CN107642186A - A kind of Super High hides window cleaning equipment rail mounted curtain wall and its construction method - Google Patents
A kind of Super High hides window cleaning equipment rail mounted curtain wall and its construction method Download PDFInfo
- Publication number
- CN107642186A CN107642186A CN201711084545.5A CN201711084545A CN107642186A CN 107642186 A CN107642186 A CN 107642186A CN 201711084545 A CN201711084545 A CN 201711084545A CN 107642186 A CN107642186 A CN 107642186A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- roller
- fixed
- fixation kit
- cleaning equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Curtains And Furnishings For Windows Or Doors (AREA)
Abstract
A kind of Super High hides window cleaning equipment rail mounted curtain wall and its construction method, including curtain wall frame and the curtain wall for being symmetrically set in curtain wall frame both sides;Curtain wall frame section is isosceles right triangle, including the ribs in the supporting plate and base on both sides, the inside extension line in curtain wall frame both sides is provided with roller baffle plate, roller baffle plate includes overhead gage and lower baffle plate, the supporting plate of the overhead gage and curtain wall frame is fixed, lower baffle plate is fixed with curtain wall, space is roller channel between overhead gage and lower baffle plate, curtain wall is symmetrically set in the corner of curtain wall frame by curtain wall fixation kit, the top of curtain wall fixation kit is fixed with main joist, bottom is divided into two fixed branches, fixed respectively with curtain wall and roller track, roller fixation kit is additionally provided with roller track.The present invention has the characteristics that safety, is applicable, and has popularization and practical value well, good economic benefit can be produced after extensive popularization and application.
Description
Technical field
The invention belongs to curtain wall construction field, more particularly to a kind of Super High to hide window cleaning equipment rail mounted curtain wall and its construction
Method.
Background technology
In Super High curtain wall construction, it is necessary to which curtain wall matching design window cleaning equipment meets the cleaning, maintenance and replacing of follow-up curtain wall
Functional requirement, to ensure that window cleaning equipment is safe for operation, it is necessary to set up window cleaning equipment running track on the outside of curtain wall, and general window cleaning equipment rail
The exposed setting in road can influence the appearance of curtain wall, and conventional curtain wall window cleaner track is independently arranged on the outside of curtain wall, stability
It is not high, while because it is exposed on the outside of curtain wall, curtain wall appearance is influenceed, and then cause building profile ineffective, individually
The window cleaning equipment track of setting also increases cost, not economical enough, in addition, how to ensure subsequently to wipe after the completion of window cleaning equipment track installation
The steady safe operation of window machine is difficult point.
The content of the invention
It is an object of the invention to provide a kind of Super High to hide window cleaning equipment rail mounted curtain wall and its construction method, to solve existing
There is the exposed technical problem for causing building profile ineffective of technological trajectory;And solve prior art and be separately provided window cleaning equipment increasing
Addition sheet, sub-economic technical problem.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of Super High hides window cleaning equipment rail mounted curtain wall, it is characterised in that:Including curtain wall frame and it is symmetrically set in curtain wall frame
The curtain wall of both sides;The curtain wall frame vertically elongated setting, section is isosceles right triangle, including the support on both sides
Ribs on plate and base, the inside extension line in the curtain wall frame both sides are provided with roller baffle plate, and roller baffle plate includes upper
Baffle plate and lower baffle plate, the supporting plate of the overhead gage and curtain wall frame are fixed, and the lower baffle plate is fixed with curtain wall, the overhead gage
Space is roller channel between lower baffle plate;
The curtain wall is symmetrically set in the corner of curtain wall frame by curtain wall fixation kit, and the top of the curtain wall fixation kit is the same as main
Keel are fixed, and bottom is divided into two fixed branches, is fixed respectively with curtain wall and roller track, rolling is additionally provided with the roller track
Take turns fixation kit, the roller fixation kit top fixes with curtain wall fixation kit, and bottom is divided into two fixed branches, respectively with
The ribs of roller track and curtain wall frame is fixed.
It is further preferred that roller track is slot type track, notch is provided with baffle plate.
Further, the curtain wall fixation kit is connected by multiple adaptors forms, and each adaptor passes through bolt
It is connected.
Further, the roller fixation kit is connected by multiple adaptors forms, and each adaptor passes through bolt
It is connected.
Further, it is bolted between the roller wall bar on the left part roller and right part roller
In addition, the lower baffle plate is fixed by the supporting plate of bolt and curtain wall frame.
It is further preferred that the overhead gage is fixed by bolt and curtain wall.
A kind of Super High hides the construction method of window cleaning equipment rail mounted curtain wall, it is characterised in that comprises the following steps:
Step 1, preparation of construction:Each component needed for preparation.
Step 2, curtain wall fixation kit and curtain wall are installed:Curtain wall fixation kit is fixed with main joist, curtain wall is fixed on
In one of fixed branch of curtain wall fixation kit;
Step 3, roller fixation kit and roller track are installed:Roller fixation kit top and curtain wall fixation kit are fixed, led to
Another fixation branch for crossing the one of fixed branch in roller fixation kit bottom and curtain wall fixation kit consolidates roller track
It is fixed;
Step 4, roller baffle plate is installed:Overhead gage and curtain wall are fixed, two lower baffle plates are symmetrically fixed on the two of curtain wall frame
In individual supporting plate;
Step 5, curtain wall frame is installed:By an another fixation for the rib ribs of curtain wall frame and roller fixation kit bottom
Branch is fixed, and so far, a kind of Super High of the present invention is hidden window cleaning equipment rail mounted curtain wall construction and finished.
Compared with prior art the invention has the characteristics that and beneficial effect:
The present invention solve in the prior art the exposed curtain wall window cleaner track of Super High is bad to curtain wall appearance, stability not
The technical problem that high and window cleaning equipment wheel may derail when running, has adapted to inclined-plane curtain wall, meets that the segmentation of Super High window cleaning equipment is set
Service requirement is counted, it is spacing to window cleaning equipment track perpendicularity and wheel to have carried out effective control, while track integrates with curtain wall frame
Design has reached firm, has saved material, practicality, the effect of economy.
The present invention by window cleaning equipment track use with curtain wall frame Integrated design, have it is firm, practical, save material, be attractive in appearance,
The advantages that economic, the roller track of window cleaning equipment, which uses aluminium alloy extrusions to make, effectively to be controlled with pair roller track perpendicularity
System, its outside set flanging baffle plate to play good position-limiting action to window cleaning equipment roller from four direction.Roller track wheel
Sub- dimidiation design can meet that window cleaning equipment track is continuous, window cleaning equipment operation is easy and subsection setup window cleaning equipment operation function is realized
The advantages that.This technology significant effect in actual applications, science, section material, practicality, the construction concept of economy are embodied, ensure that
Super High curtain wall window cleaner track construction is smoothed out.
The present invention has the characteristics that safety, is applicable, and has popularization and practical value well, can be produced after extensive popularization and application
Raw good economic benefit.
Brief description of the drawings
Fig. 1 is the structural representation that a kind of Super High of the present invention hides window cleaning equipment rail mounted curtain wall.
Reference:1- curtain walls;2- bolts;3- curtain wall frames;4- ribs;5- supporting plates;6- overhead gages;7- lower blocks
Plate;8- roller channels;9- main joists;10- baffle plates;11- left part rollers;12- right part rollers;13- roller wall bars.
Embodiment
Technological means, character of innovation, reached purpose and effect to realize the present invention are easy to understand, below to this
Invention further illustrates.
The embodiment recorded herein is specific embodiment of the invention, for illustrating the design of the present invention,
It is explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein
Outside embodiment, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious and
The other technical schemes being clear to, these technical schemes include any obvious using making for the embodiment to recording herein
The technical scheme of substitutions and modifications.
A kind of Super High hides window cleaning equipment rail mounted curtain wall, as shown in figure 1, including curtain wall frame 3 and being symmetrically set in curtain wall
The curtain wall 1 of the both sides of frame 3;Curtain wall frame 3, vertical elongated setting, section is isosceles right triangle, including on both sides
Ribs 4 in supporting plate 5 and base, the inside extension line in the both sides of curtain wall frame 3 are provided with roller baffle plate, and roller baffle plate includes
Overhead gage 6 and lower baffle plate 7, the supporting plate 5 of overhead gage 6 and curtain wall frame 3 are fixed, and lower baffle plate 7 is fixed with curtain wall 1, the He of overhead gage 6
Space is roller channel 8 between lower baffle plate 7;
Curtain wall 1 is symmetrically set in the corner of curtain wall frame 3 by curtain wall fixation kit, and the top of curtain wall fixation kit is the same as main joist 9
Fixed, bottom is divided into two fixed branches, fixed respectively with curtain wall 1 and roller track 8, being additionally provided with roller on roller track 8 consolidates
Determine component, roller fixation kit top is fixed with curtain wall fixation kit, and bottom is divided into two fixed branches, respectively with roller track
8 and the ribs 4 of curtain wall frame 3 fix.Roller track 8 is slot type track, and notch is provided with baffle plate 10, and curtain wall fixation kit is by more
Individual adaptor, which is connected, to be formed, and each adaptor is bolted fixation, and roller fixation kit is connected by multiple adaptors
Fixation is formed, and each adaptor is bolted fixation, and the roller of window cleaning equipment is provided with roller track 8, and roller includes left part
Roller 11 and right part roller 12, fixed by bolt 2 between the roller wall bar 13 on left part roller 11 and right part roller 12, lower block
Plate 7 is fixed by the supporting plate 5 of bolt and curtain wall frame 3, and overhead gage 6 is fixed by bolt and curtain wall 1, installs the rolling of window cleaning equipment
During wheels, left part roller 11 or right part roller 12 are first installed, then another side wheel is installed, after two roller half portions are passed through into bolt
2 fix one complete roller of formation.
A kind of Super High hides the construction method of window cleaning equipment rail mounted curtain wall, it is characterised in that comprises the following steps:
Step 1, preparation of construction:Each component needed for preparation.
Step 2, curtain wall fixation kit and curtain wall 1 are installed:Curtain wall fixation kit and main joist 9 are fixed, curtain wall 1 is consolidated
It is scheduled in one of fixed branch of curtain wall fixation kit;
Step 3, roller fixation kit and roller track 8 are installed:Roller fixation kit top and curtain wall fixation kit are fixed,
Branch is fixed by roller track 8 by another of the one of fixed branch in roller fixation kit bottom and curtain wall fixation kit
It is fixed;
Step 4, roller baffle plate is installed:Overhead gage 6 and curtain wall 1 are fixed, two lower baffle plates 7 are symmetrically fixed on curtain wall frame 3
Two supporting plates 5 on;
Step 5, installation curtain wall frame 3:It is solid by another one of the rib ribs 4 of curtain wall frame 3 and roller fixation kit bottom
Determine branch to fix, so far, a kind of Super High of the present invention is hidden window cleaning equipment rail mounted curtain wall construction and finished.
Traditional curtain wall window cleaner track is independently arranged by the present invention on the outside of curtain wall to be changed to set on curtain wall window cleaner track
Meter and curtain wall frame Integrated design, while set baffle plate that its track is hidden on the inside of curtain wall in outside, track is closed using aluminium
Metal type material makes and flanging baffle plate is set on the outside of track, spacing to the progress of window cleaning equipment wheel from four direction, while to track
Perpendicularity control effectively, and good position-limiting action is played to window cleaning equipment wheel, while window cleaning equipment wheel is changed into two halves and set
Meter meets window cleaning equipment track continuously design and Super High window cleaning equipment segment design service requirement.In addition, wanted to meet that curtain wall is attractive in appearance
Ask, track is arranged on inclined-plane curtain wall.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.
Claims (9)
1. a kind of Super High hides window cleaning equipment rail mounted curtain wall, it is characterised in that:Including curtain wall frame(3)Be symmetrically set in curtain wall
Frame(3)The curtain wall of both sides(1);The curtain wall frame(3)Vertical elongated setting, section are isosceles right triangle, including position
In the supporting plate on both sides(5)With the ribs on base(4), the curtain wall frame(3)The inside extension line in both sides is provided with
Roller baffle plate, roller baffle plate include overhead gage(6)And lower baffle plate(7), the overhead gage(6)With curtain wall frame(3)Supporting plate
(5)It is fixed, the lower baffle plate(7)With curtain wall(1)It is fixed, the overhead gage(6)And lower baffle plate(7)Between space be roller channel
(8);
The curtain wall(1)Curtain wall frame is symmetrically set in by curtain wall fixation kit(3)Corner, the curtain wall fixation kit it is upper
The same main joist in portion(9)Fixed, bottom is divided into two fixed branches, respectively with curtain wall(1)And roller track(8)It is fixed, the rolling
Wheel track(8)On be additionally provided with roller fixation kit, the roller fixation kit top is fixed with curtain wall fixation kit, and bottom is divided into
Two fixed branches, respectively with roller track(8)With curtain wall frame(3)Ribs(4)It is fixed.
2. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The roller track
(8)For slot type track, notch is provided with baffle plate(10).
3. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The curtain wall is fixed
Component is connected by multiple adaptors and formed, and each adaptor is bolted fixation.
4. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The roller is fixed
Component is connected by multiple adaptors and formed, and each adaptor is bolted fixation.
5. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The roller track
(8)The interior roller provided with window cleaning equipment, the roller include left part roller(11)With right part roller(12).
6. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The left part roller
(11)With right part roller(12)On roller wall bar(13)Between pass through bolt(2)It is fixed.
7. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The lower baffle plate
(7)Pass through bolt and curtain wall frame(3)Supporting plate(5)It is fixed.
8. a kind of Super High as claimed in claim 1 hides window cleaning equipment rail mounted curtain wall, it is characterised in that:The overhead gage
(6)Pass through bolt and curtain wall(1)It is fixed.
9. a kind of Super High as described in claim 1 ~ 8 any one hides the construction method of window cleaning equipment rail mounted curtain wall, its
It is characterised by, comprises the following steps:
Step 1, preparation of construction:Each component needed for preparation;
Step 2, curtain wall fixation kit and curtain wall are installed(1):By curtain wall fixation kit and main joist(9)It is fixed, by curtain wall(1)
It is fixed in one of fixed branch of curtain wall fixation kit;
Step 3, roller fixation kit and roller track are installed(8):Roller fixation kit top and curtain wall fixation kit are consolidated
It is fixed, branch is fixed by roller track by another of the one of fixed branch in roller fixation kit bottom and curtain wall fixation kit
Road(8)It is fixed;
Step 4, roller baffle plate is installed:By overhead gage(6)With curtain wall(1)It is fixed, by two lower baffle plates(7)Symmetrically it is fixed on curtain
Wall frame(3)Two supporting plates(5)On;
Step 5, curtain wall frame is installed(3):By curtain wall frame(3)Rib ribs(4)It is another with roller fixation kit bottom
One fixed branch is fixed, and so far, a kind of Super High of the present invention is hidden window cleaning equipment rail mounted curtain wall construction and finished.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711084545.5A CN107642186B (en) | 2017-11-07 | 2017-11-07 | Ultrahigh-rise track type curtain wall with hidden window cleaning machine and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711084545.5A CN107642186B (en) | 2017-11-07 | 2017-11-07 | Ultrahigh-rise track type curtain wall with hidden window cleaning machine and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107642186A true CN107642186A (en) | 2018-01-30 |
CN107642186B CN107642186B (en) | 2022-12-09 |
Family
ID=61126134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711084545.5A Active CN107642186B (en) | 2017-11-07 | 2017-11-07 | Ultrahigh-rise track type curtain wall with hidden window cleaning machine and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107642186B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2688789Y (en) * | 2004-01-06 | 2005-03-30 | 大连红太装饰工程公司 | Hidden ventilable window on glass curtain wall |
CN204781493U (en) * | 2015-07-03 | 2015-11-18 | 辽宁强风铝业工程有限公司 | Hidden track curtain |
KR101605321B1 (en) * | 2015-09-03 | 2016-03-22 | 박광구 | Multi-layer window and addition window construction method thereof |
CN207568008U (en) * | 2017-11-07 | 2018-07-03 | 中建一局集团建设发展有限公司 | A kind of Super High hides window cleaning equipment rail mounted curtain wall |
-
2017
- 2017-11-07 CN CN201711084545.5A patent/CN107642186B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2688789Y (en) * | 2004-01-06 | 2005-03-30 | 大连红太装饰工程公司 | Hidden ventilable window on glass curtain wall |
CN204781493U (en) * | 2015-07-03 | 2015-11-18 | 辽宁强风铝业工程有限公司 | Hidden track curtain |
KR101605321B1 (en) * | 2015-09-03 | 2016-03-22 | 박광구 | Multi-layer window and addition window construction method thereof |
CN207568008U (en) * | 2017-11-07 | 2018-07-03 | 中建一局集团建设发展有限公司 | A kind of Super High hides window cleaning equipment rail mounted curtain wall |
Also Published As
Publication number | Publication date |
---|---|
CN107642186B (en) | 2022-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106089253B (en) | A kind of all-hydraulic template system poured for culvert | |
CN201386251Y (en) | Transverse unit of beam column bracket | |
CN104358577A (en) | Tunnel lining trolley | |
CN205364148U (en) | PC track beam mold | |
CN204753357U (en) | Cast -in -place pavement of voiced protective screen of inter -city railway | |
CN206801592U (en) | Hydraulic lining trolley for cut-and-cover tunnel concreting | |
CN206339221U (en) | A kind of track irregularity measurement apparatus for suspension type monorail box track girder | |
CN205936645U (en) | A full liquid die plate system for culvert is pour | |
CN107642186A (en) | A kind of Super High hides window cleaning equipment rail mounted curtain wall and its construction method | |
CN207568008U (en) | A kind of Super High hides window cleaning equipment rail mounted curtain wall | |
CN205100119U (en) | Steel form device in self -propelled | |
CN219527362U (en) | Concrete main tower construction climbing die system | |
CN205205687U (en) | Removal portal in big cantilever bent cap construction | |
CN208179881U (en) | Vertical shift trolley and adjusting component for monorail track beam forms | |
CN206898620U (en) | A kind of shaped steel welding machine | |
CN207861659U (en) | Machine room car diversion sheave and lower beam devices | |
CN206553835U (en) | A kind of track guard | |
CN205591128U (en) | Inner chamber template device that continuous beam self -balancing is adjustable | |
CN202192091U (en) | Roll changer for rolling mill | |
CN202023359U (en) | Supporting and traveling device for slip forms for faces | |
CN204753382U (en) | Prefabricated pavement of voiced protective screen of inter -city railway | |
CN202165091U (en) | Lining template trolley for baffle wall in tunnel | |
CN202730709U (en) | Movable formwork for construction of dock wall | |
CN205400754U (en) | Arch abutment car is detained at station | |
CN206052545U (en) | For the maintenance of across road overline bridge or the hanging mobile platform of application |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |