CN107679747A - 一种光伏出力跟踪环境治理负荷需求的控制方法 - Google Patents

一种光伏出力跟踪环境治理负荷需求的控制方法 Download PDF

Info

Publication number
CN107679747A
CN107679747A CN201710914965.5A CN201710914965A CN107679747A CN 107679747 A CN107679747 A CN 107679747A CN 201710914965 A CN201710914965 A CN 201710914965A CN 107679747 A CN107679747 A CN 107679747A
Authority
CN
China
Prior art keywords
mrow
msub
thermal power
power plant
mfrac
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710914965.5A
Other languages
English (en)
Other versions
CN107679747B (zh
Inventor
杨立滨
张玉龙
滕云
甘嘉田
张节潭
杨军
李正曦
苏小玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang University of Technology
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Original Assignee
Shenyang University of Technology
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang University of Technology, State Grid Qinghai Electric Power Co Ltd, Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd filed Critical Shenyang University of Technology
Priority to CN201710914965.5A priority Critical patent/CN107679747B/zh
Publication of CN107679747A publication Critical patent/CN107679747A/zh
Application granted granted Critical
Publication of CN107679747B publication Critical patent/CN107679747B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提供一种光伏出力跟踪环境治理负荷需求的控制方法,涉及电气工程技术领域。一种光伏出力跟踪环境治理负荷需求的控制方法,通过建立在环境治理背景下的排污收费模型及其他因素制定灵活电价制定机制,并根据灵活电价机制计算出不同电价下的火电厂的转移负荷量,将转移负荷与光伏电站的最大可控负荷波动量进行比较,经过调度站的多次调控,最终实现光伏电站能够完全抵消火电厂的移动负荷。本发明提供的光伏出力跟踪环境治理负荷需求的控制方法,实现光伏系统实时地跟踪来自火电厂供电网的转移负荷,避免了功率不平衡现象,显著提高电力系统可靠性与经济性。

Description

一种光伏出力跟踪环境治理负荷需求的控制方法
技术领域
本发明涉及电气工程技术领域,尤其涉及一种光伏出力跟踪环境治理负荷需求的控制方法。
背景技术
随着我国经济建设的深入发展,环境问题日益突出,越来越被人们重视,电力产业是比较典型的高污染、高能耗产业,尤其是火电厂,污染物排放占到工业污染排放的一半以上。排污收费是政府控制污染的常用手段,事实证明仅仅通过对电厂排污收费来控制污染物排放而达到节能减排的力度是不够的。还应从用户侧出发,鼓励用户购买无污染又可再生的能源所发的电,刺激光伏,风电等发电量增加。所以根据不同的电的来源制定不同的购电价格,给以充分的优惠,这样减少对于火力发电的过度依赖,减少化石能源的使用达到节能减排。所以利用光伏储能系统和火电厂供电系统建立一种控制方法,既能让排污收费起到制约作用又能鼓励用户使用清洁可再生能源所发的电。在一般的排污收费标准下,相对于经济增长速度,排污价格的增长相对较少,技术创新、优化管理等污染减排行为所花成本远高于排污收费时,企业未必会选择技术创新,会造成企业污染减排效果不增反降的现象。针对不同的污染物实行不同的收费标准,可以避免出现排污收费价格不当而造成的这种现象。
发明内容
针对现有技术的缺陷,本发明提供一种光伏出力跟踪环境治理负荷需求的控制方法,通过对环境治理负荷需求的跟踪,实现对光伏出力的控制。
一种光伏出力跟踪环境治理负荷需求的控制方法,包括以下步骤:
步骤1、确定各个火力发电厂所在供电网与各个光伏电站的连接关系;
每个火电厂所在供电网连接着n个不同的光伏电站,且a≤n≤b,其中a为火电厂所在供电网中连接的最少的光伏电站数,b为火电厂所在供电网中连接的最多的光伏电站数;每个光伏电站连接t个不同供电网,且c≤t≤d,其中c为每个光伏电站连接最少的火电厂个数,d为每个光伏电站连接最多的火电厂个数;每个火电厂所在配电网必须至少连接一个大容量光伏电站和多个个小容量光伏电站;
步骤2、根据排污费的“技术效应”理论设计火电厂的排污收费模型,具体方法为:
步骤2.1:选取对火电厂排污收费产生影响的参数,具体包括:火电厂所在地区的经济发展水平RGDP、火力发电能源使用强度μS、火电厂所在地区二氧化碳排放量二氧化硫排放量悬浮颗粒物排放量FK
步骤2.2:根据所选取的对火电厂排污收费产生影响的参数,计算火电厂所在地区的排污费用WSC、环境治理成本WEC、环境影响系数QEIF、温度系数βT、湿度系数βH和温湿度影响因数αTH,具体计算方法为:
火电厂所在地区温度系数βT的计算公式如下所示:
其中,Ti′为火电厂所在地区关于温度在一周内的第i个采样数据,i=1、2、…、m,m为采样数据的总个数,T为火电厂所在地区的即时温度;
火电厂所在地区湿度系数βH的计算公式如下所示:
其中,H′j为火电厂所在地区关于湿度在一周内的第j个采样数据,j=1、2、…、m,m为采样数据的总个数,H为火电厂所在地区的即时湿度;
火电厂所在地区温湿度影响因子αTH的计算公式如下所示:
火电厂所在地区的排污费用WSC的计算公式如下所示:
其中,a1、a2和a3分别为火电厂所在地区二氧化碳排放量、二氧化硫排放量和悬浮颗粒物排放量这三个污染物排放量占总污染物排放量的比重;
火电厂所在地区的环境治理成本的计算公式如下所示:
火电厂所在地区的环境影响系数的计算公式如下所示:
步骤3、根据环境影响系数,确定火电厂向光伏系统转移的负荷,具体方法为:
步骤3.1:在环境影响下,根据环境影响系数,确定火电厂所在地区的灵活电价机制,具体为:
①当环境影响系数QEIF在0<QEIF≤0.5范围内时,该地区环境为友好型,火电电价定为E1
②当环境影响系数QEIF在0.5<QEIF≤0.8范围内时,该地区环境趋于恶略,火电电价定为E2
③当环境影响系数QEIF在0.8<QEIF<1范围内时,该地区环境已经十分恶略,火电电价定为E3
步骤3.2:根据确定的灵活电价机制,确定在不同电价机制下火电厂所在供电网分别向光伏系统转移的负荷,具体计算公式如下所示:
其中,E0为采用灵活电价机制前的标准电价,ΔPi,1为火电电价定为E1时第i个火电厂所在供电网向光伏系统转移的负荷,ΔPi,2为火电电价定为E2时第i个火电厂所在供电网向光伏系统转移的负荷,ΔPi,3为火电电价定为E3时第i个火电厂所在供电网向光伏系统转移的负荷,Pi(t)为第i个发电厂根据单位时间内的历史数据预测的火电厂在下一个单位时间内的发电功率;
步骤4、使用光伏系统接收的负荷跟踪火电厂所在供电网转移的负荷;
假设每个火电厂所在供电网的移动负荷不同,以十分钟为单位对每个火力发电厂在灵活电价机制作用下转移的负荷进行计算,得到十分钟内每个火力发电厂转移的负荷值的最大值和最小值分别为最大转移负荷ΔP′max,x和最小转移负荷为ΔP′min,x,则每个光伏电站接收的负荷需满足如下公式:
其中,a为火电厂所在供电网连接的最少的光伏电站数,d为每个光伏电站连接最多的火电厂数;
步骤5:判断光伏电站接收火电厂转移的负荷量与火电厂转移的负荷量之间的关系,并根据每个光伏电站的削峰填谷能力,监控光伏电站转移负荷量的趋势;
当光伏电站接收的转移负荷ΔPtran满足的条件时,一个光伏电站就能完成火电厂转移的负荷消纳,如果不能满足上面条件,则由火电厂所在供电网的调度站向其他光伏电站进行调度。
由上述技术方案可知,本发明的有益效果在于:一种光伏出力跟踪环境治理负荷需求的控制方法,根据不同的污染物实行不同的收费标准,不仅能根据大气的污染程度,有针对性的对污染成分进行减排,而且使排污收费更加合理,让企业更容易接受。灵活电价机制,鼓励用户使用清洁能源所发电量,从需求侧减少火力发电所占比重,同时也刺激火电厂提高技术水平,减少污染,降低电价。通过污染物排放类型和排放量将发电企业和用户建立联系,根据环境影响因子得出不同污染程度下的电价,并根据电价及其他参数得出不同电价下的转移负荷。这些负荷由光伏电站供电代替火力发电厂供电,增强了电力系统的稳定性,节约了化石能源,为环境治理做出贡献。
附图说明
图1为本发明实施例提供的一种光伏出力跟踪环境治理负荷需求的控制方法的流程图;
图2为本发明实施例提供的光伏电站与火电厂所在供电网的连接示意图。
图中:1、大容量光伏电站;2、火电厂所在供电网;3、小容量光伏电站。
具体实施方式
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。
本实施例以某地区供电网为例,使用一种光伏出力跟踪环境治理负荷需求的控制方法,实现对该地区火电厂供电系统的转移负荷进行控制。
一种光伏出力跟踪环境治理负荷需求的控制方法,如图1所示,具体步骤为:
步骤1、确定各个火力发电厂所在供电网与各个光伏电站的连接关系;
每个火电厂所在供电网连接着n个不同的光伏电站,且a≤n≤b,其中a为火电厂所在供电网中连接的最少的光伏电站数,b为火电厂所在供电网中连接的最多的光伏电站数;每个光伏电站连接t个的火电厂所在的(各火电厂在不同的供电网还是在同一个供电网?)供电网,且c≤t≤d,其中c为每个光伏电站连接最少的火电厂个数,d为每个光伏电站连接最多的火电厂个数;每个火电厂所在配电网必须至少连接一个大容量光伏电站和多个个小容量光伏电站;
本实施例中,各个火力发电厂所在供电网与各个光伏电站的连接关系如图2所示,大圆表示大容量光伏电站1,小圆表示小容量光伏电站3,椭圆表示火电厂所在供电网2。本实施例中每个火电厂所在供电网最少连接2个不同的光伏电站,a=2;每个光伏电站最多连接3个供电网个数,d=3。
步骤2、根据排污费的“技术效应”理论设计火电厂的排污收费模型,具体方法为:
步骤2.1:监测火电厂所在地区对火电厂排污收费产生影响的参数,具体包括:火电厂所在地区的经济发展水平RGDP、火力发电能源使用强度μS、火电厂所在地区二氧化碳排放量二氧化硫排放量悬浮颗粒物排放量FK和火电厂所在地区的平均温度TAV及平均湿度HAV
本实施例中,根据监测得到该地区火力发电厂在负荷为630MW时,主要污染物的排放量分别为,二氧化硫含量为7.91×104Kg,氮氧化物含量为152.35×104Kg,二氧化碳含量为3.97×108Kg,悬浮颗粒物含量为1.07×108Kg,火力发电能源使用强度μS=0.756。
步骤2.2:根据所选取的对火电厂排污收费产生影响的参数,计算火电厂所在地区的排污费用WSC、环境治理成本WEC、环境影响系数QEIF、温度系数βT、湿度系数βH和温湿度影响因数αTH,具体计算方法为:
火电厂所在地区温度系数βT的计算公式如下所示:
其中,Ti′为火电厂所在地区关于温度在一周内的第i个采样数据,i=1、2、…、m,m为采样数据的总个数,T为火电厂所在地区的即时温度;
火电厂所在地区湿度系数βH的计算公式如下所示:
其中,H′j为火电厂所在地区关于湿度在一周内的第j个采样数据,j=1、2、…、m,m为采样数据的总个数,H为火电厂所在地区的即时湿度;
火电厂所在地区温湿度影响因子αTH的计算公式如下所示:
火电厂所在地区的排污费用WSC的计算公式如下所示:
其中,a1、a2和a3分别为火电厂所在地区二氧化碳排放量、二氧化硫排放量和悬浮颗粒物排放量这三个污染物排放量占总污染物排放量的比重,
火电厂所在地区的环境治理成本的计算公式如下所示:
火电厂所在地区的环境影响系数的计算公式如下所示:
本实施例中,计算求得排污费用WSC=27万元,环境成本WEC=35万元,环境影响系数QEIF,温度系数βT=0.83,湿度系数βH=1.24,温湿度影响因数αTH=1.37,环境影响系数为QEIF=0.77。
步骤3、根据环境影响系数,确定火电厂向光伏系统转移的负荷,具体方法为:
步骤3.1:在环境影响下,根据环境影响系数,确定火电厂所在地区的灵活电价机制,具体为:
①当环境影响系数QEIF在0<QEIF≤0.5范围内时,该地区环境为友好型,火电电价定为E1
②当环境影响系数QEIF在0.5<QEIF≤0.8范围内时,该地区环境趋于恶略,火电电价定为E2
③当环境影响系数QEIF在0.8<QEIF<1范围内时,该地区环境已经十分恶略,火电电价定为E3
本实施例中,环境影响系数为QEIF=0.77,得到该地区火电电价为E2=2.16元。
步骤3.2:根据确定的灵活电价机制,确定在不同电价机制下火电厂所在供电网分别向光伏系统转移的负荷,具体计算公式如下所示:
其中,E0为采用灵活电价机制前的标准电价,ΔPi,1为火电电价定为E1时第i个火电厂所在供电网向光伏系统转移的负荷,ΔPi,2为火电电价定为E2时第i个火电厂所在供电网向光伏系统转移的负荷,ΔPi,3为火电电价定为E3时第i个火电厂所在供电网向光伏系统转移的负荷,Pi(t)为第i个火电厂根据单位时间内的历史数据预测的火电厂在下一个单位时间内的发电功率;
本实施例中,火电厂预测下一时刻发电功率为Pi(t)=109.3MW,该地区的电价为E2=2.16元,所以火电厂所在供电网向光伏系统转移的负荷为ΔPi,2=20.7MW,并将该负荷定义为该火力发电厂的最大转移负荷。
步骤4、使用光伏系统接收的负荷跟踪火电厂所在供电网转移的负荷
假设每个火电厂所在供电网的移动负荷不同,以十分钟为单位对每个火力发电厂在灵活电价机制作用下转移的负荷进行计算,得到十分钟内每个火力发电厂转移的负荷值的最大值和最小值分别为最大转移负荷ΔP′max,x和最小转移负荷为ΔP′min,x,则每个光伏电站接收的负荷需满足如下公式:
其中,a为火电厂所在供电网连接的最少的光伏电站数,d为每个光伏电站连接最多的火电厂数;
步骤5:判断光伏电站接收火电厂转移的负荷量与火电厂转移的负荷量之间的关系,并根据每个光伏电站的削峰填谷能力,监控光伏电站转移负荷量的趋势;
当光伏电站接收的转移负荷ΔP满足的条件时,一个光伏电站就能完成火电厂转移的负荷消纳,如果不能满足上面条件,则由火电厂所在供电网的调度站向其他光伏电站进行调度。
本实施例中火力发电厂的最大转移负荷ΔP’max,x=20.7MW,a为火电厂所在供电网中连接的最少的光伏电站数为a=2,每个光伏电站连接最多的火电厂个数为d=3,所以求得的每个光伏电站接收的负荷需满足
ΔPtran≤1.5ΔP′max,x=31.05
本实施例中,根据计算,光伏电站所能接收火电厂转移的负荷量大于火电厂的转移负荷量,所以一个光伏电站能满足要求。
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明权利要求所限定的范围。

Claims (4)

1.一种光伏出力跟踪环境治理负荷需求的控制方法,其特征在于:包括以下步骤:
步骤1、确定各个火力发电厂所在供电网与各个光伏电站的连接关系;
步骤2、根据排污费的“技术效应”理论设计火电厂的排污收费模型,具体方法为:
步骤2.1:选取对火电厂排污收费产生影响的参数,具体包括:火电厂所在地区的经济发展水平RGDP、火力发电能源使用强度μS、火电厂所在地区二氧化碳排放量二氧化硫排放量悬浮颗粒物排放量FK
步骤2.2:根据所选取的对火电厂排污收费产生影响的参数,计算火电厂所在地区的排污费用WSC、环境治理成本WEC、环境影响系数QEIF、温度系数βT、湿度系数βH和温湿度影响因数αTH,具体计算方法为:
火电厂所在地区温度系数βT的计算公式如下所示:
<mrow> <msub> <mi>&amp;beta;</mi> <mi>T</mi> </msub> <mo>=</mo> <mfrac> <mi>T</mi> <mrow> <mfrac> <mn>1</mn> <mi>n</mi> </mfrac> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msup> <msub> <mi>T</mi> <mi>i</mi> </msub> <mo>&amp;prime;</mo> </msup> </mrow> </mfrac> </mrow>
其中,T′i为火电厂所在地区关于温度在一周内的第i个采样数据,i=1、2、…、m,m为采样数据的总个数,T为火电厂所在地区的即时温度;
火电厂所在地区湿度系数βH的计算公式如下所示:
<mrow> <msub> <mi>&amp;beta;</mi> <mi>H</mi> </msub> <mo>=</mo> <mfrac> <mi>H</mi> <mrow> <mfrac> <mn>1</mn> <mi>n</mi> </mfrac> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msubsup> <mi>H</mi> <mi>j</mi> <mo>&amp;prime;</mo> </msubsup> </mrow> </mfrac> </mrow>
其中,H′j为火电厂所在地区关于湿度在一周内的第j个采样数据,j=1、2、…、m,m为采样数据的总个数,H为火电厂所在地区的即时湿度;
火电厂所在地区温湿度影响因子αTH的计算公式如下所示:
<mrow> <msub> <mi>&amp;alpha;</mi> <mrow> <mi>T</mi> <mi>H</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <mn>1.05</mn> <msubsup> <mi>&amp;beta;</mi> <mi>T</mi> <mn>2</mn> </msubsup> <msup> <mrow> <mo>(</mo> <msub> <mi>cos&amp;beta;</mi> <mi>H</mi> </msub> <mo>&amp;CenterDot;</mo> <msub> <mi>sin&amp;beta;</mi> <mi>H</mi> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;CenterDot;</mo> <msub> <mi>ln&amp;beta;</mi> <mi>T</mi> </msub> </mrow> <msqrt> <msub> <mi>&amp;beta;</mi> <mi>H</mi> </msub> </msqrt> </mfrac> </mrow>
火电厂所在地区的排污费用WSC的计算公式如下所示:
<mrow> <msub> <mi>W</mi> <mrow> <mi>S</mi> <mi>C</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <mn>104</mn> <msqrt> <mrow> <msubsup> <mi>a</mi> <mn>1</mn> <mn>2</mn> </msubsup> <msub> <mi>F</mi> <mrow> <msub> <mi>CO</mi> <mn>2</mn> </msub> </mrow> </msub> </mrow> </msqrt> <mo>+</mo> <mn>79</mn> <msqrt> <mrow> <msubsup> <mi>a</mi> <mn>2</mn> <mn>2</mn> </msubsup> <msub> <mi>F</mi> <mrow> <msub> <mi>SO</mi> <mn>2</mn> </msub> </mrow> </msub> </mrow> </msqrt> <mo>+</mo> <mn>50</mn> <msqrt> <mrow> <msubsup> <mi>a</mi> <mn>3</mn> <mn>2</mn> </msubsup> <msub> <mi>F</mi> <mi>K</mi> </msub> </mrow> </msqrt> </mrow> <mrow> <msub> <mi>R</mi> <mrow> <mi>G</mi> <mi>D</mi> <mi>P</mi> </mrow> </msub> <mi>ln</mi> <mrow> <mo>(</mo> <msubsup> <mi>a</mi> <mn>1</mn> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>a</mi> <mn>2</mn> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>a</mi> <mn>3</mn> <mn>2</mn> </msubsup> <mo>)</mo> </mrow> </mrow> </mfrac> </mrow>
其中,a1、a2和a3分别为火电厂所在地区二氧化碳排放量、二氧化硫排放量和悬浮颗粒物排放量这三个污染物排放量占总污染物排放量的比重;
火电厂所在地区的环境治理成本的计算公式如下所示:
<mrow> <msub> <mi>W</mi> <mrow> <mi>E</mi> <mi>C</mi> </mrow> </msub> <mo>=</mo> <mrow> <mo>(</mo> <msup> <mi>e</mi> <msub> <mi>&amp;alpha;</mi> <mrow> <mi>T</mi> <mi>H</mi> </mrow> </msub> </msup> <mo>+</mo> <msup> <mi>e</mi> <msub> <mi>&amp;mu;</mi> <mi>S</mi> </msub> </msup> <mo>)</mo> </mrow> <mfrac> <mrow> <msub> <mi>sin&amp;beta;</mi> <mi>T</mi> </msub> <msub> <mi>cos&amp;beta;</mi> <mi>H</mi> </msub> <mi>l</mi> <mi>n</mi> <mrow> <mo>(</mo> <msubsup> <mi>a</mi> <mn>1</mn> <mn>2</mn> </msubsup> <msub> <mi>F</mi> <mrow> <msub> <mi>CO</mi> <mn>2</mn> </msub> </mrow> </msub> <mo>+</mo> <msubsup> <mi>a</mi> <mn>2</mn> <mn>2</mn> </msubsup> <msub> <mi>F</mi> <mrow> <msub> <mi>SO</mi> <mn>2</mn> </msub> </mrow> </msub> <mo>+</mo> <msubsup> <mi>a</mi> <mn>3</mn> <mn>2</mn> </msubsup> <msub> <mi>F</mi> <mi>K</mi> </msub> <mo>)</mo> </mrow> </mrow> <mrow> <msub> <mi>&amp;beta;</mi> <mi>T</mi> </msub> <msub> <mi>&amp;beta;</mi> <mi>H</mi> </msub> <msqrt> <mrow> <msubsup> <mi>F</mi> <mrow> <msub> <mi>CO</mi> <mn>2</mn> </msub> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>F</mi> <mrow> <msub> <mi>SO</mi> <mn>2</mn> </msub> </mrow> <mn>2</mn> </msubsup> <mo>+</mo> <msubsup> <mi>F</mi> <mi>K</mi> <mn>2</mn> </msubsup> </mrow> </msqrt> </mrow> </mfrac> </mrow>
火电厂所在地区的环境影响系数的计算公式如下所示:
<mrow> <msub> <mi>Q</mi> <mrow> <mi>E</mi> <mi>I</mi> <mi>F</mi> </mrow> </msub> <mo>=</mo> <mfrac> <msub> <mi>W</mi> <mrow> <mi>S</mi> <mi>C</mi> </mrow> </msub> <msub> <mi>W</mi> <mrow> <mi>E</mi> <mi>C</mi> </mrow> </msub> </mfrac> </mrow>
步骤3、根据环境影响系数,确定火电厂向光伏系统转移的负荷,具体方法为:
步骤3.1:在环境影响下,根据环境影响系数,确定火电厂所在地区的灵活电价机制;
步骤3.2:根据确定的灵活电价机制,确定在不同电价机制下火电厂所在供电网分别向光伏系统转移的负荷;
步骤4、使用光伏系统接收的负荷跟踪火电厂所在供电网转移的负荷;
假设每个火电厂所在供电网的移动负荷不同,以十分钟为单位对每个火力发电厂在灵活电价机制作用下转移的负荷进行计算,得到十分钟内每个火力发电厂转移的负荷值的最大值和最小值分别为最大转移负荷ΔP′max,x和最小转移负荷为ΔP′min,x,则每个光伏电站接收的负荷需满足如下公式:
<mrow> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>t</mi> <mi>r</mi> <mi>a</mi> <mi>n</mi> </mrow> </msub> <mo>&amp;le;</mo> <mfrac> <mi>d</mi> <mi>a</mi> </mfrac> <msubsup> <mi>&amp;Delta;P</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> <mo>,</mo> <mi>x</mi> </mrow> <mo>&amp;prime;</mo> </msubsup> </mrow>
其中,a为火电厂所在供电网连接的最少的光伏电站数,d为每个光伏电站连接最多的火电厂数;
步骤5:判断光伏电站接收火电厂转移的负荷量与火电厂转移的负荷量之间的关系,并根据每个光伏电站的削峰填谷能力,监控光伏电站转移负荷量的趋势;
当光伏电站接收的转移负荷ΔPtran满足的条件时,一个光伏电站就能完成火电厂转移的负荷消纳,如果不能满足上面条件,则由火电厂所在供电网的调度站向其他光伏电站进行调度。
2.根据权利要求1所述的一种光伏出力跟踪环境治理负荷需求的控制方法,其特征在于:步骤1所述连接关系包括,每个火电厂所在供电网连接着n个不同的光伏电站,且a≤n≤b,其中a为火电厂所在供电网中连接的最少的光伏电站数,b为火电厂所在供电网中连接的最多的光伏电站数;每个光伏电站连接t个不同供电网,且c≤t≤d,其中c为每个光伏电站连接最少的火电厂个数,d为每个光伏电站连接最多的火电厂个数;每个火电厂所在配电网必须至少连接一个大容量光伏电站和多个个小容量光伏电站。
3.根据权利要求1所述的一种光伏出力跟踪环境治理负荷需求的控制方法,其特征在于:步骤3.1所述确定火电厂所在地区的灵活电价机制,具体为:
①当环境影响系数QEIF在0<QEIF≤0.5范围内时,该地区环境为友好型,火电电价定为E1
②当环境影响系数QEIF在0.5<QEIF≤0.8范围内时,该地区环境趋于恶略,火电电价定为E2
③当环境影响系数QEIF在0.8<QEIF<1范围内时,该地区环境已经十分恶略,火电电价定为E3
4.根据权利要求1所述的一种光伏出力跟踪环境治理负荷需求的控制方法,其特征在于:步骤3.2所述确定在不同电价机制下火电厂所在供电网分别向光伏系统转移的负荷,具体计算公式如下所示:
<mrow> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>i</mi> <mo>,</mo> <mn>1</mn> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mi>i</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mfrac> <mrow> <msqrt> <mrow> <mo>|</mo> <mrow> <mi>lg</mi> <mi> </mi> <msub> <mi>Q</mi> <mrow> <mi>E</mi> <mi>I</mi> <mi>F</mi> </mrow> </msub> </mrow> <mo>|</mo> </mrow> </msqrt> <mo>&amp;CenterDot;</mo> <msup> <mi>e</mi> <mfrac> <mrow> <mn>1</mn> <mo>-</mo> <msub> <mi>E</mi> <mn>1</mn> </msub> </mrow> <mn>100</mn> </mfrac> </msup> </mrow> <mrow> <msup> <mi>&amp;pi;</mi> <mn>2</mn> </msup> <mi>arctan</mi> <mrow> <mo>|</mo> <mfrac> <msub> <mi>E</mi> <mn>1</mn> </msub> <mrow> <msub> <mi>E</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>E</mi> <mn>0</mn> </msub> </mrow> </mfrac> <mo>|</mo> </mrow> </mrow> </mfrac> </mrow>
<mrow> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>i</mi> <mo>,</mo> <mn>2</mn> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mi>i</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mfrac> <msub> <mi>E</mi> <mn>2</mn> </msub> <mrow> <mn>1</mn> <mo>-</mo> <mi>l</mi> <mi>g</mi> <mi> </mi> <msub> <mi>E</mi> <mn>2</mn> </msub> </mrow> </mfrac> <mfrac> <mn>37.9</mn> <mrow> <msub> <mi>tanQ</mi> <mrow> <mi>E</mi> <mi>I</mi> <mi>F</mi> </mrow> </msub> </mrow> </mfrac> <msup> <mrow> <mo>(</mo> <msub> <mi>E</mi> <mn>2</mn> </msub> <mo>-</mo> <msub> <mi>E</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> <mrow> <mi>ln</mi> <mn>21</mn> </mrow> </msup> </mrow>
<mrow> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>i</mi> <mo>,</mo> <mn>3</mn> </mrow> </msub> <mo>=</mo> <msub> <mi>P</mi> <mi>i</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <mfrac> <msub> <mi>E</mi> <mn>2</mn> </msub> <mn>2</mn> </mfrac> <mi>tan</mi> <mi> </mi> <mi>sin</mi> <mi> </mi> <msub> <mi>E</mi> <mn>3</mn> </msub> <mo>-</mo> <mfrac> <mrow> <mi>ln</mi> <mi> </mi> <msub> <mi>Q</mi> <mrow> <mi>E</mi> <mi>I</mi> <mi>F</mi> </mrow> </msub> </mrow> <msup> <mrow> <mo>(</mo> <msub> <mi>E</mi> <mn>3</mn> </msub> <mo>-</mo> <msub> <mi>E</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> <mfrac> <mn>1</mn> <mrow> <mn>3</mn> <msub> <mi>Q</mi> <mrow> <mi>E</mi> <mi>I</mi> <mi>F</mi> </mrow> </msub> </mrow> </mfrac> </msup> </mfrac> <mo>)</mo> </mrow> </mrow>
其中,E0为采用灵活电价机制前的标准电价,ΔPi,1为火电电价定为E1时第i个火电厂所在供电网向光伏系统转移的负荷,ΔPi,2为火电电价定为E2时第i个火电厂所在供电网向光伏系统转移的负荷,ΔPi,3为火电电价定为E3时第i个火电厂所在供电网向光伏系统转移的负荷,Pi(t)为第i个发电厂根据单位时间内的历史数据预测的火电厂在下一个单位时间内的发电功率。
CN201710914965.5A 2017-09-30 2017-09-30 一种光伏出力跟踪环境治理负荷需求的控制方法 Active CN107679747B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710914965.5A CN107679747B (zh) 2017-09-30 2017-09-30 一种光伏出力跟踪环境治理负荷需求的控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710914965.5A CN107679747B (zh) 2017-09-30 2017-09-30 一种光伏出力跟踪环境治理负荷需求的控制方法

Publications (2)

Publication Number Publication Date
CN107679747A true CN107679747A (zh) 2018-02-09
CN107679747B CN107679747B (zh) 2020-11-13

Family

ID=61139432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710914965.5A Active CN107679747B (zh) 2017-09-30 2017-09-30 一种光伏出力跟踪环境治理负荷需求的控制方法

Country Status (1)

Country Link
CN (1) CN107679747B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909511A (zh) * 2017-11-20 2018-04-13 泗县汉能诚信电气工程有限公司 一种光伏电站方案生成方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120271474A1 (en) * 2009-10-05 2012-10-25 Panasonic Corporation Electric power distribution system
CN104281922A (zh) * 2014-10-14 2015-01-14 国家电网公司 考虑污染物排放的火电机组节能综合评价方法
CN104537462A (zh) * 2014-12-11 2015-04-22 廖鹰 空气细颗粒物的火电污染因素控制方法
CN106408131A (zh) * 2016-09-30 2017-02-15 安徽工程大学 一种基于需求侧管理的光伏微网多目标调度方法
CN107153986A (zh) * 2017-05-09 2017-09-12 西安交通大学 一种促进新能源消纳的发电权交易方法
CN107194539A (zh) * 2017-04-19 2017-09-22 中国能源建设集团浙江省电力设计院有限公司 一种考虑大气污染物防治的电力电量平衡方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120271474A1 (en) * 2009-10-05 2012-10-25 Panasonic Corporation Electric power distribution system
CN104281922A (zh) * 2014-10-14 2015-01-14 国家电网公司 考虑污染物排放的火电机组节能综合评价方法
CN104537462A (zh) * 2014-12-11 2015-04-22 廖鹰 空气细颗粒物的火电污染因素控制方法
CN106408131A (zh) * 2016-09-30 2017-02-15 安徽工程大学 一种基于需求侧管理的光伏微网多目标调度方法
CN107194539A (zh) * 2017-04-19 2017-09-22 中国能源建设集团浙江省电力设计院有限公司 一种考虑大气污染物防治的电力电量平衡方法
CN107153986A (zh) * 2017-05-09 2017-09-12 西安交通大学 一种促进新能源消纳的发电权交易方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨婷婷等: "基于机会约束规划的储能系统跟踪光伏发电计划出力控制方法", 《电力建设》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909511A (zh) * 2017-11-20 2018-04-13 泗县汉能诚信电气工程有限公司 一种光伏电站方案生成方法

Also Published As

Publication number Publication date
CN107679747B (zh) 2020-11-13

Similar Documents

Publication Publication Date Title
CN106169108B (zh) 含电池储能系统的主动配电网短期有功优化方法
CN107958300A (zh) 一种考虑互动响应的多微网互联运行协调调度优化方法
CN105406520B (zh) 基于双主控动态协作的独立微电网经济调度优化方法
Yang et al. Research on heat and electricity coordinated dispatch model for better integration of wind power based on electric boiler with thermal storage
CN105162149A (zh) 基于模糊自适应调节的光储系统跟踪发电计划出力方法
Yin et al. Cooperative optimization strategy for large-scale electric vehicle charging and discharging
CN103280833B (zh) 基于主动机制的储能与光伏协调的配电网控制方法
CN114330827B (zh) 多能流虚拟电厂分布式鲁棒自调度优化方法及其应用
CN105656026A (zh) 可再生能源的设备建设资源配置方法和系统
Zhou et al. Optimal sizing of pv system and bess for smart household under stepwise power tariff
CN115408808A (zh) 一种计及碳排放的能源配网系统多时间尺度优化调度方法
CN109888770A (zh) 基于机会约束规划和波动成本的风电场装机容量优化方法
CN107453408B (zh) 一种考虑不确定性的微电网能量优化调度方法
CN109474007A (zh) 一种基于大数据云技术的能源互联网调度方法
CN107679747A (zh) 一种光伏出力跟踪环境治理负荷需求的控制方法
CN117040027B (zh) 一种农村虚拟电厂的协调优化方法和装置
CN113240205A (zh) 一种基于多能源综合利用的区域用能系统替代优化方法
CN115936336B (zh) 一种虚拟电厂容量配置与调控运行优化方法
CN116961008A (zh) 计及电力弹簧与负荷需求响应的微电网容量双层优化方法
CN117239771A (zh) 一种综合能源系统中的负荷柔性调度方法及系统
CN110571868A (zh) 微电网的优化配置方法
CN105701566A (zh) 包含储热的风电供暖系统调度方法及装置
Wang et al. Optimal dispatch of an island MG including a multiple energy storage system
Ge et al. Low-carbon economic dispatch of distribution network with carbon capture power plant considering carbon trading
CN105846427A (zh) 一种基于柔性负荷的需求响应低碳效益评估方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant