工速度;
步骤12、现场施工时,根据应力、应变传感器及位移传感器采集的数据,进行实时监控,确保多级陡坡下的吊脚楼群的施工安全。
Claims (5)
1.一种多级陡坡条件下高层吊脚楼群施工速度控制方法,其特征在于,包括:
步骤1、通过现场实地考察,将吊脚楼位置、楼层信息反映在多级陡坡吊脚楼群的平面布置图上;
步骤2、将应力、应变及位移传感器布置在吊脚楼四周及挡墙上;
步骤3、在平面布置图上沿地势划分不同的阶区;
步骤4、确定多级陡坡吊脚楼整体验算面;
步骤5、给定不同阶区域荷载的初始增量值;
步骤6、将每一阶区域等效荷载施加在整体验算面上;
步骤7、根据边坡稳定性计算公式,验算现有荷载作用下边坡的整体稳定性;
步骤8、计算每相邻两阶上、下距离相近的吊脚楼施工荷载作用下的边坡局部稳定性,作为整体稳定性的补充;
步骤9、若整体稳定性及局部稳定性都满足,减少不同阶区域荷载增量值的范围;
步骤10、重新进行边坡整体稳定性及局部稳定性计算;
步骤11、计算至不能通过时,获得本多级陡坡条件下不同阶区域荷载的最大增量值,以控制每阶区域的施工速度;
步骤12、现场施工时,根据应力、应变传感器及位移传感器采集的数据,进行实时监控,确保多级陡坡下的吊脚楼群的施工安全。
2.根据权利要求1所述的多级陡坡条件下高层吊脚楼群施工速度控制方法,其特征在于,步骤3中,将标高相近的坡阶定义为一阶,从地势低洼地至地势较高低分别依次命名排序并分别统计每一阶区域吊脚楼数量、楼层信息。
3.根据权利要求1所述的一种多级陡坡条件下高层吊脚楼群施工速度控制方法,其特征在于,步骤4中,通过不同阶区域吊脚楼的分布情况,确定该阶区荷载中心。
4.根据权利要求1所述的多级陡坡条件下高层吊脚楼群施工速度控制方法,其特征在于,步骤5中,按阶区数量n,从每阶区域初始差值100%/n开始计算;其中,n为整数,且n≥1。
5.根据权利要求1所述的多级陡坡条件下高层吊脚楼群施工速度控制方法,其特征在于,步骤9中,每阶区域初始差值100%/n计算完毕后,依次变为100%/n-5%、100%/n-10%、100%/n-15%……等荷载增量值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710692639.4A CN107700842B (zh) | 2017-08-14 | 2017-08-14 | 多级陡坡条件下高层吊脚楼群施工速度控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710692639.4A CN107700842B (zh) | 2017-08-14 | 2017-08-14 | 多级陡坡条件下高层吊脚楼群施工速度控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107700842A true CN107700842A (zh) | 2018-02-16 |
CN107700842B CN107700842B (zh) | 2019-09-13 |
Family
ID=61171053
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710692639.4A Active CN107700842B (zh) | 2017-08-14 | 2017-08-14 | 多级陡坡条件下高层吊脚楼群施工速度控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107700842B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1264775A (zh) * | 1999-12-28 | 2000-08-30 | 陈艺通 | 永模预饰自固蚕进快速建筑技术 |
CN1944827A (zh) * | 2006-08-22 | 2007-04-11 | 于明江 | 沿山势斜坡建造钢结构环保节能楼房的方法 |
KR20090025737A (ko) * | 2007-09-07 | 2009-03-11 | (주)대진가설산업 | 호이스트 방호울의 조립식 진입발판대 |
JP2010112055A (ja) * | 2008-11-06 | 2010-05-20 | Toyota Home Kk | 遮蔽壁制御システム |
CN105735474A (zh) * | 2016-03-23 | 2016-07-06 | 中冶建工集团有限公司 | 一种核心筒梁柱单层钢管柱施工方法 |
CN105926982A (zh) * | 2016-06-29 | 2016-09-07 | 四川是钢实业有限公司 | 装配式轻钢吊脚楼 |
EP3184708A1 (en) * | 2015-12-22 | 2017-06-28 | Joe L. Wesney | Slope and skew hanger |
-
2017
- 2017-08-14 CN CN201710692639.4A patent/CN107700842B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1264775A (zh) * | 1999-12-28 | 2000-08-30 | 陈艺通 | 永模预饰自固蚕进快速建筑技术 |
CN1944827A (zh) * | 2006-08-22 | 2007-04-11 | 于明江 | 沿山势斜坡建造钢结构环保节能楼房的方法 |
KR20090025737A (ko) * | 2007-09-07 | 2009-03-11 | (주)대진가설산업 | 호이스트 방호울의 조립식 진입발판대 |
JP2010112055A (ja) * | 2008-11-06 | 2010-05-20 | Toyota Home Kk | 遮蔽壁制御システム |
EP3184708A1 (en) * | 2015-12-22 | 2017-06-28 | Joe L. Wesney | Slope and skew hanger |
CN105735474A (zh) * | 2016-03-23 | 2016-07-06 | 中冶建工集团有限公司 | 一种核心筒梁柱单层钢管柱施工方法 |
CN105926982A (zh) * | 2016-06-29 | 2016-09-07 | 四川是钢实业有限公司 | 装配式轻钢吊脚楼 |
Also Published As
Publication number | Publication date |
---|---|
CN107700842B (zh) | 2019-09-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lee et al. | Evaluation of coupling–control effect of a sky‐bridge for adjacent tall buildings | |
CN102966196B (zh) | 工程结构超设防烈度地震的抗震安全评估方法 | |
JP5686852B2 (ja) | 基礎地業設計システム、そのプログラムおよび記録媒体、ならびに基礎梁への負担荷重の設定方法および杭の支持力の案分方法、ならびに杭の配置情報の判定方法 | |
CN103984995A (zh) | 基于利危平衡点的深基坑工程风险预警指标的判定方法 | |
WO2021114972A1 (zh) | 既有建筑修建工程中安全风险评估方法 | |
Navale et al. | analysis of unsymmetrical building resting on sloping ground by dividing in 2d frame | |
CN107700842A (zh) | 多级陡坡条件下高层吊脚楼群施工速度控制方法 | |
CN113836625A (zh) | 一种基于能力谱法的输电塔抗震性能等级划分方法及系统 | |
CN102431912B (zh) | 一种塔机配重重量评估方法 | |
CN115618624A (zh) | 一种古建筑震后期望破坏率计算方法及系统 | |
CN115688225A (zh) | 一种评估临近边坡条形基础抗震极限承载力的失效机理 | |
Nawale et al. | Analysis of diagrid structural system by E-Tab | |
CN110990935B (zh) | 一种基于延性的砌体结构抗震性能评估方法 | |
Xu et al. | Analysis of load characteristics and responses of low-rise building under tornado | |
Lee | Additive 2D and 3D performance ratio analysis for steel outrigger alternative design | |
Verma et al. | Analysis of wind load on tall building of various aspect ratios | |
CN207160957U (zh) | 一种建筑工地用稳定性好的人字梯 | |
Gürsoy | Comparative investigation of the costs and performances of torsional irregularity structures under seismic loading according to TEC | |
Uzun et al. | Seismic behavior of a high rise RC building with different types of slabs | |
Roy et al. | Wind Induced Pressure Variation on High-Rise Geometrically Modified Building Having Interference through CFD Simulation | |
CN204959794U (zh) | 一种田字梁柱帽和无梁楼板结构体系 | |
Ayash et al. | Study of the Seismic Response of RC High-Rise Buildingns with Double Transfer Floors | |
CN213547060U (zh) | 角钢格构式大跨度户外电缆桥架 | |
Priyanka et al. | Comprehensive analysis of outrigger system for high rise structures subjected to wind and earthquake loadings | |
Mrdak et al. | ASSESSMENT OF TORSIONAL IRREGULARITY PROVISIONS FOR BUILDINGS IN ACCORDANCE WITH EUROCODE 8 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |