CN107700716A - Customize factory building and its cut-off method to set up - Google Patents
Customize factory building and its cut-off method to set up Download PDFInfo
- Publication number
- CN107700716A CN107700716A CN201710758849.9A CN201710758849A CN107700716A CN 107700716 A CN107700716 A CN 107700716A CN 201710758849 A CN201710758849 A CN 201710758849A CN 107700716 A CN107700716 A CN 107700716A
- Authority
- CN
- China
- Prior art keywords
- cut
- factory building
- roller
- race
- customization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 34
- 239000007787 solid Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 25
- 238000011161 development Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 description 8
- 238000013461 design Methods 0.000 description 6
- 238000005728 strengthening Methods 0.000 description 5
- 238000013519 translation Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
- E04B2/827—Partitions constituted of sliding panels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The present invention relates to customization factory building and its cut-off method to set up, wherein, the cut-off method to set up for customizing factory building comprises the following steps:In customization factory building floor on some races are set;In the bottom of each cut-off, some rollers are set;In the bottom of each cut-off, some holding pieces are set;Each cut-off is separately positioned on to the top of corresponding race;The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and race touches, by it is each separate the predeterminated position of race is rolled to by its roller respectively;The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and race disengages.So, race mode is coordinated using roller, roller translates in race by cut-off, is be easily moved the cut-off of customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, cut-off when necessary, can also be lifted again, the internal structure of customization factory building is easily changed, meets the needs of user's sustainable development.
Description
Technical field
The present invention relates to customization factory building field, more particularly to customization factory building and its cut-off method to set up.
Background technology
Factory building is workshop or the house of factory, usually individual layer or bilayer, different production or processing enterprise, for factory building
Supporting there is different demands.
With the development of science and technology, customization factory building, especially customization standardization factory building, have become a kind of new product, can
Substantial amounts of factory building time and building affairs are saved for user, and can meets some particular/special requirements of user for factory building, because
This is popular in users.
Exterior wall, floor and the top of customization factory building are all often that same or similar degree is higher, but for separating, also
That is partition panel or partition-type structures, then often there are different demands, therefore, it is necessary to customization is set using the flexible structure being be easily moved
The cut-off of factory building.
The content of the invention
Based on this, it is necessary to provide a kind of customization factory building and its cut-off method to set up.
A kind of cut-off method to set up for customizing factory building, it comprises the following steps:
In customization factory building floor on some races are set;
Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used to roll in race;
In the bottom of each cut-off, some holding pieces are set;
Each cut-off is separately positioned on to the top of corresponding race;
The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and corresponding race touches, by each cut-off point
The predeterminated position of corresponding race is not rolled to by its roller;
The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race disengages.
In one of the embodiments, holding piece includes upper head part, stud and lower head part, the top of upper head part be fixed on every
Disconnected bottom, the top of stud are connected with the bottom of upper head part, are provided with what is rotated for making stud during stress in the middle part of stud
Forced section, the bottom of stud are connected with the top of lower head part, and the screw thread of the screw thread on the top of stud and the bottom of stud is reversely set
Put.
In one of the embodiments, each race be arranged in parallel.
In one of the embodiments, each holding piece is corresponded with each roller and set.
In one of the embodiments, the height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race
After portion disengages, the cut-off method to set up also includes step:Each cut-off is fixed on the floor of customization factory building respectively.
In one of the embodiments, respectively by each cut-off plugged and fixed on the floor of customization factory building.
In one of the embodiments, each cut-off is locked on the floor of customization factory building respectively.
In one of the embodiments, each cut-off is spirally connected respectively and be fixed on the floor of customization factory building.
In one of the embodiments, each cut-off is secured by bolts on the floor of customization factory building respectively.
One kind customization factory building, has some cut-offs, and customization factory building is set using cut-off method to set up described in any of the above-described
Each cut-off.
Above-mentioned customization factory building and its cut-off method to set up, coordinate race mode using roller, cut-off are rolled in race
Formula translates, and is be easily moved the cut-off of customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, must
When wanting, cut-off can also be lifted again, be easily changed the internal structure of customization factory building, meet the needs of user's sustainable development.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of one embodiment of the invention.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, below in conjunction with the accompanying drawings to the present invention
Embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair
It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not
Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited by following public specific embodiment.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, it can be directly another
On one element or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be with
It is directly to another element or may be simultaneously present centering elements.Term as used herein " vertically ", " level
", "left", "right" and similar statement for illustrative purposes only, it is unique embodiment to be not offered as.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The implication that technical staff is generally understood that is identical.Used term is intended merely to describe specific reality in the description of the invention
Apply the purpose of mode, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more correlations
The arbitrary and all combination of Listed Items.
For example, as shown in figure 1, a kind of cut-off method to set up for customizing factory building, it comprises the following steps:In customization factory building
Some races are set on floor;Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used in race
Middle rolling;In the bottom of each cut-off, some holding pieces are set;Each cut-off is separately positioned on to the top of corresponding race;Turn down respectively
The height of the holding piece respectively separated is rolled each cut-off by its roller so that the bottom connection of roller and corresponding race touches respectively
To the predeterminated position of corresponding race;The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race departs from
Contact.So, using roller coordinate race mode, will cut-off in race roller translate, be easily moved customization factory building every
It is disconnected so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, cut-off when necessary, can also be lifted again, easily
In the internal structure for changing customization factory building, meets the needs of user's sustainable development.One example is that roller is to include several
The trundle group of double trundle, so, more stable rolling effect can be reached.And for example, if the bottom of race is provided with
The dry deceleration strip being parallel to each other, for example, the bearing of trend of each deceleration strip and the bearing of trend of race are perpendicular;And for example, slow down
Band has W tee sections or inverted W tee sections, to provide the slowing effect of both direction, avoids roller from being rolled too in race
It is fast to occur surprisingly.
For example, each cut-off to be separately positioned on to the top of corresponding race, including a cut-off is arranged on corresponding one
The top of race, and/or, two or more are separated to the top for being arranged on a corresponding race;And for example, it is possible to understand that
Ground, each cut-off is separately positioned on to the top of corresponding race, including each cut-off is separately positioned on to the top of corresponding race simultaneously,
Or each cut-off is separately positioned on to the top of corresponding race in order or respectively.For example, each cut-off is passed through into its roller respectively
The predeterminated position of corresponding race is rolled to, wherein, the predeterminated position is the plan installation site of cut-off, for example, according to design
Drawing or construction are instructed, and each cut-off is rolled to the predeterminated position of corresponding race by its roller respectively.
In one of the embodiments, holding piece includes upper head part, stud and lower head part, the top of upper head part be fixed on every
Disconnected bottom, the top of stud are connected with the bottom of upper head part, are provided with what is rotated for making stud during stress in the middle part of stud
Forced section, the bottom of stud are connected with the top of lower head part, and the screw thread of the screw thread on the top of stud and the bottom of stud is reversely set
Put.So, when being exerted a force to forced section, during for example with the instrument turn forced section such as spanner, under the top and stud of stud
Portion externally exports opposite direction power so that upper head part and lower head part are close to each other or are located remotely from each other, when upper head part and lower head part phase
When mutually approaching to a certain extent, holding piece departs from ground, and roller can be rolled freely;When upper head part and lower head part are located remotely from each other
When to a certain degree, holding piece abuts ground, and roller can not freely roll, separate and customization is fixed under its own Action of Gravity Field
On the floor of factory building, the floor includes subfloor and/or floor.
In one of the embodiments, each race be arranged in parallel.And for example, some regions are set, in each region, each race
It is arranged in parallel;The extension line of each race of difference region is parallel or is staggered.In one of the embodiments, each holding piece with
Each roller, which corresponds, to be set.For example, the corresponding roller of each holding piece;For example, a top is correspondingly arranged beside each roller
Gripping member.And for example, around each roller, around setting a holding piece.In this way it can be ensured that stress equalization, is not susceptible to partially
Shifting etc. is unexpected.
In one of the embodiments, the height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race
After portion disengages, the cut-off method to set up also includes step:Each cut-off is fixed on the floor of customization factory building respectively.
In one of the embodiments, respectively by each cut-off plugged and fixed on the floor of customization factory building.One wherein
In embodiment, each cut-off is locked on the floor of customization factory building respectively.Determine for example, being respectively locked in each cut-off using lockset
On the floor of factory building processed.In one of the embodiments, each cut-off is spirally connected respectively and be fixed on the floor of customization factory building.At it
In middle one embodiment, each cut-off is secured by bolts on the floor of customization factory building respectively.So, cut-off can be caused
Fixed effect is more preferable.
For example, after each cut-off is rolled into the predeterminated position of corresponding race by its roller respectively, and heighten respectively
Before the height of the holding piece respectively separated is so that the bottom of roller and corresponding race disengages, cut-off method to set up also includes step
Suddenly:Some wireropes are vacantly set;In the top of each cut-off, some mounting parts are set;In the bottom of each cut-off, some fixations are set
Portion;Each cut-off is connected at least two hanging parts, wherein, in each hanging part, the first end of hanging part is fixedly connected with cut-off
A mounting part, and separate any mounting part connection hanging part quantity be not more than one;Each cut-off is used and connected
At least two hanging parts be mounted on a wirerope, wherein, in each hanging part, the second end of hanging part is mounted on wirerope
On;Each cut-off is connected at least two fixtures, wherein, in each fixture, the first end of fixture is fixedly connected with cut-off
A fixed part, and separate any fixed part connection fixture quantity be not more than one;And/or each cut-off is heightened respectively
Holding piece height so that the bottom of roller and corresponding race disengages before or after, cut-off method to set up also includes step
Suddenly:Each cut-off is fixed on the floor of customization factory building using at least two connected fixtures, wherein, each fixture
In, the second end of fixture is fixed on the floor of customization factory building.So, using lifting mode, cut-off is mounted on wirerope,
From the aerial cut-off for flexibly setting customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, must
When wanting, cut-off can also be lifted again, be easily changed the internal structure of customization factory building, meet the needs of user's sustainable development.
For example, vacantly setting some wireropes, including the both ends of each wirerope in some wireropes are fixedly installed on and determined
The top of factory building processed is either in exterior wall portion or fixed column.In one of the embodiments, set at least in the top of each cut-off
Three mounting parts;Each cut-off is also mounted on another wirerope using at least one hanging part.So, each cut-off is mounted on
On two wireropes, the security of the steadiness of significant increase cut-off and customization factory building to a certain extent.
In one of the embodiments, two mounted wireropes of each cut-off be arranged in parallel.An or reality wherein
Apply in example, mounted two wireropes of each cut-off mutually form an angle relative to the floor of customization factory building, i.e. it is each every
Two the mounted wireropes that break mutually form an angle relative to the projection of a certain plane.In one of the embodiments, institute
It is acute angle or right angle to state angle.One example is to set at least four mounting parts in the top of each cut-off, each cut-off is using extremely
Few two hanging parts are mounted on first wirerope, are mounted on second wirerope and used using at least one hanging part
At least one hanging part is mounted on the 3rd wirerope, wherein, first wirerope be arranged in parallel with second wirerope, the 3rd steel
The projection on the floor that cable and second wirerope for example customize factory building relative to a certain plane mutually forms an angle, so, carries
The general safety effect of customization factory building is risen.
In one of the embodiments, it is one layer to customize factory building, and in each fixture, the second end of fixture, which is fixed on, determines
On the subfloor of factory building processed., should for each layer of cut-off or in one of the embodiments, customization factory building is multilayer
In each fixture of cut-off, the second end of fixture is fixed on the floor of customization factory building.For example, for every Stall
Layer, in each fixture of the cut-off of the floor, the second end of fixture is fixed on the floor of customization factory building.
In one of the embodiments, the first end of fixture is bolted to connection a fixed part of cut-off.Example
Such as, the second end of fixture has G shape structures.In this way it is easier to install and dismantle, and with preferably anti-dropout effect.At it
In middle one embodiment, the second end of fixture is secured by bolts on the floor of customization factory building.So, cut-off is fixed on
On the floor for customizing factory building, it can prevent from releasing, and be easy to dismount.
And for example, before some races are set on the floor of customization factory building, cut-off method to set up also includes step:For respectively every
It is disconnected to pre-set erection sequence;And/or each cut-off is separately positioned on to the top of corresponding race, it is specially:According to erection sequence by
One each cut-off of installation, when each cut-off is installed one by one, each cut-off is separately positioned on to the top of corresponding race;Or by each cut-off
The top of corresponding race is separately positioned on, including:Each cut-off is installed one by one according to erection sequence, will when each cut-off is installed one by one
Each cut-off is separately positioned on the top of corresponding race.And for example, before some races are set on the floor of customization factory building, cut-off is set
Putting method also includes step:Erection sequence is pre-seted for each cut-off;And/or each cut-off is rolled to phase by its roller respectively
The predeterminated position of race is answered, is specially:Each cut-off is installed one by one according to erection sequence, when installing each cut-off one by one, by each cut-off
The predeterminated position of corresponding race is rolled to by its roller respectively;Or each cut-off is rolled to accordingly by its roller respectively
The predeterminated position of race, including:Each cut-off is installed one by one according to erection sequence, when each cut-off is installed one by one, each cut-off distinguished
The predeterminated position of corresponding race is rolled to by its roller.
Wherein, each cut-off is installed one by one according to erection sequence, when two cut-offs need connection, performs following steps:It is right
In two cut-offs for needing to connect, determine that high priority cut-off and low priority level are separated according to erection sequence;Judge two
Separate whether the position being connected is to strengthen installation site;Judged result is yes, then first fixes high priority cut-off, then hang
Low priority level cut-off is filled, the connection end of control low priority level cut-off is plugged in the link slot position of high priority cut-off;
Judged result be it is no, then first fix high priority cut-off, then by low priority level separate translate, control low priority level every
Disconnected connection end is plugged in the link slot position of high priority cut-off.So, each cut-off is installed one by one using erection sequence, made
The installation effectiveness that must separate is higher, carries out additional designs for strengthening installation site, is not only easy to installation and fixes, and with steady
Solid installation effect;The design of priority level, the ability need of installation cut-off is reduced, can not only use common laborer to carry out
Installation, and be advantageously implemented mechanization and install automatically.
For example, it is not when strengthening installation site, first to fix high priority cut-off that two, which are separated the position being connected, will be low
Priority level cut-off translation, the connection end of control low priority level cut-off are plugged in the link slot position of high priority cut-off;
In this case, two cut-offs are easily installed.And for example, it is when strengthening installation site, first to fix that two, which are separated the position being connected,
High priority is separated, and then lifts low priority level cut-off, and the connection end of control low priority level cut-off is plugged in Gao You
The link slot position of first rank cut-off;In this case, two cut-offs are difficult to depart from, so as to have preferable stability.
For example, installing each cut-off one by one according to erection sequence, when at least two cut-offs need connection, following walk is performed
Suddenly:At least two cut-offs connected for needs, it is other to lowest priority to determine that limit priority does not separate according to erection sequence
The order of cut-off;Judge whether the position that at least two cut-offs are connected is to strengthen installation site;Judged result is yes, then by most
High priority separates the order do not separated to lowest priority, first fixes limit priority and does not separate, then lifts next excellent
First rank cut-off, the connection end of next priority level cut-off is controlled to be plugged in the link slot position of priority level cut-off, it is suitable
Sequence is performed until lifting is completed lowest priority and do not separated, and the connection end that control lowest priority does not separate is plugged in
The link slot position of one priority level cut-off;Judged result is no, then does not separate to lowest priority by limit priority and do not separate
Order, first fix limit priority and do not separate, then next priority level is separated and translated, controls next priority level to separate
Connection end be plugged in the link slot position of priority level cut-off, order performs not to be separated until completing lowest priority
Translation, and the connection end that control lowest priority does not separate are plugged in the link slot position that a priority level is separated.For example,
For connect three cut-offs of needs, determine that limit priority does not separate, middle priority is not separated according to erection sequence and
Lowest priority does not separate, judges that three are separated whether the position being connected is to strengthen installation site;Judged result is yes, then presses
Limit priority does not separate, middle priority does not separate the order do not separated to lowest priority, and it is other first to fix limit priority
Cut-off, then lift middle priority and do not separate, the connection end that control middle priority is not separated is plugged in limit priority
The link slot position not separated, then lift lowest priority and do not separate, the connection end grafting that control lowest priority does not separate
In the link slot position that middle priority is not separated;Judged result is no, then do not separate by limit priority, middle priority not every
Break the order do not separated to lowest priority, first fix limit priority and do not separate, middle priority is not then separated into translation,
The connection end that control middle priority is not separated is plugged in the link slot position that limit priority does not separate, then will be minimum preferential
Rank cut-off translation, the connection end that control lowest priority does not separate are plugged in the link slot position that middle priority is not separated.
By that analogy.For example, it is not when strengthening installation site, first to fix high priority cut-off that three, which are separated the position being connected, point
Not by the cut-off translation of two low priority levels, control respectively low priority level cut-off connection end be plugged in high priority every
Disconnected link slot position;And for example, it is when strengthening installation site that three, which are separated the position being connected, first fixes high priority cut-off,
Then low priority level cut-off is lifted respectively, and the connection end of control low priority level cut-off is plugged in high priority cut-off
Link slot position.
In one of the embodiments, each cut-off is installed one by one according to erection sequence, when two cut-offs need not connect, held
Row following steps:The high priority cut-off and low priority level cut-off in two cut-offs are determined according to erection sequence, is first fixed
High priority is separated, and then fixes low priority level cut-off.Such design, it is advantageously implemented foolproof installation, Wu Xugao
Deep professional skill, as long as being operated sequentially.
In one of the embodiments, erection sequence is pre-seted for each cut-off, including:Priority is pre-seted for each cut-off
Not, erection sequence is set according to the priority level of each cut-off.In one of the embodiments, it is pre- for each cut-off according to design
Priority level is set.And/or in one of the embodiments, priority level is pre-seted for each cut-off always according to installation strength.
In one of the embodiments, cut-off method to set up also includes step:Pre-set reinforcement installation site.For example, with
Reinforcement installation site is pre-seted according to security performance, safety index or design etc..For example, each angle position is pre-seted to add
Strong installation site.And for example, each tripartite's link position is pre-seted to strengthen installation site.
In one of the embodiments, the connection end of low priority level cut-off is controlled to be plugged in high priority cut-off
Link slot position, including the connection end of control low priority level cut-off are plugged in the connection that high priority is separated with being interference fitted
Groove position.Or in one of the embodiments, the connection end of control low priority level cut-off is plugged in high priority cut-off
Link slot position, including control low priority level cut-off connection end deformation be plugged in high priority separate link slot
Position.So, the connection end of low priority level cut-off is plugged in after the link slot position of high priority cut-off, unless by external force
More than preset value, otherwise it is not easy to deviate from from link slot position, so as to improve the bonding strength of cut-off, it is ensured that the stable connection of cut-off
Effect.
In one of the embodiments, the connection end of low priority level cut-off is controlled to be plugged in high priority cut-off
After link slot position, cut-off method to set up also includes step:Using be spirally connected or clamping by the way of by low priority level separate fix
Separate in high priority.So, safer fixed effect can be obtained.
In the various embodiments described above, cut-off includes partition panel or partition-type structures, for example, cut-off includes glass, aluminium alloy type
Material, foamed plastics filling section bar, plank and/or composite structure etc..
Different in the period of, it is often possible to there can be adjustment demand for the internal structure for customizing factory building, it is desirable to be able to change
Become the interior layout of customization factory building, it is necessary to adjust cut-off, it is therefore, another for the ease of the cut-off of adjustment customization factory building, the present invention
Embodiment is one kind customization factory building, has some cut-offs, and customization factory building uses separates method to set up described in any of the above-described embodiment
Each cut-off is set.So, the interior layout of customization factory building can be easily customized, adjusted, is particularly suitable for incubator, shared work
Industry garden and plant area use.And for example, a kind of customization factory building, has some cut-offs, and customization factory building uses any of the above-described embodiment institute
The correlation technique feature for stating cut-off method to set up sets each cut-off.
For example, a kind of customization factory building, wherein, customize and some races are set on the floor of factory building;The bottom respectively separated is set
Some rollers, roller match with race, and roller is used to roll in race;The bottom respectively separated sets some holding pieces;Respectively
Cut-off is separately positioned on the top of corresponding race;The height of the holding piece of each cut-off is turned down respectively so that roller and corresponding race
Bottom connection is touched, and each cut-off is rolled to the predeterminated position of corresponding race by its roller respectively;The top of each cut-off is heightened respectively
The height of gripping member is so that the bottom of roller and corresponding race disengages.For example, holding piece includes upper head part, stud and lower top
The bottom of cut-off is fixed on part, the top of upper head part, and the top of stud is connected with the bottom of upper head part, is provided with the middle part of stud
For the forced section for rotating stud during stress, the bottom of stud is connected with the top of lower head part, the screw thread on the top of stud and
The screw thread of the bottom of stud is oppositely arranged.And/or each race be arranged in parallel.And/or each holding piece corresponds with each roller
Set.And/or after heightening the height of the holding piece of each cut-off respectively so that the bottom of roller and corresponding race disengages,
The cut-off method to set up also includes step:Each cut-off is fixed on the floor of customization factory building respectively.And/or respectively will be each
Separate plugged and fixed on the floor of customization factory building.Or each cut-off is locked on the floor of customization factory building respectively.Or
Each cut-off is spirally connected respectively and is fixed on the floor of customization factory building.For example, each cut-off is secured by bolts in customiser respectively
On the floor in room.The other embodiment for customizing factory building by that analogy, in order to save length, no longer replicates in full.
It should be noted that other embodiments of the invention also include, the mutually group of the technical characteristic in the various embodiments described above
Close customization factory building and its cut-off method to set up being formed, can implementing.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of cut-off method to set up for customizing factory building, it is characterised in that comprise the following steps:
In customization factory building floor on some races are set;
Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used to roll in race;
In the bottom of each cut-off, some holding pieces are set;
Each cut-off is separately positioned on to the top of corresponding race;
The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and corresponding race touches, and each cut-off is led to respectively
Cross the predeterminated position that its roller is rolled to corresponding race;
The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race disengages.
2. separating method to set up according to claim 1, it is characterised in that holding piece includes upper head part, stud and lower head part,
The bottom of cut-off is fixed on the top of upper head part, and the top of stud is connected with the bottom of upper head part, and use is provided with the middle part of stud
The forced section for rotating stud when stress, the bottom of stud are connected with the top of lower head part, the screw thread and spiral shell on the top of stud
The screw thread of the bottom of post is oppositely arranged.
3. separate method to set up according to claim 1, it is characterised in that each race be arranged in parallel.
4. separate method to set up according to claim 1, it is characterised in that each holding piece is corresponded with each roller and set.
5. separate method to set up according to claim 1, it is characterised in that heighten respectively the height of the holding piece of each cut-off with
Make after the bottom of roller and corresponding race disengages, the cut-off method to set up also includes step:It is respectively that each cut-off is solid
Due on the floor of customization factory building.
6. separate method to set up according to claim 5, it is characterised in that respectively by each cut-off plugged and fixed in customization factory building
Floor on.
7. separate method to set up according to claim 5, it is characterised in that each cut-off is locked in the ground of customization factory building respectively
On plate.
8. separate method to set up according to claim 5, it is characterised in that each cut-off is spirally connected is fixed on customization factory building respectively
Floor on.
9. separate method to set up according to claim 8, it is characterised in that each cut-off is secured by bolts in customization respectively
On the floor of factory building.
10. one kind customization factory building, there are some cut-offs, it is characterised in that use as any one of claim 1 to 9 every
Disconnected method to set up sets each cut-off.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710758849.9A CN107700716A (en) | 2017-08-29 | 2017-08-29 | Customize factory building and its cut-off method to set up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710758849.9A CN107700716A (en) | 2017-08-29 | 2017-08-29 | Customize factory building and its cut-off method to set up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107700716A true CN107700716A (en) | 2018-02-16 |
Family
ID=61169976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710758849.9A Withdrawn CN107700716A (en) | 2017-08-29 | 2017-08-29 | Customize factory building and its cut-off method to set up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107700716A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005009263A (en) * | 2003-06-23 | 2005-01-13 | Mitsubishi Kagaku Sanshi Corp | Partition wall |
JP2005232695A (en) * | 2004-02-17 | 2005-09-02 | Okamura Corp | Step connecting structure of partition panel |
CN202170581U (en) * | 2011-07-20 | 2012-03-21 | 杨维华 | Mobile partition |
CN105464251A (en) * | 2015-12-22 | 2016-04-06 | 天元建设集团有限公司 | Pre-fabricated building removable partition, wall splicing structure, and construction method |
CN105804288A (en) * | 2016-05-12 | 2016-07-27 | 中国建筑第六工程局有限公司 | Changeable spatial combined partition wall |
CN205604529U (en) * | 2016-05-12 | 2016-09-28 | 中国建筑第六工程局有限公司 | Activity cuts off positioner |
-
2017
- 2017-08-29 CN CN201710758849.9A patent/CN107700716A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005009263A (en) * | 2003-06-23 | 2005-01-13 | Mitsubishi Kagaku Sanshi Corp | Partition wall |
JP2005232695A (en) * | 2004-02-17 | 2005-09-02 | Okamura Corp | Step connecting structure of partition panel |
CN202170581U (en) * | 2011-07-20 | 2012-03-21 | 杨维华 | Mobile partition |
CN105464251A (en) * | 2015-12-22 | 2016-04-06 | 天元建设集团有限公司 | Pre-fabricated building removable partition, wall splicing structure, and construction method |
CN105804288A (en) * | 2016-05-12 | 2016-07-27 | 中国建筑第六工程局有限公司 | Changeable spatial combined partition wall |
CN205604529U (en) * | 2016-05-12 | 2016-09-28 | 中国建筑第六工程局有限公司 | Activity cuts off positioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011138664A3 (en) | An assembly of prefabricated elements to form a prefabricated building with at least two floors and related building and installation process | |
WO2009017354A3 (en) | Multi-horizontal structure member forming method | |
CN103321297B (en) | Construction method of cantilever steel structure | |
CN107700716A (en) | Customize factory building and its cut-off method to set up | |
CN203961201U (en) | Column is adjustable extension wall device | |
CN206340460U (en) | A kind of mode connects for screw formula is stretched back box | |
CN105544838A (en) | Integrated suspended ceiling structure | |
CN107700886A (en) | Customize factory building and its cut-off installation method | |
CN107740586A (en) | Customize factory building and its cut-off hanging method | |
CN209443646U (en) | A kind of decorative ceiling structure | |
CN205530909U (en) | Piece is hung in city furred ceiling installation combination | |
CN209191992U (en) | A kind of civil engineering transport of materials device | |
CN205857579U (en) | A kind of abatvoix | |
CN203307983U (en) | Ceiling keel component | |
CN205276648U (en) | Suspended ceiling structure | |
CN212926602U (en) | Building curtain wall structure convenient to installation and dismantlement | |
CN207295997U (en) | Steel structure girder | |
CN204960683U (en) | Remove and cut off door structure | |
CN202072372U (en) | Cordwood guide rail frame for outdoor elevators | |
CN106861066A (en) | Possesses the indoor Emergency Ladder that quick splicing slide bar flees from function | |
CN201474591U (en) | Coat hanger type emergency ladder | |
CN104178985B (en) | A kind of remote control lift clothes hanger | |
CN204766455U (en) | Take steam bath canopy that interlayer can scale | |
CN204600325U (en) | A kind of wall type variable bridge | |
CN114294595B (en) | Anti-falling invisible base of heavy-duty pendant lamp and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180216 |
|
WW01 | Invention patent application withdrawn after publication |