CN107675852A - 在大型建筑内快速实现对大理石镶贴的施工工艺 - Google Patents

在大型建筑内快速实现对大理石镶贴的施工工艺 Download PDF

Info

Publication number
CN107675852A
CN107675852A CN201710902319.7A CN201710902319A CN107675852A CN 107675852 A CN107675852 A CN 107675852A CN 201710902319 A CN201710902319 A CN 201710902319A CN 107675852 A CN107675852 A CN 107675852A
Authority
CN
China
Prior art keywords
marble
mortar
cement
examination
slabstone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710902319.7A
Other languages
English (en)
Inventor
冷祥翠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710902319.7A priority Critical patent/CN107675852A/zh
Publication of CN107675852A publication Critical patent/CN107675852A/zh
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
    • E04F13/144Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass with an outer layer of marble or other natural stone

Abstract

本发明公开了一种在大型建筑内快速实现对大理石镶贴的施工工艺,包括以下步骤:选板、试拼、弹线、试排、基层处理、铺砂浆、铺大理石板、擦缝、贴踢脚板、打蜡。该工艺的过程简便,能够保证镶贴的质量,使得大理石稳固,解决了现有在对大理石的镶贴过程工序复杂,而且镶贴的质量无法进行保证,经常出现脱落,影响使用和美观的问题。

Description

在大型建筑内快速实现对大理石镶贴的施工工艺
技术领域
本发明涉及一种工艺,尤其是涉及一种在大型建筑内快速实现对大理石镶贴的施工工艺。
背景技术
建筑是建筑物与构筑物的总称,是人们为了满足社会生活需要,利用所掌握的物质技术手段,并运用一定的科学规律、风水理念和美学法则创造的人工环境。建筑的对象大到包括区域规划、城市规划、景观设计等等综合的环境设计构筑、社区形成前的相关营造过程,小到室内的家具、小物件等的制作。而其通常的对象为一定场地内的单位。
在建筑学和土木工程的范畴里,“建筑”是指兴建建筑物或发展基建的过程。一般来说,每个建筑项目都会由专案经理和建筑师负责统筹,由各级的承建商、分判商、工程顾问、工料测量师、结构工程师等专业人员负责监督。
要成功地完成每个建筑项目,有效的计划是必需的,无论设计以致完成整个建筑项目都需要充分考虑到整个建筑项目可能会带来的环境冲击、建立建筑日程安排表、财政上的安排、建筑安全、建筑材料的运输和运用、工程上的延误、准备投标文件等等。
近10多年来,我国建筑行业高速发展,建筑行业总产值从2001 年的15362亿上升到2012年的135303亿元,涨幅将近9倍,而建筑行业的高速发展也带动了相关产业的发展,大幅提高了我国的综合国力和人民的生活水平。全球建筑市场价值约7.5万亿美元,占全球GDP的13.4%。预计到2020年,其价值将达到12.7万亿美元,接下来的十年里将增长70%。到2020年,建筑业将占全球GDP的14.6%。未来10年,全球新兴市场的建筑业规模将扩大1倍,达到6.7万亿美元。中国作为最大的发展中国家,2013年的建筑市场规模将接近 10万亿元人民币,到2015年将达到12万亿元到2015年,全球将出现23座人口超过1000万的特大城市,这将极大地推动建筑业全球化,并为传统建造商之间的战略整合提供机会。从长远来看,未来50年,中国城市化率将提高到76%以上,城市对整个国民经济的贡献率将达到95%以上。在建筑的施工过程中,大理石的镶贴一项很重要的工作,传统在对大理石的镶贴过程工序复杂,而且镶贴的质量无法进行保证,经常出现脱落,影响使用和美观。
发明内容
本发明的目的在于克服上述现有在对大理石的镶贴过程工序复杂,而且镶贴的质量无法进行保证,经常出现脱落,影响使用和美观的问题,设计了一种在大型建筑内快速实现对大理石镶贴的施工工艺,该工艺的过程简便,能够保证镶贴的质量,使得大理石稳固,解决了现有在对大理石的镶贴过程工序复杂,而且镶贴的质量无法进行保证,经常出现脱落,影响使用和美观的问题。
本发明的目的通过下述技术方案实现:在大型建筑内快速实现对大理石镶贴的施工工艺,包括以下步骤:
(1)选板:对大理石板逐块认真挑选,有翘曲、拱背、宽窄不一、不方正的挑出来,用在适当部位,选用的石板背面清扫干净,用水浸湿,擦干或晾干后备用;
(2)试拼:在正式铺设前,每间按图案、颜色、纹理进行试拼,板块间缝隙一般不大于1mm,试拼后按其位置编号,然后按编号码放整齐,试拼工作,应在地面平整的房间或操作棚内进行;
(3)弹线:将找平层的标高弹在四周墙上,以便拉线控制铺灰厚度和平整度;按施工大样图弹线,将线弹在垫层上并引至墙面底部,用以控制板块位置;
(4)试排:在房间内两个垂直的方向,铺两条干砂,其宽度要大于板块,厚度不小于30mm,根据施工大样图把石板排好,以便检查板块之间的缝隙,核对板块与墙面、柱面等相对位置;
(5)基层处理:将混凝土垫层或水泥炉渣垫层表面清扫干净,不允许有松动颗粒,洒水润湿不得出现积水现象,刷水灰比0.5左右的素水泥浆一道,刷均匀不得有漏刷,刷水泥浆要与下道工序铺砂浆先后连续操作,以防止素浆干硬;
(6)铺砂浆:根据墙面上的弹线,定出找平层的厚度,拉十字线控制铺灰厚度和平整度,砂浆采用体积比位1:3~4的干硬性水泥砂浆,干硬程度以手捏成团不松散但落地即松散为宜,铺砂浆顺序,从里往门口处摊铺,用大杠找平,用木抹子拍实,其厚度宜高出实铺厚度2~3mm,大面积地段应设找平墩,间距2m,分段铺设水泥砂浆找平层,用杠尺刮平,铺完一段后要及时铺石板,以防砂浆结硬;
(7)铺大理石板:铺石板顺序:一般房间先从里开始往外进行铺设,即先从远离门口的一边开始,按照试拼编号依次铺砌,逐步退至门口,当墙边、柱脚处有镶边时,先铺镶边部分,有独立柱的大厅,宜先铺柱子与柱子之间部分,然后往两边展开,先试铺,在铺好的干硬性水泥砂浆上先试铺合适后,翻开石板,在水泥砂浆上浇一道水灰比为0.5左右的素水泥浆,然后正式铺贴,安放石板时注意四角同时下落,用橡皮锤或木锤轻击木垫板,木垫板的长度不得超过单块石板的长度,经过敲实对照拉线用铁水平尺找平,若发现空鼓,过高或过低时,即将石板掀起,调整砂浆厚度,但严禁塞砖头、石块垫平,铺完一两块石板后,再向两侧和后退方向顺序铺设,大理石板块之间接缝要严密,缝宽不大于1mm;
(8)擦缝:在石块铺砌后隔24h,洒水养护1~2次,然后进行灌浆擦缝,事先将地面清扫干净,根据大理石颜色选择颜料和水泥拌合均匀,调成稀水泥浆,稀水泥浆干燥后的颜色应与石板颜色相似,用浆壶徐徐灌入石板间的缝隙内,使缝隙、边角空隙填满水泥浆,过1~2h后,再用棉丝团或软布蘸原稀水泥浆擦缝,以使缝隙密实,与板面擦平,同时将板面上的水泥浆擦净,如接缝宽度较大,应先用1: 1水泥细砂浆填嵌,后用水泥色浆擦缝至密实、平整、光滑为止;
(9)贴踢脚板:贴大理石踢脚板分灌浆法与粘贴法两种,两种方法都要试排,使踢脚板的缝隙与地面大理石板接缝相对应为宜,墙面和附墙柱的阳角处,应采取正面板盖侧面板,或者切割成45°斜面碰角连接,采用灌浆法或粘贴法,踢脚板的擦缝,均用板面颜色相同的色浆揉擦,并将余浆擦净;
(10)打蜡:当板块接头有明显高低差时,待砂浆强度达到70%后,用油石分遍浇水磨光,最后用5%浓度草酸清洗,再打蜡,打蜡应在大理石地面和踢脚板均做完,其它工序也完工,不再上人准备交用时进行,使其光滑明亮。
综上所述,本发明的有益效果是:该工艺的过程简便,能够保证镶贴的质量,使得大理石稳固,解决了现有在对大理石的镶贴过程工序复杂,而且镶贴的质量无法进行保证,经常出现脱落,影响使用和美观的问题。
具体实施方式
下面结合实施例,对本发明作进一步的详细说明,但本发明的实施方式不仅限于此。
实施例:
在大型建筑内快速实现对大理石镶贴的施工工艺,包括以下步骤:
(1)选板:对大理石板逐块认真挑选,有翘曲、拱背、宽窄不一、不方正的挑出来,用在适当部位,选用的石板背面清扫干净,用水浸湿,擦干或晾干后备用;
(2)试拼:在正式铺设前,每间按图案、颜色、纹理进行试拼,板块间缝隙一般不大于1mm,试拼后按其位置编号,然后按编号码放整齐,试拼工作,应在地面平整的房间或操作棚内进行;
(3)弹线:将找平层的标高弹在四周墙上,以便拉线控制铺灰厚度和平整度;按施工大样图弹线,将线弹在垫层上并引至墙面底部,用以控制板块位置;
(4)试排:在房间内两个垂直的方向,铺两条干砂,其宽度要大于板块,厚度不小于30mm,根据施工大样图把石板排好,以便检查板块之间的缝隙,核对板块与墙面、柱面等相对位置;
(5)基层处理:将混凝土垫层或水泥炉渣垫层表面清扫干净,不允许有松动颗粒,洒水润湿不得出现积水现象,刷水灰比0.5左右的素水泥浆一道,刷均匀不得有漏刷,刷水泥浆要与下道工序铺砂浆先后连续操作,以防止素浆干硬;
(6)铺砂浆:根据墙面上的弹线,定出找平层的厚度,拉十字线控制铺灰厚度和平整度,砂浆采用体积比位1:3~4的干硬性水泥砂浆,干硬程度以手捏成团不松散但落地即松散为宜,铺砂浆顺序,从里往门口处摊铺,用大杠找平,用木抹子拍实,其厚度宜高出实铺厚度2~3mm,大面积地段应设找平墩,间距2m,分段铺设水泥砂浆找平层,用杠尺刮平,铺完一段后要及时铺石板,以防砂浆结硬;
(7)铺大理石板:铺石板顺序:一般房间先从里开始往外进行铺设,即先从远离门口的一边开始,按照试拼编号依次铺砌,逐步退至门口,当墙边、柱脚处有镶边时,先铺镶边部分,有独立柱的大厅,宜先铺柱子与柱子之间部分,然后往两边展开,先试铺,在铺好的干硬性水泥砂浆上先试铺合适后,翻开石板,在水泥砂浆上浇一道水灰比为0.5左右的素水泥浆,然后正式铺贴,安放石板时注意四角同时下落,用橡皮锤或木锤轻击木垫板,木垫板的长度不得超过单块石板的长度,经过敲实对照拉线用铁水平尺找平,若发现空鼓,过高或过低时,即将石板掀起,调整砂浆厚度,但严禁塞砖头、石块垫平,铺完一两块石板后,再向两侧和后退方向顺序铺设,大理石板块之间接缝要严密,缝宽不大于1mm;
(8)擦缝:在石块铺砌后隔24h,洒水养护1~2次,然后进行灌浆擦缝,事先将地面清扫干净,根据大理石颜色选择颜料和水泥拌合均匀,调成稀水泥浆,稀水泥浆干燥后的颜色应与石板颜色相似,用浆壶徐徐灌入石板间的缝隙内,使缝隙、边角空隙填满水泥浆,过1~2h后,再用棉丝团或软布蘸原稀水泥浆擦缝,以使缝隙密实,与板面擦平,同时将板面上的水泥浆擦净,如接缝宽度较大,应先用1: 1水泥细砂浆填嵌,后用水泥色浆擦缝至密实、平整、光滑为止;
(9)贴踢脚板:贴大理石踢脚板分灌浆法与粘贴法两种,两种方法都要试排,使踢脚板的缝隙与地面大理石板接缝相对应为宜,墙面和附墙柱的阳角处,应采取正面板盖侧面板,或者切割成45°斜面碰角连接,采用灌浆法或粘贴法,踢脚板的擦缝,均用板面颜色相同的色浆揉擦,并将余浆擦净;
灌浆法:在墙下脚两端先各镶贴一块踢脚板,其上楞高度应在同一水平线上,出墙厚度应一致,一般8~10mm。然后沿二块踢脚板上楞拉通线,逐块依顺序安装,随安装随检查踢脚板的上口平直和立面垂直,把相邻两块板之间及踢脚板与地面、墙面之间用石膏稳牢。灌 1:2水泥砂浆,用钎插捣以防空鼓,还要防止石板松动和位移。溢出的砂浆在随时擦净。待砂浆终凝后,再把石膏铲掉,并清理干净。
粘贴法:根据踢脚板出墙厚度,用1:2~3水泥砂浆抹墙面底灰,抹平找垂直并划毛。待底灰干硬后,在湿润阴干的踢脚石板的背面,刮抹2~3mm厚的素水泥浆加10%左右107胶后往底灰上粘贴,按控制线上口找齐,用橡皮锤或木锤敲平,使其密实。用靠尺找平,用方尺套方。粘结材料也可选用粘结剂或1:2水泥砂浆等。
(10)打蜡:当板块接头有明显高低差时,待砂浆强度达到70%后,用油石分遍浇水磨光,最后用5%浓度草酸清洗,再打蜡,打蜡应在大理石地面和踢脚板均做完,其它工序也完工,不再上人准备交用时进行,使其光滑明亮。
该工艺的过程简便,能够保证镶贴的质量,使得大理石稳固,解决了现有在对大理石的镶贴过程工序复杂,而且镶贴的质量无法进行保证,经常出现脱落,影响使用和美观的问题。
以上所述,仅是本发明的较佳实施例,并非对本发明做任何形式上的限制,凡是依据本发明的技术、方法实质上对以上实施例所作的任何简单修改、等同变化,均落入本发明的保护范围之内。

Claims (1)

1.在大型建筑内快速实现对大理石镶贴的施工工艺,其特征在于,包括以下步骤:
(1)选板:对大理石板逐块认真挑选,有翘曲、拱背、宽窄不一、不方正的挑出来,用在适当部位,选用的石板背面清扫干净,用水浸湿,擦干或晾干后备用;
(2)试拼:在正式铺设前,每间按图案、颜色、纹理进行试拼,板块间缝隙一般不大于1mm,试拼后按其位置编号,然后按编号码放整齐,试拼工作,应在地面平整的房间或操作棚内进行;
(3)弹线:将找平层的标高弹在四周墙上,以便拉线控制铺灰厚度和平整度;按施工大样图弹线,将线弹在垫层上并引至墙面底部,用以控制板块位置;
(4)试排:在房间内两个垂直的方向,铺两条干砂,其宽度要大于板块,厚度不小于30mm,根据施工大样图把石板排好,以便检查板块之间的缝隙,核对板块与墙面、柱面相对位置;
(5)基层处理:将混凝土垫层或水泥炉渣垫层表面清扫干净,不允许有松动颗粒,洒水润湿不得出现积水现象,刷水灰比0.5左右的素水泥浆一道,刷均匀不得有漏刷,刷水泥浆要与下道工序铺砂浆先后连续操作,以防止素浆干硬;
(6)铺砂浆:根据墙面上的弹线,定出找平层的厚度,拉十字线控制铺灰厚度和平整度,砂浆采用体积比位1:3~4的干硬性水泥砂浆,干硬程度以手捏成团不松散但落地即松散为宜,铺砂浆顺序,从里往门口处摊铺,用大杠找平,用木抹子拍实,其厚度宜高出实铺厚度2~3mm,大面积地段应设找平墩,间距2m,分段铺设水泥砂浆找平层,用杠尺刮平,铺完一段后要及时铺石板,以防砂浆结硬;
(7)铺大理石板:铺石板顺序:一般房间先从里开始往外进行铺设,即先从远离门口的一边开始,按照试拼编号依次铺砌,逐步退至门口,当墙边、柱脚处有镶边时,先铺镶边部分,有独立柱的大厅,宜先铺柱子与柱子之间部分,然后往两边展开,先试铺,在铺好的干硬性水泥砂浆上先试铺合适后,翻开石板,在水泥砂浆上浇一道水灰比为0.5左右的素水泥浆,然后正式铺贴,安放石板时注意四角同时下落,用橡皮锤或木锤轻击木垫板,木垫板的长度不得超过单块石板的长度,经过敲实对照拉线用铁水平尺找平,若发现空鼓,过高或过低时,即将石板掀起,调整砂浆厚度,但严禁塞砖头、石块垫平,铺完一两块石板后,再向两侧和后退方向顺序铺设,大理石板块之间接缝要严密,缝宽不大于1mm;
(8)擦缝:在石块铺砌后隔24h,洒水养护1~2次,然后进行灌浆擦缝,事先将地面清扫干净,根据大理石颜色选择颜料和水泥拌合均匀,调成稀水泥浆,稀水泥浆干燥后的颜色应与石板颜色相似,用浆壶徐徐灌入石板间的缝隙内,使缝隙、边角空隙填满水泥浆,过1~2h后,再用棉丝团或软布蘸原稀水泥浆擦缝,以使缝隙密实,与板面擦平,同时将板面上的水泥浆擦净,如接缝宽度较大,应先用1:1水泥细砂浆填嵌,后用水泥色浆擦缝至密实、平整、光滑为止;
(9)贴踢脚板:贴大理石踢脚板分灌浆法与粘贴法两种,两种方法都要试排,使踢脚板的缝隙与地面大理石板接缝相对应为宜,墙面和附墙柱的阳角处,应采取正面板盖侧面板,或者切割成45°斜面碰角连接,采用灌浆法或粘贴法,踢脚板的擦缝,均用板面颜色相同的色浆揉擦,并将余浆擦净;
(10)打蜡:当板块接头有明显高低差时,待砂浆强度达到70%后,用油石分遍浇水磨光,最后用5%浓度草酸清洗,再打蜡,打蜡应在大理石地面和踢脚板均做完,其它工序也完工,不再上人准备交用时进行,使其光滑明亮。
CN201710902319.7A 2017-09-29 2017-09-29 在大型建筑内快速实现对大理石镶贴的施工工艺 Withdrawn CN107675852A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710902319.7A CN107675852A (zh) 2017-09-29 2017-09-29 在大型建筑内快速实现对大理石镶贴的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710902319.7A CN107675852A (zh) 2017-09-29 2017-09-29 在大型建筑内快速实现对大理石镶贴的施工工艺

Publications (1)

Publication Number Publication Date
CN107675852A true CN107675852A (zh) 2018-02-09

Family

ID=61138576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710902319.7A Withdrawn CN107675852A (zh) 2017-09-29 2017-09-29 在大型建筑内快速实现对大理石镶贴的施工工艺

Country Status (1)

Country Link
CN (1) CN107675852A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833232A (zh) * 2021-09-18 2021-12-24 广东贝林建筑设计有限公司 一种大理石地面施工工艺

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833232A (zh) * 2021-09-18 2021-12-24 广东贝林建筑设计有限公司 一种大理石地面施工工艺

Similar Documents

Publication Publication Date Title
CN102140836A (zh) 大规格地砖施工方法
CN108625252A (zh) 道路铺筑施工方法
CN104120860A (zh) 一种水泥砂浆地面找平的施工方法
CN107675852A (zh) 在大型建筑内快速实现对大理石镶贴的施工工艺
Lavan Public space in late antique Ostia: excavation and survey in 2008–2011
CN106760366A (zh) 基于提高家具展厅中大理石镶贴质量的施工工艺
CN104264953A (zh) 一种支架、地面石材的铺贴方法及水泥砂浆搅拌输送一体机
CN111962349A (zh) 一种耐磨混凝土地面施工工艺
Mohammadifar et al. A Preliminary Report on Four Seasons of Excavation at Moush Tepe, Hamedan, Iran
CN111042310A (zh) 一种地下室底板构造及其施工方法
CN201809928U (zh) 一种密缝冰裂纹的纹理规划模块单元
CN214169786U (zh) 一种用在购物中心内场的水磨石地面
CN205577161U (zh) 一种建筑外墙结构
CN107010908A (zh) 花岗岩地面施工工艺
CN106400653A (zh) 一种景观园路的铺装方法
CN208502160U (zh) 一种地面加固结构
CN105926799A (zh) 一种建筑外墙结构及其施工方法
CN109629364A (zh) 一种园林铺装路面防泛碱方法
CN206158094U (zh) 一种厨卫石材地面结构
Ashurst Methods of repairing and consolidating stone buildings
CN113611202B (zh) 考古地层断面的模拟展示施工工艺及考古地层断面模型
CN202899562U (zh) 薄型地面装饰材料铺贴结构
CN206144095U (zh) 地面瓷砖快速铺装结构
Medeksza Marina el-Alamein. Conservation and restoration work in 2006
CN206562740U (zh) 一种耐磨停车场地坪

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180209

WW01 Invention patent application withdrawn after publication