Summary of the invention
Goal of the invention: the technical problem to be solved by the present invention is in view of the deficiencies of the prior art, provide a kind of quickly peace
Assemble and disassemble the oil connection unloaded.
It is including external in order to solve the above-mentioned technical problems, the present invention provides a kind of oil connection of Fast Installation disassembly
Head and nipple, the nipple are connected to inside coupling by active lock, and active lock in lock state, fix by nipple
In coupling, when unlocked, nipple can relatively move active lock with coupling.
In the present invention, the active lock includes the inscribed skull for being movably connected in nipple outer ring, and inscribed skull includes position
Wedge block in front end and the rotation connection circle positioned at rear end, the nipple is equipped with a circle lock groove, after the coupling
End is equipped with cavity, is equipped with flexibly positioned sleeve in cavity, the flexibly positioned sleeve includes being adapted to lock groove and wedge block
Elastic component, the coupling rear end is equipped with external skull, and being connected to nipple among external skull covers, and elastic component is unlocking
When state, the wedge block of inscribed skull, which moves forward, to be squeezed elastic component and makes elastic component compression up to completely disengaging lock groove, from
And complete unlock.
In the present invention, the coupling rear end is equipped with external skull, is connected to nipple among external skull and covers, described
Skull is inscribed by being rotatably connected on nipple, turns rotation connection circle forward and pushes wedge block Forward, the wedge block is
Frustum cone structure, wedge block point diameter is small, and rear end diameter is big, and wedge block includes slope inclined-plane, and slope and flexibly positioned sleeve are suitable
Match.
In the present invention, the inscribed skull is connected through a screw thread with nipple.
Vulcanization sleeve, cavity wall of the vulcanization sleeve close to inner cavity, vulcanization set are equipped in the present invention, in the cavity of the coupling
Cylinder front end is connected on flexibly positioned sleeve, and vulcanization sleeve rear end is connected to external skull inner wall.Vulcanize sleeve to be used in axial direction
On give flexibly positioned sleeve positioning.
In the present invention, the flexibly positioned sleeve front end is equipped with special-shaped seal ring, and flexibly positioned sleeve includes bending part, curved
Folding part is connected with elastic component, and bending part front end is connected on special-shaped seal ring, and bending part rear end is connected on vulcanization sleeve, bending
Portion is used to buffer external skull and tightens to the extruding force for vulcanizing sleeve.
In the present invention, the external skull includes interconnecting piece and sealing, and interconnecting piece includes internal screw thread, and sealing is equipped with close
Sealing groove, seal groove is interior to be equipped with coupling sealing ring.Prevent a small amount of oil liquid in cavity from leaking out.
In the present invention, the nipple front end is equipped with cavity sealing ring, and cavity sealing ring front end is connected to coupling inner wall
On.Prevent oil from flowing in cavity at nipple and coupling tie point.
In the present invention, the front end side wall of the inscribed skull is equipped with more than one diversion trench.Oil liquid can be made to enter
Cavity between nipple and inscribed skull avoids forming vacuum because of extruding, avoids each chamber because of the excessive initiation accident of pressure difference.
The utility model has the advantages that a kind of oil connection of Fast Installation disassembly, it is only necessary to nipple is inserted into coupling, until bullet
Property abutment sleeve elastic component be caught in the lock groove of nipple, then external skull be threaded into nipple just complete
The installation of connector.It only needs to continue when disassembly to twist inscribed skull to the left by screw thread, when continuing rotation to inscribed skull
When can jack up the elastic component of flexibly positioned sleeve, nipple can be extracted easily out of coupling.Operation of the present invention is simple and can
It leans on, repetitive operation will not break down.
Embodiment:
As shown in Figure 1, Figure 2 and Fig. 3, a kind of oil connection of Fast Installation disassembly provided in this embodiment, including, coupling 1,
Special-shaped seal ring 4, flexibly positioned sleeve 5, vulcanization sleeve 6, nipple 7, inscribed skull 8, oil duct 17, cavity 18 and coupling are close
Seal 30, nipple 7 are connected to inside coupling 1 by active lock, and active lock includes that skull 8 and flexibly positioned sleeve 5 is inscribed,
Inscribed skull 8 includes the rotation connection circle positioned at the wedge block 13 of front end and positioned at rear end, is such as schemed, 5, and nipple 7 is equipped with one
Lock groove 12 is enclosed, 1 rear end of coupling is equipped with cavity 18, is equipped with flexibly positioned sleeve 5, the elastic locating sleeve in cavity 18
Cylinder 5 includes the elastic component 15 being adapted to lock groove 12 and wedge block 13, and 1 rear end of coupling is equipped with external skull 2, external
It is connected among skull 2 on inscribed skull 8, in lock state, elastic component 15 is stuck in lock groove 12 elastic component 15;Elastic component
15 in compressive state, and for elastic component 15 outside lock groove, the wedge block 13 of inscribed skull abuts elastic component 15.
Such as Fig. 5 and Fig. 6, vulcanize sleeve 6 close to the cavity wall of inner cavity, vulcanization 6 front end of sleeve is connected to flexibly positioned sleeve 5
On, vulcanization 6 rear end of sleeve is connected to external 2 inner wall of skull, and vulcanization sleeve 6 to flexibly positioned sleeve 5 for positioning in the axial direction.
Such as Fig. 8, coupling sealing ring 30 is arranged on the square groove 11 of outer 2 inner ring of connector cover, prevents a small amount of in cavity
Oil liquid leaks out.
Such as Fig. 9, cavity sealing ring 23 is connected to nipple front end, and front end is connected on coupling inner wall 3.Including preventing oil
It is flowed in cavity 18 at connector and coupling tie point.
The setting of special-shaped seal ring 4 is hierarchic structure in flexibly positioned 5 front end of sleeve, cavity 18, and 4 front end of special-shaped seal ring is supported
It connects on outer splice cavity wall, prevents the oil liquid in oil duct from flowing out.
The rotation connection circle of inscribed skull 8 is rotatably connected on nipple 7, is turned rotation connection circle forward and is promoted wedge block
13 Forwards, the wedge block are frustum cone structure, and wedge block point diameter is small, and rear end diameter is big, and wedge block includes slope inclined-plane, slope
Face is adapted to flexibly positioned sleeve 5.
Flexibly positioned sleeve 5 includes bending part 31, V-structure 15 and connecting bracket 32, and connecting bracket 32 is connected to bending
The rear end in portion 31 is connected to inscribed 8 middle part of skull, for living flexibly positioned sleeve 5 in radial support below.
Bending part 31 is connected with elastic component 15, and bending part 31 is wavy shaped configuration, and the extruding force upward for buffer shaft is curved
Folding part 31 includes preceding bearing surface 33 and rear bearing surface 34, and preceding bearing surface 33 is connected on special-shaped seal ring 4, and rear bearing surface 34 abuts
On vulcanization sleeve 6, bending part 31 is used to buffer external skull 2 and tightens to the extruding force for vulcanizing sleeve 6;
V-structure includes connection sheet 15a and active gage 15b, and connection sheet 15a is connected on bending part 31, active gage 15b to
Lower left inclination, tilt angle are adapted to the tilt angle of wedge block 13, and active gage is stuck on lock groove 12 and is locked, interior
The front end slope surface of connector cover 8 is moved along, and abuts to V-structure, and due to the elasticity of itself, the active gage of V-structure can compress,
The front end slope surface that skull 8 is inscribed heads on stress and withdraws from lock groove 12 to up compress, and nipple can move freely at this time.
Diversion trench is arranged in the front end side wall of interior connector cover 8.During nipple 7 is packed into coupling 1, nipple 7
Original oil liquid in cavity 18 between inscribed skull 8 can be extruded.The U-shaped oblong slots 8a of inscribed skull 8 can make oil liquid
It into the cavity 18 between nipple 7 and inscribed skull 8, avoids forming vacuum because of extruding, avoids each chamber because pressure difference is excessive
Initiation accident.
Installation steps and method, referring to Figure 10:
(1) 1 other end of coupling is connect with Hydraulic Elements finishes, and O-ring seal 23 is placed on to the inside of nipple 1
In face 3.
(2) fixing ring 4 is placed on the inboard face 27 of coupling 1.
(3) special-shaped flexibly positioned sleeve 5 is filled in coupling 1, is made in left side 25 and the coupling 1 of fixing ring 4
Side 27 contacts, and the right side 26 of fixing ring 4 and a special-shaped elastic locating sleeve 5 are in close contact.
(4) the vulcanization sleeve 6 of the metal after vulcanizing treatment is filled in.Can be integrated after vulcanizing treatment the high resiliency of rubber with
The high intensity of metal.
(5) external skull 2 is screwed on 1 lateral surface screw thread 21 of coupling, by screw thread 22 such as Fig. 7.Keep special-shaped elasticity fixed
Position sleeve 5 and metal vulcanization sleeve 6 are in close contact, and metal vulcanization 6 right side of sleeve and the inboard face 28 of external skull 2 closely connect
Touching.To which the axial position of the flexibly positioned sleeve 5 of abnormity is fixed.It placed O-shaped gasket in the square slot 11 of external skull 2
Circle 30.
(6) nipple 7 is inserted into coupling 1, until the elastic component 15 of the flexibly positioned sleeve 5 of abnormity is caught in nipple 7
Lock groove 12 in, so as to avoid nipple 7 be detached from coupling 1.The axial position of nipple 7 is fixed.It is outer at this time
The O-ring seal 23 in the inboard face 3 of connector 1 is also compressed.
(7) inscribed skull 8 is screwed into the screw thread 10 of nipple 7 by screw thread 29.30 quilt of O-ring seal of external skull 2
Compression.Completion is assembled in nipple 7 and coupling 1 for the first time.
A kind of oil connection of Fast Installation disassembly of use for laboratory connection Hydraulic Elements of the invention, demounting procedure and
Method are as follows:
(1) inscribed skull 8 is continued to twist to the left by screw thread 29, abnormity can be jacked up when continuing rotation to inscribed skull 8
When the elastic component 15 of flexibly positioned sleeve 5, at this point, the elastic component 15 of the flexibly positioned sleeve 5 of abnormity also no longer connects with nipple 7
Touching, the axially position of nipple 7 are destroyed, and the screw thread 29 and screw thread 10 between inscribed skull 8 and nipple 7 are interior also without interference
Connector 7 can be extracted easily from coupling.
When needing nipple 7 accessing coupling 1 again, it is only necessary to operate two steps.
(1) nipple 7 is inserted into coupling 1, until the elastic component 15 of elastic element abnormity sleeve 5 is caught in nipple 7
Lock groove 12 in.
(2) inscribed skull 8 is screwed into the screw thread 10 of nipple 7 by screw thread 29.
The present invention provides a kind of oil connections of Fast Installation disassembly, implement the method and approach of the technical solution
Very much, the above is only a preferred embodiment of the present invention, it is noted that those skilled in the art are come
It says, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should be regarded as
Protection scope of the present invention.All undefined components in this embodiment can be implemented in the prior art.