CN207277679U - Air-entrained concrete building block and armored concrete outline border integral wall - Google Patents

Air-entrained concrete building block and armored concrete outline border integral wall Download PDF

Info

Publication number
CN207277679U
CN207277679U CN201721241630.3U CN201721241630U CN207277679U CN 207277679 U CN207277679 U CN 207277679U CN 201721241630 U CN201721241630 U CN 201721241630U CN 207277679 U CN207277679 U CN 207277679U
Authority
CN
China
Prior art keywords
air
outline border
building block
armored concrete
entrained
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721241630.3U
Other languages
Chinese (zh)
Inventor
张国标
程晓强
李培利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hangjiazetong Building Energy Saving New Materials Co., Ltd.
Original Assignee
Hangzhou Zetong Architecture Energy Saving New Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Zetong Architecture Energy Saving New Materials Co Ltd filed Critical Hangzhou Zetong Architecture Energy Saving New Materials Co Ltd
Priority to CN201721241630.3U priority Critical patent/CN207277679U/en
Application granted granted Critical
Publication of CN207277679U publication Critical patent/CN207277679U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of air-entrained concrete building block and armored concrete outline border integral wall are the utility model is related to, it includes air-entrained concrete building block and armored concrete outline border;The armored concrete outline border is located at wallboard surrounding, and air-entrained concrete building block, which is paved, to be filled in inside armored concrete outline border.The utility model can be realized constructs with structure synchronization, and lifting equipment lifting installation during using structure construction, shortens the construction period.The utility model good integrity at the same time, avoids the risk of wall crazing.

Description

Air-entrained concrete building block and armored concrete outline border integral wall
Technical field
The utility model belongs to building structure technology field, more particularly to a kind of air-entrained concrete building block and armored concrete Outline border integral wall.
Background technology
Air-entrained concrete building block is that a kind of light porous, insulation, fire protecting performance be good, nailable, sawable, planable and tool There are the New Building Materials of certain shock resistance, be one kind lighter in concrete, filling wall suitable for skyscraper and low The load bearing wall of layer building.But in the prior art, air-entrained concrete building block still needs scene and manually builds by laying bricks or stones, work efficiency bottom, construction speed Degree is slow, and it must could carry out after the completion of agent structure to build by laying bricks or stones, occupy the overall duration.
Meanwhile to improve the tensile property of concrete, a certain number of reinforcing bars are often added in concrete in tension region, are made Two kinds of materials are bonded to an entirety, bear external force jointly.This concrete equipped with reinforcing bar, is known as armored concrete.By steel The component such as beam, plate, column, basis made of reinforced concrete, is known as reinforced concrete member, it can greatly improve the carrying of component Ability, reduces the cross dimensions of component.
The content of the invention
Based on background technology there are the problem of, the purpose of the utility model is to overcome air-entrained concrete building block to need scene Manually build by laying bricks or stones, the defects of speed of application is slow proposes that one kind is prefabricated in the factory, and air-entrained concrete building block and the reinforcing bar of on-site hoisting mix Solidifying soil outline border integral wall.
For the attainment of one's purpose, technical solution provided by the utility model is:
A kind of air-entrained concrete building block and armored concrete outline border integral wall are the utility model is related to, it includes aerating and mixes Solidifying earth building blocks and armored concrete outline border;The armored concrete outline border is located at wallboard surrounding, and air-entrained concrete building block is paved It is filled in inside armored concrete outline border.
Preferably, the outer arch of the armored concrete is equipped with lifting sleeve, and the left and right sides is equipped with stop sleeve.Wallboard The lifting sleeve that top is set, was both used as lifting, and the grout sleeve being connected with superstructure, or deformed bar End anchor solid point, a thing three is with cost-effective.
Preferably, the outer arch of the armored concrete is arranged with two lifting sleeves.
Preferably, the wallboard vertical direction at corresponding lifting sleeve is equipped with deformed bar, and deformed bar passes through Air-entrained concrete building block and lifting sleeve weld.Deformed bar improves the globality of wallboard, avoids transport installation process The possibility of middle cracking.Armored concrete outline border section is reduced, the dead weight of integral wall can be reduced.
Preferably, the armored concrete outline border is identical with the air-entrained concrete building block thickness of inside filling.Outline border mixes After solidifying soil setting and hardening a close integral wall is formed with air-entrained concrete building block.
Using technical solution provided by the utility model, compared with prior art, have the advantages that:
(1) the utility model air-entrained concrete building block and armored concrete outline border integral wall, can be large-scale industrialized pre- System, reduces site workload, labour cost is reduced, so as to reduce construction cost.
(2) the utility model air-entrained concrete building block and armored concrete outline border integral wall are, it can be achieved that and structure synchronization Construction, lifting equipment lifting installation during using structure construction, shortens the construction period.
(3) the utility model air-entrained concrete building block and armored concrete outline border integral wall, good integrity, avoids wall The risk of body cracking.
(4) the utility model air-entrained concrete building block and armored concrete outline border integral wall, can avoid on-site pouring pound circle Beam constructional column, shortens the construction period so as to further reduce the cost.
Brief description of the drawings
Fig. 1 is this practicality air-entrained concrete building block and armored concrete outline border integral wall elevation;
Fig. 2 is the A-A profiles of integral wall in Fig. 1;
Fig. 3 is the B-B profiles of integral wall in Fig. 1;
Mark explanation in schematic diagram:1- air-entrained concrete building blocks;2- armored concrete outline borders;3- deformed bars;4- Lift sleeve;5- stop sleevees.
Embodiment
To further appreciate that the content of the utility model, the utility model is described in detail in conjunction with the embodiments, it is real below Apply example to be used to illustrate the utility model, but be not intended to limit the scope of the present invention.
With reference to shown in Fig. 1 to Fig. 3, the present embodiment is related to a kind of air-entrained concrete building block and armored concrete outline border integral wall Plate, it includes air-entrained concrete building block 1 and armored concrete outline border 2;The armored concrete outline border 2 is located at wallboard surrounding, Air-entrained concrete building block 1, which is paved, to be filled in inside armored concrete outline border 2.
The top of armored concrete outline border 2 is equipped with lifting sleeve 4, and the left and right sides is equipped with stop sleeve 5.The lifting sleeve 4 corresponding wallboard vertical directions are equipped with deformed bar 3, and deformed bar 3 is through air-entrained concrete building block 1 with lifting sleeve 4 welding.Deformed bar 3 improves the globality of wallboard, avoids the possibility to crack in transport installation process, reduces steel Reinforced concrete outline border sectional area, can reduce the dead weight of integral wall.The lifting sleeve 4 is used when lifting integral wall, It is used as grout sleeve when being connected with top girder construction, in addition, or the anchor point of deformed bar end.
The processing method of the integral wall of the utility model comprises the following steps:
(1) it is related to the air-entrained concrete building block perforation fluting at deformed bar position;
(2) air-entrained concrete building block, four side formwork erections are paved in die station;
(3) armored concrete outline border reinforcing bar is laid with, places pre-buried lifting sleeve and pre-buried stop sleeve;
(4) deformed bar, deformed bar and lifting sleeve weld are placed, applies prestressing force;
(5) disturbing concrete, maintenance discharge stress after reaching intensity;
(6) turnover panel is demoulded, obtains finished product.
The construction method of the integral wall of the utility model comprises the following steps:
(1) air-entrained concrete building block and armored concrete outline border integral wall are transported to construction site, spiral shell on crane hanger Tether and connect lifting sleeve 4, lifting installation is in place.
(2) supporting rod is connected with stop sleeve 5, plays temporary support.
(3) after the installation of superstructure beam is in place, the branch sleeve reserved with sleeve 4 and beam lower part, anchor are hung with anchor pole connection Gu grouting, which reaches intensity recession, removes supporting rod.
Schematically the utility model and embodiments thereof are described above, this describes no restricted, attached drawing Shown in be also the utility model embodiment, actual structure is not limited thereto.So common skill of this area Art personnel are enlightened by it, without deviating from the purpose of the present invention, are not inventively designed and the technology The similar frame mode of scheme and embodiment, all should belong to the protection range of the utility model.

Claims (5)

1. a kind of air-entrained concrete building block and armored concrete outline border integral wall, it is characterised in that it includes air entrained concrete Building block and armored concrete outline border;The armored concrete outline border is located at wallboard surrounding, and air-entrained concrete building block paves filling Inside armored concrete outline border.
2. air-entrained concrete building block according to claim 1 and armored concrete outline border integral wall, it is characterised in that institute The outer arch of armored concrete stated is equipped with lifting sleeve, and the left and right sides is equipped with stop sleeve.
3. air-entrained concrete building block according to claim 2 and armored concrete outline border integral wall, it is characterised in that institute The outer arch of armored concrete stated is arranged with two lifting sleeves.
4. air-entrained concrete building block according to claim 2 and armored concrete outline border integral wall, it is characterised in that right The wallboard vertical direction at sleeve should be lifted and be equipped with deformed bar, deformed bar is through air-entrained concrete building block with lifting Sleeve weld.
5. air-entrained concrete building block according to claim 1 and armored concrete outline border integral wall, it is characterised in that institute The armored concrete outline border stated is identical with the air-entrained concrete building block thickness of inside filling.
CN201721241630.3U 2017-09-26 2017-09-26 Air-entrained concrete building block and armored concrete outline border integral wall Active CN207277679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721241630.3U CN207277679U (en) 2017-09-26 2017-09-26 Air-entrained concrete building block and armored concrete outline border integral wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721241630.3U CN207277679U (en) 2017-09-26 2017-09-26 Air-entrained concrete building block and armored concrete outline border integral wall

Publications (1)

Publication Number Publication Date
CN207277679U true CN207277679U (en) 2018-04-27

Family

ID=61982042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721241630.3U Active CN207277679U (en) 2017-09-26 2017-09-26 Air-entrained concrete building block and armored concrete outline border integral wall

Country Status (1)

Country Link
CN (1) CN207277679U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629709A (en) * 2019-01-15 2019-04-16 中国地震局工程力学研究所 Apply the novel filling wall and construction method of compressive pre-stress by strap bolt building block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629709A (en) * 2019-01-15 2019-04-16 中国地震局工程力学研究所 Apply the novel filling wall and construction method of compressive pre-stress by strap bolt building block

Similar Documents

Publication Publication Date Title
AU2013101343B4 (en) Methods, systems and components for multi-storey building construction
CN105464244A (en) Prefabricated integrated shear wall construction method
CN101831970A (en) Integrally assembled wallboard wall and construction method thereof
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN107476337A (en) The prefabricated side wall assembling and construction method in open cut subway assembled station
CN106555453A (en) A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
CN108708394A (en) A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support
CN105178603A (en) EPS polyphenyl dismantling-exempt template concrete building cover plate construction technology method
CN205063100U (en) Prevent hot wall and prevent hot wall system
CN104405123B (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly and construction method thereof
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN207277679U (en) Air-entrained concrete building block and armored concrete outline border integral wall
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
WO2015184476A1 (en) Precast concrete falsework bubbledeck element and process of manufacturing thereof
CN207739436U (en) A kind of assembled steel reinforced concrete shear walls structure
CN206457971U (en) A kind of prefabricated overlapped hollow plate of prestressing force
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN108005265A (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer and its preparation and construction method
CN204299179U (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly
CN208201923U (en) A kind of armpit Angle formwork overlapping assembled comprehensive pipe gallery structure
CN207739437U (en) A kind of prefabricated steel reinforced concrete shear wall structure
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN110593124A (en) Suspension bridge anchorage front anchor chamber top cover plate and construction method thereof
CN108755701A (en) The construction method of the support construction of deep basal pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 311419 Building No. 53, Yushan Village, Yushan Township, Fuyang City, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Hangjiazetong Building Energy Saving New Materials Co., Ltd.

Address before: 311419 Building No. 53, Yushan Village, Yushan Township, Fuyang City, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou Zetong Architecture Energy Saving New Materials Co., Ltd.