CN107644124A - A kind of method for making BIM - Google Patents
A kind of method for making BIM Download PDFInfo
- Publication number
- CN107644124A CN107644124A CN201710780848.4A CN201710780848A CN107644124A CN 107644124 A CN107644124 A CN 107644124A CN 201710780848 A CN201710780848 A CN 201710780848A CN 107644124 A CN107644124 A CN 107644124A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- bim
- general assembly
- floor
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method for making BIM, comprise the following steps:Step 1:Newly-built general assembly model;Step 2:In general assembly model, components at different levels are assembled based on structure tree;Components at different levels include floor, wallboard and beam;The corresponding component model of each component;Step 3:According to architectural drawing, floor, wallboard and beam are decoupled for general assembly model;And door-window opening is set on wallboard;Step 4:Based on structure chart and geomantic omen electric system figure in general assembly model configuration reinforcement, built-in fitting and pre-buried electric pipeline;Step 5:Generate X-Y scheme corresponding to each component model.The method efficiency high of the making BIM, it is easy to implement.
Description
Technical field
The present invention relates to a kind of method for making BIM.
Background technology
BIM BIMs (Building Information Modeling) are the items with construction-engineering project
Basis of the relevant information data as model, carries out the foundation of BUILDINGS MODELS.It allows design, construction, management to be unified in one and put down
Worked under platform, be the integrated management environment of architectural engineering, can make architectural engineering significantly improved in its whole process efficiency,
Largely reduce risks.Because come in earlier design phase with regard to various problems that the real construction stage in later stage occurred can be found
Advanced processing, firm basis is laid for later stage activity.Can be as the actual guidance of construction, to provide conjunction in construction in later period
The arrangement and method for construction of reason and personnel, the reasonable disposition of materials'use, so as to carry out in maximum magnitude to realize resource reasonable utilization.
Currently, it is with industry manufacture Gao Pin for this new architectural mode of assembled architecture compares traditional architecture
The management mode of matter low cost replaces traditional architecture extensive style management mode.
Although Management thinking has made the transition, but Design Thinking is still generally rested on conventional two-dimensional planar design,
For example AutoCAD, day just wait two-dimensional graphicses software.Even if BIM concepts are prevailing instantly, for example, Revit, wide connection reach, master craftsman of the Spring and Autumn period, rhinoceros
Ox, sketch great master etc., although the effect of three-dimensional modeling can be accomplished by these softwares, or even turn in three-dimensional on two dimension view
It has breakthrough, but such software is still rested on the aspect for traditional architecture service, and problem is that projected depth is inadequate, no
Effectively plant produced can be instructed to stock up.So these software users still rest on overmolded collision detection and virtual existing at present
Real aspect.
Moreover, existing main flow Three-dimensional Design Software, in general application field is to be directed to automobile industry or precision machinery row
Industry;There is presently no the precedent applied main flow Three-dimensional Design Software in field of house buildings.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of method for making BIM, making building
The method efficiency high of information model, it is easy to implement.
The technical solution of invention is as follows:
A kind of method for making BIM, comprises the following steps:
Step 1:Newly-built general assembly model;
Step 2:In general assembly model, components at different levels are assembled based on structure tree;
Components at different levels include floor, wallboard and beam;The corresponding component model of each component;This method is adapted to low
The construction of layer square or low layer villa, build, and be adapted to for high level.
Step 3:According to architectural drawing, floor, wallboard and beam are decoupled for general assembly model;And door and window is set on wallboard
Hole;
Step 4:Based on structure chart and geomantic omen electric system figure in general assembly model configuration reinforcement, built-in fitting and pre-buried electricity
Gas pipeline;
Implement above-mentioned configuration in subordinate's file of general assembly model, built-in fitting refers to connector;
Step 5:Generate X-Y scheme corresponding to each component model.Designer can pull out component from composition model
To carry out Deepen Design work.
Using Unigraphics NX software development BIMs.
General assembly model is characterized using " .prt " file.
Described floor includes the floor of 2~N layers, and N is total number of plies of building, (for roof building for flat bed
Build, n-th layer floor is roofing)
Described wallboard includes the wallboard of 1~N layers;
Described beam includes the beam of 1~N layers.
Step 3, floor, wallboard and beam are decoupled using pure dry method.
X-Y scheme includes orthographic projection view;X-Y scheme also alternatively includes stereogram.
BOM inventories are listed in a two dimensional.
The technology path explanation of the present invention:
For assembled architecture, projected depth needs to reach a new high, just as production automobile, aircraft,
For industrial worker, they are only needed by figure continuous productive process, without especially taking notice of what produced part is used for
Place.
As production automobile, aircraft, present invention plan is attempted (to be used for automobile using Unigraphics NX softwares
Design, manufacture, the comprehensive software of simulation) carry out the design of package solution assembled architecture, produce, many realities that management runs into
Border problem:
1. artwork is without stock inventory, cost accounting is inaccurate, and production stock is not in place;
2. artwork specialty is broken up the family, collision problem is difficult between specialty coordinates;
Cause knowledge figure difficult 3. artwork bivariate table reaches, fallibility;
4. be related to technology alteration, artwork modification amount is huge, and the problem of leakiness;
5. artwork drawing efficiency is low, error rate is high, check of drawings is difficult to be found.
Beneficial effect:
The method of the making BIM of the present invention, has the advantage that:
1. a key generates BOM inventories, stocked up for cost accounting and production, precise and high efficiency (referring to Fig. 8 lower right corner)
2. multi-specialized solid modelling, realizes collision detection, the mistake in design is avoided;
3. in software, using PMI (Product Manufacturing Information products and machining information three
Tie up scale), it is quick to recognize product and pickup size (referring to Fig. 8 upper right corner)
4. three-dimensional link with two-dimensional, during design alteration, model need to only be modified, response X-Y scheme linkage becomes
More, thus design efficiency it is high.
5. X-Y scheme is automatically generated by graphics, the problem of preventing designer's careless omission completely and adjust chi manually, and model
I.e. completion drawing drawing is built, compared to the speed in traditional handicraft Fig. 1 .5 components/day, new method can raise speed to 9 structures
Part/day.
6. the characteristic of the present invention is, each view arrangement is more directly perceived, has multiple views on a drawing, is more convenient for
Operating personnel interpret blueprints.Existing building component or building block drawing, an a page typically only view, it is understood that one
Individual object is, it is necessary to prepare multiple drawings simultaneously, and therefore, intuitive is poor, and inconvenience is brought for operating personnel's interpreting blueprints.Therefore,
The view arrangement of the present invention can significantly improve the experience of operator, and personnel easy to operation are better understood from object.
In summary, the method for this making BIM is easy to implement, efficiency high, beneficial to promotion and implementation.
Brief description of the drawings
Fig. 1 is the structure tree schematic diagram of certain two layers of building (villa A);
Fig. 2 is that villa A first floors wallboard and beam tear plate figure open;
Fig. 3 is that villa A second layer floors tear plate figure open;
Fig. 4 is that villa A second layer wallboards tear plate figure open;
Fig. 5 is that villa A roofing floors tear plate figure open;
Fig. 6 is villa A floors, wallboard, beam assembly figure;
Fig. 7 is the three-dimensional perspective of a certain wall plate member of Stall in villa A;
Fig. 8 is the X-Y scheme of a certain wall plate member of Stall in villa A.
Embodiment
The present invention is described in further details below with reference to the drawings and specific embodiments:
Embodiment 1:Such as Fig. 1-8, using Unigraphics NX softwares, by taking company villa product A as an example, including it is following
Step:
1. opening NX softwares, upper left corner File Options card → " newly-built " → " assembling " is clicked on, generates hub file:Life
It is entitled:Villa A- general assembly models .prt;
2. " assembling parts at different levels by product tree in villa A- general assembly models .prt ";As shown in Figure 1.Such as:Point
Hit " assembling " tab → " addition " → villa A- wallboards -1F.prt (same step 1) of modeling pattern of parts at different levels.
3. according to architectural drawing, split floor, wallboard by pure dry method and door-window opening is set [pure dry method refers to Specific construction
The method of Shi Wuxu concretings] for example:Wallboard is named as:Villa A-WQ01-1F, floor are named as:Villa A-LB01-
2F, the like.Tear plate open as shown in figures 2-6.
4. according to structure chart, geomantic omen electric system figure configuration reinforcement, connector and pre-buried electric pipeline etc. (with 1 building a certain wall
Exemplified by surface model WQ01-1F), as shown in Figure 7.Step:Double-click a certain component → click " assembling " tab → " addition " → from
In race storehouse needed for selection reinforcing bar, connector or pre-buried electric pipeline → be placed on correspondence position → click " PMI " tab → general
Product size information labeling is on model.
5. two dimension view is generated, as shown in Figure 8.Step:Click on " application module " tab → click upper left corner " drawing "
Function key → click " view creates guide " or " basic views " are simultaneously placed on drawing relevant position, adjust view properties → point
Hit " parts list ", click on " partial enlargement during the right click detail list upper left corner " editor's rank " → exist partial enlargement expression
Figure " → perfect, according to factory needing, supplement mark, explanation.Two dimension view now has established linkage complete with threedimensional model
Road, it is only necessary to change model, the just corresponding change of corresponding two dimension view, or even size marking can all link change, greatly
Alleviate the workload of designer.
Claims (7)
- A kind of 1. method for making BIM, it is characterised in that comprise the following steps:Step 1:Newly-built general assembly model;Step 2:In general assembly model, components at different levels are assembled based on structure tree;Components at different levels include floor, wallboard and beam;The corresponding component model of each component;Step 3:According to architectural drawing, floor, wallboard and beam are decoupled for general assembly model;And door-window opening is set on wallboard;Step 4:Based on structure chart and geomantic omen electric system figure in general assembly model configuration reinforcement, built-in fitting and it is pre-buried electrically pipe Line;Step 5:Generate X-Y scheme corresponding to each component model.
- 2. the method according to claim 1 for making BIM, it is characterised in that using Unigraphics NX Software development BIM.
- 3. the method according to claim 1 for making BIM, it is characterised in that in step 1, general assembly model is adopted Characterized with " .prt " file.
- 4. the method according to claim 1 for making BIM, it is characterised in that in step 2, described floor Include the floor of 2~N layers, N is total number of plies of building, (for the building that roof is flat bed, n-th layer floor is roofing)Described wallboard includes the wallboard of 1~N layers;Described beam includes the beam of 1~N layers.
- 5. the method according to claim 1 for making BIM, it is characterised in that step 3, using pure dry method point Tear floor, wallboard and beam open.
- 6. the method according to claim 1 for making BIM, it is characterised in that X-Y scheme regards including orthographic projection Figure;X-Y scheme also alternatively includes stereogram.
- 7. the method for the making BIM according to claim any one of 1-6, it is characterised in that in a two dimensional List BOM inventories.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710780848.4A CN107644124A (en) | 2017-09-01 | 2017-09-01 | A kind of method for making BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710780848.4A CN107644124A (en) | 2017-09-01 | 2017-09-01 | A kind of method for making BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107644124A true CN107644124A (en) | 2018-01-30 |
Family
ID=61111066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710780848.4A Pending CN107644124A (en) | 2017-09-01 | 2017-09-01 | A kind of method for making BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107644124A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108733873A (en) * | 2018-04-03 | 2018-11-02 | 中民筑友有限公司 | Technique profile design drawing generating method, system, device and readable storage medium storing program for executing |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020194581A1 (en) * | 2001-06-11 | 2002-12-19 | Keener Bryan F. | Methods and systems for automatically translating geometric data |
CN105976089A (en) * | 2016-04-27 | 2016-09-28 | 中交第二航务工程局有限公司 | Construction data classification system based on building information model and method thereof |
-
2017
- 2017-09-01 CN CN201710780848.4A patent/CN107644124A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020194581A1 (en) * | 2001-06-11 | 2002-12-19 | Keener Bryan F. | Methods and systems for automatically translating geometric data |
CN105976089A (en) * | 2016-04-27 | 2016-09-28 | 中交第二航务工程局有限公司 | Construction data classification system based on building information model and method thereof |
Non-Patent Citations (6)
Title |
---|
何耿煌 等: "《UG NX 10.0从入门到精通》", 30 June 2016 * |
孟祥良等: "Revit软件在装配式住宅设计中的应用研究", 《绿色建筑》 * |
王书亭 黄运保等: "《机械CAD技术》", 30 September 2012 * |
王建宇等: "二次开发实现从AUTOCAD到REVIT快速翻模技术研究", 《土木建筑工程信息技术》 * |
蔡长韬 胡光忠等: "《计算机辅助设计与制造》", 31 January 2013 * |
钟成: "基于UG的发动机协同设计", 《装备制造技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108733873A (en) * | 2018-04-03 | 2018-11-02 | 中民筑友有限公司 | Technique profile design drawing generating method, system, device and readable storage medium storing program for executing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103020393B (en) | Aircraft assembly data visualization method based on Web | |
CN107885336B (en) | Virtual workshop model and information fusion display method for mapping real production situation | |
CN101216862B (en) | Paper-free three-dimensional assemblage process document accomplishing method | |
CN107145695A (en) | A kind of parametric modeling production method of fabricated shear wall structure prefabricated outer wall panel | |
CN106709660A (en) | BIM-based architectural design method | |
CN101739478B (en) | Spacecraft assembly simulation technique-based virtual assembly system and virtual assembly method | |
US8706450B2 (en) | Method and system for identification of grouping characteristics | |
CN112257160B (en) | BIM-based standardized forward design method for garbage incineration power plant | |
Robinson | Structural BIM: discussion, case studies and latest developments | |
CN105046432A (en) | Building dimensional guide construction method | |
CN102819982A (en) | Electronic map for manufacturing execution system (MES) and using method of electronic map | |
CN102608919A (en) | Stamping single-station production simulating and verifying method | |
Miller | The Hangzhou tennis center: a case study in integrated parametric design | |
US20070046695A1 (en) | System and method for computer aided design | |
Javohir et al. | APPLICATION AND CAPABILITIES OF THE AUTOCAD PROGRAM IN ARCHITECTURE | |
CN107644124A (en) | A kind of method for making BIM | |
CN1448870A (en) | Computer-aided technique planning method for silicon micro-component | |
CN107066717A (en) | Based on three-dimensional virtual scene engineering machinery layout method and system | |
Li et al. | Smart City Construction Visual Simulation Application Based on Intelligent BIM Technology | |
Navon | COCSY I: CAM-Oriented CAD System | |
Caetano et al. | Connecting design and fabrication through algorithms: current and future prospects for AEC | |
CN110502830A (en) | A kind of interior decoration design method based on BIM | |
CN110929311A (en) | Three-dimensional component modeling and construction drawing linkage editing method thereof | |
Zheng | Design method of assembly architecture based on BIM Technology | |
KR20110099151A (en) | Methods of standard about ifc based architectural elements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180130 |