CN107663861A - A kind of bridge construction piling equipment - Google Patents
A kind of bridge construction piling equipment Download PDFInfo
- Publication number
- CN107663861A CN107663861A CN201711077355.0A CN201711077355A CN107663861A CN 107663861 A CN107663861 A CN 107663861A CN 201711077355 A CN201711077355 A CN 201711077355A CN 107663861 A CN107663861 A CN 107663861A
- Authority
- CN
- China
- Prior art keywords
- rotating disc
- plate
- pole
- rotating shaft
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0038—Production methods using an auger, i.e. continuous flight type
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of bridge construction piling equipment,Including fixed bottom plate,Supporting plate is connected with by rotating shaft on fixed bottom plate,The top of supporting plate is provided with connecting plate,The first cylinder is provided with connecting plate,Side of first cylinder away from connecting plate is welded with installing frame,Installing frame is U-shaped frame body,The upper plate of installing frame is connected with rotary electric machine,The output shaft of rotary electric machine is connected with rotating disc,Rotating disc is along the circumferential direction welded with helical-blade,The center weld of rotating disc has the second cylinder,The one end of second cylinder away from rotating disc is connected with rack,Two group of first pole is provided with rotating disc,The one end of first pole away from rotating disc is connected with rotate gear by rotating shaft,Head rod is connected with by rotating shaft in rotate gear,Two group of second pole is connected with rotating disc,The present invention is simple in construction,It is novel in design,And the installation of pile body,Disassembling section is simple and convenient,Save the installing/dismounting time of a large amount of pile bodies,Improve piling efficiency.
Description
Technical field
The present invention relates to piling equipment technical field, more particularly to a kind of bridge construction piling equipment.
Background technology
In modern bridge construction process, the construction for bridge needs to drive piles, and drives piles, refers to and stake is thrown into ground,
Make building basis firm, if because above ground structure will be built on the ground, ground will bear very big pressure, must just protect
There is enough renitent intensity on card ground, and this is difficult often to accomplish, so must just enter to the ground for bearing building
Mode is born on capable reinforcing or improvement ground, so just expecting driving piles on ground, allows most of weight of building to pass through
The very deep position of below ground is passed in stake, because the ground of this position is more much bigger than ground ability to bear, to be beaten on stake more
Deep, this will see the distribution of strata situation (geologic formation is in specialty) of underground, if the pressure of building can be born enough
Power, stake get to this, if it could not, must continue to deepen.
Piling in the bridge construction process being currently known, it is general using pile body is pre-installed on piling machine, by beating
Stake machine driving pile body is installed to underground, but current pile body installation operation is cumbersome, and pile body installation is relatively time consuming, and piling terminates
Afterwards, the dismounting of pile body is also cumbersome, influence drive piles efficiency, for this we design a kind of novel bridge construction with piling equipment come
Solve the above problems.
The content of the invention
The invention aims to solve shortcoming present in prior art, and a kind of bridge construction proposed is driven piles
Device.
To achieve these goals, present invention employs following technical scheme:
A kind of bridge construction piling equipment, including bottom plate is fixed, support is connected with by rotating shaft on the fixed bottom plate
Plate, connecting plate is provided with above the supporting plate, the first cylinder is provided with the connecting plate, first cylinder is away from even
The side of fishplate bar is welded with installing frame, and the installing frame is U-shaped frame body, and the U-shaped opening of the installing frame is down, the installation
Pile body is installed, the upper plate of the installing frame is connected with rotary electric machine, and the output shaft of the rotary electric machine, which is connected with, to be turned in frame
Moving plate, the rotating disc are along the circumferential direction welded with helical-blade, and the center weld of the rotating disc has the second cylinder, and described second
The one end of cylinder away from rotating disc is connected with rack, and two group of first pole is provided with the rotating disc, and first pole is remote
One end from rotating disc is connected with rotate gear by rotating shaft, and head rod is connected with by rotating shaft in the rotate gear,
Two group of second pole is connected with the rotating disc, the described one end of second pole away from rotating disc is connected with second by rotating shaft
Connecting rod, the one end of the head rod away from rotate gear are connected with the second connecting rod, and second connecting rod is away from
One end of two poles is welded with clamp frame.
Preferably, the clamp frame is in inverted L-type framework, and the vertical side plate bottom of the clamp frame is welded with clamping
Plate, the upper top of the pile body offer the clamping slot matched with head clamp.
Preferably, the turning gear wheel and rack hinge, and the groove in the rotate gear and the groove phase on rack
Matching.
Preferably, expansion link is connected with by rotating shaft on the fixed bottom plate, the expansion link is remote to fix the one of bottom plate
End is connected by rotating shaft with supporting plate.
Compared with prior art, the beneficial effects of the invention are as follows:In the present invention, rack is promoted to move by the second cylinder,
Rack moving belt turn moving gear is rotated, and rotate gear rotates to be driven by head rod, makes two group of second connecting rod close
Or it is remote, and clamp frame is clamped or decontrol pile body, you can quickly realize Fast Installation and the dismounting to pile body, this hair
It is bright simple in construction, it is novel in design, and installation, the disassembling section of pile body are simple and convenient, save the installing/dismounting time of a large amount of pile bodies,
Improve piling efficiency.
Brief description of the drawings
Fig. 1 is a kind of structural representation of bridge construction piling equipment proposed by the present invention;
Fig. 2 is a kind of structural representation of the installing frame of bridge construction piling equipment proposed by the present invention;
Fig. 3 is a kind of structural representation of the pile body of bridge construction piling equipment proposed by the present invention.
In figure:1 fix bottom plate, 2 supporting plates, 3 first cylinders, 4 installing frames, 5 pile bodies, 6 helical-blades, 7 rotary electric machines, 8 turns
Moving plate, 9 second cylinders, 10 racks, 11 first poles, 12 second poles, 13 head rods, 14 second connecting rods, 15 clamp
Frame, 16 rotate gears.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Reference picture 1-3, a kind of bridge construction piling equipment, including fixed bottom plate 1, fix on bottom plate 1 and are connected by rotating shaft
Supporting plate 2 is connected to, the top of supporting plate 2 is provided with connecting plate, the first cylinder 3 is provided with connecting plate, the first cylinder 3 is away from even
The side of fishplate bar is welded with installing frame 4, and installing frame 4 is U-shaped frame body, and the U-shaped opening of installing frame 4 is down, pacifies in installing frame 4
Equipped with pile body 5, the upper plate of installing frame 4 is connected with rotary electric machine 7, and the output shaft of rotary electric machine 7 is connected with rotating disc 8, rotates
Disk 8 is along the circumferential direction welded with helical-blade 6, and the center weld of rotating disc 8 has the second cylinder 9, and the second cylinder 9 is away from rotating disc 8
One end be connected with rack 10, two group of first pole 11, first one end of pole 11 away from rotating disc 8 are provided with rotating disc 8
Rotate gear 16 is connected with by rotating shaft, head rod 13 is connected with by rotating shaft in rotate gear 16, connected on rotating disc 8
There is two group of second pole 12, second one end of pole 12 away from rotating disc 8 is connected with the second connecting rod 14 by rotating shaft, and first connects
The one end of extension bar 13 away from rotate gear 16 is connected with the second connecting rod 14, the second connecting rod 14 away from the second pole 12 one
End is welded with clamp frame 15.
Operation principle:In the use of the present invention, promoting rack 10 to move up and down by the second cylinder 9, rack 10 is by turning
The transmission of moving gear 16, head rod 13 is promoted or further two group of second connecting rod 14, make two groups of clamp frames 15 to pile body 5
Clamp or decontrol, realize Fast Installation and dismounting of the pile body 5 on piling equipment, effectively heighten piling efficiency, and pile body 5 is pacified
After installing frame 15, rotated by the rotational band turn Moving plate 8 of rotary electric machine 7 and promoted with the first cylinder 3, rotating disc 8 drives spiral shell
Vane 6 is rotated, and realizes the punching to ground, and pile body 5 is clamped among helical-blade 6, and pile body is same as helical-blade 6 punches
When between be arranged in hole slot, pile body, which is arranged on behind underground, unclamps clamp frame 15, and rotation pulls out helical-blade 6 and can complete to drive piles.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its
Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.
Claims (5)
1. a kind of bridge construction piling equipment, including fixed bottom plate (1), it is characterised in that pass through on the fixed bottom plate (1)
Rotating shaft is connected with supporting plate (2), is provided with connecting plate above the supporting plate (2), the first gas is provided with the connecting plate
Cylinder (3), side of first cylinder (3) away from connecting plate are welded with installing frame (4), and the installing frame (4) is U-shaped frame body,
And the U-shaped opening of the installing frame (4) is down, pile body (5), the upper top of the installing frame (4) are installed in the installing frame (4)
Plate is connected with rotary electric machine (7), and the output shaft of the rotary electric machine (7) is connected with rotating disc (8), and the rotating disc (8) is along circle
Circumferential direction is welded with helical-blade (6), and the center weld of the rotating disc (8) has the second cylinder (9), and second cylinder (9) is far
One end from rotating disc (8) is connected with rack (10), is provided with two group of first pole (11) on the rotating disc (8), and described
The one end of one pole (11) away from rotating disc (8) is connected with rotate gear (16) by rotating shaft, leads on the rotate gear (16)
Cross rotating shaft and be connected with head rod (13), two group of second pole (12), second pole are connected with the rotating disc (8)
(12) one end away from rotating disc (8) is connected with the second connecting rod (14) by rotating shaft, and the head rod (13) is remote to be turned
One end of moving gear (16) is connected with the second connecting rod (14), the one end of second connecting rod (14) away from the second pole (12)
It is welded with clamp frame (15).
2. a kind of bridge construction piling equipment according to claim 1, it is characterised in that the clamp frame (15) is in
The L-type framework put, the vertical side plate bottom of the clamp frame (15) are welded with head clamp, and the upper top of the pile body (5) opens up
There is the clamping slot matched with head clamp.
A kind of 3. bridge construction piling equipment according to claim 1, it is characterised in that the rotate gear (16) with
Rack (10) hinge, and the groove in the rotate gear (16) matches with the groove on rack (10).
4. a kind of bridge construction piling equipment according to claim 1, it is characterised in that on the fixed bottom plate (1)
Expansion link is connected with by rotating shaft, the one end of the expansion link away from fixed bottom plate (1) is connected by rotating shaft with supporting plate (2).
5. a kind of bridge construction piling equipment according to claim 1, it is characterised in that the fixed bottom plate (1)
Bottom is provided with antiskid line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711077355.0A CN107663861A (en) | 2017-11-06 | 2017-11-06 | A kind of bridge construction piling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711077355.0A CN107663861A (en) | 2017-11-06 | 2017-11-06 | A kind of bridge construction piling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107663861A true CN107663861A (en) | 2018-02-06 |
Family
ID=61144453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711077355.0A Pending CN107663861A (en) | 2017-11-06 | 2017-11-06 | A kind of bridge construction piling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107663861A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847620A (en) * | 2019-11-23 | 2020-02-28 | 张亚 | Assembled wall body temporary connection fixed equipment |
-
2017
- 2017-11-06 CN CN201711077355.0A patent/CN107663861A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847620A (en) * | 2019-11-23 | 2020-02-28 | 张亚 | Assembled wall body temporary connection fixed equipment |
CN110847620B (en) * | 2019-11-23 | 2021-07-02 | 苗珍录 | Assembled wall body temporary connection fixed equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106553561B (en) | It is a kind of portable to dismantle the new-energy automobile charging pile installed | |
CN107386288A (en) | Civil engineering piling machine | |
CN107663861A (en) | A kind of bridge construction piling equipment | |
CN208159205U (en) | A kind of tobacco planting pit-picker | |
CN102182180A (en) | Rotary extrusion sleeve anchor rod and construction method thereof | |
CN107469956A (en) | A kind of rotary iron tailings fast screening devices | |
CN209536686U (en) | A kind of swing device for capableing of quick winding wire ropes | |
CN203947451U (en) | A kind of floater is salvaged system | |
CN207553099U (en) | A kind of bridge construction piling equipment | |
CN201940775U (en) | Rotary driving mechanism of steel reinforcement cage weld-forming machine | |
CN208004697U (en) | Gabion box mesh sheet crimping machine | |
CN202969381U (en) | Pile work machine use for driving pile | |
CN108934287A (en) | A kind of forestry plantation is digged pit equipment with portable | |
CN206110215U (en) | Hydraulic suction dredge with pine mud function | |
CN211646392U (en) | Ground anchor dismounting device for power engineering | |
CN211547724U (en) | Waterborne deviation-rectifying type pile driving mechanism | |
CN209067499U (en) | A kind of horizontal centrifugal pumping system with alignment function | |
CN206468089U (en) | A kind of easy construction and firm steel tower | |
CN216504830U (en) | Device is demolishd to lower sleeve of vertical hydraulic turbine stator | |
CN219061536U (en) | Mast verticality adjusting device of small rotary drilling rig | |
CN202012294U (en) | Rotary support for workover rig without guy wire | |
CN109339673A (en) | The anti-Hongmen Gate with support automatic deploying and retracting | |
CN208407591U (en) | A kind of novel Sand screen | |
CN215977624U (en) | Municipal works wellhead assembly | |
CN207314334U (en) | A kind of adaptable building stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180206 |