CN107657087A - 基于bim技术的管线综合布置方法 - Google Patents
基于bim技术的管线综合布置方法 Download PDFInfo
- Publication number
- CN107657087A CN107657087A CN201710799659.1A CN201710799659A CN107657087A CN 107657087 A CN107657087 A CN 107657087A CN 201710799659 A CN201710799659 A CN 201710799659A CN 107657087 A CN107657087 A CN 107657087A
- Authority
- CN
- China
- Prior art keywords
- construction
- pipeline
- softwares
- revit
- cutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种基于BIM技术的管线综合布置的方法,包括以下步骤:(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;(3)建立拟切改管线的模型;(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;(6)从Revit软件中输出三维施工图。采用本方法可优化施工组织,避免重复开挖道路、交叉作业时产生冲突,确保有条不紊的施工。
Description
技术领域
本发明涉及管线综合布置方法,特别是基于BIM技术的管线综合布置方法。
背景技术
城市修建工事时,难免会受到错综复杂的地下管线影响,传统的二维图纸指导管线切改,存在众多弊端,无法传达大量的切改信息,与各管线的产权单位缺乏沟通时,易出现重复开挖路面,施工冲突,新旧管线交叉等情况。
发明内容
本发明的目的在于克服已有技术的缺点,提供一种可避免重复开挖道路、施工冲突、新旧管线交叉等情况、缩短施工工期并且减少成本的基于BIM技术的管线综合布置方法。
本发明的一种基于BIM技术的管线综合布置的方法,包括以下步骤:
(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;
(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;
(3)根据管线切改要求,建立拟切改管线的模型;
(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;
(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;
(6)从Revit软件中输出三维施工图指导现场施工。
本发明的有益效果是:
通过应用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,可以直观的查找需要切改的管线种类及部位,提高各方沟通效率,确定管线切改方案。通过Navisworks软件进行碰撞检测,可以快捷的找出新旧管线及各类管线之间的冲突,提前修改管线切改方案,避免后期方案变动而引起的工期延误。通过Navisworks软件进行四维施工模拟,可优化施工组织,避免重复开挖道路、交叉作业时产生冲突,确保有条不紊的施工。
具体实施方式
下面对本发明的具体实施方式进行详细说明。
本发明的一种基于BIM技术的管线综合布置的方法,包括以下步骤:
(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;
(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;
(3)根据管线切改要求,建立拟切改管线的模型;
(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;
(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;
(6)从Revit软件中输出三维施工图指导现场施工。
Claims (1)
1.一种基于BIM技术的管线综合布置的方法,其特征在于包括以下步骤:
(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;
(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;
(3)根据管线切改要求,建立拟切改管线的模型;
(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;
(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;
(6)从Revit软件中输出三维施工图指导现场施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710799659.1A CN107657087A (zh) | 2017-09-07 | 2017-09-07 | 基于bim技术的管线综合布置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710799659.1A CN107657087A (zh) | 2017-09-07 | 2017-09-07 | 基于bim技术的管线综合布置方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107657087A true CN107657087A (zh) | 2018-02-02 |
Family
ID=61128256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710799659.1A Pending CN107657087A (zh) | 2017-09-07 | 2017-09-07 | 基于bim技术的管线综合布置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107657087A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110222457A (zh) * | 2019-06-17 | 2019-09-10 | 中建八局轨道交通建设有限公司 | 既有结构与密贴既有结构的新建初支结构的施工方法 |
CN110990914A (zh) * | 2019-11-18 | 2020-04-10 | 中国化学工程第六建设有限公司 | 基于bim技术的大型锅炉安装方法 |
CN111382484A (zh) * | 2020-03-11 | 2020-07-07 | 深圳机械院建筑设计有限公司 | 一种基于bim建筑物管线布置优化系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104657512A (zh) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | 利用bim实现钢桁拱桥梁工程量统计的方法及装置 |
CN106055839A (zh) * | 2016-06-30 | 2016-10-26 | 上海宝冶集团有限公司 | 基于bim的三维扫描技术在建筑工程中的应用方法 |
CN106202831A (zh) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | 一种基于bim的管线综合优化方法 |
CN106202723A (zh) * | 2016-07-10 | 2016-12-07 | 北京工业大学 | 一种bim地铁施工方法 |
-
2017
- 2017-09-07 CN CN201710799659.1A patent/CN107657087A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104657512A (zh) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | 利用bim实现钢桁拱桥梁工程量统计的方法及装置 |
CN106055839A (zh) * | 2016-06-30 | 2016-10-26 | 上海宝冶集团有限公司 | 基于bim的三维扫描技术在建筑工程中的应用方法 |
CN106202723A (zh) * | 2016-07-10 | 2016-12-07 | 北京工业大学 | 一种bim地铁施工方法 |
CN106202831A (zh) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | 一种基于bim的管线综合优化方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110222457A (zh) * | 2019-06-17 | 2019-09-10 | 中建八局轨道交通建设有限公司 | 既有结构与密贴既有结构的新建初支结构的施工方法 |
CN110222457B (zh) * | 2019-06-17 | 2023-04-18 | 中建八局轨道交通建设有限公司 | 既有结构与密贴既有结构的新建初支结构的施工方法 |
CN110990914A (zh) * | 2019-11-18 | 2020-04-10 | 中国化学工程第六建设有限公司 | 基于bim技术的大型锅炉安装方法 |
CN111382484A (zh) * | 2020-03-11 | 2020-07-07 | 深圳机械院建筑设计有限公司 | 一种基于bim建筑物管线布置优化系统 |
CN111382484B (zh) * | 2020-03-11 | 2023-04-18 | 深圳机械院建筑设计有限公司 | 一种基于bim建筑物管线布置优化系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106202825A (zh) | 基于bim的地下综合管廊设计方法 | |
CN107657087A (zh) | 基于bim技术的管线综合布置方法 | |
CN106372309B (zh) | 一种基于gis和bim的电力隧道数字化敷设方法和系统 | |
CN204303029U (zh) | 用于地铁管线碰撞检测及后期运营维护的bim数据库系统 | |
CN106372293B (zh) | 一种基于三维基准线的构筑物bim模型创建方法 | |
CN110990983A (zh) | 一种给水管道交叉布置方法 | |
CN106202723A (zh) | 一种bim地铁施工方法 | |
CN106683198A (zh) | 一种综合管网的三维自动建模及调度渲染的方法 | |
CN106202831A (zh) | 一种基于bim的管线综合优化方法 | |
CN104156544A (zh) | 基于bim技术的梁柱钢筋节点自动布置与施工模拟方法 | |
CN105844017A (zh) | 一种用bim技术优化地下管网和景观绿化设计的方法 | |
NZ599412A (en) | Traffic signal control system and method | |
CN110889160A (zh) | 一种基于bim技术的市政管道施工方法 | |
CN104063529A (zh) | 一种数字化汽车工厂布局规划仿真的方法 | |
CN102663168B (zh) | 电缆层二维图纸的三维转换及管线冲突处理方法 | |
CN109829223A (zh) | 一种基于bim的大型地下综合管廊设计方法 | |
CN104631826A (zh) | 一种基于bim模型的施工总平面布置方法 | |
CN103927417A (zh) | 基于水力模型构建需求的排水管网数字化处理方法 | |
CN112733230A (zh) | 一种基于bim技术的建筑机电管线综合优化方法 | |
Waldron et al. | Embodied energy and operational energy: Case studies comparing different urban layouts | |
CN112765701A (zh) | 一种农民新村设计施工一体化建设方法 | |
CN105138757A (zh) | 基于Autodesk Revit的电力电缆工程可视化模型的建立方法 | |
CN110502834A (zh) | 基于bim的城市轨道交通车辆基地设计方法 | |
Liu et al. | Application analysis of BIM technology in metro rail transit | |
CN117763641A (zh) | 三维弧形管线系统信息化模型的构建方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180202 |