CN107681576B - Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof - Google Patents

Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof Download PDF

Info

Publication number
CN107681576B
CN107681576B CN201710997828.2A CN201710997828A CN107681576B CN 107681576 B CN107681576 B CN 107681576B CN 201710997828 A CN201710997828 A CN 201710997828A CN 107681576 B CN107681576 B CN 107681576B
Authority
CN
China
Prior art keywords
area
inner tube
aluminium strip
tube
plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710997828.2A
Other languages
Chinese (zh)
Other versions
CN107681576A (en
Inventor
陈孟永
洪小卫
陈海波
孙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG EFIELD PIPING SYSTEM CO Ltd
Original Assignee
SHANDONG EFIELD PIPING SYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG EFIELD PIPING SYSTEM CO Ltd filed Critical SHANDONG EFIELD PIPING SYSTEM CO Ltd
Priority to CN201710997828.2A priority Critical patent/CN107681576B/en
Publication of CN107681576A publication Critical patent/CN107681576A/en
Application granted granted Critical
Publication of CN107681576B publication Critical patent/CN107681576B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0462Tubings, i.e. having a closed section
    • H02G3/0481Tubings, i.e. having a closed section with a circular cross-section
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/001Combinations of extrusion moulding with other shaping operations
    • B29C48/0021Combinations of extrusion moulding with other shaping operations combined with joining, lining or laminating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/03Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
    • B29C48/09Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/15Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor incorporating preformed parts or layers, e.g. extrusion moulding around inserts
    • B29C48/151Coating hollow articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/92Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2948/00Indexing scheme relating to extrusion moulding
    • B29C2948/92Measuring, controlling or regulating
    • B29C2948/92504Controlled parameter
    • B29C2948/92704Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/22Tubes or pipes, i.e. rigid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Laminated Bodies (AREA)

Abstract

The invention discloses a kind of plastic-aluminum combined SP pipes of four layers of butt welding, are successively arranged inner tube, glue layer, middle tube and outer tube from inside to outside, and inner tube and outer tube are all made of polythene PE X material, and middle tube is high-strength alloy aluminium strip.Present invention simultaneously discloses preparation method, including inner tube extrusion, vacuum sizing, water tank are cooling, inner tube gluing;The plastic-aluminum combined SP pipe of four layers of butt welding of the invention; it can make the radiation that high-voltage electricity is shielded when the high-voltage wiring harness high-tension current 1800V of new-energy automobile; effective protection high-tension cable; effective protection high-voltage wiring harness leakproof; effective protection high-voltage line quick charge; it can guarantee that high-voltage wiring harness is bent together with protecting pipe tubing not rebounding have many advantages, such as that installation, connection can be rapidly achieved.

Description

Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof
Technical field
The present invention relates to a kind of SP tubing, more particularly to a kind of plastic-aluminum combined SP pipe of four layers of butt welding and preparation method thereof.
Background technique
The various ordinary high pressure harness protection casings of existing new-energy automobile, are unable to satisfy the new-energy automobile of high quality It is required that.Currently, pure plastics wire harness sheath pipe, when bending, easily rebounds, and rigidity is poor, causes installation inconvenient, anti-extrusion effect is poor The defects of.And stainless steel wire bundle jacket pipe, since poor toughness causes poor to high-voltage line protective effect, high-voltage high-speed charging requirement is equal It is unable to reach, can not also shield the radiation of 1800V high-tension current, and rigidity is strong, can not be fixed on vehicle frame outer bottom, when installation fee The defects of.
Summary of the invention
The purpose of the present invention is to overcome the shortcomings of the existing technology, provide a kind of plastic-aluminum combined SP pipe of four layers of butt welding and its Preparation method.
To achieve the above object the invention adopts the following technical scheme:
A kind of plastic-aluminum combined SP pipe of four layers of butt welding, is successively arranged four layers from inside to outside, respectively inner tube, glue layer, Middle tube and outer tube, inner tube and outer tube are all made of polythene PE X material, and middle tube is high-strength alloy aluminium strip.
As a further solution of the present invention, the specific material of high-strength alloy aluminium strip is A5052 alloy.
The preparation method of the above-mentioned plastic-aluminum combined SP pipe of four layers of butt welding, includes the following steps:
1), inner tube squeezes out: the raw material that will be stirred is sucked in storage vat by automatic suction machine, then through plastic extrusion Machine, five silicon carbides controls of barrel are respectively as follows: that an area is 130 DEG C, 2nd area are 135 DEG C, three at 130 DEG C -145 DEG C in extruder Area is 145 DEG C, 4th area are 145 DEG C, 5th area are 145 DEG C, and mold divides into 3rd area, and temperature is controlled respectively at 150 DEG C, plastic grain Raw material, which promotes and heat hot melt by barrel, becomes liquid, then through by the mold of temperature control, forming just shape inner tube;
2), vacuum sizing: first shape inner tube meeting approach vacuum tank under dragger effect, in vacuum tank entry position, peace Equipped with the calibration sleeve controlled for first shape internal plastic tube outer diameter, and the equal water distributor in four roads is installed on calibration sleeve, wherein three tunnels of top are Water inlet pipe, bottom be outlet pipe all the way, and three road water inlet pipes pass through the size of water flow in Flux Valve Control calibration sleeve, from But internal plastic tube is cooled directly with water while controlling outer diameter, then spray type showerhead built in vacuum chamber, and water outlet pair Quasi- approach internal plastic tube makes inner tube finally cooling, sizing, molding, then confirms that size qualification is laggard through internal layer outer diameter detecting instrument Enter next process;
3), water tank is cooling: after inner tube goes out vacuum tank, surface is dried up by blower, then on glue extruder outside Glue, the same inner layer extruder of glue extruder job specification, it is 17 that barrel temperature range, which is divided into 4th area and is respectively as follows: an area, in extruder 5 DEG C, 2nd area be 205 DEG C, 3rd area are 230 DEG C, 4th area are 260 DEG C, being followed by mold temperature is 280 DEG C, and inner tube runs through glue Mold center and by glue uniform fold in outer circle, thickness requirement 0.1mm-0.15mm, then true through glue outer diameter detecting instrument Recognize, next process is entered after size qualification;
4), inner tube is drawn: the inner tube of cementing approach dragger under the draw of dragger, on dragger Lower cylinder pressure: 0.02Mpa enters next process after size qualification, and at the same time, high-strength alloy aluminium strip is cut by aluminium strip The setting cutting of side machine, high-strength alloy aluminium strip cutting width require error to be no more than 0.15mm, and bimetallic tube is overhead in aluminium strip at this time Top, the aluminium strip after sizing cutting form bed by aluminium strip, become cylindrical from initial flush system, while overhead bimetallic tube draws Enter just in cylindrical aluminium strip, forms seamless cylinder by aluminium strip welding set, while argon arc welding can weld two aluminium strip edges It is connected in one;
5), undergauge: the aluminium strip approach undergauge set of welding fabrication keeps aluminium strip layer and inner tube gap closer, approach welding Position bumps detector, then not aluminium strip dragger, aluminium layer surface must not be had damage for approach Kazakhstan;
6), high frequency, baking oven heating: the aluminum pipe approach heating generator come out from dragger, moment strong heating, using Aluminum pipe heated oven temperature is divided into three sections, and respectively 350 degrees Celsius are tightly combined aluminium strip and inner tube, improves stripping to greatest extent From power;
7), outer tube squeezes out: aluminum pipe moulds extruder outside direct way after baking oven, four silicon carbides of barrel in extruder Control is respectively as follows: that an area is 160 DEG C, 2nd area are 190 DEG C, 3rd area are 200 DEG C, 4th area are 220 DEG C, mold at 160 DEG C -260 DEG C 2nd area are divided into, temperature is controlled respectively in 240 DEG C, 265 DEG C, and outer modeling is evenly affixed to aluminum pipe outer circle.Then cooling by way of water tank, Ink jet numbering machine stamp, traction machine travel, approach production line pathological system operation panel, operation panel are connected with four, front detection device, Signal can be provided when front occurs abnormal, can be automatically recognized when abnormal position reaches operation panel position, and automatic spray is not It identifies with color paint, then is cut through air-drying device, by client's production requirement length, carry out outer diameter, internal diameter, whole wall thickness, single layer Wall thickness, outer examine confirmation, and Cutting Length error is not more than 5MM, enters next process after all items are qualified;
8), peeling: managing the SP of well cutting, and both ends outer layer strips, length 5CM, is packed into crosslinking frame;
9), constant temperature oven is crosslinked: crosslinking time is 40 hours, and straightening after the completion of crosslinking, curvature is less than 5mm;
10), after the secondary cutting by 0.95M-1.15M of length, dust is dried up, after secondary detection, packed products.
The beneficial effects of the present invention are: the plastic-aluminum combined SP pipe of four layers of butt welding that the present invention is prepared, can make new energy The radiation of high-voltage electricity, effective protection high-tension cable, effective protection high-voltage line are shielded when the high-voltage wiring harness high-tension current 1800V of automobile Beam leakproof, effective protection high-voltage line quick charge can guarantee that high-voltage wiring harness is bent together with protecting pipe tubing and do not rebound, harness The advantages that protecting pipe can be properly placed the fixed position of automobile outer bottom, can be rapidly achieved installation, connection;It is green novel energy source automobile A kind of excellent high-voltage wiring harness sheath SP pipe.
Detailed description of the invention
Fig. 1 is the plastic-aluminum combined SP pipe longitudinal profile of four layers of butt welding of the invention;
Fig. 2 is that the plastic-aluminum combined SP of four layers of butt welding of the invention manages cross-sectional schematic diagram;
In figure: 1, inner tube, 2, glue layer, 3, middle tube, 4, outer tube.
Specific embodiment
The present invention is further elaborated in the following with reference to the drawings and specific embodiments.
As shown in Figs. 1-2, the plastic-aluminum combined SP pipe of a kind of four layers of butt welding, is successively arranged four layers from inside to outside, respectively interior Layer pipe 1, glue layer 2, middle tube 3 and outer tube 4, inner tube and outer tube are all made of polythene PE X material, and middle tube is height Strength alloys aluminium strip.
In the present embodiment, the specific material of high-strength alloy aluminium strip is A5052 alloy.
The preparation method of the above-mentioned plastic-aluminum combined SP pipe of four layers of butt welding, includes the following steps:
1), inner tube squeezes out: the raw material that will be stirred is sucked in storage vat by automatic suction machine, then through plastic extrusion Machine (model: SJ200-16), in extruder five silicon carbides controls of barrel 130 DEG C -145 DEG C (respectively: an area is 130 DEG C, 2nd area are 135 DEG C, 3rd area are 145 DEG C, 4th area are 145 DEG C, 5th area are 145 DEG C), mold divides into 3rd area, and temperature controls respectively At 150 DEG C, such plastic particles raw materials, which promote and heat hot melt by barrel, becomes liquid, then through by the mold of temperature control, shape At first shape inner tube;
2), vacuum sizing, first shape inner tube meeting approach vacuum tank under dragger effect, in vacuum tank entry position, peace Equipped with calibration sleeve (cover for the control of first shape internal plastic tube outer diameter), and the equal water distributor in four roads is installed on calibration sleeve, wherein top Three tunnels are water inlet pipe, and bottom be outlet pipe all the way, and three road water inlet pipes pass through water flow in Flux Valve Control calibration sleeve Size, to be that internal plastic tube is cooled directly with water while controlling outer diameter, then spray type showerhead built in vacuum chamber, and go out The mouth of a river is directed at approach internal plastic tube, makes inner tube finally cooling, sizing, molding, then confirm that size is (interior through internal layer outer diameter detecting instrument Diameter, outer diameter, wall thickness) it is qualified after be allowed for access next process;
3), water tank is cooling, and after inner tube goes out vacuum tank, surface is dried up by blower, then by way of glue extruder (model: SJ146-20) outside glues, the same inner layer extruder of glue extruder job specification, and barrel temperature range is divided into 4th area in extruder (respectively: an area is 175 DEG C, 2nd area are 205 DEG C, 3rd area are 230 DEG C, 4th area are 260 DEG C), being followed by temperature at mold is 280 DEG C, Inner tube through glue mold center and by glue uniform fold in outer circle, thickness requirement 0.1mm-0.15mm, then through glue The confirmation of water outer diameter detecting instrument, next process of being allowed for access after size (internal diameter, outer diameter, wall thickness) is qualified;
4), inner tube is drawn, and the inner tube of cementing approach under the draw of dragger (model: QY3830) is led Draw machine (dragger upper and lower air cylinders pressure: 0.02Mpa), one of work of being allowed for access down after size (internal diameter, outer diameter, wall thickness) is qualified Sequence.At the same time, by aluminum tape edge cutting machine setting cutting, (high-strength alloy aluminium strip cutting width requires to miss high-strength alloy aluminium strip Difference is no more than 0.15mm), bimetallic tube is overhead above aluminium strip at this time, and the aluminium strip after sizing cutting forms bed by aluminium strip, by most First flush system becomes cylindrical while overhead bimetallic tube and introduces just in cylindrical aluminium strip, welds set by aluminium strip and is formed Seamless cylinder, while two aluminium strip edges can be welded as a whole by argon arc welding.
5), undergauge, the aluminium strip approach undergauge set (purpose: keeping aluminium strip layer and inner tube gap closer) of welding fabrication, Approach welding position bumps detector, then not aluminium strip dragger, aluminium layer surface must not be had damage for approach Kazakhstan;
6), high frequency, baking oven heating, the aluminum pipe approach heating generator come out from dragger, moment strong heating, using Aluminum pipe heated oven (temperature is divided into three sections, respectively 350 degrees Celsius) purpose: it is tightly combined aluminium strip and inner tube, maximum limit Degree improves peeling force;
7), outer tube squeezes out: aluminum pipe moulds extruder outside direct way after baking oven, four silicon carbides of barrel in extruder Control is in 160 DEG C -260 DEG C (respectively: an area is 160 DEG C, 2nd area are 190 DEG C, 3rd area are 200 DEG C, 4th area are 220 DEG C), mold 2nd area are divided into, temperature is controlled respectively in 240 DEG C, 265 DEG C, and outer modeling is evenly affixed to aluminum pipe outer circle.Then cooling by way of water tank, Ink jet numbering machine stamp, traction machine travel, approach production line pathological system operation panel (operation panel with the connection of four detection devices in front, Signal can be provided when front occurs abnormal, can be automatically recognized when abnormal position reaches operation panel position, and automatic spray is not Identified with color paint, then through air-drying device), length cutting (press customer requirement), carry out outer diameter, internal diameter, whole wall thickness, single wall Thick, outer examines confirmation, and Cutting Length error is not more than 5MM, enters next process after all items are qualified.
8), peeling: managing the SP of well cutting, and both ends outer layer strips, length 5CM, is packed into crosslinking frame;
9), constant temperature oven is crosslinked, and crosslinking time is 40 hours, and straightening after the completion of crosslinking, curvature is less than 5mm;
10), after the secondary cutting by 0.95M-1.15M of length, dust is dried up, after secondary detection, packed products.
The above is present pre-ferred embodiments, for the ordinary skill in the art, according to the present invention Introduction, in the case where not departing from the principle of the present invention and spirit, changes, modifications, replacement and change that embodiment is carried out Type is still fallen within protection scope of the present invention.

Claims (2)

1. a kind of preparation method of the plastic-aluminum combined SP pipe of four layers of butt welding, which is characterized in that the plastic-aluminum combined SP pipe of four layers of butt welding It is successively arranged four layers, respectively inner tube (1), glue layer (2), middle tube (3) and outer tube (4), inner tube from inside to outside And outer tube is all made of polythene PE X material, middle tube is high-strength alloy aluminium strip;
The preparation method of the plastic-aluminum combined SP pipe of four layers of butt welding, includes the following steps:
1), inner tube squeezes out: the raw material that will be stirred is sucked in storage vat by automatic suction machine, then through plastic extruder, is squeezed The control of five silicon carbides of barrel is respectively as follows: that an area is 130 DEG C, 2nd area are 135 DEG C, 3rd area are at 130 DEG C -145 DEG C in machine out 145 DEG C, 4th area be 145 DEG C, 5th area are 145 DEG C, mold divides into 3rd area, and temperature is controlled respectively at 150 DEG C, plastic particles raw materials Hot melt is promoted and heated by barrel becomes liquid, then through by the mold of temperature control, forming just shape inner tube;
2), vacuum sizing: first shape inner tube meeting approach vacuum tank under dragger effect is equipped in vacuum tank entry position For the calibration sleeve of first shape internal plastic tube outer diameter control, and the equal water distributor in four roads is installed on calibration sleeve, wherein three tunnels of top are water inlet Pipe, bottom be outlet pipe all the way, and three road water inlet pipes pass through the size of water flow in Flux Valve Control calibration sleeve, to be Internal plastic tube is cooled directly with water while controlling outer diameter, then spray type showerhead built in vacuum chamber, and water outlet alignment way Diameter internal plastic tube makes inner tube finally cooling, sizing, molding, then confirms through internal layer outer diameter detecting instrument, enters after size qualification next Procedure;
3), water tank is cooling: after inner tube goes out vacuum tank, surface is dried up by blower, then gluing, glue outside glue extruder The same inner layer extruder of water extruder job specification, in extruder barrel temperature range be divided into 4th area be respectively as follows: an area be 175 DEG C, 2nd area are 205 DEG C, 3rd area are 230 DEG C, 4th area are 260 DEG C, and being followed by temperature at mold is 280 DEG C, and inner tube runs through glue mold Center and by glue uniform fold in outer circle, thickness requirement 0.1mm-0.15mm, then confirm through glue outer diameter detecting instrument, ruler Enter next process after very little qualification;
4), inner tube is drawn: the inner tube of cementing approach dragger under the draw of dragger, gas above and below dragger Cylinder pressure is 0.02Mpa, enters next process after size qualification, and at the same time, high-strength alloy aluminium strip passes through aluminium strip trimming Machine setting cutting, high-strength alloy aluminium strip cutting width require error to be no more than 0.15mm, and bimetallic tube is overhead on aluminium strip at this time Side, the aluminium strip after sizing cutting form bed by aluminium strip, become cylindrical while overhead bimetallic tube from initial flush system and introduce Just in cylindrical aluminium strip, seamless cylinder is formed by aluminium strip welding set, while argon arc welding can weld two aluminium strip edges It is integrated;
5), undergauge: the aluminium strip approach undergauge set of welding fabrication keeps aluminium strip layer and inner tube gap closer, approach welding position Concave-convex detector, then not aluminium strip dragger, aluminium layer surface must not be had damage for approach Kazakhstan;
6), high frequency, baking oven heating: the aluminum pipe approach heating generator come out from dragger, moment strong heating, using aluminum pipe Heated oven temperature is divided into three sections, and respectively 350 degrees Celsius are tightly combined aluminium strip and inner tube, improves removing to greatest extent Power;
7), outer tube squeezes out: aluminum pipe moulds extruder outside direct way after baking oven, four silicon carbide controls of barrel in extruder It is respectively as follows: that an area is 160 DEG C, 2nd area are 190 DEG C, 3rd area are 200 DEG C, 4th area are 220 DEG C at 160 DEG C -260 DEG C, mold is distinguished For 2nd area, temperature is controlled respectively in 240 DEG C, 265 DEG C, and outer modeling is evenly affixed to aluminum pipe outer circle, the then cooling, coding by way of water tank Machine stamp, traction machine travel, approach production line pathological system operation panel, operation panel is with the detection device connection of four, front, currently Side can provide signal when occurring abnormal, can be automatically recognized when abnormal position reaches operation panel position, and spray different face automatically Colored paint mark, then cut through air-drying device, by client's production requirement length, carry out outer diameter, internal diameter, whole wall thickness, single layer wall thickness, Outer examines confirmation, and Cutting Length error is not more than 5MM, enters next process after all items are qualified;
8), peeling: managing the SP of well cutting, and both ends outer layer strips, length 5CM, is packed into crosslinking frame;
9), constant temperature oven is crosslinked: crosslinking time is 40 hours, and straightening after the completion of crosslinking, curvature is less than 5mm;
10), after the secondary cutting by 0.95M-1.15M of length, dust is dried up, after secondary detection, packed products.
2. the preparation method of the plastic-aluminum combined SP pipe of four layers of butt welding of one kind as described in claim 1, which is characterized in that high-intensitive The specific material of alloy aluminum band is A5052 alloy.
CN201710997828.2A 2017-10-24 2017-10-24 Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof Active CN107681576B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710997828.2A CN107681576B (en) 2017-10-24 2017-10-24 Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710997828.2A CN107681576B (en) 2017-10-24 2017-10-24 Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof

Publications (2)

Publication Number Publication Date
CN107681576A CN107681576A (en) 2018-02-09
CN107681576B true CN107681576B (en) 2019-10-25

Family

ID=61141504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710997828.2A Active CN107681576B (en) 2017-10-24 2017-10-24 Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof

Country Status (1)

Country Link
CN (1) CN107681576B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719643A (en) * 2009-12-22 2010-06-02 新兴铸管股份有限公司 Electrical cable protection sleeve and making method thereof
CN102873891B (en) * 2012-06-20 2014-11-05 浙江双林塑料机械有限公司 Production line for butt welding plastic-steel compounded force pipe
CN105186408A (en) * 2015-08-07 2015-12-23 佛山市日丰企业有限公司 Aluminium-plastic composite tube for cable and preparation method thereof
CN206211445U (en) * 2016-12-08 2017-05-31 重庆映秀科技有限公司 Multiple tube

Also Published As

Publication number Publication date
CN107681576A (en) 2018-02-09

Similar Documents

Publication Publication Date Title
CN105458028B (en) Magnesium alloy profiles method for aligning and equipment
CN106270965A (en) A kind of welding procedure of X80 level pipe line steel circular weld
GB2213096A (en) Centering container end for hot air welding
CN104385617B (en) The forming method of the joint product that the metal shell of a kind of taper is formed with fiberglass heat shield
CN109399912A (en) A kind of fiber drawing tower control system
CN107681576B (en) Plastic-aluminum combined SP pipe of four layers of butt welding of one kind and preparation method thereof
CN208906605U (en) A kind of four fluorine tube flange holding device
CN102720906A (en) Plastic-filling construction method and tooling for broken pipe ends welded with flanges on lining-plastic composite steel pipe
CN206405573U (en) Boiler pipe fitting girth joint automatic submerged-arc welding system
CN106340356B (en) A kind of wisdom energy carbon fiber complex core production line
CN107225165A (en) Seven-roll Abramsen machine
CN209537311U (en) A kind of fiber drawing tower control system
CN207401948U (en) A kind of bending machine
CN214618456U (en) Pipeline water temperature control device in rubber sleeve cable vulcanization process
CN106444889B (en) A kind of high pressure orifice plate gas stagnation temperature control device and method
CN115985589A (en) Vertical processing device for cable
CN207982311U (en) Complex function cavity mechanism suitable for metal 3D printing post-processing
CN208458521U (en) A kind of calcium oxide kiln residual temperature recycling preheating device
CN207735748U (en) A kind of argon arc welding protective device
CN206104241U (en) There is seam steel pipe hot rolling system production line
CN206018994U (en) A kind of vertical chartered plane arc mouth heater of electric wire
CN210283204U (en) Encircling type machine head heating mechanism of plastic extruding machine
CN105058818B (en) Fiberglass radome pultrusion apparatus and pultrusion molding process
CN214977236U (en) Easy welding bellows mouth of pipe's forming device
CN205254370U (en) Temperature cooling frock between automatic welding bead of stainless steel pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A four layer butt welded aluminum-plastic composite SP pipe and its preparation method

Granted publication date: 20191025

Pledgee: Shandong Tengzhou Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG EFIELD PIPING SYSTEM Co.,Ltd.

Registration number: Y2024980017385

PE01 Entry into force of the registration of the contract for pledge of patent right