CN107620446A - Elevator shaft structure - Google Patents
Elevator shaft structure Download PDFInfo
- Publication number
- CN107620446A CN107620446A CN201710806812.9A CN201710806812A CN107620446A CN 107620446 A CN107620446 A CN 107620446A CN 201710806812 A CN201710806812 A CN 201710806812A CN 107620446 A CN107620446 A CN 107620446A
- Authority
- CN
- China
- Prior art keywords
- catch pit
- shaft structure
- elevator shaft
- elevator
- foundation ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a kind of elevator shaft structure, the elevator shaft structure includes:First elevator hoistways and catch pit, first elevator hoistways run through the multilayer of building so that non-Fire lift passes through, and the lower end of first elevator hoistways includes the first buffering foundation ditch, the first buffering foundation ditch is used for the buffer for installing the non-Fire lift, and the catch pit is positioned at the lower section of the described first buffering foundation ditch.The elevator shaft structure of the present invention, the space below the buffering foundation ditch of non-Fire lift can be made full use of, it is not necessary to the exceptional space of basement is taken for catch pit, cost is reduced and builds difficulty.
Description
Technical field
The invention belongs to technical field of buildings, in particular to a kind of elevator shaft structure.
Background technology
Building is typically provided with non-Fire lift and Fire lift, and Fire lift needs passage basement, non-Fire lift
Stall can be led to, so, the basement space of non-Fire lift well wastes for no reason, influences the service efficiency of basement,
Room for improvement be present.
The content of the invention
It is contemplated that at least solves one of technical problem present in prior art.Therefore, the present invention proposes a kind of electricity
Stair shaft structure, the elevator shaft structure can make full use of the space below the buffering foundation ditch of non-Fire lift.
Elevator shaft structure according to embodiments of the present invention, including:First elevator hoistways and catch pit, first elevator
Road runs through the multilayer of building so that non-Fire lift passes through, and the lower end of first elevator hoistways includes the first buffering base
Hole, the first buffering foundation ditch are used for the buffer for installing the non-Fire lift, and the catch pit is positioned at the described first buffering
The lower section of foundation ditch.
Elevator shaft structure according to embodiments of the present invention, the sky below the buffering foundation ditch of non-Fire lift can be made full use of
Between, it is not necessary to the exceptional space of basement is taken for catch pit, cost is reduced and builds difficulty.
Elevator shaft structure according to an embodiment of the invention, opening is provided with least one wall of the catch pit,
The opening is provided with retractable door body.
Elevator shaft structure according to an embodiment of the invention, the opening are located at the upper of a side wall of the catch pit
Half portion.
Elevator shaft structure according to an embodiment of the invention, the side-walls of the catch pit are provided with cat ladder.
Elevator shaft structure according to an embodiment of the invention, the cat ladder include more piece, and cat ladder belonging to more piece is along upper
Lower direction is spaced apart, and often saving the cat ladder includes U-tube, and the open section of U-tube inserts the side wall of the catch pit.
Elevator shaft structure according to an embodiment of the invention, the cat ladder include more piece, and the spacing between adjacent segments is
H1, the distance of bottom one section to the bottom wall of the catch pit is H2, and the section of the top one to the distance of the opening is H3, and full
Foot:300mm≤H1≤400mm, 300mm≤H2≤400mm, 310mm≤H≤410mm.
Elevator shaft structure according to an embodiment of the invention, the lower edge of the opening to the bottom wall of the catch pit away from
From for H4, the height between the upper lower edge of the opening is H5, and the total height of the catch pit is H6, is met:1200mm≤H4
≤ 1600mm, 900mm≤H5≤1200mm, 2200mm≤H6≤2700mm.
Elevator shaft structure according to an embodiment of the invention, the perisporium of the catch pit have waterproof mortar course, and institute
The inner corner trim for stating catch pit falls eight words.
Elevator shaft structure according to an embodiment of the invention, in addition to:Second elevator hoistways, second elevator hoistways
Each layer through the building passes through for Fire lift, and the lower end of second elevator hoistways includes the second buffering base
Hole.
Elevator shaft structure according to an embodiment of the invention, the bottom wall of the second buffering foundation ditch and the catch pit bottom
Wall flushes.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description
Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become in the description from combination accompanying drawings below to embodiment
Substantially and it is readily appreciated that, wherein:
Fig. 1 is longitudinal sectional drawing of elevator shaft structure according to embodiments of the present invention;
Fig. 2 is the structural representation of cat ladder according to embodiments of the present invention;
Fig. 3 is the transverse cross of elevator shaft structure according to embodiments of the present invention.
Reference:
Non- Fire lift 11, the first elevator hoistways 12, the first buffering foundation ditch 13, catch pit 14, door body 15, cat ladder 16, prevent
Water sand pulp layer 17,
Fire lift 21, the second elevator hoistways 22, the second buffering foundation ditch 23.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not considered as limiting the invention.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
" thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " up time
The orientation or position relationship of the instruction such as pin ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " be based on orientation shown in the drawings or
Position relationship, it is for only for ease of and describes the present invention and simplify description, rather than indicates or imply that signified device or element must
There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, limit
Surely there is " first ", one or more this feature can be expressed or be implicitly included to the feature of " second ".The present invention's
In description, unless otherwise indicated, " multiple " are meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
Elevator shaft structure according to embodiments of the present invention is described below with reference to Fig. 1-Fig. 3.
As shown in Figure 1-Figure 3, elevator shaft structure according to an embodiment of the invention includes:First elevator hoistways 12,
Two elevator hoistways 22 and catch pit 14.
Wherein, the first elevator hoistways 12 through building multilayer for non-Fire lift 11 it is current, the first elevator hoistways
12 lower end includes the first buffering foundation ditch 13, and the first buffering foundation ditch 13 is used for the buffer for installing non-Fire lift 11, such as Fig. 1
In shown embodiment, the first elevator hoistways 12 upwardly extend from the Stall (1F) of building, and the non-Fire lift 11 is from Stall
Start to stop each layer upwards, the first buffering foundation ditch 13 can be located at below the bottom plate of Stall.
Catch pit 14 positioned at the lower section of the first buffering foundation ditch 13, the top of catch pit 14 can with one layer (- 1F) located underground,
The top of catch pit 14 can so effectively utilize the limited space of B1 with one layer located underground of lower section, section
Save space, make full use of the lower section redundant space of the first buffering foundation ditch 13, low cost.
Second elevator hoistways 22 can be arranged side by side with the first elevator hoistways 12, and the second elevator hoistways 22 are through building
Each layer is current for Fire lift 21, and the lower end of the second elevator hoistways 22 includes the second buffering foundation ditch 23, than as shown in Figure 1
In embodiment, the second elevator hoistways 22 upwardly extend from the B1 (- 1F) of building, and the non-Fire lift 11 is next from ground
Layer starts to stop each layer upwards, and the second buffering foundation ditch 23 can be located in the ground below one layer of bottom plate, it is preferable that the second buffering base
The bottom wall in hole 23 flushes with the bottom wall of catch pit 14, that is to say, that depth below the room bottom plate located underground of catch pit 14 and the
The depth of two buffering foundation ditches 23 is identical, so, is easy to build.
Certainly, this form is not limited to, basement can be only so that building basement is one layer as an example above
2 layers or more layers.
Elevator shaft structure according to embodiments of the present invention, it can make full use of below the buffering foundation ditch of non-Fire lift 11
Space, it is not necessary to the exceptional space of basement is taken for catch pit 14, cost is reduced and builds difficulty.
In a preferred embodiment of the invention, as shown in Fig. 2 the perisporium of catch pit 14 has waterproof mortar course
17, the thickness of waterproof mortar course 17 can be 20mm, and the inner corner trim of catch pit 14 falls eight words, so can effectively prevent from catchmenting
Water accumulation leaking in hole 14.
As shown in figure 1, being provided with opening at least one wall of catch pit 14, opening is provided with retractable door body 15,
In order to observe and install pumping equipment.Specifically, opening can be located at the first half of a side wall of catch pit 14, and opening can
To be arranged on above the bottom plate of basement.
The lower edge of opening is H4 to the distance of the bottom wall of catch pit 14, and the height between the upper lower edge of opening is H5, is catchmented
The total height in hole 14 is H6, is met:1200mm≤H4≤1600mm, 900mm≤H5≤1200mm, 2200mm≤H6≤
2700mm, such as H4=1450mm, H5=1050mm, H6=2500mm, the floor height of basement is 2500mm, and first buffers foundation ditch
13 height is 1450mm, and the height of the second buffering foundation ditch 23 is 1450mm, and the height of elevator is 2200mm, on the ground the layer of each layer
High-order 2600mm.
The side-walls of catch pit 14 can be provided with cat ladder 16, be easy to enter catch pit 14 during maintenance, cat ladder 16 can include
More piece, such as 3 sections, cat ladder 16 is spaced apart along the vertical direction belonging to more piece, and the spacing between adjacent segments is H1, and bottom one saves
Distance to the bottom wall of catch pit 14 is H2, and the section of the top one to the distance of opening is H3, and is met:300mm≤H1≤
400mm, 300mm≤H2≤400mm, 310mm≤H≤410mm, such as H1=350mm, H2=350mm, H3=400mm,
Often section cat ladder 16 includes U-tube, and the open section of U-tube inserts the side wall of catch pit 14, such as two of U-tube
The length of supporting leg can be 350mm, and wherein 150mm is embedded within the walls, and U-tube width be 600mm, two supporting legs of U-tube oneself
Bending segment, the length position 80mm of bending segment can be equipped with by end, U-tube can form for a diameter of 20mm pipe bending.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ",
The description of " example ", " specific example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example describe
Structure, material or feature are contained at least one embodiment or example of the present invention.In this manual, to above-mentioned term
Schematic representation is not necessarily referring to identical embodiment or example.Moreover, specific features, structure, material or the spy of description
Point can combine in an appropriate manner in any one or more embodiments or example.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not
In the case of departing from the principle and objective of the present invention a variety of change, modification, replacement and modification can be carried out to these embodiments, this
The scope of invention is limited by claim and its equivalent.
Claims (10)
- A kind of 1. elevator shaft structure, it is characterised in that including:First elevator hoistways and catch pit, first elevator hoistways pass through The multilayer of building is worn so that non-Fire lift passes through, and the lower end of first elevator hoistways includes the first buffering foundation ditch, institute The buffer that the first buffering foundation ditch is used to install the non-Fire lift is stated, the catch pit is positioned at the described first buffering foundation ditch Lower section.
- 2. elevator shaft structure according to claim 1, it is characterised in that be provided with least one wall of the catch pit Opening, the opening are provided with retractable door body.
- 3. elevator shaft structure according to claim 2, it is characterised in that described be open is located at a side of the catch pit The first half of wall.
- 4. elevator shaft structure according to claim 3, it is characterised in that the side-walls of the catch pit are provided with and climbed Ladder.
- 5. elevator shaft structure according to claim 4, it is characterised in that the cat ladder includes more piece, is climbed belonging to more piece Ladder is spaced apart along the vertical direction, and often saving the cat ladder includes U-tube, and the open section of U-tube inserts the described of the catch pit Side wall.
- 6. elevator shaft structure according to claim 4, it is characterised in that the cat ladder includes more piece, between adjacent segments Spacing is H1, and the distance of bottom one section to the bottom wall of the catch pit is H2, and the distance that the top one is saved to the opening is H3, and meet:300mm≤H1≤400mm, 300mm≤H2≤400mm, 310mm≤H≤410mm.
- 7. elevator shaft structure according to claim 3, it is characterised in that the lower edge of the opening to the bottom of the catch pit The distance of wall is H4, and the height between the upper lower edge of the opening is H5, and the total height of the catch pit is H6, is met: 1200mm≤H4≤1600mm, 900mm≤H5≤1200mm, 2200mm≤H6≤2700mm.
- 8. according to the elevator shaft structure any one of claim 1-7, it is characterised in that the perisporium of the catch pit has Waterproof mortar course, and the inner corner trim of the catch pit falls eight words.
- 9. according to the elevator shaft structure any one of claim 1-7, it is characterised in that also include:Second elevator hoistways, Second elevator hoistways run through each layer of the building so that Fire lift passes through, and the lower end of second elevator hoistways Including the second buffering foundation ditch.
- 10. elevator shaft structure according to claim 9, it is characterised in that it is described second buffering foundation ditch bottom wall with it is described Catch pit bottom wall flushes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710806812.9A CN107620446A (en) | 2017-09-08 | 2017-09-08 | Elevator shaft structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710806812.9A CN107620446A (en) | 2017-09-08 | 2017-09-08 | Elevator shaft structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107620446A true CN107620446A (en) | 2018-01-23 |
Family
ID=61088484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710806812.9A Pending CN107620446A (en) | 2017-09-08 | 2017-09-08 | Elevator shaft structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107620446A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5832680A (en) * | 1993-06-10 | 1998-11-10 | Muroi; Ko | Underground construction |
CN201942378U (en) * | 2011-01-07 | 2011-08-24 | 深圳市方佳建筑设计有限公司 | Fire lift sump in lift set |
JP5363268B2 (en) * | 2009-10-14 | 2013-12-11 | 日本オーチス・エレベータ株式会社 | Connected water pipe facilities |
CN204588367U (en) * | 2015-04-08 | 2015-08-26 | 凌志电梯有限公司 | A kind of Novel car cage type elevator of high stability |
CN205652946U (en) * | 2016-04-08 | 2016-10-19 | 江苏天奥电梯有限公司 | Fire control is with elevator system that flees |
CN106672729A (en) * | 2017-03-15 | 2017-05-17 | 申芝电梯有限公司 | Environment-friendly waterproof elevator |
-
2017
- 2017-09-08 CN CN201710806812.9A patent/CN107620446A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5832680A (en) * | 1993-06-10 | 1998-11-10 | Muroi; Ko | Underground construction |
JP5363268B2 (en) * | 2009-10-14 | 2013-12-11 | 日本オーチス・エレベータ株式会社 | Connected water pipe facilities |
CN201942378U (en) * | 2011-01-07 | 2011-08-24 | 深圳市方佳建筑设计有限公司 | Fire lift sump in lift set |
CN204588367U (en) * | 2015-04-08 | 2015-08-26 | 凌志电梯有限公司 | A kind of Novel car cage type elevator of high stability |
CN205652946U (en) * | 2016-04-08 | 2016-10-19 | 江苏天奥电梯有限公司 | Fire control is with elevator system that flees |
CN106672729A (en) * | 2017-03-15 | 2017-05-17 | 申芝电梯有限公司 | Environment-friendly waterproof elevator |
Non-Patent Citations (1)
Title |
---|
王华章: "建筑地下室集水坑排水设置探讨", 《国外建材科技》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102583130B (en) | A kind of elevator shaft wall using combined shaft frame to assemble | |
CN107178393B (en) | Tunnel secondary lining water pressure control structure | |
CN201217898Y (en) | Concrete prefabricated stairs | |
ES2971715T3 (en) | Procedure to modernize a building with an elevator system and set of components to carry out the procedure | |
AU2017281305B2 (en) | Method for modernizing a building and structure with a lift system constructed in a building | |
KR20160083659A (en) | Vertical tunnel construction and constructing method for the same | |
CN109736848A (en) | Prevent two lining trolleys that vault comes to nothing and prevention vault comes to nothing construction method | |
CN110863471B (en) | Layered water taking system of rock-fill concrete gravity dam | |
CN101806162B (en) | Inner and outer barrel type free-standing steel chimney | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN107620446A (en) | Elevator shaft structure | |
CN110397081B (en) | Method for fixing middle-buried rubber waterstop and steel reinforcement framework structure | |
CN103924653A (en) | Framework type drainage well and construction method thereof | |
CN203782863U (en) | Frame type draining well | |
CN216141084U (en) | Built-in well construction elevator | |
US20120097263A1 (en) | Methods and apparatus for isolating a section of fluid line | |
CN207863464U (en) | A kind of new take-off seam aluminum alloy pattern plate | |
CN206018031U (en) | Prefabricated fixed sleeve of floor pipeline | |
CN206539026U (en) | A kind of one side formwork formwork system | |
CN113250748A (en) | Interval tunnel drainage system structure of subway | |
CN110486074B (en) | Pipe arrangement design method and construction method for ventilation in long and large tunnel construction | |
CN209637775U (en) | Prevent the two lining trolleys that vault comes to nothing | |
CN107882067A (en) | A kind of design and construction structure of contignation underground garage pipe gallery | |
CN209468821U (en) | A kind of basement fire cistern structure and building | |
CN210507348U (en) | Vertical shaft structure with step |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180123 |