CN107611944A - A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method - Google Patents

A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method Download PDF

Info

Publication number
CN107611944A
CN107611944A CN201710856671.1A CN201710856671A CN107611944A CN 107611944 A CN107611944 A CN 107611944A CN 201710856671 A CN201710856671 A CN 201710856671A CN 107611944 A CN107611944 A CN 107611944A
Authority
CN
China
Prior art keywords
equipment
secondary device
isolated
protection
loops
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710856671.1A
Other languages
Chinese (zh)
Other versions
CN107611944B (en
Inventor
石光
韩伟
马伟东
孔圣立
张道杰
王广民
肖亮
慕宗君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710856671.1A priority Critical patent/CN107611944B/en
Publication of CN107611944A publication Critical patent/CN107611944A/en
Application granted granted Critical
Publication of CN107611944B publication Critical patent/CN107611944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method, based on SCD models, builds empty path incidence model between first and second equipment correlation model and secondary device.The primary equipment having a power failure for needs, associated secondary device is obtained according to correlation model automatically.The secondary device overhauled for needs, the other secondary devices being associated are searched by Quadratic Imaginary loop, had a power failure or the peace of power-off condition does not arrange principle according to secondary device, whether the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation, further efficient to examine peace to arrange operation order safe and reliable.

Description

A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method
Technical field
The present invention relates to technical field of electric power automation, more particularly to a kind of intelligent substation secondary protection equipment safety every From measure automatic analysis method.
Background technology
At present, the loop form of the composition of relay protection device of intelligent substation has larger difference, secondary circuit with conventional stations The digital message composition being changed under IEC61850 stipulations, analog quantity sampling circuit use IEC61850 9-2 SV messages, protection The information such as tripping operation, input and output use IEC61850 8-1 GOOSE message.Intelligent substation changes, extends and during turnaround of unit, The operation of secondary device safety measure mainly by breaker tripping and closing output clamping, maintenance pressing plate, GOOSE send to receive soft pressing plate etc. a variety of Peace arranges technical combinations to form, there is pressing plate quantity it is more, not directly perceived, without " obvious electrical break point " the features such as, in operation Lou throwing is easily caused to move back, miscarry and move back.Once there is leakage throwing, miscarrying will result in serious electric network fault.
The normal safety inspection of secondary device, operation order is arranged using the peace finished, carries out safety operation.But intelligence Energy transformer station is in enlarging, reconstruction and unconventional maintenance, it usually needs interim manual compiling safety operation ticket, so safety The quality of writing of operation order is also a problem place, and the secondary device for how isolating to high efficient and reliable correlation is a urgent need solution Certainly the problem of, it is difficult to solve the problems, such as that preoperative safety analysis how is carried out to safety operation ticket to be also.
The content of the invention
It is an object of the invention to provide a kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method, Must operating for secondary device security isolation can be analyzed, so as to be able to verify that peace arranges operation order whether safe and reliable.
The technical solution adopted by the present invention is:
A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method, comprises the following steps:
A:Based on SCD models, the empty path incidence model between the association of first and second equipment of structure and secondary device:Utilize SCD texts The information modelings such as the primary equipment configuration of part, secondary device configuration, communication, pressing plate, the association of first and second equipment of structure and secondary set Empty path incidence model between standby;
B:Analysis obtains the equipment collection for needing to isolate:The primary equipment of a secondary device or deactivation to be isolated is obtained, such as Fruit is the primary equipment for needing to disable, then the secondary device of correlation is obtained automatically according to correlation model, the secondary device of correlation It is associated with secondary device collection to be isolated;If a secondary device to be isolated, then the secondary device body with isolation The equipment collection isolated as needs;
C:The secondary device input maintenance pressing plate concentrated to the equipment that needs are isolated, and secondary device collection to be isolated is judged successively Whether middle secondary device is by protection equipment, then enters step D if not by protection equipment, if by protection equipment, then First protected secondary device is carried out to enter back into step D after protection is exited;
D:The secondary device method of operation concentrated to the equipment that needs are isolated checks:Do not have a power failure if primary equipment, then Ensure that primary equipment has double set protections and at least a set of protection normal operation, then carry out in next step, otherwise directly tying Beam;
E:Primary equipment in above-mentioned steps D and/or secondary device are being had a power failure or not power-off condition according to secondary device successively Safety measure principle, the safety measure operation that the secondary device that analyzing can overhaul needs is reliably isolated, so as to according to this Security isolation is completed in safety measure operation.
Security isolation is carried out to each secondary device and/or primary equipment that secondary device to be isolated is concentrated in the step E Specifically comprise the following steps:
E1:All secondary circuits in each secondary device concentrated to secondary device to be isolated travel through successively, obtain void The equipment that the loop other end is connected, so as to judge that the empty loop of each secondary circuit is to belong to GOOSE loops or SV loops, Equipment and loop wherein to loop both ends carry out isolated operation, if primary equipment does not have a power failure, must assure that with double sets Protect and have a set of protection normal operation, otherwise isolated process exits;
E2:If the empty loop of secondary device to be isolated belongs to GOOSE loops, the GOOSE of the to be isolated equipment related to this Loop and terminal device perform peace and arrange isolation:Specifically include and exit equipment GOOSE output clampings, exit the GOOSE loops other end The GOOSE of operational outfit receives pressing plate, and wherein equipment concentrates the GOOSE between the secondary device to be isolated related to primary equipment Pressing plate does not move back;
E3:If the empty loop of equipment to be isolated is to be not belonging to GS loops, equipment to be isolated is to belong to SV loops, related to this Equipment to be isolated SV loops and the other end perform peace and arrange isolation:Specifically include:The protection equipment of the SV loops other end need to move back Go out SV and receive pressing plate, it is necessary to disable the protection device for receiving SV, device SV receives pressing plate and can not moved back.
The present invention is based on SCD models, empty path incidence model between the association of first and second equipment of structure and secondary device.It is right In the primary equipment that needs have a power failure, associated secondary device is obtained automatically according to correlation model.Two overhauled for needs Secondary device, the other secondary devices being associated are searched by Quadratic Imaginary loop, having a power failure or do not having a power failure according to secondary device The peace of situation arranges principle, and the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation, further efficient to examine peace Arrange operation order whether safe and reliable.
Brief description of the drawings
Fig. 1 is the flow chart figure of the present invention;
Fig. 2 is the flow chart of security isolation of the present invention.
Embodiment
As illustrated in fig. 1 and 2, the present invention automatically analyzes including a kind of intelligent substation secondary protection equipment security isolation measure Method, comprise the following steps:
A:Based on SCD models, the empty path incidence model between first and second equipment correlation model and secondary device is built:Utilize The information modelings such as the primary equipment configuration of SCD file, secondary device configuration, communication, pressing plate, structure first and second equipment association mould Empty path incidence model between type and secondary device;
B:Analysis obtains the equipment collection for needing to isolate:The primary equipment of a secondary device or deactivation to be isolated is obtained, such as Fruit is the primary equipment for needing to disable, then obtains the secondary device of correlation automatically according to correlation model, once set what is disabled It is standby that the secondary device collection with isolation is associated with to obtained related secondary devices all therewith;If one to be isolated two Secondary device, then the equipment collection secondary device body with isolation isolated as needs;
C:The secondary device input maintenance pressing plate concentrated to the equipment that needs are isolated, and secondary device collection to be isolated is judged successively Whether middle secondary device is protection equipment, then enters step D if not protection equipment, if protection equipment, then protection is moved back Step D is entered back into after going out;
D:The secondary device and/or the method for operation of primary equipment concentrated to the equipment that needs are isolated check:If once Equipment does not have a power failure, then ensures that primary equipment has double set protections and at least a set of protection normal operation, then carry out next Walk, otherwise direct termination of security analysis process;
E:Secondary device in above-mentioned steps D is being had a power failure or the safety measure of not power-off condition is former according to secondary device successively Then, the safety measure operation that the secondary device that analyzing can overhaul needs is reliably isolated, so as to be operated according to this safety measure Complete security isolation.Isolated operation is carried out to the equipment at loop both ends and loop in the present invention(Isolated operation refers to exiting The transmission in GOOSE and SV loops, receive pressing plate, it is also possible to which out of service, output clamping including protection equipment etc. operates), such as Fruit primary equipment does not have a power failure, then must assure that and protected with double sets and have a set of protection normal operation, otherwise isolated process is moved back Go out.
The each secondary device progress security isolation concentrated in the step E to secondary device to be isolated specifically includes as follows Step:
E1:All secondary circuits in each secondary device concentrated to secondary device to be isolated travel through successively, obtain void The equipment that the loop other end is connected, so as to judge that the empty loop of each secondary circuit is to belong to GOOSE loops or SV loops; Equipment and loop to loop both ends carry out isolated operation(Isolated operation be generally referred to as exit GOOSE and SV loops transmission, Receive pressing plate, it is also possible to which out of service, output clamping including protection equipment etc. operates), must if primary equipment does not have a power failure It must ensure that there are double sets to protect and have a set of protection normal operation, otherwise isolated process exits;
E2:If the empty loop of secondary device to be isolated belongs to GOOSE loops, the GOOSE of the to be isolated equipment related to this Loop and terminal device perform peace and arrange isolation:Specifically include and exit equipment GOOSE output clampings, exit the GOOSE loops other end The GOOSE of operational outfit receives pressing plate, and wherein equipment concentrates the GOOSE between the secondary device to be isolated related to primary equipment Pressing plate does not move back;
E3:If the empty loop of equipment to be isolated is to be not belonging to GS loops, equipment to be isolated is to belong to SV loops, related to this Equipment to be isolated SV loops and the other end perform peace and arrange isolation:Specifically include:The protection equipment of the SV loops other end need to move back Go out SV and receive pressing plate, it is necessary to disable the protection device for receiving SV, device SV receives pressing plate and can not moved back.
This patent is based on new SCD models, empty path incidence mould between the association of first and second equipment of structure and secondary device Type.The primary equipment having a power failure for needs, associated secondary device is obtained according to correlation model automatically.For needing to overhaul Secondary device, other secondary devices for being associated are searched by Quadratic Imaginary loop, had a power failure or not according to secondary device The peace of power-off condition arranges principle, and the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation;
Peace arranges the main principle of isolation as follows:During the field operation such as the verification of 1 device or defect elimination, sampling, tripping operation should be isolated, closed Lock, open it is related to operational outfit in failure loop contact, and ensure the normal operation of operational outfit;2nd, the verification of single complete equipment or During person's defect elimination, it should stop to use as a servant primary equipment;, can not when the verification of the secondary device of duplicate system retrofit, only single complete equipment or defect elimination Stop using as a servant primary equipment, but prevent primary equipment unprotect from running;3rd, there is the optical cable of soft pressing plate for sending side or receiving side, to the greatest extent Amount does not turn off optical fiber, ensures that soft pressing plate has disconnected before disconnecting;4th, during the security isolation of loop, dual safety quarantine measures are taken.It is first The transmission pressing plate of apparatus for examination and repair before this, followed by the reception pressing plate of related running gear, it is also contemplated that the maintenance pressure of apparatus for examination and repair Plate.According to isolation principle, using following steps:
A, the secondary circuit of equipment is traveled through, the equipment for obtaining empty loop information and the connection of the loop other end;
B, the method for operation of xegregating unit is checked, if primary equipment does not have a power failure, must assure that and protected with double sets And there is a set of protection normal operation, otherwise isolated process exits.
C, peace is performed to GOOSE loops and terminal device and arranges isolation:Exit equipment GOOSE output clampings;GOOSE is exited to return The GOOSE of road other end operational outfit receives pressing plate;When disabling primary equipment, the GOOSE between the secondary device that equipment is concentrated Pressing plate can not move back;
D, the SV loops to equipment and another both ends perform peace and arrange isolation:The protection equipment of the SV loops other end need to exit SV receptions Pressing plate;, it is necessary to disable the protection device for receiving SV when not disabling primary equipment, device SV receives pressing plate and can not moved back.
The present invention is based on SCD models, empty path incidence model between the association of first and second equipment of structure and secondary device.It is right In the primary equipment that needs have a power failure, associated secondary device is obtained automatically according to correlation model.Two overhauled for needs Secondary device, the other secondary devices being associated are searched by Quadratic Imaginary loop, having a power failure or do not having a power failure according to secondary device The peace of situation arranges principle, and the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation, further efficient to examine peace Arrange operation order whether safe and reliable.

Claims (2)

  1. A kind of 1. intelligent substation secondary protection equipment security isolation measure automatic analysis method, it is characterised in that:Including following Step:
    A:Based on SCD models, the empty path incidence model between the association of first and second equipment of structure and secondary device:Utilize SCD texts The information modelings such as the primary equipment configuration of part, secondary device configuration, communication, pressing plate, the association of first and second equipment of structure and secondary set Empty path incidence model between standby;
    B:Analysis obtains the equipment collection for needing to isolate:The primary equipment of a secondary device or deactivation to be isolated is obtained, such as Fruit is the primary equipment for needing to disable, then the secondary device of correlation is obtained automatically according to correlation model, the secondary device of correlation It is associated with secondary device collection to be isolated;If a secondary device to be isolated, then the secondary device body with isolation The equipment collection isolated as needs;
    C:The secondary device input maintenance pressing plate concentrated to the equipment that needs are isolated, and secondary device collection to be isolated is judged successively Whether middle secondary device is by protection equipment, then enters step D if not by protection equipment, if by protection equipment, then First protected secondary device is carried out to enter back into step D after protection is exited;
    D:The secondary device method of operation concentrated to the equipment that needs are isolated checks:Do not have a power failure if primary equipment, then Ensure that primary equipment has double set protections and at least a set of protection normal operation, then carry out in next step, otherwise directly tying Beam;
    E:Primary equipment in above-mentioned steps D and/or secondary device are being had a power failure or not power-off condition according to secondary device successively Safety measure principle, the safety measure operation that the secondary device that analyzing can overhaul needs is reliably isolated, so as to according to this Security isolation is completed in safety measure operation.
  2. 2. a kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method according to claim 1, Characterized in that, safety is carried out to each secondary device and/or primary equipment that secondary device to be isolated is concentrated in the step E Isolation specifically comprises the following steps:
    E1:All secondary circuits in each secondary device concentrated to secondary device to be isolated travel through successively, obtain void The equipment that the loop other end is connected, so as to judge that the empty loop of each secondary circuit is to belong to GOOSE loops or SV loops, Equipment and loop wherein to loop both ends carry out isolated operation, if primary equipment does not have a power failure, must assure that with double sets Protect and have a set of protection normal operation, otherwise isolated process exits;
    E2:If the empty loop of secondary device to be isolated belongs to GOOSE loops, the GOOSE of the to be isolated equipment related to this Loop and terminal device perform peace and arrange isolation:Specifically include and exit equipment GOOSE output clampings, exit the GOOSE loops other end The GOOSE of operational outfit receives pressing plate, and wherein equipment concentrates the GOOSE between the secondary device to be isolated related to primary equipment Pressing plate does not move back;
    E3:If the empty loop of equipment to be isolated is to be not belonging to GS loops, equipment to be isolated is to belong to SV loops, related to this Equipment to be isolated SV loops and the other end perform peace and arrange isolation:Specifically include:The protection equipment of the SV loops other end need to move back Go out SV and receive pressing plate, it is necessary to disable the protection device for receiving SV, device SV receives pressing plate and can not moved back.
CN201710856671.1A 2017-09-21 2017-09-21 A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method Active CN107611944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710856671.1A CN107611944B (en) 2017-09-21 2017-09-21 A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710856671.1A CN107611944B (en) 2017-09-21 2017-09-21 A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method

Publications (2)

Publication Number Publication Date
CN107611944A true CN107611944A (en) 2018-01-19
CN107611944B CN107611944B (en) 2019-06-28

Family

ID=61061631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710856671.1A Active CN107611944B (en) 2017-09-21 2017-09-21 A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method

Country Status (1)

Country Link
CN (1) CN107611944B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110070189A (en) * 2018-01-23 2019-07-30 上海毅昊信息科技股份有限公司 A kind of intelligent substation protection system peace arranges check method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346497A (en) * 2013-07-09 2013-10-09 广东电网公司珠海供电局 Intelligent substation electrical virtual circuit isolation method and system
US8774975B2 (en) * 2011-02-08 2014-07-08 Avista Corporation Outage management algorithm
CN104617672A (en) * 2015-02-12 2015-05-13 上海毅昊自动化有限公司 Online monitoring system for modeling based on physical communication medium of process level
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN106384304A (en) * 2016-10-20 2017-02-08 许继集团有限公司 Intelligent substation secondary equipment safety measure bill automatic construction method and device
CN107147214A (en) * 2017-03-02 2017-09-08 许继集团有限公司 A kind of secondary peace suitable for intelligent substation arranges monitoring system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8774975B2 (en) * 2011-02-08 2014-07-08 Avista Corporation Outage management algorithm
CN103346497A (en) * 2013-07-09 2013-10-09 广东电网公司珠海供电局 Intelligent substation electrical virtual circuit isolation method and system
CN104617672A (en) * 2015-02-12 2015-05-13 上海毅昊自动化有限公司 Online monitoring system for modeling based on physical communication medium of process level
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN106159759B (en) * 2016-07-13 2018-03-20 国网四川省电力公司电力科学研究院 A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure
CN106384304A (en) * 2016-10-20 2017-02-08 许继集团有限公司 Intelligent substation secondary equipment safety measure bill automatic construction method and device
CN107147214A (en) * 2017-03-02 2017-09-08 许继集团有限公司 A kind of secondary peace suitable for intelligent substation arranges monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110070189A (en) * 2018-01-23 2019-07-30 上海毅昊信息科技股份有限公司 A kind of intelligent substation protection system peace arranges check method
CN110070189B (en) * 2018-01-23 2023-05-23 福建永福数字能源技术有限公司 Intelligent substation protection system safety measure checking method

Also Published As

Publication number Publication date
CN107611944B (en) 2019-06-28

Similar Documents

Publication Publication Date Title
CN106159759B (en) A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure
CN106384304B (en) Automatic construction method and device for safety measure ticket of secondary equipment of intelligent substation
CN104539043B (en) A kind of automatic switching device of standby power supply system haul oneself willingly into method
CN101938117A (en) Current differential protection method for smart distribution network
CN202004540U (en) Digitized intelligent circuit breaker analog device
CN104749487B (en) A kind of method in check protection device and its loop under circuit no cut-off condition
CN101917064A (en) Back-up protection processing method of digital substation transformer based on GOOSE mode
CN102938539A (en) Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop
CN107045706A (en) Intelligent substation secondary safety measure operation order automatic generation method
CN105470935B (en) A kind of intelligent substation relay protection device defect security isolation aid decision-making method
CN107067081A (en) Substation secondary maintenance safety measure generation method based on many object models
CN103346497B (en) Intelligent substation electrical virtual circuit isolation method and system
CN108847655A (en) Intelligent substation protective device sequence method and system based on operation task
CN105305602B (en) The standby power system of railway digital traction substation and its haul oneself willingly into method
CN102005819A (en) Fault isolation method of electric distribution network
CN107611944A (en) A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method
CN107275963B (en) A kind of intelligent substation secondary maintenance safety measure automatic generation method
CN108963841A (en) It is associated with the secondary device sequence method and system of primary equipment operating status
CN107871176A (en) The safety-optimized method and system of secondary device applied to IEC61850 information modelings
CN201464882U (en) Intelligent control unit with anti-error-locking function
CN105162254B (en) Transformer station's digital improvement method
CN106487004A (en) Intelligent substation one electrical secondary system runs hidden danger Intelligent drainage checking method
CN207518284U (en) A kind of accident disconnection device of small power incorporating into power network
CN108173245B (en) The implementation method of combined floodgate is thought highly of in open circuit in a kind of intelligent substation
CN102830295B (en) Detecting system and detecting method of digital transformer substation protecting loop

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant