CN107688910A - A kind of rotary drilling rig construction management platform - Google Patents

A kind of rotary drilling rig construction management platform Download PDF

Info

Publication number
CN107688910A
CN107688910A CN201710800771.2A CN201710800771A CN107688910A CN 107688910 A CN107688910 A CN 107688910A CN 201710800771 A CN201710800771 A CN 201710800771A CN 107688910 A CN107688910 A CN 107688910A
Authority
CN
China
Prior art keywords
boss
rotary drilling
drilling rig
module
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710800771.2A
Other languages
Chinese (zh)
Inventor
殷伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710800771.2A priority Critical patent/CN107688910A/en
Publication of CN107688910A publication Critical patent/CN107688910A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Technology Law (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of rotary drilling rig construction management platform, the management platform includes database, cloud platform, boss's module, rotary drilling rig module, projects module, site manager's module, level display is layered between boss's module, rotary drilling rig module, projects module, site manager's module, boss's module, rotary drilling rig module, projects module, the corresponding relation of site manager's module are relations one-to-many from top to bottom.With advantages below:Overcome traditional phone, short message, written document report not in time, it is artificial not statistical uncertainty true the defects of, mobile interchange platform implementation information management is relied on to provide platform for rotary drilling rig unit in charge of construction, administrative staff stay indoors, you can check the construction information of equipment in each building site at any time.

Description

A kind of rotary drilling rig construction management platform
Technical field
The present invention relates to a kind of rotary drilling rig construction management platform, specifically, be related to a kind of pile foundation construction unit/ People carries out pile foundation construction information management platform using rotary drilling rig equipment, belongs to the equipment construction management based on internet platform Field.
Background technology
Rotary drilling rig came out in Calvi Er Te companies of the U.S. first before World War II, was sent out after World War II in Europe Exhibition.Have benefited from the drive of 2003 Tibetan railway engineerings and Beijing Olympic engineering etc., rotary drilling rig constructs to obtain the country extensively Accreditation, market popularity improve rapidly, and market capacity drastically expands, and are estimated according to professional person in the industry, by the end of 2016, China The rotary drilling rig recoverable amount of the various models in market reaches 10000.
Rotary drilling rig equipment is so that the features such as its efficiency high, pollution small, wide adaptability is widely used in high ferro construction, high level is built Build the filling pile construction fields such as foundation construction, urban track traffic, Very Large Bridge construction.
At present, rotary drilling rig unit in charge of construction/individual is in three problems below generally existing during construction management:
1st, more rotary drilling rig equipment are constructed simultaneously in different building sites, and each project site is apart from each other, unit in charge of construction custodian Member has to hurry back and forth back and forth in multiple building sites, and management is deficient in energy, and the efficiency of management is not high;
2nd, in rotary drilling rig work progress, outside division operation machine hand, it is also necessary to backman, the perfusion equipment such as work and excavator, crane Auxiliary construction, construction cost composition is complicated, and expense lacks system administration, and construction cost is difficult to be effectively controlled, influences to construct Unit income;
3rd, rotary drilling rig equipment purchasing price is higher, there is a situation where to provide funds jointly, runs a business in partnership, and part investment shareholder can not The very first time understands actual business circumstance, information asymmetry between partner, so as to which the overall operation to unit in charge of construction produces not Profit influences.
The content of the invention
The problem to be solved in the present invention is the deficiency for more than, there is provided a kind of rotary drilling rig construction management platform, is overcome Traditional phone, short message, written document report not in time, it is artificial not statistical uncertainty true the defects of, be rotary drilling rig unit in charge of construction according to Support mobile interchange platform implementation information management provides platform, and administrative staff stay indoors, you can check each building site at any time The construction information of middle equipment, site operation personal information, networking are realized, site operation can be believed anywhere or anytime Breath, cost information are reported, and can accurately be calculated the progress of construction information and the statistics of cost information, be substantially increased work Make efficiency.
In order to solve the above problems, the present invention uses following technical scheme,
A kind of rotary drilling rig construction management platform, the management platform include database, cloud platform, boss's module, rotary drilling rig Module, projects module, site manager's module, wherein, boss's module, rotary drilling rig module, projects module, site manager's module it Between be layered level display, boss's module, rotary drilling rig module, projects module, the corresponding relation of site manager's module are from top to bottom One-to-many relation;
The relation of boss's module and site manager's module is to be mutually related, and site manager's module reports all original interior Appearance is visible for boss's module, and system can carry out statistical summaries according to the data of site manager's module typing and form statistics Form.
Further, it is exactly a company corresponding to each boss's account in boss's module, each boss's account is More rotary drilling rigs can be possessed, boss can carry out selection to these rotary drilling rigs in main interface and check, boss can be with When grasp the status information of rotary drilling rig construction management platform, boss can record the insurance purchaser record of every rotary drilling rig, All project information of all rotary drilling rigs and cost information can be checked, can be given notice with site operation team and public Accuse;
All rotary drilling rigs under in store the said firm are recorded in the rotary drilling rig module, record rotary drilling rig construction pipe Date and insurance purchaser record are opened/bought in reason service.It can intuitively inquire about that rotary drilling rig is all to have constructed and The project of construction;
The projects module is the module of rotary drilling rig subordinate, many individual projects under every rotary drilling rig be present, including constructed Into the project of, hot work in progress, it is opening state that can only have a project under the same time, under every rotary drilling rig;
Each site manager can only correspond to a project in site manager's module, and construction information can be carried out whenever and wherever possible Report, can all cost informations of record entry whenever and wherever possible, the workload of all constructions can be recorded, site manager also may be used To check that he announces all notices of place proprietor of an establishment's issue.
Further, boss's module includes rotary drilling rig informational function, where rotary drilling rig presentation of information boss The rotary drilling rig possessed under company, boss open rotary drilling rig information after logging in;
Rotary drilling rig has newly-increased rotary drilling rig function, and boss can increase rotary drilling rig newly by newly-increased rotary drilling rig function, newly The state for increasing rotary drilling rig is necessarily off the project of state, and boss can not be opened, and increasing rotary drilling rig newly needs by flat It can just be opened after the back-stage management personnel examination & approval of platform;
There are three buttons to be respectively in rotary drilling rig list:Startup/stopping/management, startup are that boss can be to rotary drilling rig State, which is controlled, can start rotary drilling rig, start it should be noted that his that every rotary drilling rig has, often opening time Platform rotary drilling rig needed to be applied to the back-stage management personnel of platform, and every rotary drilling rig can be automatically stopped after expiring, and be arrived Boss is can not to open rotary drilling rig after phase stops, and system can prompt boss to be applied;Boss clicks on stopping rotary drilling rig can It is dead status by rotary drilling rig status modifier;Boss, which clicks on management button, can jump to insurance information and project information.
Further, boss's module also includes construction information function, and what is recorded under construction information is under boss's account The construction information of all items, there are two buttons in construction information list, be respectively:Progress and construction are detailed.
The progress is to be counted the construction information of project, and is changed into figure displaying progress, has three in progress Individual icon, respectively construction speed icon, time schedule icon, daily construction volume icon, construction speed are shown currently Construction speed and percentage construction speed figure caused by the contrast of project whole project;The content that time schedule icon is shown is regulation Deadline and the more caused percent time progress chart of current date;The content that daily construction volume icon is shown passes through for scene Manage the construction information reported daily to carry out collecting caused column diagram, column diagram can select the number of days of display, can show near Normal construction Information Statistics in seven days and it is nearly 30 days in it is normal when work Information Statistics;
Four modules be present in the construction is detailed, be normal construction respectively, stop work delay work, engineering metering, stake footpath information, normally The content of display is all normal construction information that site manager reports under the project in construction, shows each stage class here The work total amount of type;Stop work delay work display content for site manager report because certain reason stop work information;Engineering department The content of metering display is the workload that all engineering departments that site manager reports have measured, for carrying out core to engineering funds Calculate;Stake footpath informational function is that boss adds stake footpath dictionary, and for being selected during site manager's typing construction data, site manager selects stake Can be standard and computational costs that boss reports selection to site manager according to the price and workload programming count in stake footpath behind footpath Standard, boss can add new stake footpath standard in the stake footpath page.
Further, boss's module also includes cost information function, and cost information can check institute under boss company There is the expense branch artificial situation of project and record all engineering funds settled accounts, there is " account " button, point in cost information list It is detailed to hit all expenses that can be checked under cost information, three modules in account information be present:Expense expenditure, prepaid expenses, Engineering funds is settled accounts.
Further, the display content of the expense expenditure is all expenses that site manager records under all click projects Expenditure and payment situation, boss can pay the fees to the outstanding expense of site manager, and boss can also oneself addition expense Record is paid the fees, and for the demand of information privacy, still site manager is to see not to the expense record that boss can see all To the expense record of boss's addition;
The function of the prepaid expenses is that boss records all operating expenses in advance to site manager, and account information can be checked The surplus of all prepaid expenses, boss can accumulate in the surplus of prepaid expenses automatically after increasing prepaid expenses newly every time, scene warp It can automatically subtract after being paid the bill in reason expense expenditure and Payment Amount, the remaining gold of the advance payment that can be checked at any time in site manager's hand Volume;
The function of the engineering funds clearing is to record all engineering funds settled accounts, and can show in the top of account information and not tie The engineering funds of calculation, the source of engineering funds are the accumulative of engineering department's metering that site manager reports, and it is then new that boss receives engineering funds Increase engineering funds clearing.
Further, boss's module also includes statistical report form function, and statistical report form function is by all expenses of project Statistical summaries one chart of formation is carried out with information to be shown, and allows boss more intuitively to see the percent information of expense, Here it is the list of all items, display content is project name, project status, the project output value and clearing, pays in advance, deals with, Pay four buttons;
The clearing ratio that clearing display content is engineering funds is clicked on, is not settle accounts and settled accounts ratio figure respectively, can check Word form;Button is paid in click, which in advance, can check the surplus of project prepaid expenses and paid ratio figure, and the top shows all Prepaid expenses, word form can also be checked;Button is dealt with click can check all lists added of project, pass through expense Shown with type, can intuitively see very much the arrearage ratio shared by each type, show all total amounts dealt with, Word form can be checked;Click on paid can check and all add list of charges.
Further, boss's module also includes news content function, and the major function of news content is that scene is passed through Cloth of getting a haircut is announced and notice, and click can check each notice detailed content, can increase news notification newly, and news notification can save The time that boss issues bulletin is saved, different site managers can receive different bosses and notify, all news, as long as this Site manager under company can all check.
Further, boss's module also includes aid function, and supplemental functionality contains calculator, public transport And route, national weather, easy rotary digging and on;
Although each mobile phone carries calculator function, adding computer function here can be calculated faster, It can again go to find computer without background program and be calculated, can uses computer in management platform;Public transport and road The points for attention of line are that mobile phone must can just be shown equipped with Baidu map, convenient for users to use, without switching back and forth Figure program, can click on public transport and the Baidu map page that route can redirect automatically;Easy rotary digging function is it will be seen that institute is relevant In easy rotary digging trade information, display can learn rotary drilling rig information out of easy rotary digging, and this page also includes easy rotary digging in the industry News, it can be learnt and be inquired about the information that can be directly acquainted with to industry out of management platform.
Rotary drilling rig construction management platform of the present invention and its implementation, have the advantages that:
Overcome traditional phone, short message, written document report not in time, it is artificial not statistical uncertainty true the defects of, be rotary drilling rig Unit in charge of construction relies on mobile interchange platform implementation information management to provide platform, on the one hand, administrative staff stay indoors, you can The construction information of equipment in each building site is checked at any time;On the other hand, can be with using the data storage and calculation function of cloud platform For the assessment construction speed and construction cost of administrative staff's system, it is easy to search problem a little, is improved in time, realizes that management rises Level, substantially increases operating efficiency;
After this management platform, site operation personal information, networking are realized, can be anywhere or anytime to site operation Information, cost information are reported, and can accurately be calculated the progress of construction information and the statistics of cost information, greatly be lifted Rotary digging industry boss is to the ability to supervise of job site and site manager to the speed of site operation information reporting and accurate;
The slitless connection and efficient interactive of rotary digging boss and site manager are realized, saves the management cost of unit in charge of construction/individual.
Implement to obtain field data, remote control construction speed and finance by this platform and supporting APP.
The invention will be further described with reference to the accompanying drawings and examples.
Brief description of the drawings
Accompanying drawing 1 is the overall structure frame diagram of operating platform in the embodiment of the present invention;
Accompanying drawing 2 is the functional structure framework of operating platform boss app in the embodiment of the present invention;
Accompanying drawing 3 is the functional structure framework of operating platform site manager app in the embodiment of the present invention;
Accompanying drawing 4 is operating platform construction module data flow point analysis in the embodiment of the present invention;
Accompanying drawing 5 is operating platform cost model data-flow analysis in the embodiment of the present invention;
Accompanying drawing 6 is operating platform operating expenses main business data-flow analysis in the embodiment of the present invention.
Embodiment
Embodiment, as shown in figure 1, a kind of rotary drilling rig construction management platform, is formed using B/S frameworks, including database, Cloud platform, boss's module, rotary drilling rig module, projects module, site manager's module, boss's module, rotary drilling rig module, project It is layered level display between module, site manager's module, boss's module, rotary drilling rig module, projects module, site manager's module Corresponding relation is relation one-to-many from top to bottom.
As shown in fig. 6, the relation of boss's module and site manager's module is to be mutually related, site manager's module reports All original contents are visible for boss's module, and system can be according to the data of site manager's module typing(Also portion is included Divide the data of boss's module setting)Carry out statistical summaries and form statistical report form.
It is exactly a company corresponding to each boss's account in boss's module, boss's module meeting individualism one is old The information such as all construction speeds, clearing progress and reimbursement of expense that the app of plate is conveniently checked under company.Each boss's account is can To possess more rotary drilling rigs, boss can carry out selection to these rotary drilling rigs in main interface and check.Boss can be at any time The status information of rotary drilling rig construction management platform is grasped, every rotary drilling rig has its opening time, only passes through platform Back-stage management personnel examination & approval after, corresponding rotary drilling rig construction management service can just open.Boss can record every rotary digging The insurance purchaser record of rig, all project information of all rotary drilling rigs and cost information can be checked, can be with site operation Team is given notice and announced.
All rotary drilling rigs under in store the said firm are recorded in the rotary drilling rig module, rotary drilling rig is record and applies Date and insurance purchaser record are opened/bought to work management service.Can intuitively inquire about rotary drilling rig it is all constructed and The project of hot work in progress.
The projects module is the module of rotary drilling rig subordinate, many individual projects under every rotary drilling rig be present, including apply Work is completed, the project of hot work in progress, and it is opening state that can only have a project under the same time, in projects module, because all Project be unfixed place, all parts of the country may all have project, such as, wherein a rotary drilling rig Guangdong is applied Work, next project perhaps will arrive Liaoning and construct, so can only have a project under the same time, under every rotary drilling rig For opening state.
Each site manager can only correspond to a project in site manager's module, and site manager's module can individualism One site manager app, facilitates site manager to report site operation situation, and construction information can be carried out whenever and wherever possible Report, can all cost informations of record entry whenever and wherever possible, the workload of all constructions can be recorded, site manager also may be used To check that he announces all notices of place proprietor of an establishment's issue.
Summary is got off, and boss's account can manage more rotary drilling rigs in rotary drilling rig module in boss's module, but One rotary drilling rig can only correspond to boss's account;A rotary drilling rig can implement multiple project moulds in rotary drilling rig module Project in block, but one rotary drilling rig of same time is only capable of implementing a project, i.e. can only have an item under a rotary drilling rig Mesh state is opening state;A project can possess multiple project managers and be managed in projects module(It is under normal circumstances Two people), but a site manager can only be responsible for a project the same time in site manager's module.Site manager proposes report construction Information is to database, and construction information uploads arrives cloud platform again, the home-confined construction for the checking job site letter of boss's can Breath.
As shown in Fig. 2 boss's module includes six functions of modules, it is respectively:Rotary drilling rig information, construction information, expense Information, statistical report form, news content, aid.
The rotary drilling rig possessed under company where rotary drilling rig presentation of information boss, boss open after logging in Rotary drilling rig information.The bottom of rotary drilling rig list has a newly-increased rotary drilling rig function, and boss can be by increasing rotary digging newly Rig function increases rotary drilling rig newly, and the state of newly-increased rotary drilling rig is necessarily off the project of state, and boss can not be opened Open, newly-increased rotary drilling rig can just be opened after needing the back-stage management personnel examination & approval by platform.
There are three buttons to be respectively in rotary drilling rig list:Startup/stopping/management.Start:Boss can be to rotary drilling rig State be controlled and can start rotary drilling rig, start it should be noted that his that every rotary drilling rig has opening time, Every rotary drilling rig needed to be applied to the back-stage management personnel of platform, and every rotary drilling rig can be automatically stopped after expiring, The boss after stopping that expiring is can not to open rotary drilling rig, and system can prompt boss to be applied;Stop:Boss, which clicks on, stops rotary digging Rotary drilling rig status modifier can be dead status by rig;Management:Boss, which clicks on management button, can jump to insurance information and item Mesh information.Insurance information:Boss can be each to rotary drilling rig insurance purchaser record preserve, the insurance for recording purchase is public Department, purchase date, insurance period, insured amount, insurance company's associated person information, insurance of the boss to rotary drilling rig is facilitated to carry out Management.Project information:Record all projects under click project, including it is all completed, disabled and opened in project, Project under every rotary drilling rig has the project that a project is opening state.If boss selects to open when new projects Logical state and the project that also project system of opening state can close during other are opened automatically, so being needed during new projects Careful options purpose operation state.
As shown in Fig. 2 what is recorded under the construction information is logged on the construction information of all items under boss, construction information There are two buttons in list, be respectively:Progress and construction are detailed.
The progress is to be counted the construction information of project, and is changed into figure displaying progress.Have three in progress Individual icon, respectively construction speed icon, time schedule icon, daily construction volume icon.Construction speed is shown currently Construction speed and percentage construction speed figure caused by the contrast of project whole project;The content that time schedule icon is shown is regulation Deadline and the more caused percent time progress chart of current date;The content that daily construction volume icon is shown passes through for scene Manage the construction information reported daily to carry out collecting caused column diagram, column diagram can select the number of days of display, can show near Normal construction Information Statistics in seven days and it is nearly 30 days in it is normal when work Information Statistics.
Four modules be present in the construction is detailed, be normal construction respectively, stop work delay work, engineering metering, stake footpath information, As shown in figure 4, the content of display is all normal construction information that site manager reports under the project in normal construction, here Show the work total amount of each stage type, display content be stage type, pile No., stake footpath, workload, super side, on call time, Boss is facilitated to be checked.Stop work delay work display content for site manager report because certain reason stop work information, show Show that shut-down delays work state, time, reason and creation time;The content of engineering department's metering display is all works that site manager reports The workload that journey portion has measured, for being adjusted to engineering funds, display content is stake footpath, workload, creation time;Stake footpath Information major function is that boss adds stake footpath dictionary, and for being selected during site manager's typing construction data, site manager selects stake footpath Can be afterwards standard and computational costs that boss reports selection to site manager according to the price and workload programming count in stake footpath Standard, display content is stake footpath title, unit price and quantity here, and boss can add new stake footpath standard in the stake footpath page.
As shown in Fig. 2 cost information can check that the expense branch artificial situation of all items under boss company and record are all The engineering funds settled accounts.There is " account " button in cost information list, click on all expenses that can be checked under cost information It is detailed.Three modules in account information be present:Expense expenditure, prepaid expenses, engineering funds clearing.
As shown in figure 5, the display content of expense expenditure is all expense branch that site manager records under all click projects Go out and situation of paying the bill, boss can pay the fees to the outstanding expense of site manager, boss can also oneself addition expense note Record is paid the fees, it is noted here that, for the demand of information privacy, the expense record that boss can see all is still live Manager be can't see boss addition expense record, expense record display content be creation time, expense title, amount payable, The paid amount of money, payment progress, clicking on the management after list can be paid the bill.
The major function of the prepaid expenses is that boss records all operating expenses in advance to site manager, account information The surplus of all prepaid expenses can be checked, boss increases the surplus that can accumulate prepaid expenses after prepaid expenses automatically newly every time It is interior, it can automatically subtract after being paid the bill in site manager's expense expenditure and Payment Amount, the prepayment that can be checked at any time in site manager's hand Money remaining sum, to pay the amount of money, remarks, creation time in advance, boss clicks on newly-increased button and can increased newly prepaid expenses display content Prepaid expenses.
The major function of the engineering funds clearing is to record all engineering funds settled accounts, in the top meeting of account information Open engineering funds is shown, the source of engineering funds is the accumulative of engineering department's metering that site manager reports, and boss receives engineering Money and then newly-increased engineering funds clearing, newly-increased engineering funds can be settled accounts never to be subtracted in engineering funds, and major function is to record all engineerings Money settlement records, display content are settlement amounts, remarks, creation time.
As shown in Fig. 2 statistical report form function is that all cost informations of project are carried out into statistical summaries to form a figure It is shown, allows boss more intuitively to see the percent information of expense.Click on statistical report form and put on display a list, be here The list of all items, display content are project name, project status, the project output value and clearing, pay in advance, deal with, be paid four Button.
The clearing ratio that clearing display content is engineering funds is clicked on, is not settle accounts and settled accounts ratio figure respectively, on the right side There is " detail " button at upper angle, and " detail " button can check word form;Click pay in advance button can the project of checking pay in advance The surplus of expense and paid ratio figure, the top show all prepaid expenses, and clicking on the upper right corner " detail " button can look into See word form;All lists added of project can be checked by clicking on " dealing with " button, be shown by charge type, altogether It is divided into 13 types, can intuitively sees very much the arrearage ratio shared by each type, top is shown as all and dealt with Total amount, word form can be checked by clicking on the upper right corner " detail ";Click on paid can check and all add list of charges.
The major function of news content is that bulletin and notice are issued to site manager, and click can check that each notice is detailed Content, news notification can be increased newly.News notification can save the time that boss issues bulletin, and different site managers can connect Receive different boss's notices.All news, as long as the site manager under our company can all check, when eliminating Between and notice cost.
Supplemental functionality contain calculator, public transport and route, national weather, easy rotary digging and on.Computer:Although Each mobile phone carries calculator function, but addition computer function can be calculated faster here, can not had to Background program, which goes to find computer again, to be calculated, and can uses computer in management platform;Public transport and route:Public transport and The points for attention of route are that mobile phone must can just be shown equipped with Baidu map, convenient for users to use, without switching back and forth Mapping program, can click on public transport and the Baidu map page that route can redirect automatically;Easy rotary digging:The major function of easy rotary digging It is that all about easily rotary digging trade information, display can learn rotary drilling rig information out of easy rotary digging, can check easy rotary digging Parts price, the part price that can be checked in second-hand market, can check engineering information, and churning driven can be checked from easy rotary digging Machine is complete works of, and this page also includes the inside news of easy rotary digging, and can be learnt out of management platform and inquired about can be direct The information of industry is solved, the title price etc. of the various parts of various rotary drilling rigs is directly viewable, facilitates user and check easy rotation The information of digging., can also if had a question on the title of current management platform and the current version of management platform can be checked Dial and seeked advice from the service calls of the page, on bottom can click on " privacy clause relief explanation ", check The relief explanation of this management platform.
Platform of the present invention can be with Modify password, and user login code can be changed in management platform, point " Modify password " button, input Old Password and new password are hit, the login password of user will be changed, forgotten Password, please be direct Platform administrator is contacted, ensure that the security of boss's account.
Retain traditional computer operating modes, in the situation of conditions permit, can be passed by laptop computer, desktop computer etc. System large screen display class computer progress job site data summarization is checked and platform configuration, and it is main to retain giant-screen computer operation Consider the age bracket of audience;
By the network and environment of most of job site, be substantially at no wifi and without desk in the case of, done using movement Male model formula, ecosystem exploitation Android and apple site manager APP, Field Force can carry out information gathering by flow and information is looked into See, information gathering and checking is compressed to data, to flow using reducing 1/3, is increased economic efficiency.
The sector leader is on the middle and senior level to be substantially at the state moved around, relatively more in the way time, using mobile office mould Formula, ecosystem exploitation Android and apple boss APP, leader's chip time is guided to cell phone application, improves time availability And even if control all data of job site.
Citing described above for best mode for carrying out the invention, wherein the part do not addressed in detail is that this area is common The common knowledge of technical staff.Protection scope of the present invention is defined by the content of claim, any technology based on the present invention The equivalent transformation for enlightening and carrying out, also within protection scope of the present invention.

Claims (10)

  1. A kind of 1. rotary drilling rig construction management platform, it is characterised in that:The management platform includes database, cloud platform, boss Module, rotary drilling rig module, projects module, site manager's module, wherein, boss's module, rotary drilling rig module, projects module, Level display, boss's module, rotary drilling rig module, projects module, the correspondence of site manager's module are layered between site manager's module Relation is relation one-to-many from top to bottom;
    The relation of boss's module and site manager's module is to be mutually related, and site manager's module reports all original interior Appearance is visible for boss's module, and system can carry out statistical summaries according to the data of site manager's module typing and form statistics Form.
  2. A kind of 2. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:It is each in boss's module It is exactly a company corresponding to boss's account, each boss's account can possess more rotary drilling rigs, and boss can be in master Interface carries out selection to these rotary drilling rigs and checked, boss can grasp the state letter of rotary drilling rig construction management platform at any time Breath, boss can record the insurance purchaser record of every rotary drilling rig, can check all project information of all rotary drilling rigs And cost information, it can be given notice and announced with site operation team;
    All rotary drilling rigs under in store the said firm are recorded in the rotary drilling rig module, record rotary drilling rig construction pipe Date and insurance purchaser record are opened/bought in reason service.
  3. 3. it can intuitively inquire about all projects constructed with hot work in progress of rotary drilling rig;
    The projects module is the module of rotary drilling rig subordinate, many individual projects under every rotary drilling rig be present, including constructed Into the project of, hot work in progress, it is opening state that can only have a project under the same time, under every rotary drilling rig;
    Each site manager can only correspond to a project in site manager's module, and construction information can be carried out whenever and wherever possible Report, can all cost informations of record entry whenever and wherever possible, the workload of all constructions can be recorded, site manager also may be used To check that he announces all notices of place proprietor of an establishment's issue.
  4. A kind of 4. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:Boss's module includes rotation Dig rig informational function, the rotary drilling rig that is possessed under company where rotary drilling rig presentation of information boss, after boss logs in Open rotary drilling rig information;
    Rotary drilling rig has newly-increased rotary drilling rig function, and boss can increase rotary drilling rig newly by newly-increased rotary drilling rig function, newly The state for increasing rotary drilling rig is necessarily off the project of state, and boss can not be opened, and increasing rotary drilling rig newly needs by flat It can just be opened after the back-stage management personnel examination & approval of platform;
    There are three buttons to be respectively in rotary drilling rig list:Startup/stopping/management, startup are that boss can be to rotary drilling rig State, which is controlled, can start rotary drilling rig, start it should be noted that his that every rotary drilling rig has, often opening time Platform rotary drilling rig needed to be applied to the back-stage management personnel of platform, and every rotary drilling rig can be automatically stopped after expiring, and be arrived Boss is can not to open rotary drilling rig after phase stops, and system can prompt boss to be applied;Boss clicks on stopping rotary drilling rig can It is dead status by rotary drilling rig status modifier;Boss, which clicks on management button, can jump to insurance information and project information.
  5. A kind of 5. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:Boss's module also includes Construction information function, what is recorded under construction information is the construction information of all items under boss's account, is had in construction information list Two buttons, it is respectively:Progress and construction are detailed;
    The progress is to be counted the construction information of project, and is changed into figure displaying progress, three figures be present in progress Mark, respectively current construction is shown in construction speed icon, time schedule icon, daily construction volume icon, construction speed Progress and percentage construction speed figure caused by the contrast of project whole project;The content that time schedule icon is shown is that regulation is completed Time and the more caused percent time progress chart of current date;The content that daily construction volume icon is shown is every for site manager The construction information that day reports carries out collecting caused column diagram, and column diagram can select the number of days of display, can show nearly seven days Interior normal construction Information Statistics and it is nearly 30 days in it is normal when work Information Statistics;
    Four modules be present in the construction is detailed, be normal construction respectively, stop work delay work, engineering metering, stake footpath information, normally The content of display is all normal construction information that site manager reports under the project in construction, shows each stage class here The work total amount of type;Stop work delay work display content for site manager report because certain reason stop work information;Engineering department The content of metering display is the workload that all engineering departments that site manager reports have measured, for carrying out core to engineering funds Calculate;Stake footpath informational function is that boss adds stake footpath dictionary, and for being selected during site manager's typing construction data, site manager selects stake Can be standard and computational costs that boss reports selection to site manager according to the price and workload programming count in stake footpath behind footpath Standard, boss can add new stake footpath standard in the stake footpath page.
  6. A kind of 6. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:Boss's module also includes Cost information function, cost information can check the expense branch artificial situation of all items under boss company and record all tied The engineering funds of calculation, there is " account " button in cost information list, it is detailed to click on all expenses that can be checked under cost information, account Three modules in mesh information be present:Expense expenditure, prepaid expenses, engineering funds clearing.
  7. A kind of 7. rotary drilling rig construction management platform as claimed in claim 6, it is characterised in that:
    The display content of the expense expenditure is all expenses expenditure and payment feelings that site manager records under all click projects Condition, boss can pay the fees to the outstanding expense of site manager, boss can also oneself addition expense record paid the fees, For the demand of information privacy, still site manager is the expense that can't see boss's addition to the expense record that boss can see all With record;
    The function of the prepaid expenses is that boss records all operating expenses in advance to site manager, and account information can be checked The surplus of all prepaid expenses, boss can accumulate in the surplus of prepaid expenses automatically after increasing prepaid expenses newly every time, scene warp It can automatically subtract after being paid the bill in reason expense expenditure and Payment Amount, the remaining gold of the advance payment that can be checked at any time in site manager's hand Volume;
    The function of the engineering funds clearing is to record all engineering funds settled accounts, and can show in the top of account information and not tie The engineering funds of calculation, the source of engineering funds are the accumulative of engineering department's metering that site manager reports, and it is then new that boss receives engineering funds Increase engineering funds clearing.
  8. A kind of 8. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:Boss's module also includes Statistical report form function, statistical report form function are that all cost informations of project are carried out into statistical summaries one chart of formation to be opened up Show, allow boss more intuitively to see the percent information of expense, be the list of all items here, display content is entry name Title, project status, the project output value and clearing, pay in advance, deal with, paid four buttons;
    The clearing ratio that clearing display content is engineering funds is clicked on, is not settle accounts and settled accounts ratio figure respectively, can check Word form;Button is paid in click, which in advance, can check the surplus of project prepaid expenses and paid ratio figure, and the top shows all Prepaid expenses, word form can also be checked;Button is dealt with click can check all lists added of project, pass through expense Shown with type, can intuitively see very much the arrearage ratio shared by each type, show all total amounts dealt with, Word form can be checked;Click on paid can check and all add list of charges.
  9. A kind of 9. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:Boss's module also includes News content function, the major function of news content are that bulletin and notice are issued to site manager, and click can be checked each logical Know detailed content, news notification can be increased newly, news notification can save the time that boss issues bulletin, different site managers Different boss's notices, all news can be received, as long as the site manager under our company can all check.
  10. A kind of 10. rotary drilling rig construction management platform as claimed in claim 1, it is characterised in that:Boss's module is also wrapped Include aid function, supplemental functionality contain calculator, public transport and route, national weather, easy rotary digging and on;
    Although each mobile phone carries calculator function, adding computer function here can be calculated faster, It can again go to find computer without background program and be calculated, can uses computer in management platform;Public transport and road The points for attention of line are that mobile phone must can just be shown equipped with Baidu map, convenient for users to use, without switching back and forth Figure program, can click on public transport and the Baidu map page that route can redirect automatically;Easy rotary digging function is it will be seen that institute is relevant In easy rotary digging trade information, display can learn rotary drilling rig information out of easy rotary digging, and this page also includes easy rotary digging in the industry News, it can be learnt and be inquired about the information that can be directly acquainted with to industry out of management platform.
CN201710800771.2A 2017-09-07 2017-09-07 A kind of rotary drilling rig construction management platform Pending CN107688910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710800771.2A CN107688910A (en) 2017-09-07 2017-09-07 A kind of rotary drilling rig construction management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710800771.2A CN107688910A (en) 2017-09-07 2017-09-07 A kind of rotary drilling rig construction management platform

Publications (1)

Publication Number Publication Date
CN107688910A true CN107688910A (en) 2018-02-13

Family

ID=61156107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710800771.2A Pending CN107688910A (en) 2017-09-07 2017-09-07 A kind of rotary drilling rig construction management platform

Country Status (1)

Country Link
CN (1) CN107688910A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111161098A (en) * 2019-12-02 2020-05-15 中铁建设集团有限公司 Pile foundation construction machine account management system and method
CN113469840A (en) * 2021-06-16 2021-10-01 浙江华东建设工程有限公司 Intelligent management system for pile foundation construction
CN113780873A (en) * 2021-09-22 2021-12-10 健鼎(湖北)电子有限公司 Management system of drilling machine
US20220101229A1 (en) * 2020-03-17 2022-03-31 Freeport-Mcmoran Inc. Methods and systems for deploying equipment required to meet defined production targets

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN105303332A (en) * 2015-11-30 2016-02-03 国家电网公司 Electric power engineering project management system
US20160253640A1 (en) * 2004-06-29 2016-09-01 Textura Corporation Construction payment management system and method with automatic notification workflow features
CN106357724A (en) * 2016-08-18 2017-01-25 广州市利迪网络科技有限公司 Uniformly integrated information management platform system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160253640A1 (en) * 2004-06-29 2016-09-01 Textura Corporation Construction payment management system and method with automatic notification workflow features
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN105303332A (en) * 2015-11-30 2016-02-03 国家电网公司 Electric power engineering project management system
CN106357724A (en) * 2016-08-18 2017-01-25 广州市利迪网络科技有限公司 Uniformly integrated information management platform system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111161098A (en) * 2019-12-02 2020-05-15 中铁建设集团有限公司 Pile foundation construction machine account management system and method
US20220101229A1 (en) * 2020-03-17 2022-03-31 Freeport-Mcmoran Inc. Methods and systems for deploying equipment required to meet defined production targets
US20220101228A1 (en) * 2020-03-17 2022-03-31 Freeport-Mcmoran Inc. Methods and systems for deploying equipment required to meet defined production targets
US11836659B2 (en) * 2020-03-17 2023-12-05 Freeport Mcmoran Inc. Methods and systems for deploying equipment required to meet defined production targets
US11847595B2 (en) 2020-03-17 2023-12-19 Freeport-Mcmoran, Inc. Methods and systems for deploying equipment required to meet defined production targets
CN113469840A (en) * 2021-06-16 2021-10-01 浙江华东建设工程有限公司 Intelligent management system for pile foundation construction
CN113780873A (en) * 2021-09-22 2021-12-10 健鼎(湖北)电子有限公司 Management system of drilling machine
CN113780873B (en) * 2021-09-22 2023-10-27 健鼎(湖北)电子有限公司 Management system of drilling machine

Similar Documents

Publication Publication Date Title
US7305392B1 (en) Multi-organizational project management system
CN107688910A (en) A kind of rotary drilling rig construction management platform
CN107330593A (en) A kind of traffic monitoring inspection and credit worthiness management system
CN105303306B (en) Electric power material dispatching platform system
CN203165006U (en) Engineering project management system
US20040186763A1 (en) System for real-time monitoring and cost management of construction projects
WO2009070755A1 (en) A real estate management system and method
CN107038654A (en) Electric company's power marketing management information system based on cloud computing
CN106056482A (en) Electric power community grid service platform based internet
CN109582663A (en) A kind of employee insurance information management system of the architectural framework based on Java EE
Manual et al. Transportation
Ndaw Unlocking the potential of information communications technology to improve water and sanitation services
Tao et al. The research and application of network teaching platform based on cloud computing
CN106651649A (en) Gridding-based power client manager field service handheld terminal
CN109886644A (en) Engineering project based on BIM commands managing and control system
CN113313548A (en) Office building lease management system
CN107886288A (en) Settlement system and its control method on a kind of service charge line
Hu et al. Pragmatic framework of programme organizational capability for delivering megaprojects at design and construction phases: a Chinese client perspective
Ming Yu et al. Information systems in public housing management: case study of a town council in Singapore
Ofori-Kuragu Construction industry developments in Ghana
CN107944840A (en) Data processing method and device for service management
Ssekitoleko Strengthening budgeting for sustainable development: Uganda’s transition from output-based budgeting to program-based budgeting
Boban et al. Split Smart City–Future Perspective and Development Possibilities
Jeon et al. Analysis on the Implementation Plan to Increase the Joint Utilization Rate of National Research Facilities and Equipment
Le et al. Integration of financial and contract management on the Shanghai Expo Construction Program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180213

RJ01 Rejection of invention patent application after publication