CN107630559A - It is a kind of first to open constructing device and method for floor - Google Patents

It is a kind of first to open constructing device and method for floor Download PDF

Info

Publication number
CN107630559A
CN107630559A CN201610565016.6A CN201610565016A CN107630559A CN 107630559 A CN107630559 A CN 107630559A CN 201610565016 A CN201610565016 A CN 201610565016A CN 107630559 A CN107630559 A CN 107630559A
Authority
CN
China
Prior art keywords
support beam
constructing device
reinforcing bar
floor
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610565016.6A
Other languages
Chinese (zh)
Other versions
CN107630559B (en
Inventor
王武生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Peijun Technology Co.,Ltd.
Original Assignee
Shanghai Qimou Energy Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qimou Energy Technology Development Co Ltd filed Critical Shanghai Qimou Energy Technology Development Co Ltd
Priority to CN201610565016.6A priority Critical patent/CN107630559B/en
Publication of CN107630559A publication Critical patent/CN107630559A/en
Application granted granted Critical
Publication of CN107630559B publication Critical patent/CN107630559B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Constructing device and method are first opened for floor the invention discloses a kind of, the constructing device of first opening includes support beam, and the reinforcing bar for being used to fix deformed bar is provided with the both ends of the support beam and is mentioned.Described construction method of first opening includes following operation:A1) reinforcing bar for first opening constructing device being fixed on after deformed bar prestretching described in claim 1 is mentioned;B1) by step a1) formed component be lifted on lay slab form top, then carry out next step construction.The present invention can only will can work in the prestretching that factory is carried out originally, it is transferred to field conduct, so as to realize the cast-in-site of integral prefabricated floor, relative to cast-in-situ floor has high insulating effect, flatness height, span is big, construction safety, efficiency of construction are high, the advantages that 80% reinforcing bar can be saved, available for building for floor.

Description

It is a kind of first to open constructing device and method for floor
Technical field
The present invention relates to the construction technology of building, specifically, be related to it is a kind of for floor first open constructing device and Method.
Technical background
Now with the continuous improvement of living standards of the people, the quality and quantity of building, which is obtained for, to be increased substantially. Therefore, the saving to building material and the raising of construction speed seem more and more important.Attempt to save now with many inventions Building material, the number of patent application as disclosed in Patent Office of the People's Republic of China on 07 22nd, 2009 is 200910076895.6, invention It is entitled《A kind of thin-wall hollow pipe anti-floating construction method for cast-in-situ concrete hollow floor slab》Invention in disclose a kind of method, This method welds thin-wall hollow pipe anti-floating frame to solve the anti-floating of thin-wall hollow pipe in concrete placement, resist using sheet metal Move.Although this method can partly reduce the dosage of concrete, mode of operation is complicated, equipment investment is big, in high-rise In can not effectively be applied due to lacking corresponding operating platform.Therefore, it is badly in need of a kind of fundamentally save now to build Material and construction method and related device easy to operate, safe, that speed of application can be improved.
Precast floor slab is relative to cast-in-situ floor has high insulating effect, flatness height, span is big, can save 80% reinforcing bar etc. Advantage.But current construction method, it is to be spliced polylith precast floor slab, so that in advance due to the lifting limited mass of crane Easily dropping during leak, particularly earthquake easily occurs in seam between making sheet, and security is poor.In addition, prefabricated building is prepared at present Plate is, it is necessary to specific prestretching spud pile, so that the cast-in-place construction for carrying out precast floor slab at the scene can not be realized.If can be existing Field carries out the overall cast-in-place construction of precast floor slab, can not only solve precast floor slab leak and safety issue, and can save Reinforcing bar, have the advantages that flatness is good, span is big, but there is presently no correlation technique report.
The content of the invention
For the above mentioned problem and demand present in prior art, it is an object of the invention to provide it is a kind of it is easy for construction, can Site operation and it can substantially save the floor that is used for of construction material and first open constructing device and method.
It is provided by the invention it is a kind of first open constructing device, including support beam for floor, in the support beam Both ends, which are provided with the reinforcing bar for being used for fixing deformed bar and mentioned, (that is, after deformed bar is carried out into prestretching, both ends to be divided The reinforcing bar for not being fixed on the both ends of support beam is mentioned).
By using the above-mentioned technology of the present invention, the slab form set up in the air now can be become to lay on ground Scene is directly lifted into afterwards, and can only will be worked originally in the prestretching that factory is carried out, and is transferred to field conduct, is applied so as to improve Work security and efficiency of construction, the danger of construction is reduced, realize the overall cast-in-place construction of precast floor slab.
As an improvement scheme, the reinforcing bar mentions the both ends for being directly anchored to the support beam.This structure letter It is single, low manufacture cost.
As an improvement scheme, the reinforcing bar is mentioned above or below the support beam.When above When, support beam is under;When positioned at lower section, support beam is upper.
As an improvement scheme, the reinforcing bar mentions the both ends that the support beam is fixed on by fixture.Using During this structure, fixture can be wider than support beam, and the width of support beam can diminish, and is not influenceing deformed bar number The material usage of support beam can be saved on the premise of amount.
As an improvement scheme, being laid in the top of the support beam has slab form, or horizontal in the support Slab form is lifted with below beam.Present slab form is all to build steel tube frame by steel pipe, then in steel pipe support Composition is laid on frame.Long in time limit, workload is big, dangerous high.The present invention can become the slab form set up in the air now Scene is directly lifted into after being laid on ground, can improve the security of construction and efficiency of construction reduces the danger of construction.Will The support beam for installing slab form is directly lifted on load bearing wall or/and spandrel girder, then with load bearing wall or/and spandrel girder phase Even, it is possible to carry out pouring into a mould concrete construction above.It is horizontal in support when installing slab form in the lower section of support beam Beam is provided with suspension rod, and slab form is connected in the lower end of suspension rod;Upper fixing nut and lower fixing nut are provided with suspension rod, is passed through The height of the upper fixing nut of suspension rod or lower fixing nut regulation slab form, the lower fixing nut for unclamping downrod lower end can be by building Template die plate is taken apart.Slab form can be installed on the ground using this structure, security and installation effectiveness can be improved.
As an improvement scheme, when laying slab form in the top of support beam, in the support beam also One or more height adjusting part is provided with, to adjust the levelness of slab form.Since after concrete is poured into a mould, building Template die plate can be influenceed the flatness of floor by the gravity of concrete, and can ensure building by the regulation of height adjusting part The levelness of template die plate.
As an improvement scheme, the both ends of the support beam are connected with load bearing wall or/and spandrel girder.It will install Support beam be directly lifted on load bearing wall or/and spandrel girder, then be connected with load bearing wall or/and spandrel girder, it is possible to upper Face construct in next step.Connected mode has on a variety of, such as fixture is set at the both ends of the crossbeam, by described solid Determine part with load bearing wall or/and spandrel girder to be connected.The form of fixture can be various structures, the purpose is to connecting cross beam with holding Weight wall or/and spandrel girder, such as:Using hook form, when the fixture is links up with, make one side and the support beam of hook Be connected (usually active connection), the another side of hook is hung on load bearing wall or/and spandrel girder, and the hook needs to hold Carry on a shoulder pole slab form and reinforcing bar, the gross weight of concrete of crossbeam and the above.
As an improvement scheme, is additionally provided with one or more midfoot support in the middle part of the support beam Bar, to ensure the levelness of support beam.When the span of support beam is too big, it is ensured that the levelness of slab form, it is necessary to Ensure the levelness of support beam, if the intensity by improving support beam, the weight and system of support beam will be increased This is caused, therefore the present invention, to ensure the levelness of support beam, improves support beam by setting midfoot support bar at middle part Span.
As an improvement scheme, is preset with some pre-buried bars on the slab form;The pre-buried bar is by lightweight Construction material forms, and is positioned at by keeper in the concrete of floor.The keeper passes through bolt and slab form phase Connection, can make keeper be separated with slab form after unclamping the fixing nut of bolt;The keeper can fix pre-buried bar Firmly, to prevent pre-buried bar from moving and floating during concrete is poured into a mould.Because pre-buried bar is made up of light building material, Its mechanical strength and proportion are far below concrete, so the weight of floor on the one hand can be mitigated using this structure, on the other hand Cavity structure can be formed, so as to improve the span of floor.
It is provided by the invention it is a kind of first open construction method for floor, including the foregoing constructing device and such as first opened Lower operation:
A1 the described reinforcing bar first opened in constructing device) will be fixed on after deformed bar prestretching to mention;
B1) by step a1) formed component be lifted on lay slab form top, then carry out next step construction; The next step construction is exactly to pour into a mould concrete, and after construction terminates, dismounting reinforcing bar mentions the connection between deformed bar, so The slab form by support beam and above is removed afterwards, it is separated with the concrete having been cured., can for the ease of departing from Mention in reinforcing bar in advance and releasing agent is painted on slab form.
As a kind of preferred scheme, described first opens construction method, including foregoing first opens constructing device and load-bearing Wall or/and spandrel girder and following operation:
A2) slab form is laid in the top of the foregoing support beam for first opening constructing device;
B2) step a2 being fixed on after deformed bar prestretching) reinforcing bar at the both ends of the support beam mentions;
C2) by step b2) formed component be lifted on corresponding load bearing wall or/and spandrel girder, then carry out in next step Construction.
As further preferred scheme, described first opens construction method, including foregoing first open constructing device and hold Weight wall or/and spandrel girder and following operation:
A3) slab form is laid in the foregoing support beam for first opening constructing device;
B3) step a3 being fixed on after deformed bar prestretching) reinforcing bar above the both ends of the support beam mentions;
C3) by step b3) formed component be lifted on corresponding load bearing wall or/and spandrel girder;
D3) separately foregoing another support beam for first opening constructing device will be fixed on after deformed bar prestretching Reinforcing bar below both ends is mentioned;
E3) by step d3) component that is formed is lifted into and step c3) load bearing wall or/and spandrel girder are perpendicular holds On weight wall or/and spandrel girder, next step construction is then carried out.This construction method can form the pre- of intersection in slab form should The span and intensity of floor can be significantly increased in power reinforcing bar, this chi structure.
As further preferred scheme, to step e3) formed the deformed bar to intersect carry out tying up fixation.Tie up The deformed bar that two different directions intersect can be linked to be an entirety after fixation, the intensity of floor can be increased.
As further preferred scheme, before lifting, first some pre-buried bars pre-buried on the slab form, then enter again Row lifting;The pre-buried bar is made up of light building material, and is positioned at by keeper in the concrete of floor.
Compared with prior art, the present invention has following conspicuousness progress:
1st, due to the prestressing force effect of deformed bar, thus more than 80% amount of reinforcement can be saved;
2nd, using the load bearing wall and spandrel girder of building, the specific spud pile of prestretching reinforcing bar in the prior art is saved, can Realize site operation;
3rd, because deformed bar and slab form are to install on the ground, constructing operation is not only simplify, improves and applies Work efficiency rate, and also improve working security.
Brief description of the drawings
Fig. 1 is a kind of structural representation for first opening constructing device for floor that the embodiment of the present invention 1 provides;
Fig. 2 is the structural representation for first opening constructing device that the another kind that the embodiment of the present invention 2 provides is used for floor;
Fig. 3 is a kind of structural representation for first opening constructing device for being provided with slab form that the embodiment of the present invention 3 provides;
Fig. 4 is a kind of structural representation for first opening constructing device for being provided with slab form that the embodiment of the present invention 4 provides;
Fig. 5 is a kind of structural representation for first opening constructing device for being provided with slab form that the embodiment of the present invention 5 provides;
Fig. 6 is the cross-sectional view that a kind of reinforcing bar that the embodiment of the present invention 6 provides is mentioned;
Fig. 7 is a kind of structural representation for slab form for being provided with pre-buried bar that the embodiment of the present invention 7 provides;
Fig. 8 is a kind of theory structure schematic diagram for first opening construction method for floor that the embodiment of the present invention 8 provides;
Fig. 9 is a kind of theory structure schematic diagram for first opening construction method for floor that the embodiment of the present invention 9 provides;
Figure 10 is a kind of theory structure schematic diagram for first opening construction method for floor that the embodiment of the present invention 10 provides;
Figure 11 is a kind of theory structure schematic diagram for first opening construction method for floor that the embodiment of the present invention 11 provides;
Figure 12 is a kind of theory structure schematic diagram for first opening construction method for floor that the embodiment of the present invention 12 provides.
Embodiment
In order that the object, technical solutions and advantages of the present invention are more clearly understood, it is right with reference to embodiment and accompanying drawing Technical scheme is described in further detail.
Embodiment 1
Shown in reference picture 1, a kind of constructing device 1 of first opening for floor that the present embodiment provides includes support beam 2, The both ends of the support beam 2 be respectively equipped with preceding reinforcing bar mention 3 and rear reinforcing bar mention 4, deformed bar 5 is fixedly mounted on preceding steel Muscle mention 3 and rear reinforcing bar mention between 4.
When carrying out construction, described constructing device 1 of first opening is lifted on slab form, or be lifted into load bearing wall Or/and on spandrel girder, the wiretie on slab form is avoided the need for such as present form of construction work, can directly pour into a mould coagulation Soil.When concrete curing after, the preceding reinforcing bar of extraction mention 3 and rear reinforcing bar mention 4, at this moment deformed bar 5 will pull back, and produce pre- Stress.The floor so built is precast floor slab, and precast floor slab has flatness good, heat-insulated compared with present cast-in-situ floor Soundproof effect is good, can save the advantages that 80% or so amount of reinforcement.
Embodiment 2
Shown in reference picture 2, a kind of constructing device 1 of first opening for floor that the present embodiment provides includes support beam 2, The both ends of the support beam 2 are respectively equipped with fore-stock 6 and after-poppet 7, and reinforcing bar is mentioned before being fixed with the lower end of fore-stock 6 3, reinforcing bar mentions 4 after being fixed with the lower end of after-poppet 7, and deformed bar 5 is fixedly mounted on preceding reinforcing bar and mentions 3 and rear reinforcing bar extension Between tooth 4.
Embodiment 3
Shown in reference picture 3, a kind of constructing device 1 of first opening for being provided with slab form that the present embodiment provides includes support horizontal stroke Beam 2, be mounted with respectively at the both ends of described support beam 2 preceding reinforcing bar mention 3 and rear reinforcing bar mention 4, in the upper of support beam 2 Face is equipped with slab form 8, and deformed bar 5 is mounted between preceding reinforcing bar mentions 3 and rear reinforcing bar mentions 4.In support beam 2 Both ends preceding fixed hook 9 and rear fixed hook 10 are installed, for being connected with load bearing wall or/and spandrel girder.
Above-mentioned work can be carried out on the ground, it is to be installed it is good after be lifted into again on load bearing wall or/and spandrel girder and carry out coagulation The cast of soil.After concrete curing, the preceding reinforcing bar of extraction mention 3 and rear reinforcing bar mention 4, deformed bar 5 will be fixed on mixed In solidifying soil.Because deformed bar 5 itself has pulling force, while fixed again by concrete, so can be produced back to concrete Pulling force, reach prestressing force effect, so as to improve the span of floor and flatness, save reinforcing bar.
Embodiment 4
Shown in reference picture 4, a kind of constructing device 1 of first opening for being provided with slab form that the present embodiment provides includes support horizontal stroke Beam 2, suspension rod 11 and adjusting nut 12 are provided with described support beam 2, and slab form is provided with the lower end of suspension rod 11 8.The levelness of slab form 8 can be adjusted by the adjusting nut 12 adjusted on suspension rod 11, adjusting nut 12 of dismantling can be by building Template die plate 8 removes.
Embodiment 5
Shown in reference picture 5, a kind of constructing device 1 of first opening for being provided with slab form that the present embodiment provides includes support horizontal stroke Beam 2, slab form 8 is equipped with the top of described support beam 2, it is fixed before being separately installed with the both ends of support beam 2 Hook 9 and rear fixed hook 10.Be separately installed with above the both ends of support beam 2 preceding reinforcing bar mention 3 and rear reinforcing bar mention 4, Deformed bar 5 is fixedly mounted on preceding reinforcing bar and mentions 3 and between rear reinforcing bar mentions 4, and positioned at the top of slab form 8.In addition, Height adjusting screw rod 13 and adjusting nut 14 are also equipped with the middle part of support beam 2, floor can adjust by adjusting nut 14 The levelness of template 8, these work can be carried out on the ground.
Embodiment 6
Shown in reference picture 6, it is sleeve structure that the reinforcing bar of the present embodiment offer, which mentions 3, by the extension for mentioning sleeve pipe 15 and the inside Hook 16 forms, and mentioning hook 16 can move up and down mentioning the inside of sleeve pipe 15.The both ends of deformed bar 5 are mounted with steel respectively Muscle fixing card 17 and 18, after deformed bar 5 is carried out into prestretching, the reinforcing bar fixing card 17 and 18 at both ends is separately mounted to support The reinforcing bar at the both ends of crossbeam 2, which is mentioned on 3 and 4, (because reinforcing bar mentions 4 structure and reinforcing bar is mentioned 3 identical, therefore to be omitted in figure and not to draw Go out).For the ease of dismounting, can on hook 16 is mentioned smearing release agent.
Embodiment 7
Shown in reference picture 7, some pre-buried bars 19 are preset with slab form 8, the pre-buried bar 19 passes through pre-buried positioning The wrapping of card 20 is tight, and pre-buried locator card 20 is fixed on slab form 8 by standing screw 21 and fixing nut 22, makes pre-buried bar 19 On slab form 8.When pouring into a mould concrete, pre-buried bar 19 is set to be located in concrete, to prevent it in casting process Float or mobile.Unclamp fixing nut 22 again after concrete curing, slab form 8 can be removed.
Because pre-buried bar 19 is made up of light building material, the intensity of itself is far below concrete, and itself does not play branch The effect of holding, but for mechanical strength point, acted on equivalent to cavity, thus the concrete of cast can be made to possess the anti-folding effect of cavity Fruit, so as to improve the span of floor;Meanwhile light building material is also equipped with heat-insulating sound-insulating effect, it can also mitigate the weight of floor Amount.
Embodiment 8
Shown in reference picture 8, a kind of of the present embodiment offer first opens construction method, including following operation for floor:
By the both ends of deformed bar 5 be separately fixed at preceding reinforcing bar mention 3 and rear reinforcing bar mention on 4, mention 3 in preceding reinforcing bar With rear reinforcing bar mention 4 with concrete will contact position paint releasing agent or wrap mould release film, then first opening for formation is applied Frock is put 1 and is lifted on the load bearing wall 24 and spandrel girder 25 for having laid slab form 8, and slab form 8 passes through following branch Stay tube 23 is withstood.
Carry out concrete cast, wait it is concrete curing it is up to standard after, by preceding reinforcing bar mention 3 and rear reinforcing bar mention 4 from concrete Middle extraction, it will first open constructing device 1 and remove for construction next time.Because deformed bar 5 is without fulcrum, can be produced after resilience Life answer pulling force in advance, the floor for constructing to obtain is precast floor slab, with flatness height, good effect of heat insulation, can save 80% with The advantages that upper bar material.
Embodiment 9
Shown in reference picture 9, a kind of of the present embodiment offer first opens construction method, including following operation for floor:
On the ground, slab form 8 is first laid above support beam 2, before being loaded onto respectively at the both ends of support beam 2 Fixed hook 9 and rear fixed hook 10, above the both ends of support beam 2 reinforcing bar is installed respectively and mentions 3 and 4, make prestress steel Muscle 5 is fixedly mounted on preceding reinforcing bar and mentions 3 and between rear reinforcing bar mentions 4, and positioned at the top of slab form 8;By mounted group Part is lifted on load bearing wall 24 or/and load-bearing wall beam 25.
The cast of concrete is carried out, can adjust by height adjusting screw rod 13 and adjusting nut 14 and keep slab form 8 Levelness.After concrete curing, deformed bar 5 will be fixed in concrete, then extracted reinforcing bar and mentioned 3 and 4.Due to Deformed bar 5 itself has pulling force, while is fixed again by concrete, so pull-back forces can be produced to concrete, reaches pre- Stress effect.The preceding fixed hook 9 of release and rear fixed hook 10 and the connection of support beam 2, slab form 8 can be removed with Constructed in next time.
Embodiment 10
Shown in reference picture 10, a kind of of the present embodiment offer first opens construction method, including following operation for floor:
On the ground, slab form 8 is first laid above support beam 2, before being installed respectively at the both ends of support beam 2 Fixed hook 9 and rear fixed hook 10.Reinforcing bar is installed respectively on the both ends of support beam 2 and mentions 3 and 4, makes prestress steel Muscle 5 is fixedly mounted on preceding reinforcing bar and mentions 3 and between rear reinforcing bar mentions 4, and positioned at the top of slab form 8;Simultaneously in building slab Pre-buried bar 19 is installed on plate 8, pre-buried bar 19 is wrapped up tightly by pre-buried locator card 20 and is fixed in the upper of slab form 8 Face, pre-buried bar 19 is set to be located in concrete when pouring into a mould concrete, to prevent it from being floated in casting process or move.Due to pre- Bar 19 to be buried to be made up of light building material, the intensity of itself is far below concrete, and itself does not play supporting function, but from machinery For intensity angle, acted on equivalent to cavity, thus the concrete of cast can be made to possess cavity effect, so as to improve floor across Degree;Meanwhile light building material is also equipped with heat-insulating sound-insulating effect, it can also mitigate the weight of floor.
Above-mentioned work can be carried out on ground, be lifted into again after installing on load bearing wall 24 or/and load-bearing wall beam 25, be carried out The cast of concrete.Pass through height adjusting screw rod 13 and the adjustable levelness for keeping slab form 8 of adjusting nut 14.Deng coagulation After soil solidification, deformed bar 5 will be fixed in concrete, then extracted reinforcing bar and mentioned 3 and 4.Due to deformed bar 5 Body has pulling force, while is fixed again by concrete, so pull-back forces can be produced to concrete, reaches prestressing force effect.Unclamp Preceding fixed hook 9 and rear fixed hook 10 and the connection of support beam 2, can remove slab form 8 for constructing next time.
Embodiment 11
Shown in reference picture 11, a kind of of the present embodiment offer first opens construction method, including following operation for floor:
Already installed constructing device 1 of first opening is placed on corresponding load bearing wall 24 and spandrel girder 25, in preceding reinforcing bar Mention 9 and rear reinforcing bar mention 10 and paint releasing agent respectively or wrap mould release film with concrete touching position.By on suspension rod 11 Adjusting nut 12 can adjust the height of slab form 8, to ensure the levelness of slab form 8.Will by pre-buried locator card 20 Pre-buried bar 19 is fixed, and pre-buried locator card 20 is fixed on by fixing nut 22 on slab form 8, and pre-buried bar 19 is located at prestressing steel Above muscle 5, then pour into a mould concrete, after it is concrete curing it is up to standard after, unclamp adjusting nut 12 below slab form 8 and solid Determine nut 22, slab form 8 can be removed and be removed from below for constructing next time.
Embodiment 12
Shown in reference picture 12, a kind of of the present embodiment offer first opens construction method, including following operation for floor:
A) on the ground, first slab form 8 is laid in lower support beam 2;
B) the deformed bar 5B upper reinforcing bars for carrying out prestretching and being fixed on above the both ends of lower support beam 2 are mentioned 3 again And between 4, form lower prestressing frame 1B;
C) step b) the lower prestressing frame 1B formed are lifted on corresponding load bearing wall 24 or/and spandrel girder 25, and passed through The fixed hook 9 and 10 for being arranged on the lower both ends of support beam 2 is connected with load bearing wall 24 or/and spandrel girder 25;
D) separately the lower reinforcing bar being fixed on after deformed bar 5A prestretchings below the both ends of upper support beam 2 is mentioned (in figure It is not drawn into) on, prestressing frame 1A in formation;
E) step d) the upper prestressing frame 1A formed are lifted into load bearing wall 24 described with step c) or/and the phase of spandrel girder 25 is hung down On straight load bearing wall or/and spandrel girder (being not drawn into figure), then the deformed bar to intersect of formation tie up admittedly Fixed (can also press simultaneously described in embodiment 5, pre-buried some pre-buried bars 19 on slab form 8);
F) again in the upper concrete of slab form 8, after it is concrete curing it is up to standard after, upper prestressing frame 1A lower reinforcing bar is hung Tooth (being not drawn into figure) is extracted from concrete, then removes prestressing frame 1A;Lower prestressing frame 1B upper reinforcing bar is mentioned into 3 and 4 Extracted respectively from concrete, and fixed hook 9 and 10 is separated with load bearing wall 24 or/and spandrel girder 25, then removed down Prestressing frame 1B.
Finally be necessary described herein be:Above example is served only for further detailed to technical scheme work Ground explanation, it is impossible to be interpreted as limiting the scope of the invention, those skilled in the art is according to the above of the invention Some the nonessential modifications and adaptations made belong to protection scope of the present invention.

Claims (14)

1. a kind of first open constructing device for floor, it is characterized in that:The constructing device of first opening includes support beam, described The both ends of support beam are provided with the reinforcing bar for being used to fix deformed bar and mentioned.
2. according to claim 1 first open constructing device, it is characterized in that:The reinforcing bar is mentioned positioned at the support beam Above or below.
3. according to claim 1 or 2 first open constructing device, it is characterized in that:The reinforcing bar mention be directly anchored to it is described The both ends of support beam.
4. according to claim 1 or 2 first open constructing device, it is characterized in that:The reinforcing bar is mentioned to be fixed by fixture At the both ends of the support beam.
5. according to claim 1 first open constructing device, it is characterized in that:Being laid in the top of the support beam has floor Template, or it is lifted with slab form below the support beam.
6. according to claim 1 first open constructing device, it is characterized in that:The both ends of the support beam and load bearing wall or/ It is connected with spandrel girder.
7. constructing device is first opened according to claim 1 or 5, it is characterized in that:Also set up in the middle part of the support beam There is one or more midfoot support bar, to ensure the levelness of the support beam.
8. constructing device is first opened according to claim 1 or 5, it is characterized in that:One is additionally provided with the support beam Individual or more than one height adjusting part, to adjust the levelness of slab form.
9. according to claim 5 first open constructing device, it is characterized in that:It is preset with the slab form some pre-buried Bar;The pre-buried bar is made up of light building material, and is positioned at by keeper in the concrete of floor.
10. a kind of first open construction method for floor, including first opens constructing device described in claim 1, it is characterized in that, institute State and first open construction method including operating as follows:
A1) reinforcing bar for first opening constructing device being fixed on after deformed bar prestretching described in claim 1 is mentioned;
B1) by step a1) formed component be lifted on lay slab form top, then carry out next step construction.
11. a kind of first open construction method for floor, including described in claim 1 first open constructing device and load bearing wall or/ And spandrel girder, it is characterized in that, the construction method of first opening includes following operation:
A2) slab form is laid in the support beam for first opening constructing device described in claim 1;
B2) step a2 being fixed on after deformed bar prestretching) reinforcing bar at the both ends of the support beam mentions;
C2) by step b2) formed component be lifted on corresponding load bearing wall or/and spandrel girder, then carry out next step construction.
12. a kind of first open construction method for floor, including described in claim 1 first open constructing device and load bearing wall or/ And spandrel girder, it is characterized in that, the construction method of first opening includes following operation:
A3) slab form is laid in the support beam for first opening constructing device described in claim 1;
B3) step a3 being fixed on after deformed bar prestretching) reinforcing bar above the both ends of the support beam mentions;
C3) by step b3) formed component be lifted on corresponding load bearing wall or/and spandrel girder;
D3) separately by the both ends for the support beam for first opening constructing device being fixed on after deformed bar prestretching described in claim 1 The reinforcing bar of lower section is mentioned;
E3) by step d3) formed component be lifted into and step c3) the perpendicular load bearing wall of the load bearing wall or/and spandrel girder Or/and on spandrel girder, then carry out next step construction.
13. according to claim 12 first open construction method, it is characterized in that:To step e3) formed intersect it is pre- should Power reinforcing bar carries out tying up fixation.
14. construction method is first opened according to claim 10 or 11 or 12, it is characterized in that:Before lifting, first in the building Pre-buried some pre-buried bars, are then lifted again on template die plate;The pre-buried bar is made up of light building material, and by fixed Position part is positioned in the concrete of floor.
CN201610565016.6A 2016-07-18 2016-07-18 Pre-tensioning construction device and method for floor slab Active CN107630559B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610565016.6A CN107630559B (en) 2016-07-18 2016-07-18 Pre-tensioning construction device and method for floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610565016.6A CN107630559B (en) 2016-07-18 2016-07-18 Pre-tensioning construction device and method for floor slab

Publications (2)

Publication Number Publication Date
CN107630559A true CN107630559A (en) 2018-01-26
CN107630559B CN107630559B (en) 2021-04-30

Family

ID=61112887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610565016.6A Active CN107630559B (en) 2016-07-18 2016-07-18 Pre-tensioning construction device and method for floor slab

Country Status (1)

Country Link
CN (1) CN107630559B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2223525A1 (en) * 1973-03-30 1974-10-25 Metalliques Entrepr Cie Fse
CN2140928Y (en) * 1992-08-22 1993-08-25 北京市建筑工程研究所 Multi-functional form supporting beam
CN1368585A (en) * 2001-02-03 2002-09-11 朱其聪 Technology for in-situ casting prestressed hollow floor concrete slab
KR20040041821A (en) * 2002-11-12 2004-05-20 노윤근 Apparatus for reinforcing slab of girder bridge using steel wire and reinforcing method using the apparatus
CN1851191A (en) * 2006-05-18 2006-10-25 刘建康 Construction method for making congruent floor using upper support frame
CN101481935A (en) * 2009-01-20 2009-07-15 常州天普马鞍板有限公司 Prestressed reinforcement concrete double T plate, tire shuttering thereof and production method
CN201598828U (en) * 2009-07-14 2010-10-06 张军 Cast-in-situ prestressing force floor plate mould and cast-in-situ prestressing force floor plate
CN102169068A (en) * 2010-12-31 2011-08-31 扬州大学 Loading method for concrete member flexural test
CN103206084A (en) * 2012-01-17 2013-07-17 上海奇谋能源技术开发有限公司 Material-saving construction method of cast-in-place floor
JP2014227754A (en) * 2013-05-24 2014-12-08 北川工業株式会社 Bridge girder and construction method of bridge girder
CN205291224U (en) * 2015-12-23 2016-06-08 建华建材(江西)有限公司 Reinforced concrete abnormal shape matrix utensil

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2223525A1 (en) * 1973-03-30 1974-10-25 Metalliques Entrepr Cie Fse
CN2140928Y (en) * 1992-08-22 1993-08-25 北京市建筑工程研究所 Multi-functional form supporting beam
CN1368585A (en) * 2001-02-03 2002-09-11 朱其聪 Technology for in-situ casting prestressed hollow floor concrete slab
KR20040041821A (en) * 2002-11-12 2004-05-20 노윤근 Apparatus for reinforcing slab of girder bridge using steel wire and reinforcing method using the apparatus
CN1851191A (en) * 2006-05-18 2006-10-25 刘建康 Construction method for making congruent floor using upper support frame
CN101481935A (en) * 2009-01-20 2009-07-15 常州天普马鞍板有限公司 Prestressed reinforcement concrete double T plate, tire shuttering thereof and production method
CN201598828U (en) * 2009-07-14 2010-10-06 张军 Cast-in-situ prestressing force floor plate mould and cast-in-situ prestressing force floor plate
CN102169068A (en) * 2010-12-31 2011-08-31 扬州大学 Loading method for concrete member flexural test
CN103206084A (en) * 2012-01-17 2013-07-17 上海奇谋能源技术开发有限公司 Material-saving construction method of cast-in-place floor
JP2014227754A (en) * 2013-05-24 2014-12-08 北川工業株式会社 Bridge girder and construction method of bridge girder
CN205291224U (en) * 2015-12-23 2016-06-08 建华建材(江西)有限公司 Reinforced concrete abnormal shape matrix utensil

Also Published As

Publication number Publication date
CN107630559B (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN101538831B (en) Post-poured hidden coping construction method for converting simply supported beams into continuous beams
JP7429940B2 (en) Construction method of steel concrete main girder of cable-stayed bridge
JP2023546279A (en) Lifting device for bridge water surface pile tie beam and its construction method
CN107268782A (en) A kind of prefabricated frame posture device and its implementation
CN112832368A (en) Quick construction process for cantilever beam at ultrahigh position
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN106088640A (en) The method that existing frame structure is carried out demolishing columns
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN114164977A (en) Method for combining construction of aluminum template and laminated slab
CN206956979U (en) A kind of Linear shear wall with fore-set
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN110878522B (en) Main tower lower cross beam construction system and construction method
CN104164882A (en) Construction method for building support structural beam foundation on slope and structure thereof
CN107630553A (en) It is a kind of first to open rapid construction device and method for large span floor
CN107630559A (en) It is a kind of first to open constructing device and method for floor
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN211142831U (en) Suspension bridge anchorage front anchor chamber top cover plate
CN107119839A (en) Assembled Building panel and preparation method thereof
CN114277672A (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN108867548B (en) Construction platform and construction platform erection method for on-site watering high pile wharf
CN207277679U (en) Air-entrained concrete building block and armored concrete outline border integral wall
CN207484749U (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls
CN107630554B (en) Rapid construction device and method for floor slab
CN213572926U (en) High side wall construction protective structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210629

Address after: 200051 room 271, 2 / F, building 6, 2453 Wanhangdu Road, Changning District, Shanghai

Patentee after: Shanghai Peijun Technology Co.,Ltd.

Address before: 201600, A-208, No. 1558 West Hui song Road, Shanghai, Songjiang District

Patentee before: SHANGHAI QIMOU ENERGY TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right