CN107700473A - A kind of I-shaped steel joint for being welded with peg - Google Patents

A kind of I-shaped steel joint for being welded with peg Download PDF

Info

Publication number
CN107700473A
CN107700473A CN201710737850.3A CN201710737850A CN107700473A CN 107700473 A CN107700473 A CN 107700473A CN 201710737850 A CN201710737850 A CN 201710737850A CN 107700473 A CN107700473 A CN 107700473A
Authority
CN
China
Prior art keywords
steel
plate
steel plate
welded
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710737850.3A
Other languages
Chinese (zh)
Other versions
CN107700473B (en
Inventor
贺维国
江水德
江婕瑞
徐玉峰
杨世东
朱剑平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201710737850.3A priority Critical patent/CN107700473B/en
Publication of CN107700473A publication Critical patent/CN107700473A/en
Application granted granted Critical
Publication of CN107700473B publication Critical patent/CN107700473B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A kind of I-shaped steel joint for being welded with peg, the present invention relates to the underground continuous wall construction technique field in foundation pit enclosure structure;The two sides of web are close to be located at a phase diaphram wall section and the second stage of diaphram wall respectively, and two block wing plates of the phase diaphram wall section steel reinforcement cage respectively with I-steel weld;Described plugging plate is arranged in the groove by the second stage of diaphram wall side I-steel, and the web of the groove of plugging plate towards I-steel is set;The middle part of described web, ordered series of numbers peg is welded with by the second stage of diaphram wall side.The clear mud of I-shaped steel brush wall need not be carried out, I-steel is isolated with mud, ensures I-steel cleaning;I-steel web is welded with peg, and peg is anchored into the second stage of diaphragm wall section concrete, and joint anti-bending bearing capacity is high, and joint non-deformability is strong, improves the impermeability of I-shaped steel joint, and practicality is stronger.

Description

A kind of I-shaped steel joint for being welded with peg
Technical field
The present invention relates to the underground continuous wall construction technique field in foundation pit enclosure structure, and in particular to one kind is welded with peg I-shaped steel joint.
Background technology
Subway station and basement in high rise building construction are required to perform vertical soil-baffling structure, vertical soil-baffling structure master at present Have the forms such as drilled pile, diaphram wall, the stake of SMW engineering methods, steel sheet pile, cement mixing wall, when foundation ditch compared with it is deep, soil response is strong When spending that relatively low, water level is higher, there is structure building on foundation ditch periphery, vertical soil-baffling structure uses diaphram wall mostly.Underground is continuous Wall is typically to divide what wall section performed along foundation ditch periphery, typically first performs a phase diaphram wall section, waits a phase diaphram wall strong After degree reaches design strength, then perform the second stage of diaphram wall section, a phase diaphram wall section and the second stage of diaphram wall section it Between be provided with I-shaped steel joint, cross steel plate joint or fore shaft pipe joint etc..
Cross steel plate joint is made up of cross steel plate and slide type joint case, when to the integral rigidity or anti-of diaphram wall Used when being impregnated with particular/special requirement, its advantage is:1) steel plate is provided among the joint, extends permeable blind ditch, leakage performance Preferably;2) shear behavior is preferable;But its shortcoming is:1) process is more, and construction is complicated, and difficulty is larger;2) brush wall and removing wall section side Wall mud has certain difficulty;3) anti-bending strength is undesirable;4) steel plate dosage is more, and cost is higher.
When diaphram wall uses I-shaped steel joint, it is necessary to abdomen to I-steel after the second stage of diaphram wall section grooving Plate and wing plate carry out brush wall skin process native clearly.Be not in percolating water at I-shaped steel joint when in theory, using I-shaped steel joint Problem.But in Practical Project, often occurs percolating water at I-shaped steel joint, its result will cause foundation ditch periphery place underground Water level decreasing and surrounding buildings settlement cracking.Arranged so often also needing to perform extra sealing on the outside of I-shaped steel joint (for example, mixing pile, high-pressure rotary jet grouting pile) is applied, duration and increase construction costs will certainly be extended by performing extra measures of preventing water.
If part of the diaphram wall as underground agent structure, it is necessary to permanent durable, the overall ne-leakage of structure. The wall that each section of diaphram wall can meet design requirement, and composition each intersegmental attachment structure of diaphram wall is that underground is continuous Wall system key core link.If helped at present using diaphram wall as agent structure exterior wall, it is necessary to be performed in joint area Pilaster and measures of preventing water, it so can undoubtedly increase construction costs.
I-shaped steel joint percolating water has the reason for following aspect between causing diaphram wall:1) web of I-shaped steel joint and Wing plate wall is locally stained with mudcake, and the clear mud of brush wall has mass defect;2) I-shaped steel joint bending resistance is low, the second stage of diaphram wall The concrete of section only has bonding with I-shaped steel joint wall, and adhesive strength is relatively low, and I-shaped steel joint both sides pit earthwork excavates and branch Support, which is set, inconsistent easily to be caused and is ftractureed between I-shaped steel joint and concrete;(3) contraction can be produced in course of hardening, Gap can be produced between I-shaped steel joint and concrete.Therefore, I-shaped steel joint leakage problems between diaphram wall to be solved, are needed To improve from the following aspect:1) the clear shale amount of I-shaped steel joint brush wall is improved, but the clear mud of I-shaped steel joint brush wall is under water Carry out, can not check and monitor;2) bending resistance improved between I-shaped steel joint and the concrete of the second stage of diaphram wall section is strong Degree;3) measures of preventing water is taken between I-shaped steel joint and concrete.
So how to improve anti-bending bearing capacity between underground I-shaped steel joint and the second stage of diaphram wall section concrete and resist Seepage property, the clear shale amount of the I-shaped steel joint brush wall even cancellation clear bricklayer's's sequence of I-shaped steel joint brush wall is improved, put in ability Technological difficulties in face of the engineers and technicians of domain.
The content of the invention
It is reasonable in design, make in view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of simple in construction With the I-shaped steel joint for being easily welded with peg, it is not necessary to carry out the clear mud of I-shaped steel brush wall, I-steel is isolated with mud, ensure I-steel cleans;I-steel web is welded with peg, and peg is anchored into the second stage of diaphragm wall section concrete, and joint anti-bending bearing capacity is high, Joint non-deformability is strong, improves the impermeability of I-shaped steel joint, and practicality is stronger.
To achieve the above object, the technical solution adopted by the present invention is:It includes I-steel, peg and plugging plate and formed; Two block wing plates of the described I-steel by one block of web and positioned at web both sides are welded;The two sides difference of described web Be close to be located at a phase diaphram wall section and the second stage of diaphram wall, and a phase diaphram wall section steel reinforcement cage respectively with I-shaped Two blocks of wing plates welding of steel;Described plugging plate is arranged in the groove by the second stage of diaphram wall side I-steel, and is blocked The web of the groove of plate towards I-steel is set;The middle part of described web, ordered series of numbers is welded with by the second stage of diaphram wall side Peg.
Further, described plugging plate is by bottom land steel plate, side steel plate, floor, rubber slab, top rubber plate, first Top steel plate and the second top steel plate are formed;Wherein bottom land steel plate be arranged in parallel with web, and side steel plate be arranged in parallel with wing plate, And set with wing plate in certain distance, one end of two blocks of side steel plates is welded with bottom land steel plate respectively;The second described top steel Plate is located at the top surface of side steel plate, and is welded with side steel plate, and the second top steel plate is vertically arranged with bottom land steel plate, and and bottom land Steel plate welds;First top steel plate is located at the top of the second top steel plate, and is set with the second top steel plate in certain distance, the One top steel plate is vertically arranged with bottom land steel plate, and is welded with the medial surface of bottom land steel plate;Top rubber plate is folded in the first top Between portion's steel plate and the second top steel plate;Two slat gum plates are folded between two blocks of side steel plates and two blocks of wing plates respectively, and rubber The contact surface vulcanization of offset plate and top rubber plate connects;The medial shaft of described side steel plate is interval with polylith floor upwards, And floor welds with bottom land steel plate and side steel plate respectively.
Further, the thickness of described rubber slab is more than the spacing between side steel plate and I-steel wing plate.
Further, described rubber slab is big by the thickness ratio other end of one end of bottom land steel plate.
Further, connected between described rubber slab and side steel plate by bolt and viscose glue.
Further, the bottom of described plugging plate, and it is provided with bottom end steel plate by the second stage of diaphragm wall one positioned at I-steel;Bottom Hold steel plate to be welded respectively with web and wing plate, sealant sealing is used between plugging plate and bottom end steel plate.
Further, the outer top surface of described bottom end steel plate welds several nuts, and nut is provided with corresponding bolt.
Further, two flute profile fasteners are provided between described plugging plate and web top, the flute profile fastener is U-shaped Steel plate, the centre of flute profile fastener are provided with two circular holes, elongated hole are provided with the wing plate of circular hole correspondence position, flute profile fastener passes through spiral shell Bolt is fixedly connected with wing plate.
After said structure, the present invention has the beneficial effect that:A kind of I-shaped steel joint for being welded with peg of the present invention, The clear mud of I-shaped steel brush wall need not be carried out, I-steel is isolated with mud, ensures I-steel cleaning;I-steel web is welded with bolt Nail, peg are anchored into the second stage of diaphragm wall section concrete, and joint anti-bending bearing capacity is high, and joint non-deformability is strong, improve I-steel The impermeability of joint, practicality is stronger, and the present invention has simple in construction, and it is reasonable to set, the advantages that low manufacture cost.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is horizontal profile schematic diagram of the present invention in wall.
Fig. 2 is present invention horizontal profile schematic diagram in the second stage of continuous wall trench underground operating mode.
Fig. 3 is plugging plate bottom vertical cross section schematic diagram in the present invention.
Fig. 4 is plugging plate top vertical cross section schematic diagram in the present invention.
Fig. 5 is plugging plate horizontal profile schematic diagram in the present invention.
Fig. 6 is plugging plate elevational schematic view in the present invention.
The flute profile fastener schematic diagram installed in this present invention of Fig. 7 at the top of plugging plate.
Fig. 8 is flute profile fastener schematic diagram in the present invention.
Fig. 9 is rubber slab schematic diagram in the present invention.
Figure 10 is the horizontal schematic cross section of embodiment.
Description of reference numerals:
Wing plate 1, web 2, peg 3, plugging plate 4, bottom land steel plate 41, side steel plate 42, floor 43, rubber slab 44, first Top steel plate 45, nut 46, bolt 47, top rubber plate 48, the second top steel plate 49, a phase diaphram wall section steel reinforcement cage 5, Bottom end steel plate 6, the second stage of diaphram wall section steel reinforcement cage 7, band steel 8, cover plate 9, flute profile fastener 10, a phase diaphram wall section I, two Phase diaphram wall section II.
Embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
Referring to as shown in Fig. 1-Fig. 9, the technical scheme that present embodiment uses is:It includes I-steel, the and of peg 3 Plugging plate 4 is formed;Two block wing plates 1 of the described I-steel by one block of web 2 and positioned at the both sides of web 2 are welded;Described A phase diaphram wall section I and the second stage of diaphram wall section II are close to be located at respectively in the two sides of web 2, and one the phase underground connect Continuous wall section 5 two blocks of wing plates 1 respectively with I-steel of steel reinforcement cage weld;Described plugging plate 4 is arranged on by the second stage of diaphram wall In the groove of II side I-steel of section, and the web 2 of the groove of plugging plate 4 towards I-steel is set;In described web 2 Portion, ordered series of numbers peg 3 is welded with by the second stage of side of diaphram wall section II.
Further, the centre distance of described ordered series of numbers peg 3 is 260mm, and vertically spacing is 150mm to peg 3, bolt A diameter of 16mm of nail 3, the length of peg 3 is 150mm, and vertically wing plate 1 is higher by 200mm than the top surface of web 2.
Further, described plugging plate 4 is by bottom land steel plate 41, side steel plate 42, floor 43, rubber slab 44, top rubber Offset plate 48, the first top steel plate 45 and the second top steel plate 49 are formed;Wherein bottom land steel plate 41 be arranged in parallel with web 2, side Steel plate 42 be arranged in parallel with wing plate 1, and is set with wing plate 1 in certain distance, one end of two blocks of side steel plates 42 respectively with bottom land Steel plate 41 welds;The second described top steel plate 49 is located at the top surface of side steel plate 42, and is welded with side steel plate 42, the second top Portion's steel plate 49 is vertically arranged with bottom land steel plate 41, and is welded with bottom land steel plate 41;First top steel plate 45 is located at the second top steel The top of plate 49, and set with the second top steel plate 45 in certain distance, the first top steel plate 45 is vertical with bottom land steel plate 41 to be set Put, and welded with the medial surface of bottom land steel plate 41;Top rubber plate 48 is folded in the first top steel plate 45 and the second top steel plate Between 49;Two slat gum plates 44 are folded between two blocks of side steel plates 42 and two blocks of wing plates 1 respectively, and rubber slab 44 and top rubber The contact surface vulcanization connection of offset plate 48;The medial shaft of described side steel plate 42 is interval with polylith floor 43, and floor upwards 43 weld with bottom land steel plate 41 and side steel plate 42 respectively.
Further, the thickness of described rubber slab 44 is more than the spacing between side steel plate 42 and I-steel wing plate 1.
Further, described rubber slab 44 is big by the thickness ratio other end of one end of bottom land steel plate 41.
Further, connected between described rubber slab 44 and side steel plate 42 by bolt and viscose glue.
Further, the bottom of described plugging plate 4, and it is provided with bottom steel by the second stage of diaphragm wall side II positioned at I-steel Plate 6;Bottom end steel plate 6 is welded with web 2 and wing plate 1 respectively, and sealant sealing is used between plugging plate 4 and bottom end steel plate 6.
Further, the outer top surface of described bottom end steel plate 6 welds several nuts 46, and the specification of nut 46 is `M16, Nut 46 is provided with corresponding bolt 47, bolt one end is pushed against the lateral surface of plugging plate 4 by tightening bolt 47.
Further, two flute profile fasteners 10, the flute profile fastener 10 are provided between described plugging plate 4 and the top of web 2 For U-shaped steel plate, the centre of flute profile fastener 10 is provided with two circular hole (not shown)s, set on the wing plate of circular hole correspondence position There is elongated hole (not shown), flute profile fastener 10 is fixedly connected by bolt with wing plate 1, diameter of bolt 25mm, waits a phase continuous The wing plate fixing bolt of flute profile fastener and I-steel is released at the top of the steel reinforcement cage of wall section before insertion foundation trench;The steel of the flute profile fastener 10 Plate thickness 20mm, long L3=340mm, cell body length L4=190mm, horizontal outer side width H3=130mm, horizontal inner side width H4=55mm.
Further, the size of described bottom end steel plate 6 is 220mm × 930mm × 12mm.
Further, described floor 43 is vertically spaced 300mm settings;Floor 43 is right angled triangle, the right angle length of side 120mm, floor thickness 7mm.
Further, described bottom land steel plate 41 width 880mm, thickness 20mm;The height 150mm of side steel plate 42, steel Plate thickness 10mm;The inner side interplanar distance 90mm of side steel plate 42 and wing plate 1;The size of first top steel plate is 145mm × 880mm × 10mm, the size of the second top steel plate is 145mm × 700mm × 10mm;First top steel plate 45 and the second top steel plate 49 Between spacing 90mm;Described side steel plate 42 and the welding and assembling height 12mm of bottom land steel plate 41, using triangle weld seam;First top End steel plate 45 welds with bottom land steel plate 41, weld bead height 12mm;The size of rubber slab 44 and the cross section of top rubber plate 48 is shown in figure 9, L6=105mm, L7=95mm, L5=175mm, wherein L6, L7 are the horizontal width of rubber slab 44, and can be according to rubber hardness Adjustment, L5 are the length of rubber slab 44, plugging plate 4 install it is in place after transversely designed per side rubber slab 44 compressed thickness 5~ 15mm;First top steel plate 45 is 110mm from the top surface distance H1 of web 2, bottom end steel plate 6 from I-steel web bottom surface with a distance from H2 is about 250mm.
The construction process of present embodiment is as follows:
1) I-steel making is carried out first, then by firm welding between peg 3 and the web 2 of I-steel, afterwards the bottom of by Hold steel plate 6 to be welded with I-steel, and carry out the processing of plugging plate 4;
2) the grooving operation of a phase diaphram wall section I and clear base are carried out;
3) by being set in the space that two blocks of wing plates 1 of the second stage of diaphram wall section II and web 2 are formed on I-steel Plugging plate 4 is put, then multiple nuts 46 is welded in the top surface outer edge of bottom end steel plate 6, corresponding bolt 47 is installed on nut 46, The inner of bolt 47 is set to be against the outer face bottom of plugging plate 4, afterwards with fluid sealant by between plugging plate 4 and bottom end steel plate 6 Gap sealing;
4) make a phase diaphram wall section I steel reinforcement cage, and by a phase diaphram wall section steel reinforcement cage 5 respectively with work Two blocks of wing plates 1 of word steel weld together;
5) a phase diaphram wall section steel reinforcement cage 5 is inserted after the grooving of a phase diaphram wall section I, clear base, and in a phase The top of diaphram wall section steel reinforcement cage 5 releases bolt company between flute profile fastener 10 and I-steel wing plate 1 before will inserting foundation trench Connect, timely casting concrete;
6) after the second stage of grooving of diaphram wall section II, clear base, flute profile fastener 10 and plugging plate 4 are taken out;
7) the second stage of diaphram wall section steel reinforcement cage 7, timely casting concrete are inserted.
After said structure, present embodiment has the beneficial effect that:One kind described in present embodiment is welded with The I-shaped steel joint of peg, it is not necessary to carry out the clear mud of I-shaped steel brush wall, I-steel is isolated with mud, ensure I-steel cleaning; I-steel web is welded with peg, and peg is anchored into the second stage of diaphragm wall section concrete, and joint anti-bending bearing capacity is high, joint resistance to deformation energy Power is strong, improves the impermeability of I-shaped steel joint, and practicality is stronger, and the present invention has simple in construction, and it is reasonable to set, cost of manufacture Low advantage.
Embodiment:
Referring to Figure 10, a row are welded with the middle part of the side of the second stage of diaphram wall section II on web 2 in the present embodiment Peg 3, the vertical spacing between adjacent peg 3 are 100mm, remaining part and annexation with the phase of embodiment one Together.
It is described above, it is merely illustrative of the technical solution of the present invention and unrestricted, those of ordinary skill in the art are to this hair The other modifications or equivalent substitution that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, It all should cover among scope of the presently claimed invention.

Claims (8)

  1. A kind of 1. I-shaped steel joint for being welded with peg, it is characterised in that:It includes I-steel, peg and plugging plate and formed;It is described Two block wing plates of the I-steel by one block of web and positioned at web both sides be welded;It is close to respectively the two sides of described web Be located at a phase diaphram wall section and the second stage of diaphram wall, and a phase diaphram wall section steel reinforcement cage respectively with I-steel Two pieces of wing plate welding;Described plugging plate is arranged in the groove by the second stage of diaphram wall side I-steel, and plugging plate The web of groove towards I-steel is set;The middle part of described web, ordered series of numbers peg is welded with by the second stage of diaphram wall side.
  2. A kind of 2. I-shaped steel joint for being welded with peg according to claim 1, it is characterised in that:Described plugging plate and abdomen Two flute profile fasteners are provided between at the top of plate, the flute profile fastener is U-shaped steel plate, and the centre of flute profile fastener is provided with two circular holes, Elongated hole is provided with the wing plate of circular hole correspondence position, flute profile fastener is fixedly connected by bolt with wing plate.
  3. A kind of 3. I-shaped steel joint for being welded with peg according to claim 1, it is characterised in that:Described plugging plate is by groove Bottom steel plate, side steel plate, floor, rubber slab, top rubber plate, the first top steel plate and the second top steel plate are formed;Its bracket groove Bottom steel plate be arranged in parallel with web, and side steel plate be arranged in parallel with wing plate, and is set with wing plate in certain distance, two blocks of side steel Welded respectively with bottom land steel plate one end of plate;The second described top steel plate is located at the top surface of side steel plate, and with side steel plate Welding, the second top steel plate are vertically arranged with bottom land steel plate, and are welded with bottom land steel plate;First top steel plate is located at the second top The top of steel plate, and set with the second top steel plate in certain distance, the first top steel plate is vertically arranged with bottom land steel plate, and with The medial surface welding of bottom land steel plate;Top rubber plate is folded between the first top steel plate and the second top steel plate;Two slat gums Plate is folded between two blocks of side steel plates and two blocks of wing plates respectively, and the contact surface vulcanization of rubber slab and top rubber plate connects; The medial shaft of described side steel plate is interval with polylith floor upwards, and floor welds with bottom land steel plate and side steel plate respectively Connect.
  4. A kind of 4. I-shaped steel joint for being welded with peg according to claim 3, it is characterised in that:The thickness of described rubber slab Degree is more than the spacing between side steel plate and I-steel wing plate.
  5. A kind of 5. I-shaped steel joint for being welded with peg according to claim 3, it is characterised in that:Described rubber slab leans on groove The thickness ratio other end of one end of bottom steel plate is big.
  6. A kind of 6. I-shaped steel joint for being welded with peg according to claim 3, it is characterised in that:Described rubber slab and side Connected between the steel plate of face by bolt with viscose glue.
  7. A kind of 7. I-shaped steel joint for being welded with peg according to claim 3, it is characterised in that:The bottom of described plugging plate Portion, and it is provided with bottom end steel plate by the second stage of diaphragm wall one positioned at I-steel;Bottom end steel plate welds with web and wing plate respectively, plugging plate Sealant sealing is used between bottom end steel plate.
  8. A kind of 8. I-shaped steel joint for being welded with peg according to claim 7, it is characterised in that:Described bottom end steel plate Outer top surface welds several nuts, and nut is provided with corresponding bolt.
CN201710737850.3A 2017-08-24 2017-08-24 I-steel joint welded with stud Active CN107700473B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710737850.3A CN107700473B (en) 2017-08-24 2017-08-24 I-steel joint welded with stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710737850.3A CN107700473B (en) 2017-08-24 2017-08-24 I-steel joint welded with stud

Publications (2)

Publication Number Publication Date
CN107700473A true CN107700473A (en) 2018-02-16
CN107700473B CN107700473B (en) 2023-03-21

Family

ID=61170421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710737850.3A Active CN107700473B (en) 2017-08-24 2017-08-24 I-steel joint welded with stud

Country Status (1)

Country Link
CN (1) CN107700473B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736295A (en) * 2019-01-15 2019-05-10 中铁第四勘察设计院集团有限公司 A kind of building structure vertical supporting system and its construction method
CN110055952A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector structure and its construction method
CN111702921A (en) * 2020-05-28 2020-09-25 郑州市雷德水泥制品有限公司 Cement wire pole production casting mold

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11209967A (en) * 1998-01-22 1999-08-03 Shimizu Corp Joint structure of underground continuous wall
JP2003049489A (en) * 2001-08-07 2003-02-21 Kajima Corp Joint structure for steel plate concrete structure
CN102535519A (en) * 2012-03-20 2012-07-04 广州中煤江南基础工程公司 I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN204456070U (en) * 2014-12-24 2015-07-08 广州机施建设集团有限公司 Diaphragm wall shutoff stopping means
CN207159991U (en) * 2017-08-24 2018-03-30 中铁隧道勘测设计院有限公司 A kind of I-shaped steel joint for being welded with peg

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11209967A (en) * 1998-01-22 1999-08-03 Shimizu Corp Joint structure of underground continuous wall
JP2003049489A (en) * 2001-08-07 2003-02-21 Kajima Corp Joint structure for steel plate concrete structure
CN102535519A (en) * 2012-03-20 2012-07-04 广州中煤江南基础工程公司 I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN204456070U (en) * 2014-12-24 2015-07-08 广州机施建设集团有限公司 Diaphragm wall shutoff stopping means
CN207159991U (en) * 2017-08-24 2018-03-30 中铁隧道勘测设计院有限公司 A kind of I-shaped steel joint for being welded with peg

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736295A (en) * 2019-01-15 2019-05-10 中铁第四勘察设计院集团有限公司 A kind of building structure vertical supporting system and its construction method
CN109736295B (en) * 2019-01-15 2024-02-27 中铁第四勘察设计院集团有限公司 Vertical supporting system of building structure and construction method thereof
CN110055952A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector structure and its construction method
CN110055952B (en) * 2019-03-14 2024-06-14 宁波市轨道交通集团有限公司 Underground diaphragm wall joint structure and construction method thereof
CN111702921A (en) * 2020-05-28 2020-09-25 郑州市雷德水泥制品有限公司 Cement wire pole production casting mold

Also Published As

Publication number Publication date
CN107700473B (en) 2023-03-21

Similar Documents

Publication Publication Date Title
CN101736749B (en) Method for constructing soft soil foundation continuous caisson
CN107524174B (en) Continuous wall I-shaped steel joint with water swelling water stop strip
CN207159991U (en) A kind of I-shaped steel joint for being welded with peg
CN109653772B (en) Shallow buried pipe curtain supporting system and construction method thereof
CN107700473A (en) A kind of I-shaped steel joint for being welded with peg
CN112963167A (en) Z-shaped contact channel structure and construction method
CN103244143A (en) Underground engineering tunneling construction method and underground station
CN110593320A (en) Early sealing structure for outer wall post-cast strip and construction method thereof
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN213296693U (en) Stifled post-cast strip waterproof construction who dredges combination
CN207160083U (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN106759365B (en) A kind of counterfort wing wall waterproof curtain construction method of foundation pit enclosure wall
CN217107046U (en) Corrugated steel plate self-plugging structure for highway tunnel transverse passage
CN110700273A (en) In-situ protection method for side-by-side masonry pipe trench crossing foundation pit
KR101275468B1 (en) The structure assembly for building a tunnel and building method thereof
KR101835828B1 (en) Complex Steel Pipe Structure for Underground Wall and the Construction Method Using the Same
CN111058467B (en) Basement backwater surface waterproof drainage structure and construction method
CN218091363U (en) Water stop structure for joint of new and old concrete structures
CN117587856B (en) Seepage prevention method for joint position of underground diaphragm wall
KR101352429B1 (en) Water-proofing type temporary soil sheathing construction method using crrugated steel plate segments
CN118345872B (en) Assembled U-shaped groove structure and construction method
CN219509681U (en) Simple assembly type shield tunnel steel seal door emergency device
CN113279432B (en) Construction joint water stopping device and construction method
CN112922035B (en) Reverse construction method for contact channel structure of subway open cut section
CN115045299B (en) Deep foundation pit side wall reinforcing structure with electroosmosis drainage function and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190215

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Applicant before: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant