CN107611944A - A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method - Google Patents
A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method Download PDFInfo
- Publication number
- CN107611944A CN107611944A CN201710856671.1A CN201710856671A CN107611944A CN 107611944 A CN107611944 A CN 107611944A CN 201710856671 A CN201710856671 A CN 201710856671A CN 107611944 A CN107611944 A CN 107611944A
- Authority
- CN
- China
- Prior art keywords
- equipment
- secondary device
- isolated
- protection
- loops
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method, based on SCD models, builds empty path incidence model between first and second equipment correlation model and secondary device.The primary equipment having a power failure for needs, associated secondary device is obtained according to correlation model automatically.The secondary device overhauled for needs, the other secondary devices being associated are searched by Quadratic Imaginary loop, had a power failure or the peace of power-off condition does not arrange principle according to secondary device, whether the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation, further efficient to examine peace to arrange operation order safe and reliable.
Description
Technical field
The present invention relates to technical field of electric power automation, more particularly to a kind of intelligent substation secondary protection equipment safety every
From measure automatic analysis method.
Background technology
At present, the loop form of the composition of relay protection device of intelligent substation has larger difference, secondary circuit with conventional stations
The digital message composition being changed under IEC61850 stipulations, analog quantity sampling circuit use IEC61850 9-2 SV messages, protection
The information such as tripping operation, input and output use IEC61850 8-1 GOOSE message.Intelligent substation changes, extends and during turnaround of unit,
The operation of secondary device safety measure mainly by breaker tripping and closing output clamping, maintenance pressing plate, GOOSE send to receive soft pressing plate etc. a variety of
Peace arranges technical combinations to form, there is pressing plate quantity it is more, not directly perceived, without " obvious electrical break point " the features such as, in operation
Lou throwing is easily caused to move back, miscarry and move back.Once there is leakage throwing, miscarrying will result in serious electric network fault.
The normal safety inspection of secondary device, operation order is arranged using the peace finished, carries out safety operation.But intelligence
Energy transformer station is in enlarging, reconstruction and unconventional maintenance, it usually needs interim manual compiling safety operation ticket, so safety
The quality of writing of operation order is also a problem place, and the secondary device for how isolating to high efficient and reliable correlation is a urgent need solution
Certainly the problem of, it is difficult to solve the problems, such as that preoperative safety analysis how is carried out to safety operation ticket to be also.
The content of the invention
It is an object of the invention to provide a kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method,
Must operating for secondary device security isolation can be analyzed, so as to be able to verify that peace arranges operation order whether safe and reliable.
The technical solution adopted by the present invention is:
A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method, comprises the following steps:
A:Based on SCD models, the empty path incidence model between the association of first and second equipment of structure and secondary device:Utilize SCD texts
The information modelings such as the primary equipment configuration of part, secondary device configuration, communication, pressing plate, the association of first and second equipment of structure and secondary set
Empty path incidence model between standby;
B:Analysis obtains the equipment collection for needing to isolate:The primary equipment of a secondary device or deactivation to be isolated is obtained, such as
Fruit is the primary equipment for needing to disable, then the secondary device of correlation is obtained automatically according to correlation model, the secondary device of correlation
It is associated with secondary device collection to be isolated;If a secondary device to be isolated, then the secondary device body with isolation
The equipment collection isolated as needs;
C:The secondary device input maintenance pressing plate concentrated to the equipment that needs are isolated, and secondary device collection to be isolated is judged successively
Whether middle secondary device is by protection equipment, then enters step D if not by protection equipment, if by protection equipment, then
First protected secondary device is carried out to enter back into step D after protection is exited;
D:The secondary device method of operation concentrated to the equipment that needs are isolated checks:Do not have a power failure if primary equipment, then
Ensure that primary equipment has double set protections and at least a set of protection normal operation, then carry out in next step, otherwise directly tying
Beam;
E:Primary equipment in above-mentioned steps D and/or secondary device are being had a power failure or not power-off condition according to secondary device successively
Safety measure principle, the safety measure operation that the secondary device that analyzing can overhaul needs is reliably isolated, so as to according to this
Security isolation is completed in safety measure operation.
Security isolation is carried out to each secondary device and/or primary equipment that secondary device to be isolated is concentrated in the step E
Specifically comprise the following steps:
E1:All secondary circuits in each secondary device concentrated to secondary device to be isolated travel through successively, obtain void
The equipment that the loop other end is connected, so as to judge that the empty loop of each secondary circuit is to belong to GOOSE loops or SV loops,
Equipment and loop wherein to loop both ends carry out isolated operation, if primary equipment does not have a power failure, must assure that with double sets
Protect and have a set of protection normal operation, otherwise isolated process exits;
E2:If the empty loop of secondary device to be isolated belongs to GOOSE loops, the GOOSE of the to be isolated equipment related to this
Loop and terminal device perform peace and arrange isolation:Specifically include and exit equipment GOOSE output clampings, exit the GOOSE loops other end
The GOOSE of operational outfit receives pressing plate, and wherein equipment concentrates the GOOSE between the secondary device to be isolated related to primary equipment
Pressing plate does not move back;
E3:If the empty loop of equipment to be isolated is to be not belonging to GS loops, equipment to be isolated is to belong to SV loops, related to this
Equipment to be isolated SV loops and the other end perform peace and arrange isolation:Specifically include:The protection equipment of the SV loops other end need to move back
Go out SV and receive pressing plate, it is necessary to disable the protection device for receiving SV, device SV receives pressing plate and can not moved back.
The present invention is based on SCD models, empty path incidence model between the association of first and second equipment of structure and secondary device.It is right
In the primary equipment that needs have a power failure, associated secondary device is obtained automatically according to correlation model.Two overhauled for needs
Secondary device, the other secondary devices being associated are searched by Quadratic Imaginary loop, having a power failure or do not having a power failure according to secondary device
The peace of situation arranges principle, and the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation, further efficient to examine peace
Arrange operation order whether safe and reliable.
Brief description of the drawings
Fig. 1 is the flow chart figure of the present invention;
Fig. 2 is the flow chart of security isolation of the present invention.
Embodiment
As illustrated in fig. 1 and 2, the present invention automatically analyzes including a kind of intelligent substation secondary protection equipment security isolation measure
Method, comprise the following steps:
A:Based on SCD models, the empty path incidence model between first and second equipment correlation model and secondary device is built:Utilize
The information modelings such as the primary equipment configuration of SCD file, secondary device configuration, communication, pressing plate, structure first and second equipment association mould
Empty path incidence model between type and secondary device;
B:Analysis obtains the equipment collection for needing to isolate:The primary equipment of a secondary device or deactivation to be isolated is obtained, such as
Fruit is the primary equipment for needing to disable, then obtains the secondary device of correlation automatically according to correlation model, once set what is disabled
It is standby that the secondary device collection with isolation is associated with to obtained related secondary devices all therewith;If one to be isolated two
Secondary device, then the equipment collection secondary device body with isolation isolated as needs;
C:The secondary device input maintenance pressing plate concentrated to the equipment that needs are isolated, and secondary device collection to be isolated is judged successively
Whether middle secondary device is protection equipment, then enters step D if not protection equipment, if protection equipment, then protection is moved back
Step D is entered back into after going out;
D:The secondary device and/or the method for operation of primary equipment concentrated to the equipment that needs are isolated check:If once
Equipment does not have a power failure, then ensures that primary equipment has double set protections and at least a set of protection normal operation, then carry out next
Walk, otherwise direct termination of security analysis process;
E:Secondary device in above-mentioned steps D is being had a power failure or the safety measure of not power-off condition is former according to secondary device successively
Then, the safety measure operation that the secondary device that analyzing can overhaul needs is reliably isolated, so as to be operated according to this safety measure
Complete security isolation.Isolated operation is carried out to the equipment at loop both ends and loop in the present invention(Isolated operation refers to exiting
The transmission in GOOSE and SV loops, receive pressing plate, it is also possible to which out of service, output clamping including protection equipment etc. operates), such as
Fruit primary equipment does not have a power failure, then must assure that and protected with double sets and have a set of protection normal operation, otherwise isolated process is moved back
Go out.
The each secondary device progress security isolation concentrated in the step E to secondary device to be isolated specifically includes as follows
Step:
E1:All secondary circuits in each secondary device concentrated to secondary device to be isolated travel through successively, obtain void
The equipment that the loop other end is connected, so as to judge that the empty loop of each secondary circuit is to belong to GOOSE loops or SV loops;
Equipment and loop to loop both ends carry out isolated operation(Isolated operation be generally referred to as exit GOOSE and SV loops transmission,
Receive pressing plate, it is also possible to which out of service, output clamping including protection equipment etc. operates), must if primary equipment does not have a power failure
It must ensure that there are double sets to protect and have a set of protection normal operation, otherwise isolated process exits;
E2:If the empty loop of secondary device to be isolated belongs to GOOSE loops, the GOOSE of the to be isolated equipment related to this
Loop and terminal device perform peace and arrange isolation:Specifically include and exit equipment GOOSE output clampings, exit the GOOSE loops other end
The GOOSE of operational outfit receives pressing plate, and wherein equipment concentrates the GOOSE between the secondary device to be isolated related to primary equipment
Pressing plate does not move back;
E3:If the empty loop of equipment to be isolated is to be not belonging to GS loops, equipment to be isolated is to belong to SV loops, related to this
Equipment to be isolated SV loops and the other end perform peace and arrange isolation:Specifically include:The protection equipment of the SV loops other end need to move back
Go out SV and receive pressing plate, it is necessary to disable the protection device for receiving SV, device SV receives pressing plate and can not moved back.
This patent is based on new SCD models, empty path incidence mould between the association of first and second equipment of structure and secondary device
Type.The primary equipment having a power failure for needs, associated secondary device is obtained according to correlation model automatically.For needing to overhaul
Secondary device, other secondary devices for being associated are searched by Quadratic Imaginary loop, had a power failure or not according to secondary device
The peace of power-off condition arranges principle, and the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation;
Peace arranges the main principle of isolation as follows:During the field operation such as the verification of 1 device or defect elimination, sampling, tripping operation should be isolated, closed
Lock, open it is related to operational outfit in failure loop contact, and ensure the normal operation of operational outfit;2nd, the verification of single complete equipment or
During person's defect elimination, it should stop to use as a servant primary equipment;, can not when the verification of the secondary device of duplicate system retrofit, only single complete equipment or defect elimination
Stop using as a servant primary equipment, but prevent primary equipment unprotect from running;3rd, there is the optical cable of soft pressing plate for sending side or receiving side, to the greatest extent
Amount does not turn off optical fiber, ensures that soft pressing plate has disconnected before disconnecting;4th, during the security isolation of loop, dual safety quarantine measures are taken.It is first
The transmission pressing plate of apparatus for examination and repair before this, followed by the reception pressing plate of related running gear, it is also contemplated that the maintenance pressure of apparatus for examination and repair
Plate.According to isolation principle, using following steps:
A, the secondary circuit of equipment is traveled through, the equipment for obtaining empty loop information and the connection of the loop other end;
B, the method for operation of xegregating unit is checked, if primary equipment does not have a power failure, must assure that and protected with double sets
And there is a set of protection normal operation, otherwise isolated process exits.
C, peace is performed to GOOSE loops and terminal device and arranges isolation:Exit equipment GOOSE output clampings;GOOSE is exited to return
The GOOSE of road other end operational outfit receives pressing plate;When disabling primary equipment, the GOOSE between the secondary device that equipment is concentrated
Pressing plate can not move back;
D, the SV loops to equipment and another both ends perform peace and arrange isolation:The protection equipment of the SV loops other end need to exit SV receptions
Pressing plate;, it is necessary to disable the protection device for receiving SV when not disabling primary equipment, device SV receives pressing plate and can not moved back.
The present invention is based on SCD models, empty path incidence model between the association of first and second equipment of structure and secondary device.It is right
In the primary equipment that needs have a power failure, associated secondary device is obtained automatically according to correlation model.Two overhauled for needs
Secondary device, the other secondary devices being associated are searched by Quadratic Imaginary loop, having a power failure or do not having a power failure according to secondary device
The peace of situation arranges principle, and the peace that analyzing can be such that the secondary device of maintenance reliably isolates arranges operation, further efficient to examine peace
Arrange operation order whether safe and reliable.
Claims (2)
- A kind of 1. intelligent substation secondary protection equipment security isolation measure automatic analysis method, it is characterised in that:Including following Step:A:Based on SCD models, the empty path incidence model between the association of first and second equipment of structure and secondary device:Utilize SCD texts The information modelings such as the primary equipment configuration of part, secondary device configuration, communication, pressing plate, the association of first and second equipment of structure and secondary set Empty path incidence model between standby;B:Analysis obtains the equipment collection for needing to isolate:The primary equipment of a secondary device or deactivation to be isolated is obtained, such as Fruit is the primary equipment for needing to disable, then the secondary device of correlation is obtained automatically according to correlation model, the secondary device of correlation It is associated with secondary device collection to be isolated;If a secondary device to be isolated, then the secondary device body with isolation The equipment collection isolated as needs;C:The secondary device input maintenance pressing plate concentrated to the equipment that needs are isolated, and secondary device collection to be isolated is judged successively Whether middle secondary device is by protection equipment, then enters step D if not by protection equipment, if by protection equipment, then First protected secondary device is carried out to enter back into step D after protection is exited;D:The secondary device method of operation concentrated to the equipment that needs are isolated checks:Do not have a power failure if primary equipment, then Ensure that primary equipment has double set protections and at least a set of protection normal operation, then carry out in next step, otherwise directly tying Beam;E:Primary equipment in above-mentioned steps D and/or secondary device are being had a power failure or not power-off condition according to secondary device successively Safety measure principle, the safety measure operation that the secondary device that analyzing can overhaul needs is reliably isolated, so as to according to this Security isolation is completed in safety measure operation.
- 2. a kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method according to claim 1, Characterized in that, safety is carried out to each secondary device and/or primary equipment that secondary device to be isolated is concentrated in the step E Isolation specifically comprises the following steps:E1:All secondary circuits in each secondary device concentrated to secondary device to be isolated travel through successively, obtain void The equipment that the loop other end is connected, so as to judge that the empty loop of each secondary circuit is to belong to GOOSE loops or SV loops, Equipment and loop wherein to loop both ends carry out isolated operation, if primary equipment does not have a power failure, must assure that with double sets Protect and have a set of protection normal operation, otherwise isolated process exits;E2:If the empty loop of secondary device to be isolated belongs to GOOSE loops, the GOOSE of the to be isolated equipment related to this Loop and terminal device perform peace and arrange isolation:Specifically include and exit equipment GOOSE output clampings, exit the GOOSE loops other end The GOOSE of operational outfit receives pressing plate, and wherein equipment concentrates the GOOSE between the secondary device to be isolated related to primary equipment Pressing plate does not move back;E3:If the empty loop of equipment to be isolated is to be not belonging to GS loops, equipment to be isolated is to belong to SV loops, related to this Equipment to be isolated SV loops and the other end perform peace and arrange isolation:Specifically include:The protection equipment of the SV loops other end need to move back Go out SV and receive pressing plate, it is necessary to disable the protection device for receiving SV, device SV receives pressing plate and can not moved back.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710856671.1A CN107611944B (en) | 2017-09-21 | 2017-09-21 | A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710856671.1A CN107611944B (en) | 2017-09-21 | 2017-09-21 | A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107611944A true CN107611944A (en) | 2018-01-19 |
CN107611944B CN107611944B (en) | 2019-06-28 |
Family
ID=61061631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710856671.1A Active CN107611944B (en) | 2017-09-21 | 2017-09-21 | A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107611944B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110070189A (en) * | 2018-01-23 | 2019-07-30 | 上海毅昊信息科技股份有限公司 | A kind of intelligent substation protection system peace arranges check method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103346497A (en) * | 2013-07-09 | 2013-10-09 | 广东电网公司珠海供电局 | Intelligent substation electrical virtual circuit isolation method and system |
US8774975B2 (en) * | 2011-02-08 | 2014-07-08 | Avista Corporation | Outage management algorithm |
CN104617672A (en) * | 2015-02-12 | 2015-05-13 | 上海毅昊自动化有限公司 | Online monitoring system for modeling based on physical communication medium of process level |
CN106159759A (en) * | 2016-07-13 | 2016-11-23 | 国网四川省电力公司电力科学研究院 | A kind of method automatically generating secondary system of intelligent substation maintenance safety measure |
CN106384304A (en) * | 2016-10-20 | 2017-02-08 | 许继集团有限公司 | Intelligent substation secondary equipment safety measure bill automatic construction method and device |
CN107147214A (en) * | 2017-03-02 | 2017-09-08 | 许继集团有限公司 | A kind of secondary peace suitable for intelligent substation arranges monitoring system |
-
2017
- 2017-09-21 CN CN201710856671.1A patent/CN107611944B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8774975B2 (en) * | 2011-02-08 | 2014-07-08 | Avista Corporation | Outage management algorithm |
CN103346497A (en) * | 2013-07-09 | 2013-10-09 | 广东电网公司珠海供电局 | Intelligent substation electrical virtual circuit isolation method and system |
CN104617672A (en) * | 2015-02-12 | 2015-05-13 | 上海毅昊自动化有限公司 | Online monitoring system for modeling based on physical communication medium of process level |
CN106159759A (en) * | 2016-07-13 | 2016-11-23 | 国网四川省电力公司电力科学研究院 | A kind of method automatically generating secondary system of intelligent substation maintenance safety measure |
CN106159759B (en) * | 2016-07-13 | 2018-03-20 | 国网四川省电力公司电力科学研究院 | A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure |
CN106384304A (en) * | 2016-10-20 | 2017-02-08 | 许继集团有限公司 | Intelligent substation secondary equipment safety measure bill automatic construction method and device |
CN107147214A (en) * | 2017-03-02 | 2017-09-08 | 许继集团有限公司 | A kind of secondary peace suitable for intelligent substation arranges monitoring system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110070189A (en) * | 2018-01-23 | 2019-07-30 | 上海毅昊信息科技股份有限公司 | A kind of intelligent substation protection system peace arranges check method |
CN110070189B (en) * | 2018-01-23 | 2023-05-23 | 福建永福数字能源技术有限公司 | Intelligent substation protection system safety measure checking method |
Also Published As
Publication number | Publication date |
---|---|
CN107611944B (en) | 2019-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106159759B (en) | A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure | |
CN106384304B (en) | Automatic construction method and device for safety measure ticket of secondary equipment of intelligent substation | |
CN104539043B (en) | A kind of automatic switching device of standby power supply system haul oneself willingly into method | |
CN101938117A (en) | Current differential protection method for smart distribution network | |
CN202004540U (en) | Digitized intelligent circuit breaker analog device | |
CN104749487B (en) | A kind of method in check protection device and its loop under circuit no cut-off condition | |
CN101917064A (en) | Back-up protection processing method of digital substation transformer based on GOOSE mode | |
CN102938539A (en) | Double security arrangement implementation method for GOOSE (Generic Object Oriented Substation Event) virtual loop | |
CN107045706A (en) | Intelligent substation secondary safety measure operation order automatic generation method | |
CN105470935B (en) | A kind of intelligent substation relay protection device defect security isolation aid decision-making method | |
CN107067081A (en) | Substation secondary maintenance safety measure generation method based on many object models | |
CN103346497B (en) | Intelligent substation electrical virtual circuit isolation method and system | |
CN108847655A (en) | Intelligent substation protective device sequence method and system based on operation task | |
CN105305602B (en) | The standby power system of railway digital traction substation and its haul oneself willingly into method | |
CN102005819A (en) | Fault isolation method of electric distribution network | |
CN107611944A (en) | A kind of intelligent substation secondary protection equipment security isolation measure automatic analysis method | |
CN107275963B (en) | A kind of intelligent substation secondary maintenance safety measure automatic generation method | |
CN108963841A (en) | It is associated with the secondary device sequence method and system of primary equipment operating status | |
CN107871176A (en) | The safety-optimized method and system of secondary device applied to IEC61850 information modelings | |
CN201464882U (en) | Intelligent control unit with anti-error-locking function | |
CN105162254B (en) | Transformer station's digital improvement method | |
CN106487004A (en) | Intelligent substation one electrical secondary system runs hidden danger Intelligent drainage checking method | |
CN207518284U (en) | A kind of accident disconnection device of small power incorporating into power network | |
CN108173245B (en) | The implementation method of combined floodgate is thought highly of in open circuit in a kind of intelligent substation | |
CN102830295B (en) | Detecting system and detecting method of digital transformer substation protecting loop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |