CN107700716A - Customize factory building and its cut-off method to set up - Google Patents

Customize factory building and its cut-off method to set up Download PDF

Info

Publication number
CN107700716A
CN107700716A CN201710758849.9A CN201710758849A CN107700716A CN 107700716 A CN107700716 A CN 107700716A CN 201710758849 A CN201710758849 A CN 201710758849A CN 107700716 A CN107700716 A CN 107700716A
Authority
CN
China
Prior art keywords
cut
factory building
roller
race
customization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710758849.9A
Other languages
Chinese (zh)
Inventor
温玉桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou City Hignet Technology Co Ltd
Original Assignee
Huizhou City Hignet Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou City Hignet Technology Co Ltd filed Critical Huizhou City Hignet Technology Co Ltd
Priority to CN201710758849.9A priority Critical patent/CN107700716A/en
Publication of CN107700716A publication Critical patent/CN107700716A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/827Partitions constituted of sliding panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The present invention relates to customization factory building and its cut-off method to set up, wherein, the cut-off method to set up for customizing factory building comprises the following steps:In customization factory building floor on some races are set;In the bottom of each cut-off, some rollers are set;In the bottom of each cut-off, some holding pieces are set;Each cut-off is separately positioned on to the top of corresponding race;The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and race touches, by it is each separate the predeterminated position of race is rolled to by its roller respectively;The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and race disengages.So, race mode is coordinated using roller, roller translates in race by cut-off, is be easily moved the cut-off of customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, cut-off when necessary, can also be lifted again, the internal structure of customization factory building is easily changed, meets the needs of user's sustainable development.

Description

Customize factory building and its cut-off method to set up
Technical field
The present invention relates to customization factory building field, more particularly to customization factory building and its cut-off method to set up.
Background technology
Factory building is workshop or the house of factory, usually individual layer or bilayer, different production or processing enterprise, for factory building Supporting there is different demands.
With the development of science and technology, customization factory building, especially customization standardization factory building, have become a kind of new product, can Substantial amounts of factory building time and building affairs are saved for user, and can meets some particular/special requirements of user for factory building, because This is popular in users.
Exterior wall, floor and the top of customization factory building are all often that same or similar degree is higher, but for separating, also That is partition panel or partition-type structures, then often there are different demands, therefore, it is necessary to customization is set using the flexible structure being be easily moved The cut-off of factory building.
The content of the invention
Based on this, it is necessary to provide a kind of customization factory building and its cut-off method to set up.
A kind of cut-off method to set up for customizing factory building, it comprises the following steps:
In customization factory building floor on some races are set;
Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used to roll in race;
In the bottom of each cut-off, some holding pieces are set;
Each cut-off is separately positioned on to the top of corresponding race;
The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and corresponding race touches, by each cut-off point The predeterminated position of corresponding race is not rolled to by its roller;
The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race disengages.
In one of the embodiments, holding piece includes upper head part, stud and lower head part, the top of upper head part be fixed on every Disconnected bottom, the top of stud are connected with the bottom of upper head part, are provided with what is rotated for making stud during stress in the middle part of stud Forced section, the bottom of stud are connected with the top of lower head part, and the screw thread of the screw thread on the top of stud and the bottom of stud is reversely set Put.
In one of the embodiments, each race be arranged in parallel.
In one of the embodiments, each holding piece is corresponded with each roller and set.
In one of the embodiments, the height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race After portion disengages, the cut-off method to set up also includes step:Each cut-off is fixed on the floor of customization factory building respectively.
In one of the embodiments, respectively by each cut-off plugged and fixed on the floor of customization factory building.
In one of the embodiments, each cut-off is locked on the floor of customization factory building respectively.
In one of the embodiments, each cut-off is spirally connected respectively and be fixed on the floor of customization factory building.
In one of the embodiments, each cut-off is secured by bolts on the floor of customization factory building respectively.
One kind customization factory building, has some cut-offs, and customization factory building is set using cut-off method to set up described in any of the above-described Each cut-off.
Above-mentioned customization factory building and its cut-off method to set up, coordinate race mode using roller, cut-off are rolled in race Formula translates, and is be easily moved the cut-off of customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, must When wanting, cut-off can also be lifted again, be easily changed the internal structure of customization factory building, meet the needs of user's sustainable development.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of one embodiment of the invention.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, below in conjunction with the accompanying drawings to the present invention Embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited by following public specific embodiment.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, it can be directly another On one element or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be with It is directly to another element or may be simultaneously present centering elements.Term as used herein " vertically ", " level ", "left", "right" and similar statement for illustrative purposes only, it is unique embodiment to be not offered as.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The implication that technical staff is generally understood that is identical.Used term is intended merely to describe specific reality in the description of the invention Apply the purpose of mode, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more correlations The arbitrary and all combination of Listed Items.
For example, as shown in figure 1, a kind of cut-off method to set up for customizing factory building, it comprises the following steps:In customization factory building Some races are set on floor;Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used in race Middle rolling;In the bottom of each cut-off, some holding pieces are set;Each cut-off is separately positioned on to the top of corresponding race;Turn down respectively The height of the holding piece respectively separated is rolled each cut-off by its roller so that the bottom connection of roller and corresponding race touches respectively To the predeterminated position of corresponding race;The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race departs from Contact.So, using roller coordinate race mode, will cut-off in race roller translate, be easily moved customization factory building every It is disconnected so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, cut-off when necessary, can also be lifted again, easily In the internal structure for changing customization factory building, meets the needs of user's sustainable development.One example is that roller is to include several The trundle group of double trundle, so, more stable rolling effect can be reached.And for example, if the bottom of race is provided with The dry deceleration strip being parallel to each other, for example, the bearing of trend of each deceleration strip and the bearing of trend of race are perpendicular;And for example, slow down Band has W tee sections or inverted W tee sections, to provide the slowing effect of both direction, avoids roller from being rolled too in race It is fast to occur surprisingly.
For example, each cut-off to be separately positioned on to the top of corresponding race, including a cut-off is arranged on corresponding one The top of race, and/or, two or more are separated to the top for being arranged on a corresponding race;And for example, it is possible to understand that Ground, each cut-off is separately positioned on to the top of corresponding race, including each cut-off is separately positioned on to the top of corresponding race simultaneously, Or each cut-off is separately positioned on to the top of corresponding race in order or respectively.For example, each cut-off is passed through into its roller respectively The predeterminated position of corresponding race is rolled to, wherein, the predeterminated position is the plan installation site of cut-off, for example, according to design Drawing or construction are instructed, and each cut-off is rolled to the predeterminated position of corresponding race by its roller respectively.
In one of the embodiments, holding piece includes upper head part, stud and lower head part, the top of upper head part be fixed on every Disconnected bottom, the top of stud are connected with the bottom of upper head part, are provided with what is rotated for making stud during stress in the middle part of stud Forced section, the bottom of stud are connected with the top of lower head part, and the screw thread of the screw thread on the top of stud and the bottom of stud is reversely set Put.So, when being exerted a force to forced section, during for example with the instrument turn forced section such as spanner, under the top and stud of stud Portion externally exports opposite direction power so that upper head part and lower head part are close to each other or are located remotely from each other, when upper head part and lower head part phase When mutually approaching to a certain extent, holding piece departs from ground, and roller can be rolled freely;When upper head part and lower head part are located remotely from each other When to a certain degree, holding piece abuts ground, and roller can not freely roll, separate and customization is fixed under its own Action of Gravity Field On the floor of factory building, the floor includes subfloor and/or floor.
In one of the embodiments, each race be arranged in parallel.And for example, some regions are set, in each region, each race It is arranged in parallel;The extension line of each race of difference region is parallel or is staggered.In one of the embodiments, each holding piece with Each roller, which corresponds, to be set.For example, the corresponding roller of each holding piece;For example, a top is correspondingly arranged beside each roller Gripping member.And for example, around each roller, around setting a holding piece.In this way it can be ensured that stress equalization, is not susceptible to partially Shifting etc. is unexpected.
In one of the embodiments, the height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race After portion disengages, the cut-off method to set up also includes step:Each cut-off is fixed on the floor of customization factory building respectively.
In one of the embodiments, respectively by each cut-off plugged and fixed on the floor of customization factory building.One wherein In embodiment, each cut-off is locked on the floor of customization factory building respectively.Determine for example, being respectively locked in each cut-off using lockset On the floor of factory building processed.In one of the embodiments, each cut-off is spirally connected respectively and be fixed on the floor of customization factory building.At it In middle one embodiment, each cut-off is secured by bolts on the floor of customization factory building respectively.So, cut-off can be caused Fixed effect is more preferable.
For example, after each cut-off is rolled into the predeterminated position of corresponding race by its roller respectively, and heighten respectively Before the height of the holding piece respectively separated is so that the bottom of roller and corresponding race disengages, cut-off method to set up also includes step Suddenly:Some wireropes are vacantly set;In the top of each cut-off, some mounting parts are set;In the bottom of each cut-off, some fixations are set Portion;Each cut-off is connected at least two hanging parts, wherein, in each hanging part, the first end of hanging part is fixedly connected with cut-off A mounting part, and separate any mounting part connection hanging part quantity be not more than one;Each cut-off is used and connected At least two hanging parts be mounted on a wirerope, wherein, in each hanging part, the second end of hanging part is mounted on wirerope On;Each cut-off is connected at least two fixtures, wherein, in each fixture, the first end of fixture is fixedly connected with cut-off A fixed part, and separate any fixed part connection fixture quantity be not more than one;And/or each cut-off is heightened respectively Holding piece height so that the bottom of roller and corresponding race disengages before or after, cut-off method to set up also includes step Suddenly:Each cut-off is fixed on the floor of customization factory building using at least two connected fixtures, wherein, each fixture In, the second end of fixture is fixed on the floor of customization factory building.So, using lifting mode, cut-off is mounted on wirerope, From the aerial cut-off for flexibly setting customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, must When wanting, cut-off can also be lifted again, be easily changed the internal structure of customization factory building, meet the needs of user's sustainable development.
For example, vacantly setting some wireropes, including the both ends of each wirerope in some wireropes are fixedly installed on and determined The top of factory building processed is either in exterior wall portion or fixed column.In one of the embodiments, set at least in the top of each cut-off Three mounting parts;Each cut-off is also mounted on another wirerope using at least one hanging part.So, each cut-off is mounted on On two wireropes, the security of the steadiness of significant increase cut-off and customization factory building to a certain extent.
In one of the embodiments, two mounted wireropes of each cut-off be arranged in parallel.An or reality wherein Apply in example, mounted two wireropes of each cut-off mutually form an angle relative to the floor of customization factory building, i.e. it is each every Two the mounted wireropes that break mutually form an angle relative to the projection of a certain plane.In one of the embodiments, institute It is acute angle or right angle to state angle.One example is to set at least four mounting parts in the top of each cut-off, each cut-off is using extremely Few two hanging parts are mounted on first wirerope, are mounted on second wirerope and used using at least one hanging part At least one hanging part is mounted on the 3rd wirerope, wherein, first wirerope be arranged in parallel with second wirerope, the 3rd steel The projection on the floor that cable and second wirerope for example customize factory building relative to a certain plane mutually forms an angle, so, carries The general safety effect of customization factory building is risen.
In one of the embodiments, it is one layer to customize factory building, and in each fixture, the second end of fixture, which is fixed on, determines On the subfloor of factory building processed., should for each layer of cut-off or in one of the embodiments, customization factory building is multilayer In each fixture of cut-off, the second end of fixture is fixed on the floor of customization factory building.For example, for every Stall Layer, in each fixture of the cut-off of the floor, the second end of fixture is fixed on the floor of customization factory building.
In one of the embodiments, the first end of fixture is bolted to connection a fixed part of cut-off.Example Such as, the second end of fixture has G shape structures.In this way it is easier to install and dismantle, and with preferably anti-dropout effect.At it In middle one embodiment, the second end of fixture is secured by bolts on the floor of customization factory building.So, cut-off is fixed on On the floor for customizing factory building, it can prevent from releasing, and be easy to dismount.
And for example, before some races are set on the floor of customization factory building, cut-off method to set up also includes step:For respectively every It is disconnected to pre-set erection sequence;And/or each cut-off is separately positioned on to the top of corresponding race, it is specially:According to erection sequence by One each cut-off of installation, when each cut-off is installed one by one, each cut-off is separately positioned on to the top of corresponding race;Or by each cut-off The top of corresponding race is separately positioned on, including:Each cut-off is installed one by one according to erection sequence, will when each cut-off is installed one by one Each cut-off is separately positioned on the top of corresponding race.And for example, before some races are set on the floor of customization factory building, cut-off is set Putting method also includes step:Erection sequence is pre-seted for each cut-off;And/or each cut-off is rolled to phase by its roller respectively The predeterminated position of race is answered, is specially:Each cut-off is installed one by one according to erection sequence, when installing each cut-off one by one, by each cut-off The predeterminated position of corresponding race is rolled to by its roller respectively;Or each cut-off is rolled to accordingly by its roller respectively The predeterminated position of race, including:Each cut-off is installed one by one according to erection sequence, when each cut-off is installed one by one, each cut-off distinguished The predeterminated position of corresponding race is rolled to by its roller.
Wherein, each cut-off is installed one by one according to erection sequence, when two cut-offs need connection, performs following steps:It is right In two cut-offs for needing to connect, determine that high priority cut-off and low priority level are separated according to erection sequence;Judge two Separate whether the position being connected is to strengthen installation site;Judged result is yes, then first fixes high priority cut-off, then hang Low priority level cut-off is filled, the connection end of control low priority level cut-off is plugged in the link slot position of high priority cut-off; Judged result be it is no, then first fix high priority cut-off, then by low priority level separate translate, control low priority level every Disconnected connection end is plugged in the link slot position of high priority cut-off.So, each cut-off is installed one by one using erection sequence, made The installation effectiveness that must separate is higher, carries out additional designs for strengthening installation site, is not only easy to installation and fixes, and with steady Solid installation effect;The design of priority level, the ability need of installation cut-off is reduced, can not only use common laborer to carry out Installation, and be advantageously implemented mechanization and install automatically.
For example, it is not when strengthening installation site, first to fix high priority cut-off that two, which are separated the position being connected, will be low Priority level cut-off translation, the connection end of control low priority level cut-off are plugged in the link slot position of high priority cut-off; In this case, two cut-offs are easily installed.And for example, it is when strengthening installation site, first to fix that two, which are separated the position being connected, High priority is separated, and then lifts low priority level cut-off, and the connection end of control low priority level cut-off is plugged in Gao You The link slot position of first rank cut-off;In this case, two cut-offs are difficult to depart from, so as to have preferable stability.
For example, installing each cut-off one by one according to erection sequence, when at least two cut-offs need connection, following walk is performed Suddenly:At least two cut-offs connected for needs, it is other to lowest priority to determine that limit priority does not separate according to erection sequence The order of cut-off;Judge whether the position that at least two cut-offs are connected is to strengthen installation site;Judged result is yes, then by most High priority separates the order do not separated to lowest priority, first fixes limit priority and does not separate, then lifts next excellent First rank cut-off, the connection end of next priority level cut-off is controlled to be plugged in the link slot position of priority level cut-off, it is suitable Sequence is performed until lifting is completed lowest priority and do not separated, and the connection end that control lowest priority does not separate is plugged in The link slot position of one priority level cut-off;Judged result is no, then does not separate to lowest priority by limit priority and do not separate Order, first fix limit priority and do not separate, then next priority level is separated and translated, controls next priority level to separate Connection end be plugged in the link slot position of priority level cut-off, order performs not to be separated until completing lowest priority Translation, and the connection end that control lowest priority does not separate are plugged in the link slot position that a priority level is separated.For example, For connect three cut-offs of needs, determine that limit priority does not separate, middle priority is not separated according to erection sequence and Lowest priority does not separate, judges that three are separated whether the position being connected is to strengthen installation site;Judged result is yes, then presses Limit priority does not separate, middle priority does not separate the order do not separated to lowest priority, and it is other first to fix limit priority Cut-off, then lift middle priority and do not separate, the connection end that control middle priority is not separated is plugged in limit priority The link slot position not separated, then lift lowest priority and do not separate, the connection end grafting that control lowest priority does not separate In the link slot position that middle priority is not separated;Judged result is no, then do not separate by limit priority, middle priority not every Break the order do not separated to lowest priority, first fix limit priority and do not separate, middle priority is not then separated into translation, The connection end that control middle priority is not separated is plugged in the link slot position that limit priority does not separate, then will be minimum preferential Rank cut-off translation, the connection end that control lowest priority does not separate are plugged in the link slot position that middle priority is not separated. By that analogy.For example, it is not when strengthening installation site, first to fix high priority cut-off that three, which are separated the position being connected, point Not by the cut-off translation of two low priority levels, control respectively low priority level cut-off connection end be plugged in high priority every Disconnected link slot position;And for example, it is when strengthening installation site that three, which are separated the position being connected, first fixes high priority cut-off, Then low priority level cut-off is lifted respectively, and the connection end of control low priority level cut-off is plugged in high priority cut-off Link slot position.
In one of the embodiments, each cut-off is installed one by one according to erection sequence, when two cut-offs need not connect, held Row following steps:The high priority cut-off and low priority level cut-off in two cut-offs are determined according to erection sequence, is first fixed High priority is separated, and then fixes low priority level cut-off.Such design, it is advantageously implemented foolproof installation, Wu Xugao Deep professional skill, as long as being operated sequentially.
In one of the embodiments, erection sequence is pre-seted for each cut-off, including:Priority is pre-seted for each cut-off Not, erection sequence is set according to the priority level of each cut-off.In one of the embodiments, it is pre- for each cut-off according to design Priority level is set.And/or in one of the embodiments, priority level is pre-seted for each cut-off always according to installation strength.
In one of the embodiments, cut-off method to set up also includes step:Pre-set reinforcement installation site.For example, with Reinforcement installation site is pre-seted according to security performance, safety index or design etc..For example, each angle position is pre-seted to add Strong installation site.And for example, each tripartite's link position is pre-seted to strengthen installation site.
In one of the embodiments, the connection end of low priority level cut-off is controlled to be plugged in high priority cut-off Link slot position, including the connection end of control low priority level cut-off are plugged in the connection that high priority is separated with being interference fitted Groove position.Or in one of the embodiments, the connection end of control low priority level cut-off is plugged in high priority cut-off Link slot position, including control low priority level cut-off connection end deformation be plugged in high priority separate link slot Position.So, the connection end of low priority level cut-off is plugged in after the link slot position of high priority cut-off, unless by external force More than preset value, otherwise it is not easy to deviate from from link slot position, so as to improve the bonding strength of cut-off, it is ensured that the stable connection of cut-off Effect.
In one of the embodiments, the connection end of low priority level cut-off is controlled to be plugged in high priority cut-off After link slot position, cut-off method to set up also includes step:Using be spirally connected or clamping by the way of by low priority level separate fix Separate in high priority.So, safer fixed effect can be obtained.
In the various embodiments described above, cut-off includes partition panel or partition-type structures, for example, cut-off includes glass, aluminium alloy type Material, foamed plastics filling section bar, plank and/or composite structure etc..
Different in the period of, it is often possible to there can be adjustment demand for the internal structure for customizing factory building, it is desirable to be able to change Become the interior layout of customization factory building, it is necessary to adjust cut-off, it is therefore, another for the ease of the cut-off of adjustment customization factory building, the present invention Embodiment is one kind customization factory building, has some cut-offs, and customization factory building uses separates method to set up described in any of the above-described embodiment Each cut-off is set.So, the interior layout of customization factory building can be easily customized, adjusted, is particularly suitable for incubator, shared work Industry garden and plant area use.And for example, a kind of customization factory building, has some cut-offs, and customization factory building uses any of the above-described embodiment institute The correlation technique feature for stating cut-off method to set up sets each cut-off.
For example, a kind of customization factory building, wherein, customize and some races are set on the floor of factory building;The bottom respectively separated is set Some rollers, roller match with race, and roller is used to roll in race;The bottom respectively separated sets some holding pieces;Respectively Cut-off is separately positioned on the top of corresponding race;The height of the holding piece of each cut-off is turned down respectively so that roller and corresponding race Bottom connection is touched, and each cut-off is rolled to the predeterminated position of corresponding race by its roller respectively;The top of each cut-off is heightened respectively The height of gripping member is so that the bottom of roller and corresponding race disengages.For example, holding piece includes upper head part, stud and lower top The bottom of cut-off is fixed on part, the top of upper head part, and the top of stud is connected with the bottom of upper head part, is provided with the middle part of stud For the forced section for rotating stud during stress, the bottom of stud is connected with the top of lower head part, the screw thread on the top of stud and The screw thread of the bottom of stud is oppositely arranged.And/or each race be arranged in parallel.And/or each holding piece corresponds with each roller Set.And/or after heightening the height of the holding piece of each cut-off respectively so that the bottom of roller and corresponding race disengages, The cut-off method to set up also includes step:Each cut-off is fixed on the floor of customization factory building respectively.And/or respectively will be each Separate plugged and fixed on the floor of customization factory building.Or each cut-off is locked on the floor of customization factory building respectively.Or Each cut-off is spirally connected respectively and is fixed on the floor of customization factory building.For example, each cut-off is secured by bolts in customiser respectively On the floor in room.The other embodiment for customizing factory building by that analogy, in order to save length, no longer replicates in full.
It should be noted that other embodiments of the invention also include, the mutually group of the technical characteristic in the various embodiments described above Close customization factory building and its cut-off method to set up being formed, can implementing.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of cut-off method to set up for customizing factory building, it is characterised in that comprise the following steps:
In customization factory building floor on some races are set;
Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used to roll in race;
In the bottom of each cut-off, some holding pieces are set;
Each cut-off is separately positioned on to the top of corresponding race;
The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and corresponding race touches, and each cut-off is led to respectively Cross the predeterminated position that its roller is rolled to corresponding race;
The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race disengages.
2. separating method to set up according to claim 1, it is characterised in that holding piece includes upper head part, stud and lower head part, The bottom of cut-off is fixed on the top of upper head part, and the top of stud is connected with the bottom of upper head part, and use is provided with the middle part of stud The forced section for rotating stud when stress, the bottom of stud are connected with the top of lower head part, the screw thread and spiral shell on the top of stud The screw thread of the bottom of post is oppositely arranged.
3. separate method to set up according to claim 1, it is characterised in that each race be arranged in parallel.
4. separate method to set up according to claim 1, it is characterised in that each holding piece is corresponded with each roller and set.
5. separate method to set up according to claim 1, it is characterised in that heighten respectively the height of the holding piece of each cut-off with Make after the bottom of roller and corresponding race disengages, the cut-off method to set up also includes step:It is respectively that each cut-off is solid Due on the floor of customization factory building.
6. separate method to set up according to claim 5, it is characterised in that respectively by each cut-off plugged and fixed in customization factory building Floor on.
7. separate method to set up according to claim 5, it is characterised in that each cut-off is locked in the ground of customization factory building respectively On plate.
8. separate method to set up according to claim 5, it is characterised in that each cut-off is spirally connected is fixed on customization factory building respectively Floor on.
9. separate method to set up according to claim 8, it is characterised in that each cut-off is secured by bolts in customization respectively On the floor of factory building.
10. one kind customization factory building, there are some cut-offs, it is characterised in that use as any one of claim 1 to 9 every Disconnected method to set up sets each cut-off.
CN201710758849.9A 2017-08-29 2017-08-29 Customize factory building and its cut-off method to set up Withdrawn CN107700716A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710758849.9A CN107700716A (en) 2017-08-29 2017-08-29 Customize factory building and its cut-off method to set up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710758849.9A CN107700716A (en) 2017-08-29 2017-08-29 Customize factory building and its cut-off method to set up

Publications (1)

Publication Number Publication Date
CN107700716A true CN107700716A (en) 2018-02-16

Family

ID=61169976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710758849.9A Withdrawn CN107700716A (en) 2017-08-29 2017-08-29 Customize factory building and its cut-off method to set up

Country Status (1)

Country Link
CN (1) CN107700716A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005009263A (en) * 2003-06-23 2005-01-13 Mitsubishi Kagaku Sanshi Corp Partition wall
JP2005232695A (en) * 2004-02-17 2005-09-02 Okamura Corp Step connecting structure of partition panel
CN202170581U (en) * 2011-07-20 2012-03-21 杨维华 Mobile partition
CN105464251A (en) * 2015-12-22 2016-04-06 天元建设集团有限公司 Pre-fabricated building removable partition, wall splicing structure, and construction method
CN105804288A (en) * 2016-05-12 2016-07-27 中国建筑第六工程局有限公司 Changeable spatial combined partition wall
CN205604529U (en) * 2016-05-12 2016-09-28 中国建筑第六工程局有限公司 Activity cuts off positioner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005009263A (en) * 2003-06-23 2005-01-13 Mitsubishi Kagaku Sanshi Corp Partition wall
JP2005232695A (en) * 2004-02-17 2005-09-02 Okamura Corp Step connecting structure of partition panel
CN202170581U (en) * 2011-07-20 2012-03-21 杨维华 Mobile partition
CN105464251A (en) * 2015-12-22 2016-04-06 天元建设集团有限公司 Pre-fabricated building removable partition, wall splicing structure, and construction method
CN105804288A (en) * 2016-05-12 2016-07-27 中国建筑第六工程局有限公司 Changeable spatial combined partition wall
CN205604529U (en) * 2016-05-12 2016-09-28 中国建筑第六工程局有限公司 Activity cuts off positioner

Similar Documents

Publication Publication Date Title
WO2011138664A3 (en) An assembly of prefabricated elements to form a prefabricated building with at least two floors and related building and installation process
WO2009017354A3 (en) Multi-horizontal structure member forming method
CN103321297B (en) Construction method of cantilever steel structure
CN107700716A (en) Customize factory building and its cut-off method to set up
CN203961201U (en) Column is adjustable extension wall device
CN206340460U (en) A kind of mode connects for screw formula is stretched back box
CN105544838A (en) Integrated suspended ceiling structure
CN107700886A (en) Customize factory building and its cut-off installation method
CN107740586A (en) Customize factory building and its cut-off hanging method
CN209443646U (en) A kind of decorative ceiling structure
CN205530909U (en) Piece is hung in city furred ceiling installation combination
CN209191992U (en) A kind of civil engineering transport of materials device
CN205857579U (en) A kind of abatvoix
CN203307983U (en) Ceiling keel component
CN205276648U (en) Suspended ceiling structure
CN212926602U (en) Building curtain wall structure convenient to installation and dismantlement
CN207295997U (en) Steel structure girder
CN204960683U (en) Remove and cut off door structure
CN202072372U (en) Cordwood guide rail frame for outdoor elevators
CN106861066A (en) Possesses the indoor Emergency Ladder that quick splicing slide bar flees from function
CN201474591U (en) Coat hanger type emergency ladder
CN104178985B (en) A kind of remote control lift clothes hanger
CN204766455U (en) Take steam bath canopy that interlayer can scale
CN204600325U (en) A kind of wall type variable bridge
CN114294595B (en) Anti-falling invisible base of heavy-duty pendant lamp and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180216

WW01 Invention patent application withdrawn after publication