CN107657087A - 基于bim技术的管线综合布置方法 - Google Patents

基于bim技术的管线综合布置方法 Download PDF

Info

Publication number
CN107657087A
CN107657087A CN201710799659.1A CN201710799659A CN107657087A CN 107657087 A CN107657087 A CN 107657087A CN 201710799659 A CN201710799659 A CN 201710799659A CN 107657087 A CN107657087 A CN 107657087A
Authority
CN
China
Prior art keywords
construction
pipeline
softwares
revit
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710799659.1A
Other languages
English (en)
Inventor
凌健
张贺南
买子威
潘阳
高明鹤
徐利
郭靖
易敏
任富芝
祝新
刘倩
李海英
张金秋
吕志国
王子豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201710799659.1A priority Critical patent/CN107657087A/zh
Publication of CN107657087A publication Critical patent/CN107657087A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种基于BIM技术的管线综合布置的方法,包括以下步骤:(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;(3)建立拟切改管线的模型;(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;(6)从Revit软件中输出三维施工图。采用本方法可优化施工组织,避免重复开挖道路、交叉作业时产生冲突,确保有条不紊的施工。

Description

基于BIM技术的管线综合布置方法
技术领域
本发明涉及管线综合布置方法,特别是基于BIM技术的管线综合布置方法。
背景技术
城市修建工事时,难免会受到错综复杂的地下管线影响,传统的二维图纸指导管线切改,存在众多弊端,无法传达大量的切改信息,与各管线的产权单位缺乏沟通时,易出现重复开挖路面,施工冲突,新旧管线交叉等情况。
发明内容
本发明的目的在于克服已有技术的缺点,提供一种可避免重复开挖道路、施工冲突、新旧管线交叉等情况、缩短施工工期并且减少成本的基于BIM技术的管线综合布置方法。
本发明的一种基于BIM技术的管线综合布置的方法,包括以下步骤:
(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;
(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;
(3)根据管线切改要求,建立拟切改管线的模型;
(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;
(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;
(6)从Revit软件中输出三维施工图指导现场施工。
本发明的有益效果是:
通过应用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,可以直观的查找需要切改的管线种类及部位,提高各方沟通效率,确定管线切改方案。通过Navisworks软件进行碰撞检测,可以快捷的找出新旧管线及各类管线之间的冲突,提前修改管线切改方案,避免后期方案变动而引起的工期延误。通过Navisworks软件进行四维施工模拟,可优化施工组织,避免重复开挖道路、交叉作业时产生冲突,确保有条不紊的施工。
具体实施方式
下面对本发明的具体实施方式进行详细说明。
本发明的一种基于BIM技术的管线综合布置的方法,包括以下步骤:
(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;
(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;
(3)根据管线切改要求,建立拟切改管线的模型;
(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;
(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;
(6)从Revit软件中输出三维施工图指导现场施工。

Claims (1)

1.一种基于BIM技术的管线综合布置的方法,其特征在于包括以下步骤:
(1)调查施工场地周边环境,确定建筑物、构筑物及各类管线的信息;
(2)利用Revit软件建立拟施工结构、拟施工场地周边环境及各类管线的模型,结合工程施工筹划,确定需要切改的管线种类及部位;
(3)根据管线切改要求,建立拟切改管线的模型;
(4)将Revit模型导入Navisworks软件进行碰撞检测和四维施工模拟;
(5)根据碰撞检测结果修改管线切改方案,并且结合用户需求以及四维施工模拟优化协调施工组织方案;
(6)从Revit软件中输出三维施工图指导现场施工。
CN201710799659.1A 2017-09-07 2017-09-07 基于bim技术的管线综合布置方法 Pending CN107657087A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710799659.1A CN107657087A (zh) 2017-09-07 2017-09-07 基于bim技术的管线综合布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710799659.1A CN107657087A (zh) 2017-09-07 2017-09-07 基于bim技术的管线综合布置方法

Publications (1)

Publication Number Publication Date
CN107657087A true CN107657087A (zh) 2018-02-02

Family

ID=61128256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710799659.1A Pending CN107657087A (zh) 2017-09-07 2017-09-07 基于bim技术的管线综合布置方法

Country Status (1)

Country Link
CN (1) CN107657087A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222457A (zh) * 2019-06-17 2019-09-10 中建八局轨道交通建设有限公司 既有结构与密贴既有结构的新建初支结构的施工方法
CN110990914A (zh) * 2019-11-18 2020-04-10 中国化学工程第六建设有限公司 基于bim技术的大型锅炉安装方法
CN111382484A (zh) * 2020-03-11 2020-07-07 深圳机械院建筑设计有限公司 一种基于bim建筑物管线布置优化系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104657512A (zh) * 2015-03-19 2015-05-27 中铁二局第五工程有限公司 利用bim实现钢桁拱桥梁工程量统计的方法及装置
CN106055839A (zh) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 基于bim的三维扫描技术在建筑工程中的应用方法
CN106202831A (zh) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 一种基于bim的管线综合优化方法
CN106202723A (zh) * 2016-07-10 2016-12-07 北京工业大学 一种bim地铁施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104657512A (zh) * 2015-03-19 2015-05-27 中铁二局第五工程有限公司 利用bim实现钢桁拱桥梁工程量统计的方法及装置
CN106055839A (zh) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 基于bim的三维扫描技术在建筑工程中的应用方法
CN106202723A (zh) * 2016-07-10 2016-12-07 北京工业大学 一种bim地铁施工方法
CN106202831A (zh) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 一种基于bim的管线综合优化方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222457A (zh) * 2019-06-17 2019-09-10 中建八局轨道交通建设有限公司 既有结构与密贴既有结构的新建初支结构的施工方法
CN110222457B (zh) * 2019-06-17 2023-04-18 中建八局轨道交通建设有限公司 既有结构与密贴既有结构的新建初支结构的施工方法
CN110990914A (zh) * 2019-11-18 2020-04-10 中国化学工程第六建设有限公司 基于bim技术的大型锅炉安装方法
CN111382484A (zh) * 2020-03-11 2020-07-07 深圳机械院建筑设计有限公司 一种基于bim建筑物管线布置优化系统
CN111382484B (zh) * 2020-03-11 2023-04-18 深圳机械院建筑设计有限公司 一种基于bim建筑物管线布置优化系统

Similar Documents

Publication Publication Date Title
CN106202825A (zh) 基于bim的地下综合管廊设计方法
CN107657087A (zh) 基于bim技术的管线综合布置方法
CN106372309B (zh) 一种基于gis和bim的电力隧道数字化敷设方法和系统
CN204303029U (zh) 用于地铁管线碰撞检测及后期运营维护的bim数据库系统
CN106372293B (zh) 一种基于三维基准线的构筑物bim模型创建方法
CN110990983A (zh) 一种给水管道交叉布置方法
CN106202723A (zh) 一种bim地铁施工方法
CN106683198A (zh) 一种综合管网的三维自动建模及调度渲染的方法
CN106202831A (zh) 一种基于bim的管线综合优化方法
CN104156544A (zh) 基于bim技术的梁柱钢筋节点自动布置与施工模拟方法
CN105844017A (zh) 一种用bim技术优化地下管网和景观绿化设计的方法
NZ599412A (en) Traffic signal control system and method
CN110889160A (zh) 一种基于bim技术的市政管道施工方法
CN104063529A (zh) 一种数字化汽车工厂布局规划仿真的方法
CN102663168B (zh) 电缆层二维图纸的三维转换及管线冲突处理方法
CN109829223A (zh) 一种基于bim的大型地下综合管廊设计方法
CN104631826A (zh) 一种基于bim模型的施工总平面布置方法
CN103927417A (zh) 基于水力模型构建需求的排水管网数字化处理方法
CN112733230A (zh) 一种基于bim技术的建筑机电管线综合优化方法
Waldron et al. Embodied energy and operational energy: Case studies comparing different urban layouts
CN112765701A (zh) 一种农民新村设计施工一体化建设方法
CN105138757A (zh) 基于Autodesk Revit的电力电缆工程可视化模型的建立方法
CN110502834A (zh) 基于bim的城市轨道交通车辆基地设计方法
Liu et al. Application analysis of BIM technology in metro rail transit
CN117763641A (zh) 三维弧形管线系统信息化模型的构建方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180202