CN107740586A - Customize factory building and its cut-off hanging method - Google Patents
Customize factory building and its cut-off hanging method Download PDFInfo
- Publication number
- CN107740586A CN107740586A CN201710757502.2A CN201710757502A CN107740586A CN 107740586 A CN107740586 A CN 107740586A CN 201710757502 A CN201710757502 A CN 201710757502A CN 107740586 A CN107740586 A CN 107740586A
- Authority
- CN
- China
- Prior art keywords
- cut
- factory building
- hanging
- fixture
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/612—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
- E04B1/6125—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
Abstract
The present invention relates to customization factory building and its cut-off hanging method, wherein, the cut-off hanging method for customizing factory building comprises the following steps:Some wireropes are vacantly set;In the top of each cut-off, some mounting parts are set;In the bottom of each cut-off, some fixed parts are set;Each cut-off is connected at least two hanging parts;Each cut-off is mounted on a wirerope using at least two connected hanging parts;Each cut-off is connected at least two fixtures;Each cut-off is fixed on the floor of customization factory building using at least two connected fixtures.So, using lifting mode, cut-off is mounted on wirerope, from the aerial cut-off for flexibly setting customization factory building so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, cut-off when necessary, can also be lifted again, the internal structure of customization factory building is easily changed, meets the needs of user's sustainable development.
Description
Technical field
The present invention relates to customization factory building field, more particularly to customization factory building and its cut-off hanging method.
Background technology
Factory building is workshop or the house of factory, usually individual layer or bilayer, different production or processing enterprise, for factory building
Supporting there is different demands.
With the development of science and technology, customization factory building, especially customization standardization factory building, have become a kind of new product, can
Substantial amounts of factory building time and building affairs are saved for user, and can meets some particular/special requirements of user for factory building, because
This is popular in users.
Exterior wall, floor and the top of customization factory building are all often that same or similar degree is higher, but for separating, also
That is partition panel or partition-type structures, then often there are different demands, therefore, it is necessary to the cut-off of factory building is customized from aerial flexibly setting.
The content of the invention
Based on this, it is necessary to provide a kind of customization factory building and its cut-off hanging method.
A kind of cut-off hanging method for customizing factory building, it comprises the following steps:
Some wireropes are vacantly set;
In the top of each cut-off, some mounting parts are set;
In the bottom of each cut-off, some fixed parts are set;
Each cut-off is connected at least two hanging parts, wherein, in each hanging part, the first end of hanging part is fixedly connected
One mounting part of cut-off, and the quantity of any mounting part connection hanging part separated is not more than one;
Each cut-off is mounted on a wirerope using at least two connected hanging parts, wherein, each hanging part
In, the second end of hanging part is mounted on wirerope;
Each cut-off is connected at least two fixtures, wherein, in each fixture, the first end of fixture is fixedly connected
One fixed part of cut-off, and the quantity of any fixed part connection fixture separated is not more than one;
Each cut-off is fixed on the floor of customization factory building using at least two connected fixtures, wherein, it is each
In fixture, the second end of fixture is fixed on the floor of customization factory building.
In one of the embodiments, at least three mounting parts are set in the top of each cut-off;Each cut-off is also using extremely
A few hanging part is mounted on another wirerope.
In one of the embodiments, two mounted wireropes of each cut-off be arranged in parallel.
In one of the embodiments, two mounted wireropes of each cut-off are relative to the mutual shape in floor for customizing factory building
In an angle.
In one of the embodiments, the angle is acute angle or right angle.
In one of the embodiments, it is one layer to customize factory building, and in each fixture, the second end of fixture, which is fixed on, determines
On the subfloor of factory building processed.
In one of the embodiments, it is multilayer to customize factory building, for each layer of cut-off, each fixture of the cut-off
In, the second end of fixture is fixed on the floor of customization factory building.
In one of the embodiments, the first end of fixture is bolted to connection a fixed part of cut-off.
In one of the embodiments, the second end of fixture is secured by bolts on the floor of customization factory building.
For example, the second end of fixture has G shape structures.
One kind customization factory building, has some cut-offs, and customization factory building is set using cut-off hanging method described in any of the above-described
Each cut-off.
Above-mentioned customization factory building and its cut-off hanging method, using lifting mode, cut-off are mounted on wirerope, from aerial spirit
The cut-off living that customization factory building is set so that the installation effectiveness of cut-off is higher, and is easily installed fixation;Also, when necessary, may be used also
To lift cut-off again, the internal structure of customization factory building is easily changed, meets the needs of user's sustainable development.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of one embodiment of the invention.
Fig. 2 is the connection diagram of the cut-off of one embodiment of the invention.
Fig. 3 is the connection diagram of the cut-off of another embodiment of the present invention.
Fig. 4 is the connection diagram of the cut-off of another embodiment of the invention.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, below in conjunction with the accompanying drawings to the present invention
Embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair
It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not
Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited by following public specific embodiment.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, it can be directly another
On one element or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be with
It is directly to another element or may be simultaneously present centering elements.Term as used herein " vertically ", " level
", "left", "right" and similar statement for illustrative purposes only, it is unique embodiment to be not offered as.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The implication that technical staff is generally understood that is identical.Used term is intended merely to describe specific reality in the description of the invention
Apply the purpose of mode, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more correlations
The arbitrary and all combination of Listed Items.
For example, as shown in figure 1, a kind of cut-off hanging method for customizing factory building, it comprises the following steps:Vacantly set some
Wirerope;In the top of each cut-off, some mounting parts are set;In the bottom of each cut-off, some fixed parts are set;Each cut-off is connected
At least two hanging parts, wherein, in each hanging part, the first end of hanging part is fixedly connected with a mounting part of cut-off, and every
The quantity of disconnected any mounting part connection hanging part is not more than one;Each cut-off is hung using at least two connected hanging parts
It is connected on a wirerope, wherein, in each hanging part, the second end of hanging part is mounted on wirerope;Each cut-off is connected to
Few two fixtures, wherein, in each fixture, the first end of fixture is fixedly connected with a fixed part of cut-off, and separates
Any fixed part connection fixture quantity be not more than one;Each cut-off is fixed using at least two connected fixtures
In on the floor of customization factory building, wherein, in each fixture, the second end of fixture is fixed on the floor of customization factory building.This
Sample, using lifting mode, cut-off is mounted on wirerope, from the aerial cut-off for flexibly setting customization factory building so that the peace of cut-off
It is higher to fill efficiency, and is easily installed fixation;Also, cut-off when necessary, can also be lifted again, is easily changed customization factory building
Internal structure, meets the needs of user's sustainable development.For example, each wirerope forms network, and each wirerope is fixed at least
On two wireropes;And for example, each wirerope forms woven mesh structure;For example, each wirerope forms woven mesh structure, and each wirerope is by extremely
Few three wirerope institute supports, and/or, each wirerope is fixed at least on two wireropes.So, more effective safety can be provided
Protection, avoid that contingency occurs.
For example, vacantly setting some wireropes, including the both ends of each wirerope in some wireropes are fixedly installed on and determined
The top of factory building processed is either in exterior wall portion or fixed column.In one of the embodiments, set at least in the top of each cut-off
Three mounting parts;Each cut-off is also mounted on another wirerope using at least one hanging part.So, each cut-off is mounted on
On two wireropes, the security of the steadiness of significant increase cut-off and customization factory building to a certain extent.
In one of the embodiments, two mounted wireropes of each cut-off be arranged in parallel.An or reality wherein
Apply in example, mounted two wireropes of each cut-off mutually form an angle relative to the floor of customization factory building, i.e. it is each every
Two the mounted wireropes that break mutually form an angle relative to the projection of a certain plane.In one of the embodiments, institute
It is acute angle or right angle to state angle.One example is to set at least four mounting parts in the top of each cut-off, each cut-off is using extremely
Few two hanging parts are mounted on first wirerope, are mounted on second wirerope and used using at least one hanging part
At least one hanging part is mounted on the 3rd wirerope, wherein, first wirerope be arranged in parallel with second wirerope, the 3rd steel
The projection on the floor that cable and second wirerope for example customize factory building relative to a certain plane mutually forms an angle, so, carries
The general safety effect of customization factory building is risen.
In one of the embodiments, it is one layer to customize factory building, and in each fixture, the second end of fixture, which is fixed on, determines
On the subfloor of factory building processed., should for each layer of cut-off or in one of the embodiments, customization factory building is multilayer
In each fixture of cut-off, the second end of fixture is fixed on the floor of customization factory building.For example, for every Stall
Layer, in each fixture of the cut-off of the floor, the second end of fixture is fixed on the floor of customization factory building.
In one of the embodiments, the first end of fixture is bolted to connection a fixed part of cut-off.Example
Such as, the second end of fixture has G shape structures.In this way it is easier to install and dismantle, and with preferably anti-dropout effect.At it
In middle one embodiment, the second end of fixture is secured by bolts on the floor of customization factory building.So, cut-off is fixed on
On the floor for customizing factory building, it can prevent from releasing, and be easy to dismount.
And for example, before each cut-off is mounted on a wirerope using at least two connected hanging parts, or, will
Before each cut-off is fixed on the floor of customization factory building using at least two connected fixtures, cut-off hanging method also wraps
Include step:In customization factory building floor on some races are set;In the bottom of each cut-off, some rollers, roller and race phase are set
Matching, roller are used to roll in race;In the bottom of each cut-off, some holding pieces are set;Each cut-off is separately positioned on corresponding
The top of race;The height of the holding piece of each cut-off is turned down respectively so that the bottom connection of roller and corresponding race touches, will respectively every
The disconnected predeterminated position for being rolled to corresponding race by its roller respectively;And for example, each cut-off is rolled to phase by its roller respectively
After the predeterminated position for answering race, and each cut-off is fixed on using at least two connected fixtures and customizes factory building
Before on floor, cut-off hanging method also includes step:Heighten the height of the holding piece of each cut-off respectively so that roller with it is corresponding
The bottom of race disengages.And for example, after some wireropes are vacantly set, and by each cut-off using at least two connected
Before individual fixture is fixed on the floor of customization factory building, cut-off hanging method also includes step:In on the floor of customization factory building
Some races are set;Some rollers are set in the bottom of each cut-off, roller matches with race, and roller is used to roll in race
It is dynamic;In the bottom of each cut-off, some holding pieces are set;Each cut-off is separately positioned on to the top of corresponding race;Turn down respectively respectively every
Each cut-off is rolled to phase so that the bottom connection of roller and corresponding race touches by the height of disconnected holding piece by its roller respectively
Answer the predeterminated position of race;The height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race departs from and connect
Touch.So, race mode is coordinated using roller, by cut-off, roller translates in race, is be easily moved the cut-off of customization factory building,
So that the installation effectiveness of cut-off is higher, and it is easily installed fixation;Also, cut-off when necessary, can also be lifted again, is easy to change
Become the internal structure of customization factory building, meet the needs of user's sustainable development.
For example, each cut-off to be separately positioned on to the top of corresponding race, including a cut-off is arranged on corresponding one
The top of race, and/or, two or more are separated to the top for being arranged on a corresponding race;And for example, it is possible to understand that
Ground, each cut-off is separately positioned on to the top of corresponding race, including each cut-off is separately positioned on to the top of corresponding race simultaneously,
Or each cut-off is separately positioned on to the top of corresponding race in order or respectively.For example, each cut-off is passed through into its roller respectively
The predeterminated position of corresponding race is rolled to, wherein, the predeterminated position is the plan installation site of cut-off, for example, according to design
Drawing or construction are instructed, and each cut-off is rolled to the predeterminated position of corresponding race by its roller respectively.
In one of the embodiments, holding piece includes upper head part, stud and lower head part, the top of upper head part be fixed on every
Disconnected bottom, the top of stud are connected with the bottom of upper head part, are provided with what is rotated for making stud during stress in the middle part of stud
Forced section, the bottom of stud are connected with the top of lower head part, and the screw thread of the screw thread on the top of stud and the bottom of stud is reversely set
Put.So, when being exerted a force to forced section, during for example with the instrument turn forced section such as spanner, under the top and stud of stud
Portion externally exports opposite direction power so that upper head part and lower head part are close to each other or are located remotely from each other, when upper head part and lower head part phase
When mutually approaching to a certain extent, holding piece departs from ground, and roller can be rolled freely;When upper head part and lower head part are located remotely from each other
When to a certain degree, holding piece abuts ground, and roller can not freely roll, separate and customization is fixed under its own Action of Gravity Field
On the floor of factory building, the floor includes subfloor and/or floor.
In one of the embodiments, each race be arranged in parallel.And for example, some regions are set, in each region, each race
It is arranged in parallel;The extension line of each race of difference region is parallel or is staggered.In one of the embodiments, each holding piece with
Each roller, which corresponds, to be set.For example, the corresponding roller of each holding piece;For example, a top is correspondingly arranged beside each roller
Gripping member.And for example, around each roller, around setting a holding piece.In this way it can be ensured that stress equalization, is not susceptible to partially
Shifting etc. is unexpected.
In one of the embodiments, the height of the holding piece of each cut-off is heightened respectively so that the bottom of roller and corresponding race
After portion disengages, cut-off hanging method also includes step:Each cut-off is fixed on the floor of customization factory building respectively.
In one of the embodiments, respectively by each cut-off plugged and fixed on the floor of customization factory building.One wherein
In embodiment, each cut-off is locked on the floor of customization factory building respectively.Determine for example, being respectively locked in each cut-off using lockset
On the floor of factory building processed.In one of the embodiments, each cut-off is spirally connected respectively and be fixed on the floor of customization factory building.At it
In middle one embodiment, each cut-off is secured by bolts on the floor of customization factory building respectively.So, cut-off can be caused
Fixed effect is more preferable.
And for example, before vacantly setting some wireropes, cut-off hanging method also includes step:It is suitable that installation is pre-seted for each cut-off
Sequence;And/or be mounted on each cut-off on a piece wirerope using at least two connected hanging parts, it is specially:According to installation
Order installs each cut-off one by one, and when installing each cut-off one by one, each cut-off is mounted using at least two connected hanging parts
In on a wirerope;Or be mounted on each cut-off on a piece wirerope using at least two connected hanging parts, including:
Each cut-off is installed one by one according to erection sequence, when each cut-off is installed one by one, each cut-off is used at least two connected extensions
Fitting is mounted on a wirerope.Wherein, each cut-off is installed one by one according to erection sequence, when two cut-offs need connection, held
Row following steps:Two cut-offs connected for needs, high priority cut-off and low priority level are determined according to erection sequence
Cut-off;Judge that two are separated whether the position being connected is to strengthen installation site;Judged result is yes, then first fixes high priority
Do not separate, then lift low priority level cut-off, control low priority level cut-off connection end be plugged in high priority every
Disconnected link slot position;Judged result is no, then first fixes high priority cut-off, then separates low priority level and translates, control
The connection end of low priority level cut-off processed is plugged in the link slot position of high priority cut-off.So, using erection sequence by
One each cut-off of installation so that the installation effectiveness of cut-off is higher, carries out additional designs for strengthening installation site, is not only easy to install
It is fixed, and with firm installation effect;The design of priority level, the ability need of installation cut-off is reduced, not only can be with
Installed using common laborer, and be advantageously implemented mechanization and install automatically.
For example, as shown in Fig. 2 the position that two cut-offs are connected is not when strengthening installation site, first to fix high priority
Do not separate, low priority level is separated and translated, the connection end of control low priority level cut-off is plugged in high priority cut-off
Link slot position;In this case, two cut-offs are easily installed.And for example, as shown in figure 3, two are separated the position being connected and are
When strengthening installation site, high priority cut-off is first fixed, then lifts low priority level cut-off, control low priority level cut-off
Connection end be plugged in high priority cut-off link slot position;And for example, as shown in figure 4, two are separated the position being connected
For strengthen installation site when, first fix high priority cut-off, then lift low priority level cut-off, control low priority level every
Disconnected connection end is plugged in the link slot position of high priority cut-off;Under both of these case, two cut-offs are difficult to depart from, so as to
With preferable stability.
For example, installing each cut-off one by one according to erection sequence, when at least two cut-offs need connection, following walk is performed
Suddenly:At least two cut-offs connected for needs, it is other to lowest priority to determine that limit priority does not separate according to erection sequence
The order of cut-off;Judge whether the position that at least two cut-offs are connected is to strengthen installation site;Judged result is yes, then by most
High priority separates the order do not separated to lowest priority, first fixes limit priority and does not separate, then lifts next excellent
First rank cut-off, the connection end of next priority level cut-off is controlled to be plugged in the link slot position of priority level cut-off, it is suitable
Sequence is performed until lifting is completed lowest priority and do not separated, and the connection end that control lowest priority does not separate is plugged in
The link slot position of one priority level cut-off;Judged result is no, then does not separate to lowest priority by limit priority and do not separate
Order, first fix limit priority and do not separate, then next priority level is separated and translated, controls next priority level to separate
Connection end be plugged in the link slot position of priority level cut-off, order performs not to be separated until completing lowest priority
Translation, and the connection end that control lowest priority does not separate are plugged in the link slot position that a priority level is separated.For example,
For connect three cut-offs of needs, determine that limit priority does not separate, middle priority is not separated according to erection sequence and
Lowest priority does not separate, judges that three are separated whether the position being connected is to strengthen installation site;Judged result is yes, then presses
Limit priority does not separate, middle priority does not separate the order do not separated to lowest priority, and it is other first to fix limit priority
Cut-off, then lift middle priority and do not separate, the connection end that control middle priority is not separated is plugged in limit priority
The link slot position not separated, then lift lowest priority and do not separate, the connection end grafting that control lowest priority does not separate
In the link slot position that middle priority is not separated;Judged result is no, then do not separate by limit priority, middle priority not every
Break the order do not separated to lowest priority, first fix limit priority and do not separate, middle priority is not then separated into translation,
The connection end that control middle priority is not separated is plugged in the link slot position that limit priority does not separate, then will be minimum preferential
Rank cut-off translation, the connection end that control lowest priority does not separate are plugged in the link slot position that middle priority is not separated.
By that analogy.For example, it is not when strengthening installation site, first to fix high priority cut-off that three, which are separated the position being connected, point
Not by the cut-off translation of two low priority levels, control respectively low priority level cut-off connection end be plugged in high priority every
Disconnected link slot position;And for example, it is when strengthening installation site that three, which are separated the position being connected, first fixes high priority cut-off,
Then low priority level cut-off is lifted respectively, and the connection end of control low priority level cut-off is plugged in high priority cut-off
Link slot position.
In one of the embodiments, each cut-off is installed one by one according to erection sequence, when two cut-offs need not connect, held
Row following steps:The high priority cut-off and low priority level cut-off in two cut-offs are determined according to erection sequence, is first fixed
High priority is separated, and then fixes low priority level cut-off.Such design, it is advantageously implemented foolproof installation, Wu Xugao
Deep professional skill, as long as being operated sequentially.
In one of the embodiments, erection sequence is pre-seted for each cut-off, including:Priority is pre-seted for each cut-off
Not, erection sequence is set according to the priority level of each cut-off.In one of the embodiments, it is pre- for each cut-off according to design
Priority level is set.And/or in one of the embodiments, priority level is pre-seted for each cut-off always according to installation strength.
In one of the embodiments, cut-off hanging method also includes step:Pre-set reinforcement installation site.For example, with
Reinforcement installation site is pre-seted according to security performance, safety index or design etc..For example, each angle position is pre-seted to add
Strong installation site.And for example, each tripartite's link position is pre-seted to strengthen installation site.
In one of the embodiments, the connection end of low priority level cut-off is controlled to be plugged in high priority cut-off
Link slot position, including the connection end of control low priority level cut-off are plugged in the connection that high priority is separated with being interference fitted
Groove position.Or in one of the embodiments, the connection end of control low priority level cut-off is plugged in high priority cut-off
Link slot position, including control low priority level cut-off connection end deformation be plugged in high priority separate link slot
Position.So, the connection end of low priority level cut-off is plugged in after the link slot position of high priority cut-off, unless by external force
More than preset value, otherwise it is not easy to deviate from from link slot position, so as to improve the bonding strength of cut-off, it is ensured that the stable connection of cut-off
Effect.
In one of the embodiments, the connection end of low priority level cut-off is controlled to be plugged in high priority cut-off
After link slot position, cut-off hanging method also includes step:Using be spirally connected or clamping by the way of by low priority level separate fix
Separate in high priority.So, safer fixed effect can be obtained.
In the various embodiments described above, cut-off includes partition panel or partition-type structures, for example, cut-off includes glass, aluminium alloy type
Material, foamed plastics filling section bar, plank and/or composite structure etc..
Different in the period of, it is often possible to there can be adjustment demand for the internal structure for customizing factory building, it is desirable to be able to change
Become the interior layout of customization factory building, it is necessary to adjust cut-off, it is therefore, another for the ease of the cut-off of adjustment customization factory building, the present invention
Embodiment is one kind customization factory building, has some cut-offs, and customization factory building uses separates hanging method described in any of the above-described embodiment
Each cut-off is set.So, the interior layout of customization factory building can be easily customized, adjusted, is particularly suitable for incubator, shared work
Industry garden and plant area use.And for example, a kind of customization factory building, has some cut-offs, and customization factory building uses any of the above-described embodiment institute
The correlation technique feature for stating cut-off hanging method sets each cut-off.
For example, a kind of customization factory building, wherein, some wireropes are vacantly set;The top respectively separated sets some mounting parts;Respectively
The bottom of cut-off sets some fixed parts;At least two hanging parts of each cut-off connection, wherein, in each hanging part, hanging part
First end be fixedly connected with a mounting part of cut-off, and the quantity of any mounting part connection hanging part separated is not more than one;
Each cut-off is mounted on a wirerope using at least two connected hanging parts, wherein, in each hanging part, hanging part
Second end is mounted on wirerope;At least two fixtures of each cut-off connection, wherein, in each fixture, the first of fixture
End is fixedly connected with a fixed part of cut-off, and the quantity of any fixed part connection fixture separated is not more than one;It is each every
It is disconnected to be fixed on using at least two connected fixtures on the floor of customization factory building, wherein, in each fixture, fixture
Second end is fixed on the floor of customization factory building.And for example, the top respectively separated sets at least three mounting parts;Each cut-off is also adopted
It is mounted on at least one hanging part on another wirerope;And for example, two mounted wireropes of each cut-off be arranged in parallel.Again
Such as, two mounted wireropes of each cut-off mutually form an angle relative to the floor of customization factory building.And for example, the angle
For acute angle or right angle.And for example, it is one layer to customize factory building, and in each fixture, customization factory building is fixed at the second end of fixture
On subfloor.And for example, it is multilayer to customize factory building, for each layer of cut-off, in each fixture of the cut-off, fixture
Second end is fixed on the floor of customization factory building.And for example, the first end of fixture is bolted to connection the one of cut-off
Individual fixed part.And for example, the second end of fixture is secured by bolts on the floor of customization factory building.For example, the second of fixture
End has G shape structures.The other embodiment for customizing factory building by that analogy, in order to save length, no longer replicates in full.
It should be noted that other embodiments of the invention also include, the mutually group of the technical characteristic in the various embodiments described above
Close customization factory building and its cut-off hanging method being formed, can implementing.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of cut-off hanging method for customizing factory building, it is characterised in that comprise the following steps:
Some wireropes are vacantly set;
In the top of each cut-off, some mounting parts are set;
In the bottom of each cut-off, some fixed parts are set;
Each cut-off is connected at least two hanging parts, wherein, in each hanging part, the first end of hanging part is fixedly connected with cut-off
A mounting part, and separate any mounting part connection hanging part quantity be not more than one;
Each cut-off is mounted on a wirerope using at least two connected hanging parts, wherein, in each hanging part, hang
Second end of fitting is mounted on wirerope;
Each cut-off is connected at least two fixtures, wherein, in each fixture, the first end of fixture is fixedly connected with cut-off
A fixed part, and separate any fixed part connection fixture quantity be not more than one;
Each cut-off is fixed on the floor of customization factory building using at least two connected fixtures, wherein, each fixation
In part, the second end of fixture is fixed on the floor of customization factory building.
2. separate hanging method according to claim 1, it is characterised in that at least three mountings are set in the top of each cut-off
Portion;Each cut-off is also mounted on another wirerope using at least one hanging part.
3. separate hanging method according to claim 2, it is characterised in that two mounted wireropes of each cut-off are parallel to be set
Put.
4. separate hanging method according to claim 2, it is characterised in that mounted two wireropes of each cut-off relative to
The floor of customization factory building mutually forms an angle.
5. separate hanging method according to claim 4, it is characterised in that the angle is acute angle or right angle.
6. separating hanging method according to claim 1, it is characterised in that customization factory building is one layer, in each fixture, Gu
The second end for determining part is fixed on the subfloor of customization factory building.
7. separate hanging method according to claim 1, it is characterised in that customization factory building is multilayer, for each layer every
Disconnected, in each fixture of the cut-off, the second end of fixture is fixed on the floor of customization factory building.
8. separate hanging method according to claim 1, it is characterised in that the first end of fixture is bolted to connection
One fixed part of cut-off.
9. separate hanging method according to claim 1, it is characterised in that the second end of fixture is secured by bolts in fixed
On the floor of factory building processed.
10. one kind customization factory building, there are some cut-offs, it is characterised in that use as any one of claim 1 to 9 every
Disconnected hanging method sets each cut-off.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710757502.2A CN107740586A (en) | 2017-08-29 | 2017-08-29 | Customize factory building and its cut-off hanging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710757502.2A CN107740586A (en) | 2017-08-29 | 2017-08-29 | Customize factory building and its cut-off hanging method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107740586A true CN107740586A (en) | 2018-02-27 |
Family
ID=61235778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710757502.2A Withdrawn CN107740586A (en) | 2017-08-29 | 2017-08-29 | Customize factory building and its cut-off hanging method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107740586A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1061194A (en) * | 1996-08-26 | 1998-03-03 | Sekisui Chem Co Ltd | Hanging tool of building unit |
CN201195661Y (en) * | 2008-03-27 | 2009-02-18 | 中国二十冶建设有限公司 | Permanent deflection-proof sheet metal sling |
CN201228195Y (en) * | 2008-06-24 | 2009-04-29 | 山西太钢不锈钢股份有限公司 | Tools for swinging rolling mill working roll |
CN101487234A (en) * | 2009-03-02 | 2009-07-22 | 杭州萧宏建设集团有限公司 | Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge |
CN201907917U (en) * | 2011-01-12 | 2011-07-27 | 河南省矿山起重机有限公司 | Steel-reinforcement cage hanger |
CN102877680A (en) * | 2012-10-09 | 2013-01-16 | 陕西有色建设有限公司 | Construction method for prefabricated column to be lifted in position for one time |
CN103950821A (en) * | 2014-05-19 | 2014-07-30 | 中国海洋石油总公司 | Pipeline hoisting rigging |
CN104404888A (en) * | 2014-12-12 | 2015-03-11 | 青岛第一市政工程有限公司 | Large hoisting system allowing gradient to be adjusted in air and application |
CN204738543U (en) * | 2015-06-10 | 2015-11-04 | 重庆建工第四建设有限责任公司 | Reinforcement cage hoisting hoist |
CN205036094U (en) * | 2015-09-10 | 2016-02-17 | 河北建设集团有限公司 | Assembled superimposed sheet hoist device |
-
2017
- 2017-08-29 CN CN201710757502.2A patent/CN107740586A/en not_active Withdrawn
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1061194A (en) * | 1996-08-26 | 1998-03-03 | Sekisui Chem Co Ltd | Hanging tool of building unit |
CN201195661Y (en) * | 2008-03-27 | 2009-02-18 | 中国二十冶建设有限公司 | Permanent deflection-proof sheet metal sling |
CN201228195Y (en) * | 2008-06-24 | 2009-04-29 | 山西太钢不锈钢股份有限公司 | Tools for swinging rolling mill working roll |
CN101487234A (en) * | 2009-03-02 | 2009-07-22 | 杭州萧宏建设集团有限公司 | Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge |
CN201907917U (en) * | 2011-01-12 | 2011-07-27 | 河南省矿山起重机有限公司 | Steel-reinforcement cage hanger |
CN102877680A (en) * | 2012-10-09 | 2013-01-16 | 陕西有色建设有限公司 | Construction method for prefabricated column to be lifted in position for one time |
CN103950821A (en) * | 2014-05-19 | 2014-07-30 | 中国海洋石油总公司 | Pipeline hoisting rigging |
CN104404888A (en) * | 2014-12-12 | 2015-03-11 | 青岛第一市政工程有限公司 | Large hoisting system allowing gradient to be adjusted in air and application |
CN204738543U (en) * | 2015-06-10 | 2015-11-04 | 重庆建工第四建设有限责任公司 | Reinforcement cage hoisting hoist |
CN205036094U (en) * | 2015-09-10 | 2016-02-17 | 河北建设集团有限公司 | Assembled superimposed sheet hoist device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2009017354A3 (en) | Multi-horizontal structure member forming method | |
CN107500174B (en) | Flat step pneumatic elevator upstairs | |
CN107740586A (en) | Customize factory building and its cut-off hanging method | |
CN107700886A (en) | Customize factory building and its cut-off installation method | |
CN107700716A (en) | Customize factory building and its cut-off method to set up | |
CN105735247B (en) | The construction method of steel reinforcement cage unit, system and construction method and diaphram wall | |
CN107594921A (en) | The method for substituting indoor brickwork separating wall body using furniture is fixedly mounted with | |
CN107724643A (en) | One kind installs elevator hoistways structure and installation method additional | |
CN203716455U (en) | Supporting frame for performing auxiliary supporting on flues | |
KR200457495Y1 (en) | Multi-hanger type drying device | |
CN204475813U (en) | A kind of building operations height adjustable scaffold | |
CN205804706U (en) | A kind of light partition wall attachment structure and light partition wall | |
CN209369105U (en) | A kind of pre-cast building wall structure for fabricated structure | |
CN210687243U (en) | Finished product support hanger | |
CN203905254U (en) | Prefabricated installation structure for special-shaped sculpture modelling hung ceiling | |
CN104234401B (en) | A kind of construction of lift well operation frame | |
CN106592956A (en) | Method for moving and changing fastener type steel pipe double-row scaffold | |
CN106861066A (en) | Possesses the indoor Emergency Ladder that quick splicing slide bar flees from function | |
CN204983386U (en) | LED externally -hanging wallboard prefabricated component | |
CN109113364B (en) | Suspension structure for additionally installing two floors on ultrahigh floor and construction method | |
CN203735787U (en) | Supporting leg device | |
CN210177218U (en) | Students' dormitory is with clothes hanger that dries in air | |
CN204661111U (en) | The two-layer twin columns lifting working platform of two-stage | |
CN115573485B (en) | Steel member with stable structure and disassembly and assembly method thereof | |
CN107253653A (en) | A kind of Domestic lift ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180227 |