CN107679713A - A kind of power transmission and transformation equipment state alert processing method - Google Patents

A kind of power transmission and transformation equipment state alert processing method Download PDF

Info

Publication number
CN107679713A
CN107679713A CN201710836490.2A CN201710836490A CN107679713A CN 107679713 A CN107679713 A CN 107679713A CN 201710836490 A CN201710836490 A CN 201710836490A CN 107679713 A CN107679713 A CN 107679713A
Authority
CN
China
Prior art keywords
event
alarm
power transmission
processing method
alarm event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710836490.2A
Other languages
Chinese (zh)
Inventor
邬蓉蓉
赵坚
黄辉敏
苏毅
蒙国斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201710836490.2A priority Critical patent/CN107679713A/en
Publication of CN107679713A publication Critical patent/CN107679713A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Monitoring And Testing Of Transmission In General (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)
  • Monitoring And Testing Of Exchanges (AREA)

Abstract

A kind of power transmission and transformation equipment state alert processing method, comprises the following steps:(1)Alarm event gathers and pretreatment;(2)Alarm event standardizes and classification;(3)Alarm event is suppressed with merging;(4)Alarm event filters;(5)Alarm event is removed;(6)Alarm event post-processes.Using the method for the present invention, the accuracy, validity and uniqueness of alarm event information are fully ensured that, operation maintenance personnel can be quickly found out the position of faulty equipment, so as to improve the efficiency of management.

Description

A kind of power transmission and transformation equipment state alert processing method
Technical field
The present invention relates to electric power monitoring technical field, more particularly to a kind of power transmission and transformation equipment state alert processing method.
Background technology
Power transmission and transforming equipment operation system is a set of complex software platform, passes downwardly through GPRS, MSTP and each class set Zhong Qi transformer stations terminal integrates, and realizes that integrated and data acquisition, the power transmission and transformation equipment state monitoring system of each Terminal Type include The network foundation resources such as all kinds of servers, cluster, database, Web applications.The warning information of complete professional the whole network is subjected to unified receipts Collection management, can cause alarm amount huge, even send a large amount of false alarm signals.In this case, it is desirable to operation maintenance personnel Hit the jackpot warning information within the extremely short time from a large amount of warning information, judges that it is very tired to alert caused real causes Difficult.Therefore, substantive warning information how is extracted from mass alarm information, improves alert analysis and troubleshooting efficiency, it is right The rapid handling failure of troubleshooting personnel, ensure that the safe and stable operation tool of power network is of great significance.
The content of the invention
For in place of overcome the deficiencies in the prior art, it is an object of the invention to establish a set of accurately alarming processing mechanism, By power transmission and transforming equipment and the alarm event of application, according to predefined event rules, ring is handled by filtering, classification etc. Section, forms effective early warning or fault warning information.
To achieve the above object, the technical solution adopted by the present invention is:
A kind of power transmission and transformation equipment state alert processing method, comprises the following steps:
S1:Alarm event gathers and pretreatment;
S2:Alarm event standardizes and classification;
S3:Alarm event is suppressed with merging;
S4:Alarm event filters;
S5:Alarm event is removed;
S6:Alarm event post-processes.
Preferably, the collection of alarm event is by distributed implementation in the step S1.
Preferably, the information that alarm event gathers in the step S1 includes active state poll and obtains status information, quilt Move and receive SNMP Trap and Syslog acquisition fault message, collect the event information of monitor agent upload and managed from other The event information that module forwards come.
Preferably, the pretreatment in the step S1 includes shielding junk information.
Preferably, the step S2 specifically includes time calibration, homogeneous classification, object positioning, subtitle standard and content Redefine.
Preferably, the step S3 is specially to identical event or derivation type event is suppressed and merger.
Preferably, the step S4 is specially the alarm event that the condition of being unsatisfactory for is filtered according to filtering rule.
Preferably, the filtering rule includes setting by event generation network element, alarm level, event/alarm classification or title Filtering rule, the filtering rule according to a certain specific event setting, the filtering rule of the curriculum offering according to event information put.
Preferably, the step S5 is specially the alarm event information to being disposed, labeled as removing, the alarm Event information will exit from current alarm view and into history alarm record, and the removing includes time-out and removed and manual Remove.
Preferably, the post processing in the step S6 includes statistics and backup.
Benefit of the invention is that:
(1)Due to using distributed capture alarm event information, the high efficiency of alarm event information transfer has been fully ensured that;
(2)Due to having used the correlation techniques such as standardization, classification, therefore, the alarm event that is prompted to user is accurate, hommization, Operation maintenance personnel can be quickly found out the position of faulty equipment;
(3)By filtering warning information, will be not concerned with being shielded with invalid mass alarm, so as to ensure what is received Alarm notification is all effective, accurate;
(4)By being suppressed warning information, being merged, so as to keep the accuracy of warning information and uniqueness.
(5)By being purged to history alarm information so that administrative staff can constantly optimize to monitoring system, So as to improve the efficiency of management.
(6)By providing the function such as statistical analysis and backup so that administrative staff can carry out deep to monitoring system Analysis and research, Rule Summary, so as to improve constantly the efficiency of management.
Brief description of the drawings
Fig. 1 is the workflow diagram of the present invention.
Embodiment
A kind of power transmission and transformation equipment state alert processing method, as shown in figure 1, comprising the following steps:
S1:Alarm event gathers and pretreatment;
System is by distributed capture alarm event information and is pre-processed.Event data source has a lot, including system is led to Active state poll is crossed to obtain status information, passive reception SNMP Trap and Syslog acquisition fault message, collect monitor agent The event information of upload and event information is forwarded from other management modules, for example the super thresholding of application performance index, matched somebody with somebody Put information change etc..In pretreatment stage, system mainly shields to the junk information collected, can so as to ensure information By property, validity.Meanwhile the network topology structure of system employs the data/address bus mode based on ESB, has fully ensured that alarm The high efficiency sent in information.
S2:Alarm event standardizes and classification;
ALM data acquisition possesses platform class, using class system and equipment alarm information Unified Explanation function, to alarm Event information is standardized, and forms the standardization event of unified form, specifically includes time calibration, homogeneous classification, right As positioning, subtitle standard and content redefine.System can integrate resource distribution function when carrying out event criteria, profit Warning information is improved with configuration service, adds resource allocation information, including crucial rank, geographical letter in warning information automatically The information such as breath, maintenance state, and using the processing alarm of these configuration informations, fully ensured that the accuracy of fault location.Together When, by performance management and configuration processing function, system, which can obtain, to be the super thresholding of performance indications of standard Event and has matched somebody with somebody The event informations such as confidence breath change.
S3:Alarm event is suppressed with merging;
Alarm event generation after, have been processed before, it is possible to generate repeated events.Such as when certain equipment passes through status wheel Ask after finding its abnormal state, each status poll will generate a repeated events.Same event may be come due to event simultaneously Source is different and generates multiple event alarms.The event compacting of system is exactly to identical event or the progress of derivation type event with merging Compacting and merger, so as to keep the accuracy of warning information and uniqueness.
S4:Alarm event filters;
System provides alarm event filtering function, and it can be directed to the situation that a large amount of alarm events occur in the unit interval, by maintenance It is required that, administrative department require and actual management situation, from bottom extraction alarm event information in filter unessential information, subtract Few interference slightly alerted, to improve the efficiency of monitoring and processing.
System provides flexible filtering rule, including can press event occur network element, alarm level, event/alarm classification or Title etc. sets filtering rule;Filtering rule can be set according to a certain specific event, can also be shielded according to the content of event information Fall some secondary fields.The filtering rule set is needed to provide preservation and modification function, is easy to attendant flexibly to select Select.
S5:Alarm event is removed;
The confirmation that system can provide to current alarm operates and is labeled as having confirmed that, for the announcement being disposed in system Alert information, it can be purged and operate and can be exited from current alarm view labeled as removing, alarm and enter history alarm In record, and removing mainly includes two kinds of time-out removing and manual removal.
S6:Alarm event post-processes;
System additionally provides the function that statistical analysis and backup are carried out to alarm event so that administrative staff can be carried out to system Deep analysis and research, Rule Summary, so as to improve constantly the efficiency of management.
By using this method, effective early warning or fault warning information can be formed, so as to quickly find failure, And the position of fault is accurately positioned, clear failure occurrence cause, so as to reduce the work difficulty of operation maintenance personnel and workload, carry really The efficiency of high O&M.

Claims (10)

1. a kind of power transmission and transformation equipment state alert processing method, it is characterised in that comprise the following steps:
S1:Alarm event gathers and pretreatment;
S2:Alarm event standardizes and classification;
S3:Alarm event is suppressed with merging;
S4:Alarm event filters;
S5:Alarm event is removed;
S6:Alarm event post-processes.
A kind of 2. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S1 The collection of middle alarm event is by distributed implementation.
A kind of 3. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S1 The information of middle alarm event collection includes active state poll acquisition status information, the passive SNMP Trap and Syslog of receiving is obtained Obtain fault message, the event information collected the event information of monitor agent upload and forwarded from other management modules.
A kind of 4. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S1 In pretreatment include junk information is shielded.
A kind of 5. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S2 Time calibration, homogeneous classification, object positioning, subtitle standard and content is specifically included to redefine.
A kind of 6. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S3 Specially to identical event or derivation type event is suppressed and merger.
A kind of 7. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S4 The alarm event for the condition of being unsatisfactory for specially is filtered according to filtering rule.
A kind of 8. power transmission and transformation equipment state alert processing method according to claim 7, it is characterised in that the filtering rule Then include network element, alarm level, event/alarm classification or the filtering rule of title setting occurring, according to a certain specific by event Filtering rule that event is set, the filtering rule according to the curriculum offering of event information.
A kind of 9. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step S5 Specially to the alarm event information being disposed, labeled as removing, the alarm event information will be from current alarm view In exit and into history alarm record in, it is described removing include time-out removing and manual removal.
A kind of 10. power transmission and transformation equipment state alert processing method according to claim 1, it is characterised in that the step Post processing in S6 includes statistics and backup.
CN201710836490.2A 2017-09-16 2017-09-16 A kind of power transmission and transformation equipment state alert processing method Pending CN107679713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710836490.2A CN107679713A (en) 2017-09-16 2017-09-16 A kind of power transmission and transformation equipment state alert processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710836490.2A CN107679713A (en) 2017-09-16 2017-09-16 A kind of power transmission and transformation equipment state alert processing method

Publications (1)

Publication Number Publication Date
CN107679713A true CN107679713A (en) 2018-02-09

Family

ID=61136588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710836490.2A Pending CN107679713A (en) 2017-09-16 2017-09-16 A kind of power transmission and transformation equipment state alert processing method

Country Status (1)

Country Link
CN (1) CN107679713A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969721A (en) * 2019-10-18 2020-04-07 珠海格力电器股份有限公司 Data processing method, device and equipment and touch screen
CN111294218A (en) * 2018-12-06 2020-06-16 云智慧(北京)科技有限公司 Information processing method, device, system and storage medium
CN111339293A (en) * 2020-02-11 2020-06-26 支付宝(杭州)信息技术有限公司 Data processing method and device of alarm event and classification method of alarm event
CN113139658A (en) * 2021-04-23 2021-07-20 上海中通吉网络技术有限公司 Pipeline theory method for processing fault based on change and alarm event stream
WO2021174694A1 (en) * 2020-03-06 2021-09-10 平安科技(深圳)有限公司 Operation and maintenance monitoring method and apparatus based on data center, device, and storage medium
CN113691392A (en) * 2021-07-13 2021-11-23 上海威派格智慧水务股份有限公司 Internet of things alarm system based on business rules
CN115294736A (en) * 2022-10-09 2022-11-04 深圳曼顿科技有限公司 Alarm message control method, device, terminal equipment and storage medium
CN115294741A (en) * 2022-10-10 2022-11-04 深圳曼顿科技有限公司 Alarm message pushing method and device, terminal equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103903195A (en) * 2014-04-10 2014-07-02 国家电网公司 Power transmission and transformation equipment online monitoring data alarm monitoring method
CN104636989A (en) * 2015-02-11 2015-05-20 广东电网有限责任公司中山供电局 Electric power system monitoring warning information processing method and system
CN106778873A (en) * 2016-12-19 2017-05-31 北京市天元网络技术股份有限公司 A kind of warning information classification method of disposal and device based on white list rule

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103903195A (en) * 2014-04-10 2014-07-02 国家电网公司 Power transmission and transformation equipment online monitoring data alarm monitoring method
CN104636989A (en) * 2015-02-11 2015-05-20 广东电网有限责任公司中山供电局 Electric power system monitoring warning information processing method and system
CN106778873A (en) * 2016-12-19 2017-05-31 北京市天元网络技术股份有限公司 A kind of warning information classification method of disposal and device based on white list rule

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111294218A (en) * 2018-12-06 2020-06-16 云智慧(北京)科技有限公司 Information processing method, device, system and storage medium
CN111294218B (en) * 2018-12-06 2022-07-26 云智慧(北京)科技有限公司 Information processing method, device, system and storage medium
CN110969721A (en) * 2019-10-18 2020-04-07 珠海格力电器股份有限公司 Data processing method, device and equipment and touch screen
CN111339293A (en) * 2020-02-11 2020-06-26 支付宝(杭州)信息技术有限公司 Data processing method and device of alarm event and classification method of alarm event
CN111339293B (en) * 2020-02-11 2023-08-22 支付宝(杭州)信息技术有限公司 Data processing method and device for alarm event and classifying method for alarm event
WO2021174694A1 (en) * 2020-03-06 2021-09-10 平安科技(深圳)有限公司 Operation and maintenance monitoring method and apparatus based on data center, device, and storage medium
CN113139658A (en) * 2021-04-23 2021-07-20 上海中通吉网络技术有限公司 Pipeline theory method for processing fault based on change and alarm event stream
CN113691392A (en) * 2021-07-13 2021-11-23 上海威派格智慧水务股份有限公司 Internet of things alarm system based on business rules
CN115294736A (en) * 2022-10-09 2022-11-04 深圳曼顿科技有限公司 Alarm message control method, device, terminal equipment and storage medium
CN115294736B (en) * 2022-10-09 2023-02-10 深圳曼顿科技有限公司 Alarm message control method, device, terminal equipment and storage medium
CN115294741A (en) * 2022-10-10 2022-11-04 深圳曼顿科技有限公司 Alarm message pushing method and device, terminal equipment and storage medium
CN115294741B (en) * 2022-10-10 2023-02-10 深圳曼顿科技有限公司 Alarm message pushing method and device, terminal equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107679713A (en) A kind of power transmission and transformation equipment state alert processing method
CN106294091B (en) It is a kind of to intercept method for analyzing performance and system without intrusive log
CN104363106B (en) A kind of communicating for power information fault pre-alarming analysis method based on big data technology
CN103023695B (en) Master station system monitoring model based on power dispatching automation
WO2015043441A1 (en) Smart alarm inference method based on multi-scenario analysis
CN102447570B (en) Monitoring device and method based on health degree analysis
CN103491354B (en) System operation monitoring and controlling visual platform
CN105183609A (en) Real-time monitoring system and method applied to software system
CN111176879A (en) Fault repairing method and device for equipment
CN107645414A (en) A kind of power transmission and transformation equipment state alarming processing system
CN107171293A (en) The system and method for relay protection O&M information multidimensional issue is realized in intelligent grid
CN106055608A (en) Method and apparatus for automatically collecting and analyzing switch logs
CN104144071A (en) System log processing method and platform
CN108134685A (en) A kind of power transmission and transformation equipment state alarm and control system
CN104574219A (en) System and method for monitoring and early warning of operation conditions of power grid service information system
CN107547228A (en) A kind of safe operation management platform based on big data realizes framework
CN103957118A (en) Real-time intelligent analysis method for network flow of electric power data communication network and system thereof
CN107658980A (en) A kind of analysis method and system for being used to check power system monitor warning information
CN108156017A (en) A kind of power transmission and transformation equipment state alarm management method
CN110784352B (en) Data synchronous monitoring and alarming method and device based on Oracle golden gate
CN105553691A (en) Monitoring alarm realization method based on electric power supervision information
CN116257021A (en) Intelligent network security situation monitoring and early warning platform for industrial control system
CN116738163A (en) Energy consumption monitoring management system and method based on rule engine
CN115208059A (en) Transformer substation power and environment monitoring alarm processing system and method
CN104915279A (en) Multi-system state operation monitoring method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication