CN107628571A - Caravan handling method - Google Patents
Caravan handling method Download PDFInfo
- Publication number
- CN107628571A CN107628571A CN201710705875.5A CN201710705875A CN107628571A CN 107628571 A CN107628571 A CN 107628571A CN 201710705875 A CN201710705875 A CN 201710705875A CN 107628571 A CN107628571 A CN 107628571A
- Authority
- CN
- China
- Prior art keywords
- caravan
- crossbeam
- handling method
- hydraulic jack
- longeron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Loading Or Unloading Of Vehicles (AREA)
Abstract
The present invention relates to the technical field of caravan, disclose caravan handling method, by in support frame of the bottom of the caravan installation with hydraulic jack, by the height of hydraulic jack regulation support so as to adjusting the elevated height of caravan so that carrier loader and fork truck can realize the carrying to caravan, so, solve higher using cost during crane auxiliary handling caravan, and easily limited by environment, reduce the wish that people use caravan, the problem of being unfavorable for the popularization and use of caravan.
Description
Technical field
The present invention relates to the technical field of caravan, especially caravan handling method.
Background technology
Caravan, also known as " family on wheel ", have " room " and " car " two big function concurrently, be that one kind is removable, have house must
The car type of standby basic facilities, the house facility on its car have:Bedding, stove, refrigerator, cabinet, sofa, dining table and chair, washing are set
Apply, furniture and the electrical equipment such as air-conditioning, TV, sound equipment, driver area, accommodation area, bedroom region, hygiene sector, kitchen can be divided into
Region etc., caravan are to integrate " clothing, food, shelter, OK ", realize the trendy product of " being travelled in life, lived in travelling ".
Caravan applied in China it is relatively broad, but because caravan does not have power resources, when needing to be transported through,
Just need to realize by handling instrument.At present, loading and unloading the method that caravan is taken in the industry is:When needing to deliver caravan, use
Caravan is lifted on the wagon box of carrier loader by crane, and carrier loader delivers caravan to destination;When carrier loader delivers caravan to purpose
Behind ground, caravan is hung down with crane and is placed in destination.
However, crane is easily limited by environment, and it is higher using the cost of crane auxiliary handling caravan, reduce people
Using caravan wish, be unfavorable for the popularization and use of caravan.
The content of the invention
Caravan handling method provided by the invention, it is intended to solve in the prior art, using crane aid in handling caravan when into
This is higher, and is easily limited by environment, reduces the wish that people use caravan, is unfavorable for the popularization of caravan and what is used ask
Topic.
The present invention is achieved in that when needing to deliver caravan, in the bottom of caravan installation band hydraulic jack
Support frame, the caravan is raised by the hydraulic jack, forms the first spacing with ground, the wagon box of carrier loader enters
After first spacing, the hydraulic jack declines the caravan, until the caravan is stabilized on the wagon box, unloads described
Support frame, the carrier loader deliver the caravan to destination;After the carrier loader delivers the caravan to destination, it is necessary to
When the caravan is unloaded from the carrier loader, support frame as described above is arranged on the caravan bottom again, passes through institute
State hydraulic jack to raise the caravan, the second spacing is formed with the wagon box, by between the palette fork insertion described second of fork truck
Away from, the caravan is directly carried to by ground from the wagon box by the fork truck.
Further, support frame as described above includes the crossbeam and two longerons separately arranged two separately, each
The longeron is connected with two crossbeams respectively, and the hydraulic jack is connected to the both ends of the crossbeam.
Further, the both ends of the longeron are respectively formed with the connecting portion for connecting the crossbeam, and the longeron is arranged on
The top of the crossbeam.
Further, the longeron is provided with columnar projections in the connecting portion, and the columnar projections extend down.
Further, the crossbeam is provided with through hole, and the columnar projections are inserted in the through hole, and the columnar projections
Bottom is extended to outside the through hole.
Further, the bottom of the columnar projections is provided with clamp button of the spring, and the clamp button of the spring is arranged on described lead to
Outside hole.
Further, set on the crossbeam it is fluted, forklift transport the caravan when, the fork truck palette fork insertion
Into the groove.
Further, the length of the crossbeam is more than the width of the caravan.
Further, the bottom of the caravan is stretched out at the crossbeam both ends respectively, and the hydraulic jack is separately positioned on
The crossbeam stretches out the both ends of caravan bottom.
Further, the connecting portion is respectively arranged in the caravan bottom.
Compared with prior art, caravan handling method provided by the invention, hydraulic pressure is carried by the installation in the bottom of caravan
The support frame of jack, the height of support frame is adjusted and then the adjustment elevated height of caravan by hydraulic jack so that delivery
Car and fork truck can realize the carrying to caravan, so, solve when aiding in handling caravan using crane that cost is higher, and easily
Limited by environment, reduce the wish that people use caravan, the problem of being unfavorable for the popularization and use of caravan.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of caravan handling method provided in an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
It is described in detail below in conjunction with realization of the specific embodiment to the present invention.
Same or analogous label corresponds to same or analogous part in the accompanying drawing of the present embodiment;In description of the invention
In, it is to be understood that if having the instructions such as term " on ", " under ", "left", "right" orientation or position relationship for based on accompanying drawing institute
The orientation or position relationship shown, it is for only for ease of the description present invention and simplifies description, rather than instruction or the dress for implying meaning
Put or element must have specific orientation, with specific azimuth configuration and operation, therefore described in accompanying drawing position relationship use
Language being given for example only property explanation, it is impossible to the limitation to this patent is interpreted as, for the ordinary skill in the art, can be with
The concrete meaning of above-mentioned term is understood as the case may be.
It is preferred embodiment provided by the invention shown in reference picture 1.
Caravan handling method provided by the invention, for the handling and carrying of caravan, also available for other kinds of caravan,
It is not limited only to the present embodiment.
Caravan handling method comprises the following steps:When needing to deliver caravan 16, in the bottom of caravan 16, installation carries liquid
The support frame of jack 13 is pressed, in the present embodiment, support frame includes two crossbeams 11 separately and two are separately arranged
Longeron 12, each longeron 12 is connected with two crossbeams 11 respectively, and hydraulic jack 13 is connected to the both ends of crossbeam 11;
Caravan 16 is raised by hydraulic jack 13, forms the first spacing with ground, first spacing can allow for the car of carrier loader
Bucket enters.After the wagon box of carrier loader enters the first spacing, four hydraulic jacks 13 decline caravan 16, until caravan 16 is steady
Gu on wagon box, lower bracing frame is now unloaded, caravan 16 is then delivered to destination by carrier loader.
After carrier loader delivers caravan 16 to destination, it is necessary to when caravan 16 is unloaded from carrier loader, again will
Support frame is arranged on the bottom of caravan 16, is raised caravan 16 by the hydraulic jack 13 being connected on support frame so that caravan
16 bottom forms the second spacing with wagon box, and the palette fork of fork truck is inserted in the second spacing, by fork truck directly by caravan 16 from
Ground is carried on wagon box.
The handling method of caravan 16 that upper body provides, by the branch that hydraulic jack 13 is connected with the installation of the bottom of caravan 16
Support, 16 elevated height of caravan is adjusted by hydraulic jack 13 so that carrier loader and fork truck can be realized to caravan 16
Carry, so, solve when aiding in handling caravan 16 using crane that cost is higher, and easily limited by environment, reduce people
Using caravan 16 wish, the problem of being unfavorable for the popularization and use of caravan 16.
Specifically, the connecting portion of longitudinal beam connected 12 is respectively formed with the both ends of longeron 11, longeron 12 is arranged on crossbeam 11
Top, so, in 13 lifting caravan 16 of hydraulic jack, crossbeam 11 applies upward power to longeron 12 by connecting portion,
So longeron 12 can give caravan 16 apply support lift so that caravan can stable lifting, avoid the situation for turning over side from going out
It is existing.
Specifically, longeron 12 is provided with columnar projections 14 in connecting portion, and the columnar projections 14 extend down.The present embodiment
In, columnar projections 14 are cylinder, for coordinating with crossbeam 11 so that longeron 12 is connected fastening with crossbeam 11, according to actual need
Will, columnar projections 14 also may be configured as other kinds of cylinder.
Correspondingly, crossbeam 11 is provided with through hole, and the columnar projections 14 on longeron 12 are inserted in the through hole, and columnar projections 14
Bottom is extended to outside through hole.So so that crossbeam 11 is connected with longeron 12 according to consolidating, and is avoided in the mistake of carrying fork truck caravan 16
Cheng Zhong, the opposing side rails 12 of crossbeam 11 produce displacement so that safer in the cargo handling process of caravan 16.
Further, the bottom of columnar projections 14 is provided with clamp button of the spring, and clamp button of the spring is arranged on outside through hole.Work as post
After shape projection 14 inserts the through hole on crossbeam 11, the clamp button of the spring positioned at the bottom of columnar projections 14 is ejected, and crossbeam 11 is locked, and is prevented
Only crossbeam 11 departs from longeron 12.
In the present embodiment, fluted 15 are set on crossbeam 11, when forklift transports caravan 16, the palette fork of fork truck is embedded into recessed
In groove 15.By setting groove 15 on crossbeam 11 so that fork truck is carrying the formula of caravan 16, is capable of the placement support of fast accurate
Fork, plays a part of fast positioning.Further, since palette fork is absorbed in groove 15, can so avoid when carrying caravan 16, room
Car 16 moves toward both sides, avoids caravan 16 and turns over side.
Because handler loads and unloads sometimes for a variety of caravans 16 in different size, in order to be adapted to
Different caravans 16, in the present embodiment, the length of crossbeam 11 are more than the width of caravan 16, so, when handler needs pair
When other larger caravans 16 are loaded and unloaded, remain able to carry out operation.
When the hydraulic jack 13 of reality is arranged, it can be arranged in the bottom of caravan 16, can also be arranged in stretching
The position of the bottom of caravan 16, in order to be easy to operate, in the present embodiment, wanted when the strength and stiffness of crossbeam 11 reach certain
After asking, the bottom of caravan 16 is stretched out at the both ends of crossbeam 11 respectively, and hydraulic jack 13 is separately positioned on crossbeam 11 and stretches out the bottom of caravan 16
The both ends in portion, so it will become very convenient when being arranged to hydraulic jack 13, without bending over hydraulic jack
13 to stretch into caravan 16 low.
Because longeron 12 needs to participate in the stress of the bottom of caravan 16, in order that stress maximizes, in the present embodiment, connection
Portion is respectively arranged in the bottom of caravan 16, that is to say, that four connecting portions directly participate in the stress to the bottom of caravan 16, no
The connecting portion having occurs outside the bottom of caravan 16, situation of some connecting portions in the bottom of caravan 16.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.
Claims (10)
1. caravan handling method, it is characterised in that when needing to deliver caravan, in the bottom of caravan installation band hydraulic jack
The support frame on top, the caravan is raised by the hydraulic jack, form the first spacing with ground, the wagon box of carrier loader enters
After entering the first spacing, the hydraulic jack declines the caravan, until the caravan is stabilized on the wagon box, unloads institute
Support frame is stated, the carrier loader delivers the caravan to destination;After the carrier loader delivers the caravan to destination, need
When the caravan is unloaded from the carrier loader, support frame as described above is arranged on the caravan bottom again, passed through
The hydraulic jack raises the caravan, and the second spacing is formed with the wagon box, and the palette fork of fork truck is inserted into described second
In spacing, the caravan is directly carried to by ground from the wagon box by the fork truck.
2. caravan handling method as claimed in claim 1, it is characterised in that support frame as described above includes the crossbeam two separately
And two longerons separately arranged, each longeron are connected with two crossbeams respectively, the hydraulic jack point
The both ends of the crossbeam are not connected to.
3. caravan handling method as claimed in claim 2, it is characterised in that the both ends of the longeron are respectively formed with connection institute
The connecting portion of crossbeam is stated, the longeron is arranged on the top of the crossbeam.
4. caravan handling method as claimed in claim 3, it is characterised in that the longeron is provided with column in the connecting portion
Projection, the columnar projections extend down.
5. caravan handling method as claimed in claim 4, it is characterised in that the crossbeam is provided with through hole, and the column is convex
Rise in the insertion through hole, and the columnar projections bottom is extended to outside the through hole.
6. caravan handling method as claimed in claim 5, it is characterised in that the bottom of the columnar projections is provided with Spring Card
Button, and the clamp button of the spring is arranged on outside the through hole.
7. the caravan handling method as described in any one of claim 1 to 6, it is characterised in that set on the crossbeam it is fluted,
When forklift transports the caravan, the palette fork of the fork truck is embedded into the groove.
8. caravan handling method as claimed in claim 7, it is characterised in that the length of the crossbeam is more than the width of the caravan
Degree.
9. caravan handling method as claimed in claim 8, it is characterised in that the caravan is stretched out at the crossbeam both ends respectively
Bottom, the hydraulic jack are separately positioned on the both ends that the crossbeam stretches out caravan bottom.
10. caravan handling method as claimed in claim 9, it is characterised in that the connecting portion is respectively arranged on the room
In car bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710705875.5A CN107628571B (en) | 2017-08-17 | 2017-08-17 | Caravan handling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710705875.5A CN107628571B (en) | 2017-08-17 | 2017-08-17 | Caravan handling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107628571A true CN107628571A (en) | 2018-01-26 |
CN107628571B CN107628571B (en) | 2019-07-05 |
Family
ID=61099985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710705875.5A Active CN107628571B (en) | 2017-08-17 | 2017-08-17 | Caravan handling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107628571B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112249969A (en) * | 2020-10-28 | 2021-01-22 | 苏州市晟腾机械有限公司 | Scissor lift convenient to carry |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2478988Y (en) * | 2001-01-15 | 2002-02-27 | 中国国际海运集装箱(集团)股份有限公司 | Lifting device for transposition of container |
CN201010379Y (en) * | 2007-03-27 | 2008-01-23 | 沈阳埃普轮胎机械有限公司 | Reshipping cab apron of container |
CN201923000U (en) * | 2011-03-07 | 2011-08-10 | 湖北海龙专用汽车有限公司 | Special automatic loading and unloading vehicle for containers |
CN202130370U (en) * | 2011-06-27 | 2012-02-01 | 张权 | Container carrier |
CN102774307A (en) * | 2012-08-13 | 2012-11-14 | 柳州延龙汽车有限公司 | Dump truck easy for replacing carriage |
CN205417326U (en) * | 2016-01-13 | 2016-08-03 | 刘建 | Novel car as a house |
-
2017
- 2017-08-17 CN CN201710705875.5A patent/CN107628571B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2478988Y (en) * | 2001-01-15 | 2002-02-27 | 中国国际海运集装箱(集团)股份有限公司 | Lifting device for transposition of container |
CN201010379Y (en) * | 2007-03-27 | 2008-01-23 | 沈阳埃普轮胎机械有限公司 | Reshipping cab apron of container |
CN201923000U (en) * | 2011-03-07 | 2011-08-10 | 湖北海龙专用汽车有限公司 | Special automatic loading and unloading vehicle for containers |
CN202130370U (en) * | 2011-06-27 | 2012-02-01 | 张权 | Container carrier |
CN102774307A (en) * | 2012-08-13 | 2012-11-14 | 柳州延龙汽车有限公司 | Dump truck easy for replacing carriage |
CN205417326U (en) * | 2016-01-13 | 2016-08-03 | 刘建 | Novel car as a house |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112249969A (en) * | 2020-10-28 | 2021-01-22 | 苏州市晟腾机械有限公司 | Scissor lift convenient to carry |
Also Published As
Publication number | Publication date |
---|---|
CN107628571B (en) | 2019-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8240496B2 (en) | Collapsible container and hinge used for collapsible container | |
CN107628571A (en) | Caravan handling method | |
CN206466558U (en) | Automatic storing goods shelf | |
CN206783073U (en) | A kind of multilayer cargo lift | |
CN207192361U (en) | A kind of logistics automatic loading and unloading goods device | |
CN204675558U (en) | Be easy to the baggage elevator loading and unloading loading | |
CN203111862U (en) | Container | |
CN107444242A (en) | Caravan handler | |
CN207128720U (en) | Caravan handler | |
CN215624175U (en) | Folding type rack box | |
CN109229028A (en) | The luggage carrier of the convenient handling of new-energy automobile | |
CN205802042U (en) | Shelf are unloaded in Power Material activity | |
CN107672936A (en) | A kind of mask plate clip and its fixing device | |
CN205772980U (en) | The dual-purpose construction elevator of portable type | |
CN207226922U (en) | One kind unloading crane | |
CN201347063Y (en) | Flatly connected end ferrying plate between railway freight-car bodies | |
CN203111830U (en) | Container | |
CN204334384U (en) | Magnetic suspension transporter and comprise the magnetic suspension movement system of magnetic suspension transporter | |
CN209276106U (en) | A kind of dedicated fork of stevedore ton packet cargo | |
CN206704765U (en) | A kind of cargo pallet | |
CN105923572A (en) | Steel coil support with lifting function | |
CN206327391U (en) | wheelbarrow and transportation system | |
CN207449742U (en) | A kind of multi-purpose vehicle transport vehicle | |
CN107827016B (en) | A kind of packing method of trolley of casing that rises and falls | |
CN206426918U (en) | A kind of supporting and mounting bracket structure of tank of sewage suction truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230616 Address after: Room 2103, 21/F, Block C, Phase III (South District), New Industrial Park, Shushan District, Hefei, Anhui Province, 230000 Patentee after: China Industrial Economics and Credit Investment Development Co.,Ltd. Address before: 230031 Floor 17, Block C, Phase III (South Area), Independent Innovation Industrial Base, New Industrial Park, Shushan District, Hefei, Anhui Province Patentee before: GUOHAI SCIENCE AND TECHNOLOGY CO.,LTD. |
|
TR01 | Transfer of patent right |