CN104281922A - 考虑污染物排放的火电机组节能综合评价方法 - Google Patents

考虑污染物排放的火电机组节能综合评价方法 Download PDF

Info

Publication number
CN104281922A
CN104281922A CN201410540234.5A CN201410540234A CN104281922A CN 104281922 A CN104281922 A CN 104281922A CN 201410540234 A CN201410540234 A CN 201410540234A CN 104281922 A CN104281922 A CN 104281922A
Authority
CN
China
Prior art keywords
environmental
thermal power
mergeformat
generating unit
power generating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410540234.5A
Other languages
English (en)
Inventor
林琳
边疆
宋莉
王中荣
邢立功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410540234.5A priority Critical patent/CN104281922A/zh
Publication of CN104281922A publication Critical patent/CN104281922A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种考虑污染物排放的火电机组节能综合评价方法,包括步骤:获得火电机组一段时间内的供电煤耗bg,然后将所消耗煤折算成标煤的价格c0;计算火电机组这段时间内的环境成本ce;得出火力发电机组每发一度电所需要的总成本为:将总成本转化为供电煤耗,得到综合供电煤耗;计算综合能耗因子和环境损耗因子。本发明的指标可以定量的反映火电机组整体的经济性和环保性,该方法可以为电网的节能优化调度提供科学依据,对国家节能减排政策的实施具有重要意义,而且计算简单,容易理解,工程应用方便。

Description

考虑污染物排放的火电机组节能综合评价方法
技术领域
本发明属于火电机组节能综合评价技术领域,尤其是一种考虑污染物排放的火电机组节能综合评价方法。
背景技术
随着我国节能减排力度的不断加大,火力发电的节能调度也提上日程。长期以来,发电企业一直使用供电煤耗来评价火力发电的节能效果,而对环境等因素考虑较少。然而,供电煤耗并不能全面反映电厂的节能减排效果,还要考虑污染物排放等其他因素。例如,脱硫和脱硝系统的投运会使机组的供电煤耗增加,但是由于减少了NOx和SO2等污染物排放,会带来很好的社会效益。可以看出,科学合理地评价火力发电企业的节能减排效果,对国家实施节能减排政策以及电网企业执行节能调度,都具有重要的意义。
发明内容
本发明的目的是针对现有技术的不足,而提出一种考虑污染物排放的火电机组节能综合评价方法。
本发明解决其技术问题是采取以下技术方案实现的:
一种考虑污染物排放的火电机组节能综合评价方法,包括步骤如下:
第一步,获得火电机组一段时间内的供电煤耗bg,然后将所消耗煤折算成标煤的价格c0
第二步,计算火电机组这段时间内的环境成本ce,环境成本ce包括:在火力发电生产过程中治理污染物排放的成本和污染物排放给环境带来的损失,计算步骤如下:
(1)获得该机组环保设备的总投资CTI,将总投资CTI在电厂运行寿命期内均摊,按等额支付原则得到年均投资为:
CaI=CTI×i(1+i)n/[(1+i)n-1]       \*MERGEFORMAT(1)
式中i为折现率,n为电厂运行寿命年数,那么平均每度电对应的环保设备投资成本为:
cI=CaI/Wa                 \*MERGEFORMAT(2)
式中Wa为年平均发电量,
计每度电的环保设备运行维护成本为cM,那么在火电厂运行寿命期内机组治理污染物排放的成本为:
ce1=cI+cM           \*MERGEFORMAT(3);
(2)计算这段时间内火力发电的环境损失,包括①污染物排放所造成环境质量下降和环境污染所导致的非环境方面的损失,②向环保部门缴纳的排污费,公式表示为:
c e 2 = ( Σ i = 1 N ( V ei Q i ) + C p ) / W , \ * MERGEFORMAT - - - ( 4 )
式中Vei为第i项污染物的环境价值,Qi为第i项污染物的排放量,N为火电机组主要污染物种类数,Cp为该段时间内总的排污费;
(3)计算该机组在这段时间内的环境成本为:
ce=ce1+ce2               \*MERGEFORMAT(5)
第三步,利用第一,第二步的结果得出火力发电机组每发一度电所需要的总成本为:
c=bg×c0+ce            \*MERGEFORMAT(6)
第四步,将总成本转化为供电煤耗,可以得到综合供电煤耗
b z = c c 0 = b g + b e , \ * MERGEFORMAT - - - ( 7 )
第五步,计算综合能耗因子和环境损耗因子,其中综合能耗因子定义为一定时间内的综合供电煤耗与实际供电煤耗的比值,环境损耗因子定义为一段时间内环境折算煤耗与实际煤耗之比,
θ = b z b g = b g + b e b g = 1 + δ , \ * MERGEFORMAT - - - ( 8 )
δ = b e b g , \ * MERGEFORMAT - - - ( 9 )
其中θ为综合能耗因子,δ为环境损耗因子。
而且,所述第二步(1)步中的计每度电的环保设备运行维护成本为cM,的具体方法为:电厂运行寿命年数内总的维护成本除以总的发电量。
而且,所述第二步(2)步中的Vei为第i项污染物的环境价值,是以防护费用作为该污染物的单位环境价值。
本发明的优点和积极效果是:
本发明可以合理综合地评价火电机组的节能减排性能,为电网节能调度提供依据,为节能减排政策的实施提供解决方案,计算方法简单方便。
附图说明
图1是本发明综合评价方法的流程图;
图2是本发明实例中某地四个电厂的环境成本折算煤耗;
图3是本发明实例中某地四个电厂供电煤耗和综合供电煤耗对比图。
具体实施方式
以下对本发明实施做进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种考虑污染物排放的火电机组节能综合评价方法,包括步骤如下:
第一步,获得火电机组一段时间内的供电煤耗bg,然后将所消耗煤折算成标煤的价格c0
第二步,计算火电机组这段时间内的环境成本ce,这里环境成本是指在火力发电生产过程中治理污染物排放的成本和污染物排放给环境带来的损失,计算步骤如下:
(1)获得该机组环保设备的总投资CTI,包括脱硫、脱硝、除尘设备,将初始时刻投资在电厂运行寿命期内均摊,按等额支付原则得到年均投资为:
CaI=CTI×i(1+i)n/[(1+i)n-1]   \*MERGEFORMAT(1)
式中i为折现率,n为电厂运行寿命,那么平均每度电对应的环保设备投资成本为:
cI=CaI/Wa                    \*MERGEFORMAT(2)
式中Wa为年平均发电量,每度电环保设备运行维护成本为cM,电厂运行寿命年数内总的维护成本除以总的发电量。那么在火电厂运行寿命期内机组治理污染物排放的成本为:
ce1=cI+cM                    \*MERGEFORMAT(3);
(2)在环境经济学研究中,普遍认为用环境价值来衡量环境损失更合理,但是从电网调度的角度出发,火力发电厂虽然缴纳了排污费,但是仍然排放了污染物,给环境造成了损失,因此,计算火力发电的环境成本不仅要考虑排污费,还要考虑排放污染物的环境价值,该机组的环境损失由两部分组成:①污染物排放所造成环境质量下降和环境污染所导致的非环境方面的损失,如环境污染引起的农业减产,环境污染造成人体健康损害;②向环保部门缴纳的排污费,因此,这段时间内火力发电的环境损失为
c e 2 = ( Σ i = 1 N ( V ei Q i ) + C p ) / W , \ * MERGEFORMAT - - - ( 4 )
式中Vei为第i项污染物的环境价值,Qi为第i项污染物的排放量,N为火电机组主要污染物种类数,Cp为该段时间内总的排污费,
(3)该机组在这段时间内的环境成本为:
ce=ce1+ce2                \*MERGEFORMAT(5)
第三步,利用步骤1-2的结果得出火力发电机组每发一度电所需要的总成本为:
c=bg×c0+ce             \*MERGEFORMAT(6)
第四步,将总成本转化为供电煤耗,可以得到综合供电煤耗
b z = c c 0 = b g + b e , \ * MERGEFORMAT - - - ( 7 )
第五步,计算综合能耗因子和环境损耗因子,定量的表征机组的节能减排性能,其中综合能耗因子定义为一定时间内的综合供电煤耗与实际供电煤耗的比值,环境损耗因子定义为一段时间内环境折算煤耗与实际煤耗之比,
θ = b z b g = b g + b e b g = 1 + δ , \ * MERGEFORMAT - - - ( 8 )
δ = b e b g , \ * MERGEFORMAT - - - ( 9 )
其中θ为综合能耗因子,δ为环境损耗因子。
实例
本实施例为对某地区火电机组进行综合评价,如图1所示,应用该方法时不仅需要知道该机组的运行数据,还需要获得环保设备投资和维护费用,然而与环保设备相关的数据很难得到或者近似估计。一方面,环保设备的初始投资涉及电厂的商业机密,一般无法获取;另一方面,环保设备的运行维护费用不定,随着的寿命的增加而增加,难以准确估计,因此,本实施例中的环境成本仅考虑环境损失。
第一步,取出一段时间n个月内机组运行数据:烟囱入口SO2浓度ρ1、烟囱入口NOx浓度ρ2、烟气流量q、机组电负荷w和供电煤耗bg,以时间间隔为△t,共s个数据点,计算该机组用煤折算成标煤价格c0
第二步,计算该段时间内SO2的排放量:
Q1=∑ρ1q△t       \*MERGEFORMAT(10)
NOx的排放量:
Q2=∑ρ2q△t           \*MERGEFORMAT(11)
总发电量:
W=∑w△t                   \*MERGEFORMAT(12);
第三步,第j个月SO2的排放量为:
Q(1,j)=∑ρ1(j)q(j)△t    \*MERGEFORMAT(13)
第j个月NOx的排放量:
Q(2,j)=∑ρ2(j)q(j)△t    \*MERGEFORMAT(14)
第j个月SO2排放平均浓度为:
ρ(1,j)=Q(1,j)/∑q(j)△t    \*MERGEFORMAT(15)
第j个月NOx排放平均浓度:
ρ(2,j)=Q(2,j)/∑q(j)△t    \*MERGEFORMAT(16)
将ρ(1,j)、ρ(2,j)代入下式分别求出第j个月SO2和NOx的差别化排污系数k(1,j)、k(2,j),
k ( i , j ) = 1 ( 0.9 &rho; 0 < &rho; ( i , j ) &le; &rho; 0 ) 0.9 ( 0.8 &rho; 0 < &rho; ( i , j ) &le; 0.9 &rho; 0 ) 0.8 ( 0.7 &rho; 0 < &rho; ( i , j ) &le; 0.8 &rho; 0 ) 0.6 ( 0.6 &rho; 0 < &rho; ( i , j ) &le; 0.7 &rho; 0 ) 0.5 ( 0.5 &rho; 0 < &rho; ( i , j ) &le; 0.6 &rho; 0 ) 0.4 ( &rho; ( i , j ) &le; 0.5 &rho; 0 ) 2 ( &rho; ( i , j ) > &rho; 0 ) , \ * MERGEFORMAT - - - ( 17 )
上式中ρ(i,j)为第i项污染物第j月的平均排放浓度,ρ0为该项污染物的排放标准;
第四步,第i项污染物第j月的排污费为Cp(i,j)
Cp(i,j)=k(i,j)·C(i)·Q(i,j)    \*MERGEFORMAT(18)
式中C(i)为第i项污染物的排污收费标准,Q(i,j)为第i项污染物第j月的排放量,则从第1月到第n月该项污染物的排污费为:
C p ( i ) = &Sigma; j = 1 n C p ( i , j ) , \ * MERGEFORMAT - - - ( 19 )
那么该地区火电机组总排污费为:
环境成本为:
c e = ( &Sigma; m = 1 2 ( V em Q m ) + &Sigma; i = 1 2 &Sigma; j = 1 n k ( i , j ) &CenterDot; C ( i ) &CenterDot; Q ( i , j ) ) W , \ * MERGEFORMAT - - - ( 21 ) ;
第五步,发电成本为:
c=bg×c0+ce    \*MERGEFORMAT(22)
综合供电煤耗为:
                        \*MERGEFORMAT(23);
第六步,计算综合能耗因子:
&theta; = b z b g = b g + b e b g , \ * MERGEFORMAT - - - ( 24 )
环境损耗因子:
&delta; = b e b g , \ * MERGEFORMAT - - - ( 25 )
国家有关部门已经出台了详细的排污费征收法规,而对于污染引起的环境质量下降,则很难获取直接评估环境损失所需的定量数据,因此,常常以防护费用来间接作为污染物的单位环境价值,综合考虑国内各种污染物的处理费用、排放总量和排污费征收标准,评估得出目前中国火力发电过程中排放SO2、NOx的环境价值标准,如表1所示,
表1
近年来,国家和地方出台了越来越严格的环保法规,环保部新颁布的《火电厂大气污染物排放标准》提高的SO2和NOx的排放浓度标准,如表2所示,
表2
以本实施例所在的某地为例,某地是四大直辖市之一,环保要求一直很高,最新出台的《关于二氧化硫等4种污染物排污费征收标准调整及差别化收费实施细则》提高了SO2和NOx排污费的征收标准,如表3所示,
表3
本实施例中,对某地区四个火电厂的火电机组进行综合评价,得到各发电厂环境成本折算煤耗率如图2所示。由图中可以看出,不同电厂环境成本所折算的煤耗在5g/kWh-50g/kWh范围内变化,相对于平均供电煤耗率来说不能忽略。环境成本从低到高依次是A、C、D、B,如果以环境成本最低为目标,那么电网调度应该按照以上次序优先分配负荷,但是这没有考虑发电成本,显然不符合市场经济运行的规律。
图3是利用本发明对某地四个电厂进行综合评价得到的供电煤耗和综合供电煤耗的对比,从图中不难看出,供电煤耗从高到低依次是C、B、A、D,但是综合供电煤耗从低到高是C、A、D、B。单从发电经济性角度来说,C、B、A、D依次最好,但是综合考虑发电成本和环境成本,C、A、D、B依次最好。电网调度可直接按C、A、D、B次序分配负荷,或者依照此顺序多分配负荷,从而使火力发电综合效益最大化。因此,综合考虑环境成本后得到的结果更科学,综合供电煤耗可以为电网节能调度决策提供依据。

Claims (3)

1.一种考虑污染物排放的火电机组节能综合评价方法,其特征在于包括步骤如下:
第一步,获得火电机组一段时间内的供电煤耗bg,然后将所消耗煤折算成标煤的价格c0
第二步,计算火电机组这段时间内的环境成本ce,环境成本ce包括:在火力发电生产过程中治理污染物排放的成本和污染物排放给环境带来的损失,计算步骤如下:
(1)获得该机组环保设备的总投资CTI,将总投资CTI在电厂运行寿命期内均摊,按等额支付原则得到年均投资为:
CaI=CTI×i(1+i)n/[(1+i)n-1]\*MERGEFORMAT  (1)
式中i为折现率,n为电厂运行寿命年数,那么平均每度电对应的环保设备投资成本为:
cI=CaI/Wa   \*MERGEFORMAT  (2)
式中Wa为年平均发电量,
计每度电的环保设备运行维护成本为cM,那么在火电厂运行寿命期内机组治理污染物排放的成本为:
ce1=cI+cM   \*MERGEFORMAT (3);
(2)计算这段时间内火力发电的环境损失,包括①污染物排放所造成环境质量下降和环境污染所导致的非环境方面的损失,②向环保部门缴纳的排污费,公式表示为:
c e 2 = ( &Sigma; i = 1 N ( V ei Q i ) + C p ) / W , \ * MERGEFORMAT - - - ( 4 )
式中Vei为第i项污染物的环境价值,Qi为第i项污染物的排放量,N为火电机组主要污染物种类数,Cp为该段时间内总的排污费;
(3)计算该机组在这段时间内的环境成本为:
ce=ce1+ce2   \*MERGEFORMAT (5)
第三步,利用第一,第二步的结果得出火力发电机组每发一度电所需要的总成本为:
c=bg×c0+ce   \*MERGEFORMAT (6)
第四步,将总成本转化为供电煤耗,可以得到综合供电煤耗
b z = c c 0 = b g + b e , \ * MERGEFORMAT - - - ( 7 )
第五步,计算综合能耗因子和环境损耗因子,其中综合能耗因子定义为一定时间内的综合供电煤耗与实际供电煤耗的比值,环境损耗因子定义为一段时间内环境折算煤耗与实际煤耗之比,
&theta; = b z b g = b g + b e b g = 1 + &delta; , \ * MERGEFORMAT - - - ( 8 )
&delta; = b e b g , \ * MERGEFORMAT - - - ( 9 )
其中θ为综合能耗因子,δ为环境损耗因子。
2.根据权利要求1所述的考虑污染物排放的火电机组节能综合评价方法,其特征在于:所述第二步(1)步中的计每度电的环保设备运行维护成本为cM,的具体方法为:电厂运行寿命年数内总的维护成本除以总的发电量。
3.根据权利要求1所述的考虑污染物排放的火电机组节能综合评价方法,其特征在于:所述第二步(2)步中的Vei为第i项污染物的环境价值,是以防护费用作为该污染物的单位环境价值。
CN201410540234.5A 2014-10-14 2014-10-14 考虑污染物排放的火电机组节能综合评价方法 Pending CN104281922A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410540234.5A CN104281922A (zh) 2014-10-14 2014-10-14 考虑污染物排放的火电机组节能综合评价方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410540234.5A CN104281922A (zh) 2014-10-14 2014-10-14 考虑污染物排放的火电机组节能综合评价方法

Publications (1)

Publication Number Publication Date
CN104281922A true CN104281922A (zh) 2015-01-14

Family

ID=52256780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410540234.5A Pending CN104281922A (zh) 2014-10-14 2014-10-14 考虑污染物排放的火电机组节能综合评价方法

Country Status (1)

Country Link
CN (1) CN104281922A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184502A (zh) * 2015-09-23 2015-12-23 云南电网有限责任公司电力科学研究院 一种基于机组污染物排放的节能减排机组调度方法
CN105243600A (zh) * 2015-07-21 2016-01-13 河南行知专利服务有限公司 一种电网发电调节方法
CN105844545A (zh) * 2016-04-15 2016-08-10 国网天津市电力公司 一种燃煤锅炉运行经济性的评价方法
CN107679747A (zh) * 2017-09-30 2018-02-09 国网青海省电力公司 一种光伏出力跟踪环境治理负荷需求的控制方法
CN112101821A (zh) * 2020-10-28 2020-12-18 西安西热锅炉环保工程有限公司 一种火力发电机组超低排放系统成本指标评价方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120004784A1 (en) * 2010-07-02 2012-01-05 Lsis., Ltd. Apparatus and method for energy management
CN102779322A (zh) * 2012-06-29 2012-11-14 西安理工大学 基于环境保护和经济效益的火电厂综合调度方法
CN103426032A (zh) * 2013-07-25 2013-12-04 广东电网公司电力科学研究院 一种热电联产机组的经济优化调度方法
CN104077658A (zh) * 2014-07-01 2014-10-01 国家电网公司 应用于燃煤发电厂环保在线监测系统的电网调度方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120004784A1 (en) * 2010-07-02 2012-01-05 Lsis., Ltd. Apparatus and method for energy management
CN102779322A (zh) * 2012-06-29 2012-11-14 西安理工大学 基于环境保护和经济效益的火电厂综合调度方法
CN103426032A (zh) * 2013-07-25 2013-12-04 广东电网公司电力科学研究院 一种热电联产机组的经济优化调度方法
CN104077658A (zh) * 2014-07-01 2014-10-01 国家电网公司 应用于燃煤发电厂环保在线监测系统的电网调度方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王运民 等: "燃煤电厂运行经济性综合评价指标的研究", 《长沙理工大学学报(自然科学版)》 *
赵彦春: "电站供电的能耗和污染成本指标研究", 《能源与节能》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105243600A (zh) * 2015-07-21 2016-01-13 河南行知专利服务有限公司 一种电网发电调节方法
CN105184502A (zh) * 2015-09-23 2015-12-23 云南电网有限责任公司电力科学研究院 一种基于机组污染物排放的节能减排机组调度方法
CN105184502B (zh) * 2015-09-23 2019-07-12 云南电网有限责任公司电力科学研究院 一种基于机组污染物排放的节能减排机组调度方法
CN105844545A (zh) * 2016-04-15 2016-08-10 国网天津市电力公司 一种燃煤锅炉运行经济性的评价方法
CN107679747A (zh) * 2017-09-30 2018-02-09 国网青海省电力公司 一种光伏出力跟踪环境治理负荷需求的控制方法
CN107679747B (zh) * 2017-09-30 2020-11-13 国网青海省电力公司 一种光伏出力跟踪环境治理负荷需求的控制方法
CN112101821A (zh) * 2020-10-28 2020-12-18 西安西热锅炉环保工程有限公司 一种火力发电机组超低排放系统成本指标评价方法

Similar Documents

Publication Publication Date Title
Wu et al. Energy and water nexus in power generation: The surprisingly high amount of industrial water use induced by solar power infrastructure in China
Mao et al. Co-control of local air pollutants and CO2 from the Chinese coal-fired power industry
Arvesen et al. Assessing the life cycle environmental impacts of wind power: A review of present knowledge and research needs
Klemeš et al. Techno-economic modelling and cost functions of CO2 capture processes
Sun et al. Capacity planning and optimization for integrated energy system in industrial park considering environmental externalities
Zhang et al. Embodied energy and emergy analyses of a concentrating solar power (CSP) system
Wang et al. Environmental co-benefits of energy efficiency improvement in coal-fired power sector: A case study of Henan Province, China
CN104281922A (zh) 考虑污染物排放的火电机组节能综合评价方法
Zhang et al. Does it pay to develop a ground source heat pump system? Evidence from China
Alizadeh et al. Development of a framework for the sustainability evaluation of renewable and fossil fuel power plants using integrated LCA-emergy analysis: A case study in Iran
Ma et al. What changes can solar and wind power bring to the electrification of China compared with coal electricity: From a cost-oriented life cycle impact perspective
Wang et al. Economic benefits assessment of urban wind power central heating demonstration project considering the quantification of environmental benefits: A case from northern China
Dong et al. Environmental implications of China’s wind-coal combined power generation system
CN104484543A (zh) 一种兼顾节能减排和三公调度的机组综合运行评价方法
Bezpalov et al. Formation of an intelligent control system in the field of electric power industry based on the technological development of power supply components
Jiang Drivers of air pollution reduction paradox: Empirical evidence from directly measured unit-level data of Chinese power plants
CN105023059A (zh) 一种基于净收益投资比值法的电能替代综合效益评价方法
CN105844083A (zh) 一种scr脱硝催化剂最佳更换时间的实时计算方法
CN105787651A (zh) 一种区域电网电源侧污染物与碳排放水平评价方法
Chen et al. Emissions inventory and scenario analyses of air pollutants in Guangdong Province, China
Becerra-Lopez et al. Dynamic exergy analysis for capacity expansion of regional power-generation systems: Case study of far West Texas
Jun et al. Economic analysis and policy suggestions on gas power generation projects considering carbon emission reduction
CN113592561A (zh) 一种基于电力经济大数据的绿电指数生成方法
CN104793050A (zh) 火电厂脱硝上网电量的计算方法
Zhao et al. Co-benefits of local air pollutants and greenhouse gas reduction achieved by hydropower development in Xizang (Tibet) Autonomous Region, China

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150114