CN107665384B - 一种含多区域能源站的电力-热力综合能源系统调度方法 - Google Patents

一种含多区域能源站的电力-热力综合能源系统调度方法 Download PDF

Info

Publication number
CN107665384B
CN107665384B CN201711026216.5A CN201711026216A CN107665384B CN 107665384 B CN107665384 B CN 107665384B CN 201711026216 A CN201711026216 A CN 201711026216A CN 107665384 B CN107665384 B CN 107665384B
Authority
CN
China
Prior art keywords
energy
power
regional
distribution network
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711026216.5A
Other languages
English (en)
Other versions
CN107665384A (zh
Inventor
王丹
智云强
贾宏杰
王伟亮
孟政吉
刘柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201711026216.5A priority Critical patent/CN107665384B/zh
Publication of CN107665384A publication Critical patent/CN107665384A/zh
Application granted granted Critical
Publication of CN107665384B publication Critical patent/CN107665384B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Geometry (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种含多区域能源站的电力‑热力综合能源系统调度方法,所述方法包括以下步骤:构建由配电网、区域能源站、区域热力系统组成的区域电力‑热力综合能源系统;构建上述区域电力‑热力综合能源系统的调度模型;基于群体智能的随机搜索对区域电力‑热力综合能源系统的调度模型进行求解。本发明可通过不同类型区域能源站的协调,充分挖掘多能源优势互补潜力降低配电网网络损耗,改善配电网尖峰负荷现象,提高可再生能源消纳率,同时有效降低区域电力‑热力系统运行成本。

Description

一种含多区域能源站的电力-热力综合能源系统调度方法
技术领域
本发明涉及电力-热力综合能源系统领域,尤其涉及一种含多能源站以及高比例可再生能源的区域电力-热力综合能源系统调度方法。
背景技术
以燃煤为原料的集中式供暖,是我国北方地区冬季传统供暖方式,然而该供暖方式给城市环境以及居民健康带来了严重影响。有研究表明,就北京市而言,该供暖方式使得PM2.5浓度增加50%以上。自2013年9月10日国务院发布《大气污染防治行动计划》起,各地陆续出台相关政策与补贴措施鼓励采用清洁的天然气来替代燃煤来供暖。同年,国网公司提出实施“电能替代”战略,力求在终端能源消费环节实现用电能替代散烧煤、直燃油等化石燃料,实现能源发展方式的根本转变。2016年5月16日国家发展改革委、国家能源局等多部门联合印发了《关于推进电能替代的指导意见》,鼓励推广电锅炉等清洁供热设备。然而供暖经济性以及电采暖设备容易造成尖峰负荷等原因严重限制了清洁供热设备的推广使用。
综合能源系统通过多种能源系统的统一规划和协调运行,可以实现能源的梯级利用及能源系统间的有机协调,提高能源利用率,促进可再生能源的消纳,同时实现能源供应开源与节流的目标。
在区域电力-热力综合能源系统中,通过不同类型区域能源站的协调,充分挖掘多能源优势互补潜力,降低配电网网络损耗,改善配电网尖峰负荷现象,提高可再生能源消纳率,同时有效降低区域电力-热力系统运行成本,有利于响应国家“煤改气”政策及“电能替代”战略,推广以热电联产系统、电锅炉为代表的清洁供热设备。
发明人在实现本发明的过程中,发现现有技术中至少存在以下缺点和不足:
现有针对区域电力-热力综合能源系统的研究较少关注区域能源站间的协同调度。而区域能源站作为区域热力系统热源以及区域热力系统与配电网耦合的核心环节,对整个区域电力-热力系统状态具有至关重要的作用,不同类型区域能源站可为多能源的科学调度提供空间。对含多区域能源站的电力-热力综合能源系统,实现其协同调度需关注多种关键设备的运行约束以及各能源系统的网络约束,而这些约束往往具有高维、非线性的特点。
这些因素使得少有学者对作为区域热力系统热源的区域能源站间的协同调度进行研究,而已存在的研究也往往仅从能量平衡的角度,未考虑整个系统网络的影响。
发明内容
本发明提供了一种含多能源站以及高比例可再生能源的区域电力-热力综合能源系统调度方法,本发明可通过不同类型区域能源站的协调,充分挖掘多能源优势互补潜力降低配电网网络损耗,改善配电网尖峰负荷现象,提高可再生能源消纳率,同时有效降低区域电力-热力系统运行成本,详见下文描述:
一种含多区域能源站的电力-热力综合能源系统调度方法,所述方法包括以下步骤:
构建由配电网、区域能源站、区域热力系统组成的区域电力-热力综合能源系统;
构建上述区域电力-热力综合能源系统的调度模型;
基于群体智能的随机搜索对区域电力-热力综合能源系统的调度模型进行求解。
其中,所述区域能源站包括:
由热电联产单元、电力变压器以及一级换热站组成的第一类能源站;还包括:
由电锅炉、储热装置、电力变压器以及一级换热站组成的第二类能源站;
第一类能源站和第二类能源站分别遵守相应的能量平衡方程。
其中,所述区域热力系统包括:水流的质量和温度模型。
进一步地,所述构建上述区域电力-热力综合能源系统的调度模型具体为:
构建由区域能源站运行成本、配电网网损最小为优化目标、可再生能源的消纳组成的目标函数,同时将弃风电量以惩罚项的形式加入;
分别建立配电网、区域能源站、区域热力系统的约束条件。
进一步地,所述目标函数具体为:
Figure BDA0001448419970000021
其中,
Figure BDA0001448419970000022
为电能价格;
Figure BDA0001448419970000023
为配电网网损;
Figure BDA00014484199700000210
为天然气价格;
Figure BDA0001448419970000024
为I型能源站输送到配电网的电量;
Figure BDA0001448419970000025
为I型能源站所购天然气的量;
Figure BDA0001448419970000026
为II型能源站所购电量;
Figure BDA0001448419970000027
为弃风惩罚项;
Figure BDA0001448419970000028
Figure BDA0001448419970000029
分别为风机最大的预测功率和实际功率;N为时段总数;NesI和NesII为I型和II型能源站个数;Nwt为配电网中风机个数。
进一步地,所述基于群体智能的随机搜索对区域电力-热力综合能源系统的调度模型进行求解具体为:
1)读取能源系统、外界环境相关信息,设置目标函数以及相应约束,初始化群体智能产生初始种群以及相应粒子速度;
2)检查粒子约束,采用约束处理机制直接处理部分约束;
3)区域热力系统能量流求解,计算不同类型区域能源站能量交互信息,进行配电网潮流仿真;
4)采用罚函数法间接处理其他相关约束,计算各个粒子的适应值,更新当前种群的最优位置以及全部粒子最优位置;
5)判断全部粒子最优位置是否满足结束要求或者达到最大迭代次数,若是则生成最优调度计划,否则返回步骤2)。本发明提供的技术方案的有益效果是:
1、本发明在保证区域热力系统用户温度舒适度的基础上,可有效采用电采暖设备所造成的配电网尖峰负荷现象;
2、本发明可通过多能源站的增强配电网的灵活性,改善热电联产系统。工作在“以热定电”模式下所造成的可再生能源消纳问题,同时可有效降低配电网网络损耗;
3、本发明可有效降低区域电力-热力系统运行成本,促进“煤改气”以及“电能替代”政策的推广。
附图说明
图1为一种含多区域能源站的电力-热力综合能源系统调度方法的流程图;
图2为本发明提供的不同类型区域能源站的模型图;
图3为本发明提供的PSO(粒子群优化)算法约束处理机制的原理图;
图4为本发明提供的含多能源站以及高比例可再生能源的区域电力-热力综合能源系统调度方法的详细流程图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面对本发明实施方式作进一步地详细描述。
实施例1
本发明实施例提供了一种含多能源站以及高比例可再生能源的区域电力-热力综合能源系统调度方法,参见图1-图4,该方法包括以下步骤:
101:构建由配电网、区域能源站、区域热力系统组成的区域电力-热力综合能源系统;
其中,区域电力-热力综合能源系统主要包括:配电网、区域能源站、区域热力系统三个部分,本发明实施例针对这三个部分进行仿真模型的建立,并最终构建了区域电力-热力综合能源系统仿真模型。
102:构建上述区域电力-热力综合能源系统的调度模型;
其中,在区域电力-热力综合能源系统调度模型中,以配电网网损、弃风惩罚以及区域能源站运行费用最优为目标,同时综合考虑了三相不平衡配电网、区域热力系统、区域能源站的运行约束。
103:基于群体智能的随机搜索对区域电力-热力综合能源系统的调度模型进行求解。
该求解方法基于约束处理机制的PSO(粒子群优化)算法,其求解框架如图4所示。
其中,步骤101中的区域能源站包括:
由热电联产单元、电力变压器以及一级换热站组成的第一类能源站;还包括:
由电锅炉、储热装置、电力变压器以及一级换热站组成的第二类能源站;
第一类能源站和第二类能源站分别遵守相应的能量平衡方程。
其中,步骤101中的区域热力系统包括:水流的质量和温度模型。
进一步地,步骤102中的构建上述区域电力-热力综合能源系统的调度模型具体为:
构建由区域能源站运行成本、配电网网损最小为优化目标、可再生能源的消纳组成的目标函数,同时将弃风电量以惩罚项的形式加入;
分别建立配电网、区域能源站、区域热力系统的约束条件。
综上所述,本发明实施例通过上述步骤101-步骤103可通过不同类型区域能源站的协调,充分挖掘多能源优势互补潜力降低配电网网络损耗,改善配电网尖峰负荷现象,提高可再生能源消纳率,同时有效降低区域电力-热力系统运行成本。
实施例2
下面结合具体的计算公式、图1-图4对实施例1中的方案进行进一步地介绍,详见下文描述:
201:区域电力-热力综合能源系统建模;
(1)区域能源站;
主要构建了两种类型的区域能源站,不同类型区域能源站为实现多能源的科学调度提供了空间,第I类能源站包含CHP(热电联产单元)、电力变压器以及PHE(一级换热站)、CHP所产生的电能一部分经电力变压器变压后提供给区域能源站中的水泵,剩余的电能则输送到配电网;所产生的热能经PHE输送到区域热力网络中,其能量平衡方程如下式(1)所示:
Figure BDA0001448419970000051
其中,
Figure BDA0001448419970000052
为提供给水泵的电能;
Figure BDA0001448419970000053
为输送到配电网的电能;
Figure BDA0001448419970000054
为输送到区域热力网络的热能;λ1为提供给水泵的电能占CHP所产生的电能的比例;ηT为变压器的效率;ηCHP为CHP的效率;φCHP为CHP的热电比;ηPHE为一级换热站的效率;
Figure BDA0001448419970000055
为能源站所消耗天然气量。
第II类能源站包含:电锅炉、储热装置、电力变压器以及PHE,电锅炉所产生的热量既可以经PHE输送到区域热力网络也可以存储到储热装置中,同时储热装置中的热量也可以经PHE输送到区域热力网络;区域能源站中水泵所需电能则由配电网电能经电力变压器变压后提供,其能量平衡方程如下式(2)所示:
Figure BDA0001448419970000056
其中,
Figure BDA0001448419970000057
为储热装置的功率;λ2为水泵消耗电能占总消耗电能的比例;ηEB为电锅炉的效率;
Figure BDA0001448419970000058
为能源站所消耗的电能。
(2)区域热力系统;
区域热力系统的负荷模型计算可基于下式(3):
Figure BDA0001448419970000059
其中,
Figure BDA00014484199700000510
为第i节点所供暖的热负荷;
Figure BDA00014484199700000511
为供暖区域建筑的单位体积热需求系数;Vi为供暖区域建筑的体积;
Figure BDA00014484199700000512
为供暖区域建筑室内设计温度;Ta,t为外界环境温度;
Figure BDA00014484199700000513
为区域热力网络负荷节点集合。
描述区域热力网络时,需要从水流的质量和温度两个角度出发。
1)水力模型:
基于图论思想对区域热力系统网络进行描述,对区域热力系统水流的流动规律进行建模,其能量流连续性方程可以用下式(4)来描述:
Figure BDA00014484199700000514
其中,A是区域热力网络中节点和管道的关联矩阵,
Figure BDA00014484199700000515
是管道的水流质量流率,
Figure BDA00014484199700000516
是节点的注入水流质量流率。
在水网的每个封闭回路中,水头损失向量之和为零,即:
Figure BDA0001448419970000061
其中,B为区域热力网络中节点和管道的关联矩阵;K为管道的阻尼系数;
Figure BDA0001448419970000062
为管道的水流质量流量。
2)热力模型:
各节点热功率可用式(6)进行描述:
Figure BDA0001448419970000063
其中,Φ为热负荷所消耗的热功率,Cp为水的比热,
Figure BDA0001448419970000064
为注入每个节点的质量流率,Ts是每个节点供水温度向量,To是各节点出水温度向量。
考虑到区域热力系统管道热损失,在其传输中水流温度的降落可以由式(7)所示:
Figure BDA0001448419970000065
令T′end=Tend-Ta,T′start=Tstart-Ta
Figure BDA0001448419970000066
其中,λ为表征管道材质保温性能的参数。
则式(7)可变换为:
Figure BDA0001448419970000067
其中,Tstart指水流进入管道时的温度,Tend指其从管道流出时的温度,Ta指外界环境的温度,
Figure BDA0001448419970000068
是每个管道单位长度的热量降落系数。L是每个管道的长度,Cp=4.182*10- 3MJ*kg-1*℃-1
在多个管道的交汇节点,其汇合后的温度可按式(9)计算:
Figure BDA0001448419970000069
其中,
Figure BDA00014484199700000612
是出水管道的质量流率,
Figure BDA00014484199700000611
是进水管道的质量流率,Tout是出水管道的温度,Tin是进水管道的温度。
(3)配电网络
随着可再生能源发电在配电网中的渗透及配电网与其他区域能源系统能流互动的日益密切,传统配电网单向潮流的基本格局得到了改变,给配电网潮流计算带来了诸多挑战,但配电网潮流计算模型仍可依据以下公式:
Figure BDA0001448419970000071
其中,
Figure BDA0001448419970000072
Figure BDA0001448419970000073
分别为配电网第i节点m相的有功、无功负荷;
Figure BDA0001448419970000074
为配电网第i节点m相电压幅值,
Figure BDA0001448419970000075
Figure BDA0001448419970000076
为配电网第i节点与第j节点间m相与n相间的电导和电纳;
Figure BDA0001448419970000077
为配电网第i节点与第j节点间m相与n相电压的相角差。
202:含多能源站的区域电力-热力综合能源系统调度模型;
(1)目标函数
以区域能源站运行成本、配电网网损最小为优化目标,同时考虑可再生能源的消纳,将弃风电量以惩罚项的形式加入目标函数中。
Figure BDA0001448419970000078
其中,
Figure BDA0001448419970000079
为电能价格;
Figure BDA00014484199700000710
为配电网网损;
Figure BDA00014484199700000711
为天然气价格;
Figure BDA00014484199700000712
为I型能源站输送到配电网的电量;
Figure BDA00014484199700000713
为I型能源站所购天然气的量;
Figure BDA00014484199700000714
为II型能源站所购电量;
Figure BDA00014484199700000715
为弃风惩罚项;
Figure BDA00014484199700000716
Figure BDA00014484199700000717
分别为风机最大的预测功率和实际功率;N为时段总数;NesI和NesII为I型和II型能源站个数;Nwt为配电网中风机个数。
(2)约束条件
1)区域能源站约束:
区域能源站内部涉及诸多设备,I型能源站中设备约束来自于CHP,如下式:
Figure BDA00014484199700000718
其中,
Figure BDA00014484199700000719
Figure BDA00014484199700000720
分别为CHP的最大和最小功率;
Figure BDA00014484199700000721
为CHP的实际功率;
Figure BDA00014484199700000722
为CHP的爬坡率;
Figure BDA00014484199700000723
为CHP爬坡率上限。
II型能源站中设备约束来自于电锅炉以及储热设备,电锅炉的约束如下式:
Figure BDA00014484199700000724
其中,
Figure BDA00014484199700000725
Figure BDA00014484199700000726
分别为电锅炉的最大和最小功率;
Figure BDA00014484199700000727
为电锅炉的实际功率;
Figure BDA00014484199700000728
为电锅炉爬坡率;
Figure BDA00014484199700000729
为电锅炉爬坡率上限。
对于储热设备而言,充放能前后储热装置的能量关系如下式:
Figure BDA0001448419970000081
其中,
Figure BDA0001448419970000082
为t时刻储热装置的储热量;
Figure BDA0001448419970000083
为t-1时刻储热装置的储热量;
Figure BDA0001448419970000084
Figure BDA0001448419970000085
分别为储热和放热的功率;ηc和ηd分别为储热和放热的效率;Δt为时间间隔。
基于式(14),定义如下式(15)来描述储热装置的运行状态:
Figure BDA0001448419970000086
其中,
Figure BDA0001448419970000087
描述了储热装置的储热状态;
Figure BDA0001448419970000088
Δhsoc k分别为储热装置储热和放热时最大状态变化量;
Figure BDA0001448419970000089
为储热装置的最大储热量;
Figure BDA00014484199700000810
Figure BDA00014484199700000811
分别为最大的储热和放热功率。
为保证储热装置稳定运行,需满足如下式所示约束:
Figure BDA00014484199700000812
其中,
Figure BDA00014484199700000813
hsoc k分别为储热装置最大和最小储热状态;
Figure BDA00014484199700000814
为储热装置状态变化量
Figure BDA00014484199700000815
为调度周期结束时刻储热装置状态;
Figure BDA00014484199700000816
为调度周期开始时刻储热装置状态。
2)区域热力系统
为保证区域热力网络水力工况的稳定,各PHE处所提供热量应满足下式:
Figure BDA00014484199700000817
其中,
Figure BDA00014484199700000818
为第i个PHE所提供的热量。
区域热力系统中的加压水泵实际功率不能超过其额定功率:
Figure BDA00014484199700000819
其中,
Figure BDA00014484199700000820
为第i个水泵的实际功率;
Figure BDA00014484199700000821
为水流的质量流量;ρ为水流的密度;ηp为水泵的效率;
Figure BDA00014484199700000822
为第i个水泵的额定功率。
区域热力网络中管道的水压降不能超过其最大允许水压损失:
Figure BDA00014484199700000823
其中,Δpk,t为管道的水压降;
Figure BDA00014484199700000824
为管道的最大允许水压降。
3)配电网
配电网节点电压在运行过程中需要保持在一定范围内:
Figure BDA0001448419970000091
其中,Vi m为配电网节点电压的下限;
Figure BDA0001448419970000092
为配电网第i个节点的电压;
Figure BDA0001448419970000093
配电网节点电压上限。
配电网线路上输送的功率不能超过线路允许的最大功率:
Figure BDA0001448419970000094
其中,
Figure BDA0001448419970000095
为第k条线路的实际功率;
Figure BDA0001448419970000096
为第k条线路的允许功率的最大值。
为保证供电的可靠性,配电网平衡节点处的功率有如下约束:
Figure BDA0001448419970000097
其中,
Figure BDA0001448419970000098
为平衡节点处有功功率的最大值;
Figure BDA0001448419970000099
为平衡节点处的实际功率。
203:含多能源站的区域电力-热力综合能源系统调度策略求解方法与框架。
PSO(Particle Swarm Optimization)是一种基于群体智能的随机搜索算法,对不同优化问题都具有良好的适应性,但该算法容易陷入局部最优。约束处理机制(constrainthandling technique,CHT)能够有效提高PSO算法的速度,同时改善其容易陷入局部收敛的缺点,其原理可描述如下:
基于PSO算法的基本原理可知,第i个粒子第j维第k次迭代时速度和位置分别满足如下条件:
Figure BDA00014484199700000910
Figure BDA00014484199700000911
其中,
Figure BDA00014484199700000912
Figure BDA00014484199700000913
分别表示算法所设定的粒子的速度与位置上下限,
Figure BDA00014484199700000914
Figure BDA00014484199700000915
分别表示实际中粒子的速度与位置的最大、最小值,
Figure BDA00014484199700000916
和gbestj分别为粒子的最优位置以及全部粒子最优位置,ω为惯性系数,c1和c2为加速系数。
受PSO中粒子更新时速度的影响,其每一维度都存一个“飞行区间”,意味着粒子更新的位置存在一个“飞行空间”,尽可能的在粒子位置的“飞行空间”内通过CHT修正粒子的空间位置,使得粒子从不可行域进入可行域,在进行约束处理时尽可能保持PSO算法的自然过程。
本发明优化调度模型的求解过程如下所示:
1)读取能源系统、外界环境相关信息,设置目标函数以及相应约束,初始化PSO产生初始种群以及相应粒子速度;
2)检查粒子约束,采用CHT直接处理部分约束;
3)区域热力系统能量流求解,计算不同类型区域能源站能量交互信息,进行配电网潮流仿真。
4)采用罚函数法间接处理其他相关约束,计算各个粒子的适应值,更新当前种群的gbest和所有粒子的pbest;
5)判断gbest是否满足结束要求或者达到最大迭代次数,若是则生成日前最优经济调度计划,否则返回步骤2)。
综上所述,本发明实施例通过上述步骤201-步骤203可通过不同类型区域能源站的协调,充分挖掘多能源优势互补潜力降低配电网网络损耗,改善配电网尖峰负荷现象,提高可再生能源消纳率,同时有效降低区域电力-热力系统运行成本。
本发明实施例对各器件的型号除做特殊说明的以外,其他器件的型号不做限制,只要能完成上述功能的器件均可。
本领域技术人员可以理解附图只是一个优选实施例的示意图,上述本发明实施例序号仅仅为了描述,不代表实施例的优劣。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (4)

1.一种含多区域能源站的电力-热力综合能源系统调度方法,其特征在于,所述方法包括以下步骤:
1)构建由配电网、区域能源站、区域热力系统组成的区域电力-热力综合能源系统;
2)构建上述区域电力-热力综合能源系统的调度模型;
3)基于群体智能的随机搜索对区域电力-热力综合能源系统的调度模型进行求解;
其中,步骤2)具体为:
构建由区域能源站运行成本、配电网网损最小为优化目标、可再生能源的消纳组成的目标函数,同时将弃风电量以惩罚项的形式加入;
分别建立配电网、区域能源站、区域热力系统的约束条件;
所述目标函数具体为:
Figure FDA0002875061880000011
其中,
Figure FDA0002875061880000012
为电能价格;
Figure FDA0002875061880000013
为配电网网损;
Figure FDA0002875061880000014
为天然气价格;
Figure FDA0002875061880000015
为I型能源站输送到配电网的电量;
Figure FDA0002875061880000016
为I型能源站所购天然气的量;
Figure FDA0002875061880000017
为II型能源站所购电量;
Figure FDA0002875061880000018
为弃风惩罚项;
Figure FDA0002875061880000019
Figure FDA00028750618800000110
分别为风机最大的预测功率和实际功率;N为时段总数;NesI和NesII为I型和II型能源站个数;Nwt为配电网中风机个数;
其中,
(1)区域能源站约束:
Figure FDA00028750618800000111
Figure FDA00028750618800000112
其中,
Figure FDA00028750618800000113
Figure FDA00028750618800000114
分别为CHP的最小和最大功率;
Figure FDA00028750618800000115
为CHP的实际功率;
Figure FDA00028750618800000116
为CHP的爬坡率;
Figure FDA00028750618800000117
为CHP爬坡率上限;
Figure FDA00028750618800000118
Figure FDA00028750618800000119
其中,
Figure FDA00028750618800000120
Figure FDA00028750618800000121
分别为电锅炉的最小和最大功率;
Figure FDA00028750618800000122
为电锅炉的实际功率;
Figure FDA00028750618800000123
为电锅炉爬坡率;
Figure FDA00028750618800000124
为电锅炉爬坡率上限;
Figure FDA00028750618800000125
Figure FDA00028750618800000126
Figure FDA00028750618800000127
其中,
Figure FDA00028750618800000128
hsoc k分别为储热装置最大和最小储热状态;
Figure FDA00028750618800000129
为储热装置状态变化量
Figure FDA00028750618800000130
为调度周期结束时刻储热装置状态;
Figure FDA00028750618800000131
为调度周期开始时刻储热装置状态;
(2)区域热力系统约束:
Figure FDA0002875061880000021
其中,
Figure FDA0002875061880000022
为第i个PHE所提供的热量;
Figure FDA0002875061880000023
其中,
Figure FDA0002875061880000024
为第i个水泵的实际功率;
Figure FDA0002875061880000025
为水流的质量流量;ρ为水流的密度;ηp为水泵的效率;
Figure FDA0002875061880000026
为第i个水泵的额定功率;
Figure FDA0002875061880000027
其中,Δpk,t为管道的水压降;
Figure FDA0002875061880000028
为管道的最大允许水压降;
(3)配电网约束
Figure FDA0002875061880000029
其中,V i m为配电网节点电压的下限;
Figure FDA00028750618800000210
为配电网第i个节点的电压;
Figure FDA00028750618800000211
配电网节点电压上限;
Figure FDA00028750618800000212
其中,
Figure FDA00028750618800000213
为第k条线路的实际功率;
Figure FDA00028750618800000214
为第k条线路的允许功率的最大值;
Figure FDA00028750618800000215
其中,
Figure FDA00028750618800000216
为平衡节点处有功功率的最大值;
Figure FDA00028750618800000217
为平衡节点处的实际功率。
2.根据权利要求1所述的一种含多区域能源站的电力-热力综合能源系统调度方法,其特征在于,所述区域能源站包括:
由热电联产单元、电力变压器以及一级换热站组成的第一类能源站;还包括:
由电锅炉、储热装置、电力变压器以及一级换热站组成的第二类能源站;
第一类能源站和第二类能源站分别遵守相应的能量平衡方程。
3.根据权利要求1所述的一种含多区域能源站的电力-热力综合能源系统调度方法,其特征在于,所述区域热力系统包括:水流的质量和温度模型。
4.根据权利要求1所述的一种含多区域能源站的电力-热力综合能源系统调度方法,其特征在于,所述基于群体智能的随机搜索对区域电力-热力综合能源系统的调度模型进行求解具体为:
11)读取能源系统、外界环境相关信息,设置目标函数以及相应约束,初始化群体智能产生初始种群以及相应粒子速度;
12)检查粒子约束,采用约束处理机制直接处理部分约束;
13)区域热力系统能量流求解,计算不同类型区域能源站能量交互信息,进行配电网潮流仿真;
14)采用罚函数法间接处理其他相关约束,计算各个粒子的适应值,更新当前种群的最优位置以及全部粒子最优位置;
15)判断全部粒子最优位置是否满足结束要求或者达到最大迭代次数,若是则生成最优调度计划,否则返回步骤12)。
CN201711026216.5A 2017-10-27 2017-10-27 一种含多区域能源站的电力-热力综合能源系统调度方法 Active CN107665384B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711026216.5A CN107665384B (zh) 2017-10-27 2017-10-27 一种含多区域能源站的电力-热力综合能源系统调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711026216.5A CN107665384B (zh) 2017-10-27 2017-10-27 一种含多区域能源站的电力-热力综合能源系统调度方法

Publications (2)

Publication Number Publication Date
CN107665384A CN107665384A (zh) 2018-02-06
CN107665384B true CN107665384B (zh) 2021-02-19

Family

ID=61144198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711026216.5A Active CN107665384B (zh) 2017-10-27 2017-10-27 一种含多区域能源站的电力-热力综合能源系统调度方法

Country Status (1)

Country Link
CN (1) CN107665384B (zh)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255487A (zh) * 2018-09-21 2019-01-22 国网浙江省电力有限公司 一种基于标准化矩阵模型的综合能源系统优化方法
CN109347107A (zh) * 2018-09-29 2019-02-15 河海大学 一种并网运行电热互联综合能源系统潮流计算方法
CN109599890B (zh) * 2018-10-31 2021-03-02 中国农业大学 一种低压配电网的高比例光伏消纳方法及系统
DE102019200738A1 (de) * 2019-01-22 2020-07-23 Siemens Aktiengesellschaft Computergestütztes Verfahren zur Simulation eines Betriebes eines Energiesystems sowie Energiemanagementsystem
CN110070213B (zh) * 2019-03-28 2022-05-20 广东工业大学 一种电-气综合能源系统的日前调度方法
CN110535128B (zh) * 2019-09-05 2022-12-13 东北大学 基于用能舒适度的多区域综合能源系统协同调度方法
CN113048547A (zh) * 2019-12-27 2021-06-29 中国电力科学研究院有限公司 一种综合能源供热系统的功率分配方法及装置
CN111193268B (zh) * 2019-12-30 2021-12-10 国网北京市电力公司 电采暖设备的处理方法和装置
CN112070266B (zh) * 2020-07-27 2022-07-12 中国能源建设集团天津电力设计院有限公司 一种基于多代理技术的多区域综合能源管理系统架构
CN112529244B (zh) * 2020-10-23 2022-08-23 河海大学 一种考虑电负荷需求响应的综合能源系统协同优化运行法
CN113904337B (zh) * 2021-10-18 2024-04-26 山东大学 计及配电网灵活性的综合能源系统分布式优化调度方法
CN114165829B (zh) * 2021-11-10 2022-12-16 三峡大学 基于配电网负荷平衡度指标的蓄热式电采暖有序运行方法
CN114565236B (zh) * 2022-02-15 2023-04-18 石河子大学 一种双碳目标下的电力综合能源系统调度方法及装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106773704A (zh) * 2017-01-04 2017-05-31 中国科学院过程工程研究所 多系统联合优化调度方法及装置
CN106786603A (zh) * 2017-02-22 2017-05-31 天津大学 一种区域综合能源系统多目标最优混合潮流算法
CN106777708A (zh) * 2016-12-21 2017-05-31 天津大学 一种电力‑天然气区域综合能源系统的稳态分析方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106777708A (zh) * 2016-12-21 2017-05-31 天津大学 一种电力‑天然气区域综合能源系统的稳态分析方法
CN106773704A (zh) * 2017-01-04 2017-05-31 中国科学院过程工程研究所 多系统联合优化调度方法及装置
CN106786603A (zh) * 2017-02-22 2017-05-31 天津大学 一种区域综合能源系统多目标最优混合潮流算法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Economic dispatch of generalized multi-source energy storage in regional integrated energy systems;Wang Weiliang等;《Energy Procedia》;20170824;第3270-3275页 *
study on day-ahead optimal economic operation of active distribution networks based on Kriging model assisted particle swarm optimization with constraint handling techniques;Jia Tang等;《Applied Energy》;20170712;全文 *
基于改进CPSO算法的区域电热综合能源系统经济调度;刘洪等;《电力自动化设备》;20170630;第37卷(第6期);全文 *
能源互联网背景下的典型区域综合能源系统稳态分析研究综述;王伟亮等;《中国电机工程学报》;20160620;第36卷(第12期);全文 *

Also Published As

Publication number Publication date
CN107665384A (zh) 2018-02-06

Similar Documents

Publication Publication Date Title
CN107665384B (zh) 一种含多区域能源站的电力-热力综合能源系统调度方法
Wang et al. Optimal scheduling strategy of district integrated heat and power system with wind power and multiple energy stations considering thermal inertia of buildings under different heating regulation modes
Pan et al. Interactions of district electricity and heating systems considering time-scale characteristics based on quasi-steady multi-energy flow
CN105576710B (zh) 一种综合能源系统中的分布式电源的配置方法
CN107508328A (zh) 考虑风电消纳的联合系统能量优化方法
CN106372742A (zh) 考虑电转气多源储能型微网日前最优经济调度方法
CN108667007A (zh) 计及电-气耦合系统约束的电压稳定裕度计算方法
CN109389248B (zh) 基于区域热网的综合能源系统热电功率协调调度方法
CN109523076A (zh) 一种储能参与下的综合能源系统日前稳态优化分析方法
Fan et al. Review on coordinated planning of source-network-load-storage for integrated energy systems
Bracco et al. A system of systems model for the control of the University of Genoa Smart Polygeneration Microgrid
Pan et al. Operation optimization of integrated energy systems based on heat storage characteristics of heating network
CN112234656A (zh) 含多能交互的多园区综合能源系统分散协调调度方法
CN114707783A (zh) 一种区域电-热综合能源系统太阳能消纳设备两阶段鲁棒规划方法
CN113131513A (zh) 考虑碳排放的电、热、气转换优化运行配置方法和存储介质
Liu et al. Research on the optimal dispatch of wind power consumption based on combined heat and power with thermal energy storage
Zhang et al. Review and prospect of modeling and optimization of integrated energy system
Yu et al. Wind-CHP generation aggregation with storage capability of district heating network
Chen et al. Optimally coordinated operation of a multi-energy microgrid with coupled electrical and heat networks
Fan et al. Research on collaborative planning of power source, grid and load for Shanghai distribution network
Li et al. The expansion planning of wind-thermal co-generation system based on harmony search algorithm under smart grid
Cong et al. Review of research on system thermal inertia modelling and optimal scheduling from the perspective of flexible resources
Bracco et al. A multi-objective optimization tool for the daily management of sustainable smart microgrids: Case Study: the savona campus SPM and SEB facilities
Li et al. Study on integrated scheduling model of CHP including wind power, electric boiler and phase change thermal storage station
Shi et al. An optimal dispatching method for integrated community energy systems based on the economic optimality

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant