CN107694359A - A kind of preparation facilities and preparation method of hydrogen deuterium Standard Gases - Google Patents

A kind of preparation facilities and preparation method of hydrogen deuterium Standard Gases Download PDF

Info

Publication number
CN107694359A
CN107694359A CN201711006965.1A CN201711006965A CN107694359A CN 107694359 A CN107694359 A CN 107694359A CN 201711006965 A CN201711006965 A CN 201711006965A CN 107694359 A CN107694359 A CN 107694359A
Authority
CN
China
Prior art keywords
gas
hydrogen
deuterium
gas cylinder
preparation facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711006965.1A
Other languages
Chinese (zh)
Other versions
CN107694359B (en
Inventor
武超
任英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Atomic of Energy
Original Assignee
China Institute of Atomic of Energy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Atomic of Energy filed Critical China Institute of Atomic of Energy
Priority to CN201711006965.1A priority Critical patent/CN107694359B/en
Publication of CN107694359A publication Critical patent/CN107694359A/en
Application granted granted Critical
Publication of CN107694359B publication Critical patent/CN107694359B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F23/00Mixing according to the phases to be mixed, e.g. dispersing or emulsifying
    • B01F23/10Mixing gases with gases
    • B01F23/19Mixing systems, i.e. flow charts or diagrams; Arrangements, e.g. comprising controlling means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/20Measuring; Control or regulation
    • B01F35/21Measuring
    • B01F35/211Measuring of the operational parameters
    • B01F35/2113Pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/20Measuring; Control or regulation
    • B01F35/22Control or regulation
    • B01F35/221Control or regulation of operational parameters, e.g. level of material in the mixer, temperature or pressure
    • B01F35/2213Pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/20Measuring; Control or regulation
    • B01F35/22Control or regulation
    • B01F35/221Control or regulation of operational parameters, e.g. level of material in the mixer, temperature or pressure
    • B01F35/2217Volume of at least one component to be mixed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/20Measuring; Control or regulation
    • B01F35/22Control or regulation
    • B01F35/221Control or regulation of operational parameters, e.g. level of material in the mixer, temperature or pressure
    • B01F35/2218Weight of at least one component to be mixed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/80Forming a predetermined ratio of the substances to be mixed
    • B01F35/88Forming a predetermined ratio of the substances to be mixed by feeding the materials batchwise
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/80Forming a predetermined ratio of the substances to be mixed
    • B01F35/88Forming a predetermined ratio of the substances to be mixed by feeding the materials batchwise
    • B01F35/881Forming a predetermined ratio of the substances to be mixed by feeding the materials batchwise by weighing, e.g. with automatic discharge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/80Forming a predetermined ratio of the substances to be mixed
    • B01F35/88Forming a predetermined ratio of the substances to be mixed by feeding the materials batchwise
    • B01F35/882Forming a predetermined ratio of the substances to be mixed by feeding the materials batchwise using measuring chambers, e.g. volumetric pumps, for feeding the substances
    • B01F35/8821Forming a predetermined ratio of the substances to be mixed by feeding the materials batchwise using measuring chambers, e.g. volumetric pumps, for feeding the substances involving controlling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/0004Gaseous mixtures, e.g. polluted air
    • G01N33/0006Calibrating gas analysers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/30Driving arrangements; Transmissions; Couplings; Brakes
    • B01F2035/35Use of other general mechanical engineering elements in mixing devices
    • B01F2035/351Sealings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F2101/00Mixing characterised by the nature of the mixed materials or by the application field
    • B01F2101/23Mixing of laboratory samples e.g. in preparation of analysing or testing properties of materials

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating And Analyzing Materials By Characteristic Methods (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention belongs to calibrating gas preparing technical field, is related to a kind of preparation facilities and preparation method of hydrogen deuterium Standard Gases.Described preparation facilities include hydrogen feed gas cylinder, deuterium raw material gas cylinder, hydrogen delivery tube road, deuterium transfer pipeline, gas delivery main road, gas conveying bypass conduit, ordinarily manometer, high-precision pressure gauge, with gas cylinder, vacuum pump set, mass comparator, reference gas cylinder, valve.Utilize the preparation facilities and preparation method of the hydrogen deuterium Standard Gases of the present invention, can be when precision preparation requires high, gravimetric method is used when preparing low abundance hydrogen deuterium Standard Gases (D abundance is less than or equal to 1%), volumetric method is used during high abundance hydrogen deuterium Standard Gases (D abundance is more than 1%) in preparation;When precision preparation is less demanding, a kind of preparation of carry out hydrogen deuterium Standard Gases in optional gravimetric method or volumetric method.

Description

A kind of preparation facilities and preparation method of hydrogen deuterium Standard Gases
Technical field
The invention belongs to calibrating gas preparing technical field, is related to a kind of preparation facilities of hydrogen deuterium Standard Gases and preparation side Method.
Background technology
Hydrogen is the main raw material of industry, and important industrial gasses and special gas, and hydrogen isotope gas is in state Important role is played in anti-industry.In many projects, the accurate quantitative analysis technical process of analytical equipment need to be utilized each Hydrogen isotope abundance in stage sample, to be monitored to process, product abundance is measured.Obtain the same position of hydrogen The plain accurate isotope abundance value of gas, first have to carry out phase to analytical equipment using the hydrogen isotope reference sample of known composition Close calibration.
The hydrogen isotope calibrating gas of the existing related concentrations of foreign countries, but be not easy to buy, and it is domestic be difficult to obtain hydrogen at present it is same The plain calibrating gas in position, also no pertinent literature can consult.With reference to the preparation data of other Standard Gases, with reference to hydrogen isotope from Body feature, it is mainly weighing method and partial pressure method to prepare calibration with the more feasible method of hydrogen deuterium hybrid standard gas.
Weighing method prepares calibration gas mixture, is that unstrpped gas quantitatively is transferred into gaseous mixture gas cylinder from raw material gas cylinder to have come Into, unstrpped gas can be pure gas or main constituent, by weighing method prepare gaseous mixture.Gas component Addition be to fill front and rear gas bottle or raw material gas bottle match somebody with somebody by weighing to determine, the difference of weighing is equal to twice Addition.The uncertainty of weighing method is mainly derived from:(1) uncertainty of balance weighing value;(2) buoyancy effect introduces not Degree of certainty;(3) the introduced uncertainty of mass change caused by gas cylinder disassembly process;(4) caused by Multi-stage dilution not The accumulation of degree of certainty.Although weighing method compared with other methods is not the best way in production efficiency, it is with quality list Position is foundation, can be traceable to the measurement of fundamental quantity, reliable in precision, therefore is preparation gas mark generally acknowledged in the world The basic skills of quasi- material, the preparation of the reference gas of every country are substantially using weighing method.
Partial pressure method (also known as pressure method or pressure application) is a kind of static method, and can largely prepare standard with pressure with this method mixes Gas.Component A, B, C etc. and carrier gas be filled with successively one be assumed to constant volume closed vessel in, this container answer pre-wash and Evacuate (expansion for ignoring the container caused by internal pressure changes).Every time after inflation, container pressure is measured.Partial pressure method Physical basis are dalton (Dalton) laws, i.e., standard (mixing) gas each component partial pressure sum is equal to the stagnation pressure of calibrating gas Power, and the partial pressure of component is equal to the molar fraction of the component and the product of gross pressure.The uncertainty of partial pressure method is mainly derived from: (1) uncertainty of piezometry (pressure gauge value);(2) pressure ratio is converted into the uncertainty of molar concentration introducing;(3) press The uncertainty that contracting heat introduces.
The content of the invention
The present invention primary and foremost purpose be to provide a kind of preparation facilities of hydrogen deuterium Standard Gases, with can use the preparation facilities with When required precision processed is high, gravimetric method is used when preparing low abundance hydrogen deuterium Standard Gases (D abundance is less than or equal to 1%), in preparation High abundance hydrogen deuterium Standard Gases use volumetric method when (D abundance is more than 1%);When precision preparation is less demanding, optional gravimetric method or A kind of preparation of carry out hydrogen deuterium Standard Gases in volumetric method.
In order to achieve this, in the embodiment on basis, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, institute The preparation facilities stated includes hydrogen feed gas cylinder, deuterium raw material gas cylinder, hydrogen delivery tube road, deuterium transfer pipeline, gas Convey main line, gas conveying bypass conduit, ordinarily manometer, high-precision pressure gauge, with gas cylinder, vacuum pump set, mass ratio compared with Instrument, reference gas cylinder, valve,
The hydrogen feed gas and deuterium unstripped gas that described hydrogen feed gas cylinder and deuterium raw material gas cylinder provides respectively, Respectively behind described hydrogen delivery tube road and the conveying of deuterium transfer pipeline, it is defeated to share described gas delivery main road progress Send, the end on described gas delivery main road is connected with the described vacuum pump set for vacuumizing;
The gas delivery main road described in one end connection of gas conveying bypass conduit described in each bar, the other end connect respectively Described ordinarily manometer, high-precision pressure gauge, with gas cylinder, reference gas cylinder;
Described gas cylinder of matching somebody with somebody is used to prepare described hydrogen deuterium Standard Gases;
Described mass comparator is used to weigh the described weight with gas cylinder together with wherein gas;
Described reference gas cylinder is with described identical with gas cylinder specification, for the weighing results and ginseng according to mass comparator More described than the weight difference calculating of gas cylinder matches somebody with somebody the weight that gas is filled with gas cylinder;
It is other that described valve is arranged on described hydrogen delivery tube road, deuterium transfer pipeline, the gas conveying described in each bar Road pipeline, and described gas delivery main road connect the pipeline before and after the gas conveying bypass conduit described in each bar On.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described The relative error of high-precision pressure gauge measurement is less than 0.1%.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described High-precision pressure gauge has two pieces, is connected in different described gas conveying bypass conduits.
In a kind of more preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein two The range of high-precision pressure gauge described in block is respectively 0-1000Torr and 0-100Torr.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described Material with gas cylinder and described reference gas cylinder is aluminum alloy materials, and pressure-resistant is 25Mpa.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described The range of mass comparator is 5200g, precision 0.2mg.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described Preparation facilities also includes isotope mass spectrometer, for being quantified to the hydrogen deuterium Standard Gases prepared;Gas described in one is defeated Bypass conduit is sent to connect described isotope mass spectrometer in end by described valve.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described Preparation facilities also includes leak test plant, for determine in described preparation facilities each pipeline, part whether gas leakage, so as to ensure The gas tightness for the preparation facilities stated is good.
In a preferred embodiment, the present invention provides a kind of preparation facilities of hydrogen deuterium Standard Gases, wherein described The range of pressure gauge is 0-25MPa.
Second object of the present invention is to provide the method that the preparation facilities of foregoing hydrogen deuterium Standard Gases prepares hydrogen deuterium Standard Gases, So that weight can be used when preparing low abundance hydrogen deuterium Standard Gases (D abundance is less than or equal to 1%) when precision preparation requires high Method, volumetric method is used during high abundance hydrogen deuterium Standard Gases (D abundance is more than 1%) in preparation;When precision preparation is less demanding, The preparation of optional gravimetric method or a kind of carry out hydrogen deuterium Standard Gases in volumetric method.
In order to achieve this, in the embodiment on basis, the present invention provides the preparation facilities system of foregoing hydrogen deuterium Standard Gases The method of standby hydrogen deuterium Standard Gases, comprises the following steps:
1) to hydrogen delivery tube road, deuterium transfer pipeline, gas delivery main road and/or each before being filled with or conveying gas Gas conveying bypass conduit carries out vacuumize process with described vacuum pump set respectively;
2) hydrogen and deuterium are filled with sequentially adjustable in gas cylinder to described, according in the hydrogen deuterium Standard Gases of required preparation The required proportioning of hydrogen and deuterium, control are filled with the described difference weighed with gas cylinder and/or described height before and after every kind of gas Precision pressure table measures the difference of pressure.
In a preferred embodiment, the preparation facilities of the foregoing hydrogen deuterium Standard Gases of present invention offer prepares hydrogen deuterium standard The method of gas, wherein also hunted leak to described preparation facilities before the step 1), cleaned to described with gas cylinder and height Pure hydrogen Passivation Treatment.
In a kind of more preferred embodiment, the preparation facilities that the present invention provides foregoing hydrogen deuterium Standard Gases prepares hydrogen deuterium The method of Standard Gases, wherein the time of described high-purity hydrogen Passivation Treatment is 48 hours.
In a preferred embodiment, the preparation facilities of the foregoing hydrogen deuterium Standard Gases of present invention offer prepares hydrogen deuterium standard The method of gas, wherein before step 2) is filled with gas, match somebody with somebody gas cylinder described at least 6 times dismounting, mass comparator is weighed, so as to most The uncertainty that may be introduced with gas cylinder disassembly process described in the reduction of limits.
The beneficial effects of the present invention are, can using the preparation facilities and preparation method of the hydrogen deuterium Standard Gases of the present invention When precision preparation requires high, gravimetric method is used when preparing low abundance hydrogen deuterium Standard Gases (D abundance is less than or equal to 1%), with In system volumetric method is used during high abundance hydrogen deuterium Standard Gases (D abundance is more than 1%);When precision preparation is less demanding, optional weight A kind of preparation of carry out hydrogen deuterium Standard Gases in method or volumetric method.Best hydrogen deuterium mark can be so obtained in the range of full abundance Quasi- gas prepares product without changing air distributing device, and can also choose any one kind of them air distributing method system when requirement is not high Gas.
The preparation facilities of the hydrogen deuterium Standard Gases of the present invention can prepare hydrogen deuterium Standard Gases with weighing method and partial pressure method simultaneously, and Simple in construction, operation is easy, and prepared hydrogen deuterium Standard Gases error is less than 1%, is less than 1% with respect to expanded uncertainty, meets Demand for analytical equipment calibration.The present invention compensate for the blank of hydrogen isotope Standard Gases preparation field.
Brief description of the drawings
Fig. 1 is the composition figure of the preparation facilities of exemplary hydrogen deuterium Standard Gases of the invention.
Embodiment
The embodiment of the present invention is further illustrated below in conjunction with accompanying drawing.
The preparation facilities of exemplary hydrogen deuterium Standard Gases of the invention is as shown in figure 1, including hydrogen feed gas cylinder 1, deuterium Gas raw material gas cylinder 2, the steel cylinder of standby raw material gas 3, pressure gauge 4 (range 0-25MPa), (the range 0- of high-grade pressure gauge 5 1000Torr, measurement relative error be less than 0.1%), high-grade pressure gauge 6 (range 0-100Torr, measurement relative error be less than 0.1%), isotope mass spectrometer 7, (also serve as standby with gas cylinder 8 (material is aluminum alloy materials, and pressure-resistant is 25Mpa), reference gas cylinder 9 With with gas cylinder, material is aluminum alloy materials, and pressure-resistant is 25Mpa), vacuum pump set 10, hydrogen delivery tube road 11, deuterium transfer pipeline 12nd, standby raw material letter shoot road 13, gas delivery main road 14, gas conveying bypass conduit 15, (range is mass comparator Be not drawn into 5200g, precision 0.2mg, Fig. 1), leak test plant, the valve V1-V11 (for VCR joints valve) on each pipeline, Valve V12 is carried with gas cylinder, reference gas cylinder carries valve V13.
Hydrogen feed gas that hydrogen feed gas cylinder 1, deuterium raw material gas cylinder 2, the steel cylinder of standby raw material gas 3 provide respectively, Deuterium unstripped gas and standby raw material gas, it is defeated through described hydrogen delivery tube road 11, deuterium transfer pipeline 12, standby raw material gas respectively After sending pipeline 13 to convey, common gas conveying main line 14 is conveyed.The end on gas delivery main road 14, which is connected with, to be used for The vacuum pump set 10 vacuumized.
Each bar gas conveying bypass conduit 15 one end connection gas delivery main road 13, the other end connects usual pressure respectively Table 4, high-precision pressure gauge 5, high-precision pressure gauge 6, isotope mass spectrometer 7 (are used to determine the hydrogen deuterium Standard Gases prepared Amount), with gas cylinder 8, reference gas cylinder 9.
It is used to match somebody with somebody hydrogen manufacturing deuterium Standard Gases with gas cylinder 8.
Mass comparator is used to weigh the weight with gas cylinder 8 together with wherein gas.
Reference gas cylinder 9 is identical with the specification of gas cylinder 8, for the weighing results according to mass comparator and reference gas cylinder 9 Weight difference calculates the weight matched somebody with somebody and gas is filled with gas cylinder 8.
Leak test plant be used to determine in described preparation facilities each pipeline, part whether gas leakage, so as to ensure preparation facilities Gas tightness it is good.
Valve V1 is arranged on hydrogen delivery tube road 11;Valve V2 is arranged on deuterium transfer pipeline 12;Valve V3 is set On standby raw material letter shoot road 13;Valve V4, V11 are separately positioned on the front-end and back-end on gas delivery main road 14;Valve Door V5-V10 is separately positioned on connection pressure gauge 4, high-precision pressure gauge 5, high-precision pressure gauge 6, isotope mass spectrometer 7, distribution Bottle 8, the gas of reference gas cylinder 9 are conveyed in bypass conduit 15.
Exemplary hydrogen deuterium Standard Gases system is carried out using the preparation facilities of the hydrogen deuterium Standard Gases of the invention of above-mentioned example Standby method is as follows.
(1) gravimetric method
This method application top load mass comparator weighs the hydrogen that is fitted into aluminium alloy gas cylinder and deuterium, according to hydrogen with The mass ratio of deuterium, calculate the concentration of gas cylinder Plays gas.This method compared with other method is not most in production efficiency Good method, but it is using mass unit as foundation, it is reliable in precision, therefore, it is considered to be prepare the master of reference gas Method is wanted, the preparation of the reference gas of every country uses gravimetric method substantially.
1. being hunted leak using leak test plant to whole device, leak rate is less than 10-11atm·ml/s。
2. determine deuterium concentration and final charge pressure.
3. a pair reference gas cylinder 9 pre-processes, dirt is removed with wipes of alcohol gas washing bottle surface, gas cylinder valve V13 is opened, allows Gas cylinder internal and atmospheric equilibrium 24 hours, tighten valve V13.
4. pair being pre-processed with gas cylinder 8, dirt is removed with wipes of alcohol gas washing bottle surface, is put into heating under reduced pressure in baking oven, Steam is removed after cooling.
5. gas cylinder 8 is matched somebody with somebody in installation, gas cylinder is soaked 48 hours with high-purity hydrogen to be passivated gas cylinder.
6. opening V9, V11, V12,10 will be evacuated to gas cylinder 8-5Pa;V9, V11, V12 are closed, pulls down with gas cylinder 8, uses Mass comparator is weighed, the m of poor quality of record and reference gas cylinder 90
7. reinstalling with gas cylinder 8, V4, V5, V9, V11 are opened, distribution pipeline is evacuated to 10-5Continue to take out very after Pa It is empty 30 minutes.
8. turning off V11, V12 is opened, slowly opens V2, the pointer position of pressure gauge 4 is observed, is closed after reaching both constant-pressures V2, V9, V12, pull down with gas cylinder 8, weighed with mass comparator, record now matches somebody with somebody the m of poor quality of gas cylinder 8 and reference gas cylinder 91, m1-m0It is the filling quality of deuterium.
9. reinstalling with gas cylinder 8, V4, V5, V9, V11 are opened, distribution pipeline is evacuated to 10-5Continue to take out very after Pa It is empty 4 hours.
10. turning off V11, V1 is slowly opened, observes the pointer position of pressure gauge 4, ensures that now loine pressure is more than and matches somebody with somebody gas cylinder 8 The charge pressure of middle deuterium, V12 is opened, V1, V9, V12 is closed after reaching both constant-pressures, pulls down gas cylinder 8, claimed with mass comparator Weight, record now match somebody with somebody the m of poor quality of gas cylinder 8 and reference gas cylinder 92, m2-m1It is the filling quality of hydrogen.
11. mix balance 2 days.
12. using the concentration of deuterium in the Mass Calculation institute gas distribution for filling hydrogen and deuterium of record, to whole distribution The uncertainty of process is calculated, and is strictly controlling preparation process, on the premise of avoiding the surface of gas cylinder from staiing and collide, mainly Consider the uncertainty of deuterium unstripped gas purity and the uncertainty that mass comparator weighs.
13. being compared Par value to the hydrogen deuterium Standard Gases of preparation with the isotope mass spectrometer 7 calibrated, and carry out stabilization The checking of property and uniformity.
14. if matched somebody with somebody deuterium concentration is relatively low, need to be prepared using Multi-stage dilution method, the intermediate concentration that will now prepare Hydrogen deuterium Standard Gases as unstripped gas, contained with reference gas cylinder 9 and final match somebody with somebody hydrogen deuterium Standard Gases, preparation method and step 1- 13 is identical.
By way of improving charge pressure and being prepared using Multi-stage dilution, full abundance scope is prepared using above-mentioned gravimetric method The preparation error of hydrogen deuterium Standard Gases is less than 0.5%, and with respect to expanded uncertainty, (related definition and computational methods are shown in GB/T 5274- 2008 " gas analysis calibration prepares weighing method with mixed gas ") it is less than 0.5% (Coverage factor k=2).
(2) volumetric method
It is to be filled with the deuterium of concentration known and hydrogen successively to be assumed to constant volume that volumetric method, which prepares hydrogen deuterium Standard Gases, In closed container, this container answers pre-wash and evacuates and (ignore the container caused by internal pressure increase to expand), every time After inflation, container inner pressure is measured, standard gas concentration is represented with pressure ratio, and it is equal to the partial pressure for being filled with the component and matches somebody with somebody standard The ratio between gas gross pressure.Specific implementation step is as follows:
1. being hunted leak using leak test plant to whole device, leak rate is less than 10-11atm·ml/s。
2. determine deuterium concentration and final charge pressure.
3. pair being pre-processed with gas cylinder 8, dirt is removed with wipes of alcohol gas washing bottle surface, is put into heating under reduced pressure in baking oven, Steam is removed after cooling;
4. gas cylinder 8 match somebody with somebody in installation, with high-purity hydrogen immersion gas cylinder and air distributing device 48 hours to be passivated gas cylinder.
5. opening V4, V6, V9, V11, V12, pipeline and gas bottle to be matched somebody with somebody are evacuated simultaneously with vacuum pump set 10, is evacuated to 10- 5Pa, V11 is closed, whether the observation registration of high-grade pressure gauge 5 is stablized, if registration is unstable, continues to vacuumize until stabilizing to Only, the registration P of pressure gauge 5 is recorded0, close V11.
6. slowly opening V2, the registration of high-grade pressure gauge 5 is observed, after reaching predetermined pressure, V2 is closed, treats that registration is steady It is fixed, record pressure value P shown in pressure gauge 51, P1-P0It is then the charge pressure of deuterium.Close V12.
7. opening hydrogen pressure-reducing valve, decompression valve outlet pressure is set to be much larger than P1(two magnitudes), slowly opens V1, and observation is high The registration of precision pressure meter 5, after reaching predetermined pressure, V1 is closed, treat that registration is stable, record pressure value P shown in pressure gauge 52, P2- P1It is then the charge pressure of hydrogen.
8. mix balance 2 days.
9. using the concentration of deuterium in the pressure value calculating institute gas distribution for filling hydrogen and deuterium of record, to whole distribution The uncertainty of process is calculated, in strictly control preparation process, the main uncertainty for considering deuterium unstripped gas purity and The uncertainty of pressure gauge reading.
10. being compared Par value to the hydrogen deuterium Standard Gases of preparation with the isotope mass spectrometer 7 calibrated, and carry out stabilization The checking of property and uniformity.
11. if matched somebody with somebody deuterium concentration is relatively low, need to be prepared using Multi-stage dilution method, the intermediate concentration that will now prepare Hydrogen deuterium Standard Gases as unstripped gas, contained with reference gas cylinder 9 and final match somebody with somebody hydrogen deuterium Standard Gases, preparation method and step 1- 10 is identical.
By using the mode of Multi-stage dilution, preparing low abundance hydrogen deuterium Standard Gases using above-mentioned volumetric method, (D abundance is less than Equal to 1%) when, prepare error be less than 1%, be less than 0.5% (k=2) with respect to expanded uncertainty;High abundance hydrogen deuterium mark in preparation During quasi- gas (D abundance is more than 1%), prepare error and be less than 0.5%, be less than 0.2% (k=2) with respect to expanded uncertainty.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if belonging to the model of the claims in the present invention and its equivalent technology to these modifications and variations of the present invention Within enclosing, then the present invention is also intended to comprising including these changes and modification.Above-described embodiment or embodiment are simply to the present invention For example, the present invention can also be implemented with other ad hoc fashions or other particular forms, without departing from the present invention's Main idea or substantive characteristics.Therefore, it is regarded as from the point of view of the embodiment of description is in terms of any illustrative and non-limiting.This The scope of invention should be illustrated that any change equivalent with the intention of claim and scope should also include by appended claims Within the scope of the invention.

Claims (10)

  1. A kind of 1. preparation facilities of hydrogen deuterium Standard Gases, it is characterised in that:Described preparation facilities includes hydrogen feed gas cylinder, deuterium Gas raw material gas cylinder, hydrogen delivery tube road, deuterium transfer pipeline, gas delivery main road, gas conveying bypass conduit, common pressure Power table, high-precision pressure gauge, with gas cylinder, vacuum pump set, mass comparator, reference gas cylinder, valve,
    The hydrogen feed gas and deuterium unstripped gas that described hydrogen feed gas cylinder and deuterium raw material gas cylinder provides respectively, respectively Behind described hydrogen delivery tube road and the conveying of deuterium transfer pipeline, share described gas delivery main road and conveyed, institute The end on the gas delivery main road stated is connected with the described vacuum pump set for vacuumizing;
    The gas delivery main road described in one end connection of gas conveying bypass conduit described in each bar, the other end connects described respectively Ordinarily manometer, high-precision pressure gauge, with gas cylinder, reference gas cylinder;
    Described gas cylinder of matching somebody with somebody is used to prepare described hydrogen deuterium Standard Gases;
    Described mass comparator is used to weigh the described weight with gas cylinder together with wherein gas;
    Described reference gas cylinder is with described identical with gas cylinder specification, for the weighing results and reference gas according to mass comparator Match somebody with somebody the weight that gas is filled with gas cylinder described in the weight difference calculating of bottle;
    Described valve is arranged on described hydrogen delivery tube road, deuterium transfer pipeline, the gas conveying shunt valve described in each bar Road, and described gas delivery main road are connected on the pipeline before and after the gas conveying bypass conduit described in each bar.
  2. 2. preparation facilities according to claim 1, it is characterised in that:The relative error of described high-precision pressure gauge measurement Less than 0.1%.
  3. 3. preparation facilities according to claim 1, it is characterised in that:Described high-precision pressure gauge has two pieces, connects respectively It is connected in different described gas conveying bypass conduits.
  4. 4. preparation facilities according to claim 3, it is characterised in that:The range difference of high-precision pressure gauge described in two pieces For 0-1000Torr and 0-100Torr.
  5. 5. preparation facilities according to claim 1, it is characterised in that:The described material with gas cylinder and described reference gas cylinder Matter is aluminum alloy materials, and pressure-resistant is 25Mpa.
  6. 6. preparation facilities according to claim 1, it is characterised in that:The range of described mass comparator is 5200g, essence Spend for 0.2mg.
  7. 7. preparation facilities according to claim 1, it is characterised in that:Described preparation facilities also includes isotope mass spectrometry Instrument, for being quantified to the hydrogen deuterium Standard Gases prepared;Gas conveying bypass conduit described in one passes through described valve The described isotope mass spectrometer of connection in end.
  8. 8. preparation facilities according to claim 1, it is characterised in that:Described preparation facilities also includes leak test plant, uses In it is determined that in described preparation facilities each pipeline, part whether gas leakage, so as to ensure the gas tightness of described preparation facilities Well.
  9. 9. the method that the preparation facilities in a kind of 1-8 using claim described in any one prepares hydrogen deuterium Standard Gases, including such as Lower step:
    1) to hydrogen delivery tube road, deuterium transfer pipeline, gas delivery main road and/or each gas before being filled with or conveying gas Conveying bypass conduit carries out vacuumize process with described vacuum pump set respectively;
    2) hydrogen and deuterium are filled with sequentially adjustable in gas cylinder to described, according to hydrogen in the hydrogen deuterium Standard Gases of required preparation With the required proportioning of deuterium, control is filled with the described difference weighed with gas cylinder and/or described high accuracy before and after every kind of gas The difference of pressure gauges measure pressure.
  10. 10. according to the method for claim 9, it is characterised in that:Also described preparation facilities is examined before step 1) Leakage, cleaned to described with gas cylinder and high-purity hydrogen Passivation Treatment.
CN201711006965.1A 2017-10-25 2017-10-25 Preparation device and preparation method of hydrogen deuterium standard gas Active CN107694359B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711006965.1A CN107694359B (en) 2017-10-25 2017-10-25 Preparation device and preparation method of hydrogen deuterium standard gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711006965.1A CN107694359B (en) 2017-10-25 2017-10-25 Preparation device and preparation method of hydrogen deuterium standard gas

Publications (2)

Publication Number Publication Date
CN107694359A true CN107694359A (en) 2018-02-16
CN107694359B CN107694359B (en) 2024-07-23

Family

ID=61182300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711006965.1A Active CN107694359B (en) 2017-10-25 2017-10-25 Preparation device and preparation method of hydrogen deuterium standard gas

Country Status (1)

Country Link
CN (1) CN107694359B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108554207A (en) * 2018-06-15 2018-09-21 上海雷密传感技术有限公司 A kind of low concentration calibrating gas continues generating means and its method for generation
CN111017878A (en) * 2019-12-18 2020-04-17 中国原子能科学研究院 For preparing equilibrium state H2-HD-D2Apparatus and method for standard gas
CN111744423A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Preparation device and preparation method of standard mixed gas
CN113694820A (en) * 2021-09-08 2021-11-26 中国工程物理研究院材料研究所 Integrated device and method for rapidly preparing and detecting hydrogen isotope gas
CN115212738A (en) * 2022-06-29 2022-10-21 广西电网有限责任公司电力科学研究院 Multistage gas distribution device based on Dalton voltage division method
CN118032456A (en) * 2024-02-23 2024-05-14 中国计量科学研究院 Gas distribution system and method for greenhouse gas carbon dioxide isotope standard substance

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5147612A (en) * 1989-10-09 1992-09-15 Raal Johan D Apparatus for preparation of standard gas mixtures
CN203737125U (en) * 2014-02-19 2014-07-30 昆明鹏翼达气体产品有限公司 Portable standard gas configuration device
CN203829931U (en) * 2014-02-19 2014-09-17 昆明鹏翼达气体产品有限公司 Standard gas preparation device
CN204429223U (en) * 2014-12-17 2015-07-01 大连光明特种气体有限公司 High-precision standard gas distribution equipment
CN104888635A (en) * 2015-06-11 2015-09-09 中国船舶重工集团公司第七一八研究所 Device and method for compounding multiple cylinders of mixed gas
CN205627677U (en) * 2016-05-25 2016-10-12 成都赛普生科技有限公司 Continuous and steady distributing device of tolerance
CN207385222U (en) * 2017-10-25 2018-05-22 中国原子能科学研究院 A kind of preparation facilities of hydrogen deuterium Standard Gases

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5147612A (en) * 1989-10-09 1992-09-15 Raal Johan D Apparatus for preparation of standard gas mixtures
CN203737125U (en) * 2014-02-19 2014-07-30 昆明鹏翼达气体产品有限公司 Portable standard gas configuration device
CN203829931U (en) * 2014-02-19 2014-09-17 昆明鹏翼达气体产品有限公司 Standard gas preparation device
CN204429223U (en) * 2014-12-17 2015-07-01 大连光明特种气体有限公司 High-precision standard gas distribution equipment
CN104888635A (en) * 2015-06-11 2015-09-09 中国船舶重工集团公司第七一八研究所 Device and method for compounding multiple cylinders of mixed gas
CN205627677U (en) * 2016-05-25 2016-10-12 成都赛普生科技有限公司 Continuous and steady distributing device of tolerance
CN207385222U (en) * 2017-10-25 2018-05-22 中国原子能科学研究院 A kind of preparation facilities of hydrogen deuterium Standard Gases

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108554207A (en) * 2018-06-15 2018-09-21 上海雷密传感技术有限公司 A kind of low concentration calibrating gas continues generating means and its method for generation
CN108554207B (en) * 2018-06-15 2023-12-12 上海雷密传感技术有限公司 Low-concentration standard gas continuous generation device and generation method thereof
CN111744423A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Preparation device and preparation method of standard mixed gas
CN111017878A (en) * 2019-12-18 2020-04-17 中国原子能科学研究院 For preparing equilibrium state H2-HD-D2Apparatus and method for standard gas
CN111017878B (en) * 2019-12-18 2021-12-17 中国原子能科学研究院 For preparing equilibrium state H2-HD-D2Apparatus and method for standard gas
CN113694820A (en) * 2021-09-08 2021-11-26 中国工程物理研究院材料研究所 Integrated device and method for rapidly preparing and detecting hydrogen isotope gas
CN113694820B (en) * 2021-09-08 2023-04-07 中国工程物理研究院材料研究所 Integrated device and method for rapidly preparing and detecting hydrogen isotope gas
CN115212738A (en) * 2022-06-29 2022-10-21 广西电网有限责任公司电力科学研究院 Multistage gas distribution device based on Dalton voltage division method
CN118032456A (en) * 2024-02-23 2024-05-14 中国计量科学研究院 Gas distribution system and method for greenhouse gas carbon dioxide isotope standard substance

Also Published As

Publication number Publication date
CN107694359B (en) 2024-07-23

Similar Documents

Publication Publication Date Title
CN107694359A (en) A kind of preparation facilities and preparation method of hydrogen deuterium Standard Gases
CN104888635B (en) Device and method for compounding multiple cylinders of mixed gas
CN204816244U (en) Weigh device of many bottles of standard gas mixtures of cofabrication on line
Valkiers et al. Preparation of argon primary measurement standards for the calibration of ion current ratios measured in argon
CN106501425B (en) A kind of transformer online gc verification preparation method of standard oil
CN207385222U (en) A kind of preparation facilities of hydrogen deuterium Standard Gases
CN104180861A (en) Standard device and measuring method using mass method for detecting high-pressure gas filling flow
US8636040B2 (en) Installation for packaging NO using mass flow meters
CN113866373B (en) Method for measuring methane henry constant in water and measuring cavity
CN203139972U (en) Standard mixed gas preparation apparatus
CN109781896B (en) Standard series and gas sample analysis method based on internal standard method
CN109745880B (en) Trace gas transfer device and method
CN111595408B (en) Equipment for measuring liquid level in constant-temperature closed container, film coating device and method for measuring liquid level
WO2018193444A1 (en) Combined volumetric - gravimetric system and method for preparation of gas mixtures
Picard et al. Mass comparisons using air buoyancy artefacts
Russe et al. Synthetic isotope mixtures for the calibration of isotope amount ratio measurements of carbon
CN208566179U (en) More bottles of charging devices of Standard Gases
CN111006926A (en) Nitrogen dioxide gas standard substance in carbon dioxide and preparation method and application thereof
CN105757448A (en) Accurate gas sub-packaging device
CN105954462B (en) Solid moisture standards material and preparation method thereof
RU2446005C1 (en) Method for preparation of multi-component gas mixes
CN112697632B (en) Coal rock and shale bulk sample weight method isothermal adsorption measurement device and method
CN112129799B (en) Ppm-level dimethyl ether standard mixed gas configuration device and method
JP2003065495A (en) Mixed gas charging method and device
RU2522629C1 (en) Method of preparing multicomponent gas mixtures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant