CN107687124A - Concrete floor, bed course, road construction tear plank sheathing open with quick branch - Google Patents
Concrete floor, bed course, road construction tear plank sheathing open with quick branch Download PDFInfo
- Publication number
- CN107687124A CN107687124A CN201710720890.7A CN201710720890A CN107687124A CN 107687124 A CN107687124 A CN 107687124A CN 201710720890 A CN201710720890 A CN 201710720890A CN 107687124 A CN107687124 A CN 107687124A
- Authority
- CN
- China
- Prior art keywords
- straight flange
- bed course
- concrete floor
- stencil body
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
- E01C19/504—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes adapted to, or provided with, means to maintain reinforcing or load transfer elements in a required position
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention provides a kind of concrete floor, bed course, road construction to tear plank sheathing open with quick branch, it is characterised in that including:Stencil body with the first side for supporting foregoing concrete structures side;It is arranged on the second side of the stencil body, the supporting construction for supporting the stencil body;It is arranged in the supporting construction, the fixed structure that the stencil body is fixed on the ground;The supporting construction includes:The second side for being arranged on the stencil body is respectively provided with the first location division and the second location division of connecting hole, the connecting rod of the first hypotenuse for being connected with the connecting hole with first location division, the first straight flange being connected with the connecting hole of second location division and the second straight flange for connecting first hypotenuse and first straight flange, wherein, second straight flange is additionally operable to the structure that is connected.It is simple and easy present invention optimizes the wood formwork system used in the tradition in concrete floor, bed course, road construction.
Description
Technical field
The present invention relates to the concrete floor in architectural engineering, municipal works, highway engineering construction, bed course, road construction
Technical field, plank sheathing is torn open with quick branch in particular to a kind of concrete floor, bed course, road construction.
Background technology
In concrete floor, bed course, road construction, the installation of template is particularly critical with removing this process, because its is straight
Connect and determine concrete finished product quality and construction speed.Construction in the past uses plank sheathing, during construction in advance plank sheathing close to it is upper,
Each fixed flitch to be to ensure rigidity at lower both sides, during installation form, situations such as further according to form height, exists along template length direction
Template medial and lateral it is each it is spaced apart, squeeze on ground reinforcing bar against template and timber wedge makees vertical support, and with short flitch work
Diagonal brace, this mounting means technique is cumbersome, template peace tears time length open, mold plate verticality should not control, preferably cause template deformation, mould
The plate number of turnover is few, directly governs construction quality and progress.
China Patent Publication No. 104806010B discloses a kind of floor construction adjustable formwork and its construction method, including template
Angle steel main body, the side of template angle steel main body is lowering or hoisting gear, and lowering or hoisting gear includes the template being welded in template angle steel main body
Faller, by increasing the firm banking being bolted in template angle steel main body, be provided with adjustable elongated hole, template on firm banking
Faller passes through hinged bolt connection with firm banking.After installing adjustable formwork, bolt is increased using on lowering or hoisting gear, is entered
Row is fine-tuned, and main template body is adjusted to design height, then carries out construction technology, can by form removable after minimum 3 days
Reuse.This formwork structure is more complicated, and the present invention redesigns a kind of template simple in construction.
The content of the invention
In consideration of it, the present invention proposes a kind of concrete floor, bed course, road construction tear plank sheathing open with quick branch, it is intended to
It is proposed a kind of simple in construction, the quick branch form removal that can reuse.
The present invention proposes a kind of concrete floor, bed course, road construction tear plank sheathing open with quick branch, it is characterised in that
Including:Stencil body with the first side for supporting foregoing concrete structures side;It is arranged on the of the stencil body
Two side faces, the supporting construction for support shuttering;Be arranged in the supporting construction, for fixed form body on the ground
Fixed structure;The supporting construction includes:The second side for being arranged on the stencil body is respectively provided with the first positioning of connecting hole
Portion and the second location division, there is the first hypotenuse being connected with the connecting hole of the first location division, the connecting hole company with the second location division
The first straight flange connect and the second straight flange for connecting the first hypotenuse and the first straight flange, wherein, the second straight flange is additionally operable to connect
Fixed structure.
Further, above-mentioned concrete floor, bed course, road construction are torn open in plank sheathing with quick branch, the fixed structure
Including:It is fixedly connected with supporting construction, middle part is provided with the sleeve of through hole;Embedment ground when through hole through sleeve, fixed form
The fix bar in face.
Further, above-mentioned concrete floor, bed course, road construction are torn open in plank sheathing with quick branch, first hypotenuse
With the second straight flange predetermined angle.
Further, above-mentioned concrete floor, bed course, road construction are torn open in plank sheathing with quick branch, first straight flange
Kink, the kink and connecting hole socket are provided with the end of first hypotenuse.
Beneficial effects of the present invention:
Present invention optimizes the wood formwork system used in the tradition in concrete floor, bed course, road construction, template takes
Material, composition, making are simple and easy, simplify plank sheathing peace and tear step open, stable system is reliable, improves efficiency of construction, easily ensures
Construction quality, increase the template number of turnover and efficiency, save construction cost.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area
Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention
Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structural representation of embodiments of the invention.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in accompanying drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
Completely it is communicated to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and
Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, embodiment provided by the invention includes:With the first side for supporting concrete structures side
Stencil body 1;It is arranged on the second side of the stencil body, the supporting construction for support shuttering;It is arranged on the branch
Fixed structure on support structure, for fixed form body on the ground.
Specifically, supporting construction includes:It is arranged on the second side of the stencil body, first with connecting hole is determined
The location division 3 of position portion 2 and second;The first hypotenuse being connected with the connecting hole with the first location division and the connection of the second location division 2
First straight flange of hole connection and the connecting rod 4 of the second straight flange for connecting the first hypotenuse and the first straight flange;Wherein, second is straight
While it is additionally operable to the structure that is connected.The fixed structure includes:It is fixedly connected with supporting construction, middle part is provided with the sleeve of through hole
5;The fix bar 6 on ground is embedded to when through hole through sleeve, fixed form.Set on first location division and determine with described second
The connecting hole of equivalent amount in the portion of position.
With continued reference to Fig. 1, first hypotenuse and the second straight flange predetermined angle, the first hypotenuse is as diagonal brace to template
Supporting is carried out, prevents stencil body from being overturn by rotary shaft of template fixing point, predetermined angle is 100 degree to 150 degree, with realization
State effect.
With continued reference to Fig. 1, the fixed structure include be fixedly connected with supporting construction, middle part be provided with through hole sleeve and
The fix bar on ground is embedded to when through hole through sleeve, fixed form.During installation form to precalculated position, fix bar passes through through hole
Ground is inserted, fix bar inserts the certain depth in ground with the position of fixed form and limits the translation of template horizontal direction.
In the present embodiment, template, the first location division, the second location division of supporting construction use wood materials, it is specific and
Speech, template are rectangle thin plate, and the first location division and the second location division use rectangle batten, blind hole or through hole set on batten
As connecting hole.
In the present embodiment, connecting rod, sleeve and fix bar use steel material, and the first straight flange of connecting rod and first
The end of hypotenuse is respectively provided with kink, and the kink and the connecting hole of the first location division and the second location division coordinate socket.It is fixed
Structure reaches the effect to shuttering supporting using connecting rod as medium.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.
Claims (4)
1. a kind of concrete floor, bed course, road construction tear plank sheathing open with quick branch, it is characterised in that including:
Stencil body with the first side for supporting foregoing concrete structures side;
It is arranged on the second side of the stencil body, the supporting construction for supporting the stencil body;
It is arranged in the supporting construction, the fixed structure that the stencil body is fixed on the ground;
The supporting construction includes:The second side for being arranged on the stencil body is respectively provided with the first location division and of connecting hole
Two location divisions, there is the first hypotenuse being connected with the connecting hole of first location division, the connecting hole with second location division
First straight flange of connection and the connecting rod of the second straight flange for connecting first hypotenuse and first straight flange, wherein,
Second straight flange is additionally operable to the structure that is connected.
2. concrete floor according to claim 1, bed course, road construction tear plank sheathing open with quick branch, it is characterised in that
The fixed structure includes:
The sleeve that middle part is provided with through hole is fixedly connected with the supporting construction;
Through hole through the sleeve is used for the fix bar for inserting ground.
3. concrete floor according to claim 2, bed course, road construction tear plank sheathing open with quick branch, it is characterised in that
Angle predetermined angle between first hypotenuse and second straight flange.
4. the concrete floor, bed course, road construction according to Claims 2 or 3 tear plank sheathing open with quick branch, its feature exists
In the end of first straight flange and first hypotenuse is provided with kink, the kink and connecting hole socket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710720890.7A CN107687124A (en) | 2017-08-21 | 2017-08-21 | Concrete floor, bed course, road construction tear plank sheathing open with quick branch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710720890.7A CN107687124A (en) | 2017-08-21 | 2017-08-21 | Concrete floor, bed course, road construction tear plank sheathing open with quick branch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107687124A true CN107687124A (en) | 2018-02-13 |
Family
ID=61153567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710720890.7A Pending CN107687124A (en) | 2017-08-21 | 2017-08-21 | Concrete floor, bed course, road construction tear plank sheathing open with quick branch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107687124A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202543778U (en) * | 2012-04-13 | 2012-11-21 | 中国十七冶集团有限公司 | Quick disassembling and assembling concrete floor supporting template device |
CN203021899U (en) * | 2013-01-15 | 2013-06-26 | 中冶天工上海十三冶建设有限公司 | Quick-assembling template device for concrete ground construction |
CN103510450A (en) * | 2012-06-21 | 2014-01-15 | 五冶集团上海有限公司 | Support for supporting template of highway cement stabilizing layer and using method thereof |
CN205637522U (en) * | 2016-03-12 | 2016-10-12 | 中天建设集团有限公司 | A side form support system for terrace construction |
CN206308595U (en) * | 2016-12-20 | 2017-07-07 | 江苏环宇建筑设备制造有限公司 | A kind of highway bridge concrete steel form |
-
2017
- 2017-08-21 CN CN201710720890.7A patent/CN107687124A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202543778U (en) * | 2012-04-13 | 2012-11-21 | 中国十七冶集团有限公司 | Quick disassembling and assembling concrete floor supporting template device |
CN103510450A (en) * | 2012-06-21 | 2014-01-15 | 五冶集团上海有限公司 | Support for supporting template of highway cement stabilizing layer and using method thereof |
CN203021899U (en) * | 2013-01-15 | 2013-06-26 | 中冶天工上海十三冶建设有限公司 | Quick-assembling template device for concrete ground construction |
CN205637522U (en) * | 2016-03-12 | 2016-10-12 | 中天建设集团有限公司 | A side form support system for terrace construction |
CN206308595U (en) * | 2016-12-20 | 2017-07-07 | 江苏环宇建筑设备制造有限公司 | A kind of highway bridge concrete steel form |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100587165C (en) | Cast-in-situ beam-making construction method of assembled support | |
CN205604088U (en) | But bent cap quick adjustment support | |
CN102767288A (en) | Method and structure for mounting precast reinforced concrete stairs | |
CN106223516A (en) | ALC steam-pressing aero-concrete batten tilts curtain wall structure and construction method | |
CN107806019A (en) | Large-span suspension bridge gate Sarasota construction method | |
CN105113786A (en) | Pad block support system for supporting fixed adjustable cast-in-situ stair formwork | |
CN107571392A (en) | A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder | |
CN105649248B (en) | Prefabricated PC concrete core slab and Cast-in-situ Beam integral construction method | |
CN106522282A (en) | Liftable post-cast strip template structure and system and construction method thereof | |
CN203238950U (en) | Concrete beam formwork supported by trusses suspended in air | |
CN201620598U (en) | Combined beam mould | |
CN107687124A (en) | Concrete floor, bed course, road construction tear plank sheathing open with quick branch | |
CN104131635B (en) | Method and platform for constructing peripheral shear wall of prefabricated staircase | |
CN114277672B (en) | Large-span prestressed concrete bent cap structure and construction method thereof | |
CN104894943A (en) | Integral formwork for road and bridge drainage ditch construction concrete pouring | |
CN217149897U (en) | Cast-in-place support of steel pipe bailey beam bridge | |
CN107090772B (en) | A kind of construction method of the especially big cast-in-place boom support of cable-stayed bridge end bay | |
CN115573597A (en) | Fully-assembled concrete canopy and construction method thereof | |
CN205476468U (en) | Non - design, can all rotary die plate bodys be prefabricated staircase bench template | |
CN214245823U (en) | Advance through structure of new and old structure girder on two sides of mid-partition wall | |
CN115126254A (en) | Construction method of assembled composite floor slab support | |
CN113622328A (en) | Box culvert construction assembly, application thereof and box culvert construction method | |
CN201343704Y (en) | Movable scaffolding system for casting T-shaped beam bridge flange slabs in situ | |
CN204626965U (en) | For the steel stair template of poured up at a time between architectural stair | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180213 |