CN107609778A - Marine economy operational monitoring and assessment system and method - Google Patents
Marine economy operational monitoring and assessment system and method Download PDFInfo
- Publication number
- CN107609778A CN107609778A CN201710832518.5A CN201710832518A CN107609778A CN 107609778 A CN107609778 A CN 107609778A CN 201710832518 A CN201710832518 A CN 201710832518A CN 107609778 A CN107609778 A CN 107609778A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- unit
- examination
- collecting unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention discloses a kind of marine economy operational monitoring and assessment system and method.The marine economy operational monitoring includes with assessment system:Data processing module;Secondary server;Communication module;Identify computing module;Analysis module;Information issuing module;Wherein, the data processing module includes the first collecting unit, the first examination & verification unit, the second collecting unit, second instance nuclear unit, the 3rd collecting unit, the 3rd examination & verification unit and authorization unit.Marine economy operational monitoring provided by the invention and assessment system and method data summarization speed are fast, and are capable of the error of effective calibration data.
Description
Technical field
The present invention relates to marine economy technical field, and in particular to a kind of marine economy operational monitoring and assessment system and side
Method.
Background technology
Marine economy refers to develop, utilization and all kinds of commecial activities for protecting ocean, and is further associated the total of activity
With.With the continuous development of national economy and being continuously increased for national economy class, the connotation and extension of marine economy is not yet
Disconnected abundant and expansion, 19 marine industries are developed into by 6 initial marine industries, are related to national economy all 20 doors
Class.Since the new century, China's marine economy shows the situation of fast development, and marine economy comprehensive strength significantly increases,
Marine industry constitution optimizes, and ocean infrastructure is substantially strengthened, and marine economy has become the important component of national economy.
As the proposition of ocean power theory, supporting role of the marine economy to national economy and social development are obvious all the more.With seawater
Aquatic breeding, marine aquatic product deep processing industry, sea salt retrofit industry etc. are the upgrading power of the ocean conventional industries of representative
Degree continues to increase;Using marine organisms medicine, multipurpose use of sea water, exploitation of marine energy and other ocean new high-tech industries as representative
A collection of emerging marine industries emerge rapidly, the emerging marine industries in part gradually form scale, and industrialization process is further speeded up.
In addition, China part marine industries also play very important effect in the world.China's sea salt yield occupies the world for many years
First;The cargo handling capacity at coastal 20 harbours is more than hundred million tons, and wherein PORT OF SHANGHAI cargo handling capacity occupies the whole world for continuous 5 years
One.
With the deep implementation of national " east initiative development " strategy and Regional Development Strategy, Development of Regional Marine Economy rule
Mould constantly expands, and regional economy social development general layout has basically formed.With Circum-Bohai Sea, Yangtze River Delta and the Delta of the Pearl River
The Development of Regional Marine Economy that Qu Wei is represented is rapid, and three Large Marine Ecosystem economic zone Methodology of Gross Production of Ocean sums in 2015 account for national sea
The 87.5% of foreign total output value.From coastal economy band, Binhai New Area in Tianjin, Shandong Peninsula blueness economic zone, Littoral Jiangsu Province,
Yangtze River Delta, Fujian west-bank economic region, to Pearl River Delta economic zone, Beibu Bay, guangxi economic zone and Hainan international tourism
The coastal economy Regional Distribution that island is formed from north orientation south has basically formed, to realize that " east initiative development " strategic objective is established
Solid foundation.
However, the development of marine economy is also faced with resource, environment, sci-tech innovation ability etc. constraint, such as coastal waters fishing
Industry resource fail the problems such as serious, many technologies be not addressed also, the excessively extensive exploitation of coastline resource, offshore pollution increasingly
Seriously, irrational Perioperative cardiac events make phenomena such as ground clearly.Even more noteworthy, China's marine economy Intensive Growth side
Formula is not yet formed, and the capability of independent innovation is weaker, and science and technology achievements conversion is indifferent, region marine industries low-quality, isomorphism, is become
It is more universal with phenomenon, it is due gather fail to give full play to scale effect, cause a large amount of coastlines, beach and other resources
Poorly efficient utilization.Contradiction between resource environment and the marine economy development of long term accumulation has highlighted, and can not again continue biography
Extensive the marine economy growth pattern and development model of system.Therefore, if marine economy can continue to keep the increasing of stable health
Long situation, actively promote marine economy operational monitoring with assess, promote marine economy it is benign reasonably develop it is imperative.
In correlation technique, for marine economy monitoring and evaluation often through single data sheet and data statistics
To realize, this kind of mode data summarization speed is slow, and lacks effective alignment mechanism.
Asked therefore, it is necessary to provide a kind of new marine economy operational monitoring and solve above-mentioned technology with assessment system and method
Topic.
The content of the invention
The main object of the present invention is to provide a kind of marine economy operational monitoring and assessment system, it is intended to solves existing sea
The mode data summarization speed of foreign economic monitoring and evaluation is slow, and lacks the technical problem of effective alignment mechanism.
To achieve the above object, marine economy operational monitoring proposed by the present invention includes with assessment system:Data processing mould
Block, the data processing module are used to generate final data;Secondary server, the secondary server are used to store supplement number
According to;Communication module, the communication module are used to obtain the supplementary data;Computing module is identified, the identification computing module is used
In the identification final data and the type and primary source of the supplementary data, and calculate the final data and the supplement
The relevant parameter of data;Analysis module, the analysis module is according to the identification of the identification computing module with result of calculation pre-
If time interval generation economic data chart;Information issuing module, described information release module are described for issuing and inquiring about
Economic data chart;Wherein, the data processing module include the first collecting unit, first examination & verification unit, the second collecting unit,
Second instance nuclear unit, the 3rd collecting unit, the 3rd examination & verification unit and authorization unit;First collecting unit is used to gather first
Data, the first examination & verification unit are used to confirm whether first data are accurate;When confirming the first data inaccuracy,
The first examination & verification unit is used to first data retracting first collecting unit;When confirmation first data are accurate
When, described first audits unit by the first data transmission to the second instance nuclear unit;Second collecting unit is used for
The second data are gathered, the second instance nuclear unit judges whether second data are accurate according to first data;When described
When second instance nuclear unit judges the second data inaccuracy, second data are retracted described by the second instance nuclear unit
Two collecting units, when the second instance nuclear unit judges that second data are accurate, the second instance nuclear unit is by described
Two data and the first data transmission are to the described 3rd examination & verification unit;3rd collecting unit is used to gather the 3rd data,
The 3rd examination & verification unit judges whether the 3rd data are accurate according to second data, when judging the 3rd data not
When accurate, the 3rd data are retracted the 3rd collecting unit by the 3rd examination & verification unit, when judging the 3rd data
When accurate, the 3rd examination & verification unit examines the 3rd data, second data and the first data transmission to described
Order member;The authorization unit is used to judge that arbitrarily both to be in the 3rd data, second data, first data
No matching, when both any mismatches in first data, second data and the 3rd data, by described first
Data, second data and the 3rd data retract the 3rd examination & verification unit, when first data, second number
According to and the 3rd data in both any matchings when, will first data, second data and the 3rd data turn
Turn to the final data.
Preferably, the marine economy operational monitoring also includes geography information module, the geography information with assessment system
Module is used to generate geographic information data figure according to the final data and the supplementary data.
Preferably, the marine economy operational monitoring also includes authority module with assessment system, and the authority module is used for
Set for data processing module, secondary server, communication module, identification computing module, analysis module and information issuing module
Operating right.
Preferably, the marine economy operational monitoring also includes diagnostic module and Surveillance center with assessment system, described to examine
Disconnected module is used to detect the data processing module, secondary server, communication module, identification computing module, analysis module and letter
Cease release module whether normal operation, when finding that the data processing module, secondary server, communication module, identification calculates mould
During at least one party's irregular operating in block, analysis module and information issuing module, the diagnostic module generates fault-signal number
According to, and the fault-signal data are sent to the Surveillance center.
Preferably, the quantity of first collecting unit, second collecting unit and the 3rd collecting unit is multiple.
The present invention also provides a kind of marine economy operational monitoring and appraisal procedure, comprises the following steps:
Data processing module generates final data;
Identify that computing module identifies type and the source of the final data and the supplementary data to prestore, and calculate institute
State final data and the relevant parameter of the supplementary data;
Analysis module generates economical according to the identification of the identification computing module with result of calculation in default time interval
Data drawing list;
The economic data chart is issued and inquired about to information issuing module;
Wherein, the step of data processing module generation final data, specifically comprises the following steps:
First collecting unit gathers the first data, and the first examination & verification unit confirms whether first data are accurate;
When confirming the first data inaccuracy, first data are retracted described first by the first examination & verification unit
Collecting unit;
When confirming that first data are accurate, the first examination & verification unit audits the first data transmission to second
Unit;
Second collecting unit gathers the second data, and the second instance nuclear unit judges described second according to first data
Whether data are accurate;
When the second instance nuclear unit judges the second data inaccuracy, the second instance nuclear unit is by described second
Data retract second collecting unit;
When the second instance nuclear unit judges that second data are accurate, the second instance nuclear unit counts described second
According to and the first data transmission to the 3rd examination & verification unit;
3rd collecting unit gathers the 3rd data, and the 3rd examination & verification unit judges the described 3rd according to second data
Whether data are accurate;
When judging the 3rd data inaccuracy, the 3rd data are retracted the described 3rd by the 3rd examination & verification unit
Collecting unit;
When judging that the 3rd data are accurate, the described 3rd audits unit by the 3rd data, second data
And the first data transmission is to authorizing unit;
The authorization unit is used to judge both any in the 3rd data, second data, first data
Whether match;
When in first data, second data and the 3rd data it is any both mismatch when, by described the
One data, second data and the 3rd data retract the 3rd examination & verification unit;
When both any matchings in first data, second data and the 3rd data, by described first
Data, second data and the 3rd data are converted into the final data.
Preferably, the marine economy operation also comprises the following steps with appraisal procedure:
Geography information module generates geographic information data figure according to the final data and the supplementary data.
Preferably, the marine economy operational monitoring also comprises the following steps with appraisal procedure:
Authority module is set for data processing module, secondary server, communication module, identification computing module, analysis mould
The operating right of block and information issuing module.
Preferably, the marine economy operational monitoring also comprises the following steps with appraisal procedure:
Diagnostic module detects the data processing module, secondary server, communication module, identification computing module, analysis mould
Block and information issuing module whether normal operation;
When the discovery data processing module, secondary server, communication module, identification computing module, analysis module and letter
When ceasing at least one party's irregular operating in release module, the diagnostic module generates fault-signal data, and by the failure
Signal data is sent to Surveillance center.
Preferably, the quantity of first collecting unit, second collecting unit and the 3rd collecting unit is multiple.
Marine economy operational monitoring proposed by the present invention and assessment system, final data is generated by data processing module;
Identify that computing module identifies type and the source of the final data and the supplementary data to prestore, and calculate the final number
According to and the supplementary data relevant parameter;Analysis module is according to the identification of the identification computing module with result of calculation default
Time interval generation economic data chart;The economic data chart is issued and inquired about to information issuing module;So as to
Quick obtaining economic graph data in the time being manually set.Wherein, first collecting unit, second collecting unit and
3rd collecting unit can in a manner of being widely distributed gathered data, at county level, city-level and provincial data can be corresponded to respectively
Collection, and ensure diversity, the comprehensive and accuracy of data collected, the first examination & verification unit, second examination & verification
Unit, the 3rd examination & verification unit and the setting for authorizing unit, can repeatedly carry out data comparison calibration, improve final data
Accuracy, and then improve the accuracy of economic data chart.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the Organization Chart of a kind of marine economy operational monitoring provided by the invention and assessment system;
Fig. 2 is the Organization Chart of the data processing module shown in Fig. 1;
Fig. 3 is the workflow of the first embodiment of a kind of marine economy operational monitoring provided by the invention and appraisal procedure
Figure;
Fig. 4 is the workflow diagram for the step of data processing module shown in Fig. 3 generates final data;
Fig. 5 is the workflow of the second embodiment of a kind of marine economy operational monitoring provided by the invention and appraisal procedure
Figure;
Fig. 6 is the workflow of the 3rd embodiment of a kind of marine economy operational monitoring provided by the invention and appraisal procedure
Figure;
Fig. 7 is the workflow of the fourth embodiment of a kind of marine economy operational monitoring provided by the invention and appraisal procedure
Figure.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its
His embodiment, belongs to the scope of protection of the invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention
In explaining the relative position relation under a certain particular pose (as shown in drawings) between each part, motion conditions etc., if should
When particular pose changes, then directionality instruction also correspondingly changes therewith.
In addition, in the present invention such as relating to the description of " first ", " second " etc. be only used for describe purpose, and it is not intended that
Indicate or imply its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ",
At least one this feature can be expressed or be implicitly included to the feature of " second ".In the description of the invention, " multiple " contain
Justice is at least two, such as two, three etc., unless otherwise specifically defined.
In the present invention, unless otherwise clearly defined and limited, term " connection ", " fixation " etc. should be interpreted broadly,
For example, " fixation " can be fixedly connected or be detachably connected, or integrally;Can be mechanically connect or
Electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be the connection or two of two element internals
The interaction relationship of individual element, limited unless otherwise clear and definite.For the ordinary skill in the art, can basis
Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
In addition, the technical scheme between each embodiment of the present invention can be combined with each other, but must be general with this area
Logical technical staff can be implemented as basis, will be understood that when the combination appearance of technical scheme is conflicting or can not realize this
The combination of technical scheme is not present, also not within the protection domain of application claims.
The present invention provides a kind of marine economy operational monitoring and assessment system 1.
Fig. 1-Fig. 2 is referred to, in one embodiment of this invention, marine economy operational monitoring includes with assessment system 1:Number
According to processing module 11, the data processing module 11 is used to generate final data;Secondary server 12, the secondary server 12
For storing supplementary data;Communication module 13, the communication module 13 are used to obtain the supplementary data;Identify computing module
14, the identification computing module 14 is used for the type and primary source for identifying the final data and the supplementary data, and counts
Calculate the final data and the relevant parameter of the supplementary data;Analysis module 15, the analysis module 15 is according to the identification
The identification of computing module 14 generates economic data chart with result of calculation in default time interval;Information issuing module 16, institute
Information issuing module 16 is stated to be used to issuing and inquiring about the economic data chart;Wherein, the data processing module 11 includes the
One collecting unit 111, first examination & verification unit 112, the second collecting unit 113, second instance nuclear unit 114, the 3rd collecting unit
115th, the 3rd examination & verification unit 116 and authorization unit 117;First collecting unit 111 be used for gather the first data, described first
Examination & verification unit 112 is used to confirm whether first data are accurate;When confirming the first data inaccuracy, described first examines
Nuclear unit 112 is used to first data retracting first collecting unit 111;When confirming that first data are accurate,
Described first audits unit 112 by the first data transmission to the second instance nuclear unit 114;Second collecting unit
113 are used to gather the second data, and the second instance nuclear unit 114 judges whether second data are accurate according to first data
Really;When the second instance nuclear unit 114 judges the second data inaccuracy, the second instance nuclear unit 114 is by described
Two data retract second collecting unit 113, when the second instance nuclear unit 114 judges that second data are accurate, institute
Second instance nuclear unit 114 is stated by second data and the first data transmission to the described 3rd examination & verification unit 116;Described
Three collecting units 115 are used to gather the 3rd data, and the 3rd examination & verification unit 116 judges the described 3rd according to second data
Whether data are accurate, and when judging the 3rd data inaccuracy, the 3rd examination & verification unit 116 retracts the 3rd data
3rd collecting unit 115, when judging that the 3rd data are accurate, the 3rd examination & verification unit 116 counts the described 3rd
According to, second data and the first data transmission to the authorization unit 117;The authorization unit 117 is used to judge institute
State in the 3rd data, second data, first data it is any both whether match, when first data, described the
In two data and the 3rd data during both any mismatches, by first data, second data and the described 3rd
Data retract the 3rd examination & verification unit 116, when any two in first data, second data and the 3rd data
When person matches, first data, second data and the 3rd data are converted into the final data.
In the present embodiment, first collecting unit 111, second collecting unit 113 and the 3rd collecting unit 115
Quantity is multiple.First collecting unit 111, the first examination & verification unit 112, second collecting unit 113, described the
Second trial nuclear unit 114, the 3rd collecting unit 115, the 3rd examination & verification unit 116 and the authorization unit 117 can be with
For any of mobile terminal, computer, laptop computer or electronic equipment.
As a kind of preferable mode of the present embodiment, first collecting unit 111, second collecting unit 113
And the 3rd collecting unit 115 is mobile terminal, to facilitate the collection anywhere or anytime of gathered data relevant staff;Institute
Stating the first examination & verification unit 112, the second instance nuclear unit 114, the 3rd examination & verification unit 116 and the authorization unit 117 is
Computer, to facilitate the staff of examination & verification data to audit data.
First collecting unit 111 can be for the enterprise person of making a report at county level, the unit person of making a report at county level and She Hai departments at county level
The person of making a report on uses;The first examination & verification unit 112 can use for auditor at county level.Second collecting unit 113 can be for
The city-level person of making a report on and the city-level She Hai department persons of making a report on use, and the second instance nuclear unit 114 can use for city-level auditor.Institute
Stating the 3rd collecting unit 115 for the provincial person of making a report on and provincial can relate to the extra large part person of making a report on and use;The 3rd examination & verification unit 116
It can be used for provincial first trial person.The authorization unit 117 can be for provincial last instance librarian use.
Marine economy operational monitoring proposed by the present invention and assessment system 1, final number is generated by data processing module 11
According to;Identification computing module 14 identifies the final data and the type of the supplementary data to prestore and source, and described in calculating
The relevant parameter of final data and the supplementary data;Analysis module 15 is according to the identification and calculating for identifying computing module 14
As a result economic data chart is generated in default time interval;The economic data figure is issued and inquired about to information issuing module 16
Table;So as to the quick obtaining economic graph data within the time being manually set.Wherein, first collecting unit 111, institute
State the second collecting unit 113 and the 3rd collecting unit 115 can in a manner of being widely distributed gathered data, can correspond to respectively
At county level, city-level and provincial data acquisition, and ensure diversity, the comprehensive and accuracy of data collected, described first
Unit 112, the second instance nuclear unit 114, the 3rd examination & verification unit 116 and the setting for authorizing unit 117 are audited, can be more than enough
Secondary progress data comparison calibration, improves the accuracy of final data, and then improves the accuracy of economic data chart.
In the present embodiment, the marine economy operation also includes geography information module 17, the geographical letter with assessment system
Cease module 17 to be used to generate geographic information data figure according to the final data and the supplementary data, to facilitate user in combination
Manage information and understand final data and supplementary data.
The marine economy operational monitoring also includes authority module 18 with assessment system 1, and the authority module 18 is used to set
Put for data processing module 11, secondary server 12, communication module 13, identification computing module 14, analysis module 15 and information
The operating right of release module 16, to facilitate the use operating right of division different user, it is easy to the marine economy operation prison
Survey the orderly use with assessment system 1.
The marine economy operational monitoring also includes diagnostic module 19 and Surveillance center 10, the diagnosis with assessment system 1
Module 19 is used to detect the data processing module 11, secondary server 12, communication module 13, identification computing module 14, analysis
Module 15 and information issuing module 16 whether normal operation, when finding the data processing module 11, secondary server 12, communication
It is described during at least one party's irregular operating in module 13, identification computing module 14, analysis module 15 and information issuing module 16
Diagnostic module 19 generates fault-signal data, and the fault-signal data are sent to the Surveillance center 10, so as to realize
Find in time with diagnosing the marine economy operational monitoring and the failure situation of assessment system 1.
Referring to Fig. 3, the present invention also provides a kind of marine economy operational monitoring and comprised the following steps with appraisal procedure 100:
S10, data processing module generation final data;
Specifically, statistics on marine economy situation of the final data for statistics gained.Such as:Certain fishery
Visitor's number of fish culture amount, certain traffic harbour in plant's a period of time and the handling goods of certain cargo berth are total
Amount.
S20, identification computing module identifies type and the source of the final data and the supplementary data to prestore, and counts
Calculate the final data and the relevant parameter of the supplementary data;
Specifically, the supplementary data can be pre-stored in secondary server 12, the secondary server 12 to be among the people or
The website of official.The type can include the ocean primary industry, ocean secondary industry and the ocean tertiary industry;The source can
With including the fishery Room, enterprise at county level and ocean office;The relevant parameter can include total amount and growth rate.
For example, final data is the fish culture amount of certain fishery cultivating field month, the supplementary data is the fishery cultivating
Fish culture amount in the adjacent previous moon of field, the institute that identification computing module 14 identifies the type of the final data and prestored
The type for stating supplementary data is the ocean primary industry, and identification computing module 14 identifies that the source of the final data is fishery Room work
Make personnel on site's real-time statistics, identification computing module 14 identifies that the source of the supplementary data to prestore is fishery Room official net
Stand, identification computing module 14 calculates that fish culture total amount in the fishery cultivating field two months is total and the cultivation amount of one month
Growth rate;
S30, analysis module generate according to the identification of the identification computing module with result of calculation in default time interval
Economic data chart;
Specifically, default time interval can be three months, six months or 12 months.
The economic data chart is issued and inquired about to S40, information issuing module;
Specifically, the economic data chart can be the form of classification, or cake chart, block diagram or curve
Figure.
Referring to Fig. 4, the step S10, the step of data processing module generation final data, following step is specifically included
Suddenly:
S101, the first collecting unit gather the first data, and the first examination & verification unit confirms whether first data are accurate
Really;
In the present embodiment, first collecting unit 111 can for the enterprise person of making a report at county level, the unit person of making a report at county level and
The She Hai departments person of making a report at county level uses;The first examination & verification unit 112 can use for auditor at county level.
For example, the fishery Room person of making a report in A counties gathers the first data by the first collecting unit 111, wherein, the first data are six
The fish culture amount in all fishing grounds in Ge Yuenei A counties;A counties fishery Room auditor goes through according to actual conditions, and really
Whether accurate recognize the first data.
The fishery Room person of making a report in B counties gathers the first data by the first collecting unit 111, wherein, the first data are six months
The fish culture amount in all fishing grounds in interior B counties;B fishery Room auditors at county level go through according to actual conditions, and confirm
Whether the first data are accurate.
The fishery Room person of making a report in C counties gathers the first data by the first collecting unit 111, wherein, the first data are six months
The fish culture amount in all fishing grounds in interior C counties;C fishery Room auditors at county level go through according to actual conditions, and confirm
Whether the first data are accurate.
S103, when confirming the first data inaccuracy, first data are retracted institute by the first examination & verification unit
State the first collecting unit;
For example, A fishery Room auditors at county level confirm that first data are inaccurate according to actual conditions inspection, the fishing of A counties
First data are returned to first collecting unit 111, A by industry Room auditor by the described first examination & verification unit 112
Fishery Room person of making a report in county's knows that first data are retired by first collecting unit 111.
S102, when confirming that first data are accurate, the first examination & verification unit is by the first data transmission to the
Second trial nuclear unit;
In the present embodiment, the second instance nuclear unit 114 can use for city-level auditor.
For example, A, B and C county fishery Room auditor confirm that first data are accurate according to actual conditions inspection, and lead to
Cross the first examination & verification unit 112 and the first data transmission to second instance nuclear unit 114, D city-level auditors are passed through second
Examination & verification unit 114 knows the first data.
S104, the second collecting unit gather the second data, and the second instance nuclear unit judges institute according to first data
Whether accurate state the second data;
In the present embodiment, second collecting unit 113 can be for the city-level person of making a report on and the city-level She Hai department persons of making a report on
Use;
For example, the D city-level fishery Room persons of making a report on gather the second data by the second collecting unit 113, wherein, the second data are
The fish culture amount in all fishing grounds in certain city in six months;And the second data are transferred to the second instance nuclear unit 114.D cities
Level auditor knows first data and second data by second instance nuclear unit 114, and second described in comparative analysis
Whether data are accurate.
S106, when the second instance nuclear unit judges the second data inaccuracy, the second instance nuclear unit 114 will
Second data retract second collecting unit;
For example, D city-levels auditor judges that second data are inaccurate by the second instance nuclear unit 114, and pass through
Second data are returned to second collecting unit 113 by the second instance nuclear unit 114.
S105, when the second instance nuclear unit judges that second data are accurate, the second instance nuclear unit is by described in
Second data and the first data transmission are to the 3rd examination & verification unit;
In embodiment, the 3rd examination & verification unit 116 can use for the provincial first trial persons of E.
For example, D city-levels auditor judges that second data are accurate by the second instance nuclear unit 114, and pass through institute
Second instance nuclear unit 114 is stated by second data and the first data transmission to the 3rd examination & verification unit 116.The E is provincial
First trial person knows first data and second data by the described 3rd examination & verification unit 116.
S107, the 3rd collecting unit gather the 3rd data, and the 3rd examination & verification unit judges institute according to second data
Whether accurate state the 3rd data;
In the present embodiment, the 3rd collecting unit 115 for the provincial persons of making a report on of E and provincial can relate to the extra large part person of making a report on and make
With.
For example, the provincial fishery Room persons of making a report on of E gather the 3rd data by the 3rd collecting unit 115, wherein, described the
Three data are the fish culture amount that certain saves all fishing grounds in six months, and the provincial fishery Room persons of making a report on of E also pass through the 3rd collecting unit
115 send the 3rd data to the described 3rd examination & verification unit 116, and the provincial first trial persons of E pass through the described 3rd and audit unit 116
And judge whether the 3rd data are accurate according to second data.
S109, when judging the 3rd data inaccuracy, the 3rd data are retracted institute by the 3rd examination & verification unit
State the 3rd collecting unit;
For example, when the provincial first trial persons of E judge the 3rd data inaccuracy by the described 3rd examination & verification unit 116, E is provincial
3rd data are retracted the 3rd collecting unit 115 by first trial person by the described 3rd examination & verification unit 116;
S110, when judging that the 3rd data are accurate, the described 3rd audits unit by the 3rd data, described second
Data and the first data transmission are to authorizing unit;
In the present embodiment, the authorization unit 117 can be for the provincial last instance librarian uses of E.
For example, when the provincial first trial persons of E judge that the 3rd data are accurate by the 3rd examination & verification unit 116, the described 3rd examines
3rd data, second data and the first data transmission are extremely authorized unit 117 by nuclear unit 116;
S110, the authorization unit are used to judge any in the 3rd data, second data, first data
Whether both match;
For example, the provincial last instance personnel of E judge the 3rd data, second data, institute by the authorization unit 117
Both any in the first data whether match stated;
S112, when both any mismatches in first data, second data and the 3rd data, by institute
State the first data, second data and the 3rd data and retract the 3rd examination & verification unit;
For example, when both any mismatches in first data, second data and the 3rd data, E is saved
First data, second data and the 3rd data are retracted institute by level last instance personnel by the authorization unit 117
State the 3rd examination & verification unit 116;
S111, when both any matchings in first data, second data and the 3rd data, by described in
First data, second data and the 3rd data are converted into the final data.
For example, when both any matchings in first data, second data and the 3rd data, E is provincial
First data, second data and the 3rd data are converted into institute by last instance personnel by the authorization unit 117
State final data.
In this embodiment, first collecting unit 111, second collecting unit 113 and the 3rd collecting unit 115
Quantity is multiple.First collecting unit 111, the first examination & verification unit 112, second collecting unit 113, described the
Second trial nuclear unit 114, the 3rd collecting unit 115, the 3rd examination & verification unit 116 and the authorization unit 117 can be with
For any of mobile terminal, computer, laptop computer or electronic equipment.
As a kind of preferable mode of the present embodiment, first collecting unit 111, second collecting unit 113
And the 3rd collecting unit 115 is mobile terminal, to facilitate the collection anywhere or anytime of gathered data relevant staff;Institute
Stating the first examination & verification unit 112, the second instance nuclear unit 114, the 3rd examination & verification unit 116 and the authorization unit 117 is
Computer, to facilitate the staff of examination & verification data to audit data.
Marine economy operational monitoring proposed by the present invention and appraisal procedure, final number is generated by data processing module 11
According to;Identification computing module 14 identifies the final data and the type of the supplementary data to prestore and source, and described in calculating
The relevant parameter of final data and the supplementary data;Analysis module 15 is according to the identification and calculating for identifying computing module 14
As a result economic data chart is generated in default time interval;The economic data figure is issued and inquired about to information issuing module 16
Table;So as to the quick obtaining economic graph data within the time being manually set.Wherein, first collecting unit 111, institute
State the second collecting unit 113 and the 3rd collecting unit 115 can in a manner of being widely distributed gathered data, can correspond to respectively
At county level, city-level and provincial data acquisition, and ensure diversity, the comprehensive and accuracy of data collected, described first
Unit 112, the second instance nuclear unit 114, the 3rd examination & verification unit 116 and the setting for authorizing unit 117 are audited, can be more than enough
Secondary progress data comparison calibration, improves the accuracy of final data, and then improves the accuracy of economic data chart.
Referring to Fig. 5, based on the marine economy operational monitoring in the first embodiment of the present invention and appraisal procedure, in this hair
In marine economy operational monitoring and appraisal procedure in bright second embodiment, the step S10~S40 and first embodiment phase
Together, will not be repeated here;Its difference is that the marine economy operation also comprises the following steps with appraisal procedure:
S50, geography information module generate geographic information data figure according to the final data and the supplementary data.
So as to facilitate user's combining geographic information to understand final data and supplementary data.
Referring to Fig. 6, based on the marine economy operational monitoring in the first embodiment of the present invention and appraisal procedure, in this hair
In marine economy operational monitoring and appraisal procedure in bright 3rd embodiment, the step S10~S50 and second embodiment phase
Together, will not be repeated here;Its difference is that the marine economy operation also comprises the following steps with appraisal procedure:
S60, authority module set for data processing module, secondary server, communication module, identification computing module, point
Analyse the operating right of module and information issuing module.
Operating right is used so as to convenient division different user, is easy to the marine economy operational monitoring and assessment system
1 orderly use.
Referring to Fig. 7, based on the marine economy operational monitoring in the first embodiment of the present invention and appraisal procedure, in this hair
In marine economy operational monitoring and appraisal procedure in bright 3rd embodiment, the step S10~S60 and second embodiment phase
Together, will not be repeated here;Its difference is that the marine economy operation also comprises the following steps with appraisal procedure:
S70, diagnostic module detect the data processing module, secondary server, communication module, identification computing module, point
Analyse module and information issuing module whether normal operation;
S80, when the discovery data processing module, secondary server, communication module, identification computing module, analysis module
And during at least one party's irregular operating in information issuing module, the diagnostic module generates fault-signal data, and will described in
Fault-signal data are sent to Surveillance center.
Found in time so as to realize with diagnosing the marine economy operational monitoring and the failure situation of assessment system 1.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the scope of the invention, it is every at this
Under the design of invention, the equivalent structure transformation made using description of the invention and accompanying drawing content, or directly/it is used in indirectly
He is included in the scope of patent protection of the present invention related technical field.
Claims (10)
1. a kind of marine economy operational monitoring and assessment system, it is characterised in that including:
Data processing module, the data processing module are used to generate final data;
Secondary server, the secondary server are used to store supplementary data;
Communication module, the communication module are used to obtain the supplementary data;
Computing module is identified, the identification computing module is used for the type and original for identifying the final data and the supplementary data
Beginning source, and calculate the final data and the relevant parameter of the supplementary data;
Analysis module, the analysis module is according to the identification of the identification computing module with result of calculation in default time interval
Generate economic data chart;
Information issuing module, described information release module are used to issuing and inquiring about the economic data chart;
Wherein, the data processing module includes the first collecting unit, the first examination & verification unit, the second collecting unit, the second examination & verification
Unit, the 3rd collecting unit, the 3rd examination & verification unit and authorization unit;First collecting unit is used to gather the first data, institute
The first examination & verification unit is stated to be used to confirm whether first data are accurate;When confirming the first data inaccuracy, described
First sentence nuclear unit is used to first data retracting first collecting unit;When confirming that first data are accurate, institute
The first examination & verification unit is stated by the first data transmission to the second instance nuclear unit;Second collecting unit is used to gather the
Two data, the second instance nuclear unit judge whether second data are accurate according to first data;When the second instance
When nuclear unit judges the second data inaccuracy, second data are retracted second collection by the second instance nuclear unit
Unit, when the second instance nuclear unit judges that second data are accurate, the second instance nuclear unit is by second data
And the first data transmission to the described 3rd examination & verification unit;3rd collecting unit is used to gathering the 3rd data, and described the
Three examination & verification units judge whether the 3rd data are accurate according to second data, when judging the 3rd data inaccuracy
When, the 3rd data are retracted the 3rd collecting unit by the 3rd examination & verification unit, when judging that the 3rd data are accurate
When, the 3rd examination & verification unit is single to the authorization by the 3rd data, second data and the first data transmission
Member;The authorization unit be used to judging in the 3rd data, second data, first data it is any both whether
Match somebody with somebody, when both any mismatches in first data, second data and the 3rd data, described first is counted
The 3rd examination & verification unit is retracted according to, second data and the 3rd data, when first data, second data
And first data, second data and the 3rd data are converted during both any matchings in the 3rd data
For the final data.
2. marine economy operational monitoring as claimed in claim 1 and assessment system, it is characterised in that the marine economy operation
Monitoring and evaluation system also includes geography information module, and the geography information module is used for according to the final data and the benefit
Make up the number according to generation geographic information data figure.
3. marine economy operational monitoring as claimed in claim 1 and assessment system, it is characterised in that the marine economy operation
Monitoring and evaluation system also includes authority module, the authority module be used to setting for data processing module, secondary server,
Communication module, the operating right for identifying computing module, analysis module and information issuing module.
4. marine economy operational monitoring as claimed in claim 1 and assessment system, it is characterised in that the marine economy operation
Monitoring and evaluation system also includes diagnostic module and Surveillance center, the diagnostic module be used to detecting the data processing module,
Secondary server, communication module, identification computing module, analysis module and information issuing module whether normal operation, when finding institute
State in data processing module, secondary server, communication module, identification computing module, analysis module and information issuing module extremely
During few side's irregular operating, the diagnostic module generates fault-signal data, and the fault-signal data are sent to institute
State Surveillance center.
5. marine economy operational monitoring and assessment system as any one of claim 1-4, it is characterised in that described
The quantity of one collecting unit, second collecting unit and the 3rd collecting unit is multiple.
6. a kind of marine economy operational monitoring and appraisal procedure, it is characterised in that comprise the following steps:
Data processing module generates final data;
Identify that computing module identifies type and the source of the final data and the supplementary data to prestore, and described in calculating most
The relevant parameter of whole data and the supplementary data;
Analysis module generates economic data with result of calculation according to the identification of the identification computing module in default time interval
Chart;
The economic data chart is issued and inquired about to information issuing module;
Wherein, the step of data processing module generation final data, specifically comprises the following steps:
First collecting unit gathers the first data, and the first examination & verification unit confirms whether first data are accurate;
When confirming the first data inaccuracy, first data are retracted first collection by the first examination & verification unit
Unit;
When confirming that first data are accurate, described first audits unit by the first data transmission to second instance vouching
Member;
Second collecting unit gathers the second data, and the second instance nuclear unit judges second data according to first data
It is whether accurate;
When the second instance nuclear unit judges the second data inaccuracy, the second instance nuclear unit is by second data
Retract second collecting unit;
When the second instance nuclear unit judges that second data are accurate, the second instance nuclear unit by second data and
The first data transmission to the 3rd examination & verification unit;
3rd collecting unit gathers the 3rd data, and the 3rd examination & verification unit judges the 3rd data according to second data
It is whether accurate;
When judging the 3rd data inaccuracy, the 3rd data are retracted the 3rd collection by the 3rd examination & verification unit
Unit;
When judging that the 3rd data are accurate, the described 3rd audits unit by the 3rd data, second data and institute
First data transmission is stated to authorizing unit;
The authorization unit be used to judging in the 3rd data, second data, first data it is any both whether
Matching;
When both any mismatches in first data, second data and the 3rd data, described first is counted
The 3rd examination & verification unit is retracted according to, second data and the 3rd data;
When both any matchings in first data, second data and the 3rd data, by first data,
Second data and the 3rd data are converted into the final data.
7. marine economy operational monitoring as claimed in claim 1 and appraisal procedure, it is characterised in that marine economy operation with
Appraisal procedure also comprises the following steps:
Geography information module generates geographic information data figure according to the final data and the supplementary data.
8. marine economy operational monitoring as claimed in claim 1 and appraisal procedure, it is characterised in that the marine economy operation prison
Survey also comprises the following steps with appraisal procedure:
Authority module set for data processing module, secondary server, communication module, identification computing module, analysis module and
The operating right of information issuing module.
9. marine economy operational monitoring as claimed in claim 1 and appraisal procedure, it is characterised in that the marine economy operation prison
Survey also comprises the following steps with appraisal procedure:
Diagnostic module detect the data processing module, secondary server, communication module, identification computing module, analysis module and
Information issuing module whether normal operation;
When the discovery data processing module, secondary server, communication module, identification computing module, analysis module and information hair
During at least one party's irregular operating in cloth module, the diagnostic module generates fault-signal data, and by the fault-signal
Data are sent to Surveillance center.
10. marine economy operational monitoring and appraisal procedure as any one of claim 6-9, it is characterised in that described
The quantity of one collecting unit, second collecting unit and the 3rd collecting unit is multiple.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710832518.5A CN107609778A (en) | 2017-09-15 | 2017-09-15 | Marine economy operational monitoring and assessment system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710832518.5A CN107609778A (en) | 2017-09-15 | 2017-09-15 | Marine economy operational monitoring and assessment system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107609778A true CN107609778A (en) | 2018-01-19 |
Family
ID=61060079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710832518.5A Pending CN107609778A (en) | 2017-09-15 | 2017-09-15 | Marine economy operational monitoring and assessment system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107609778A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111581927A (en) * | 2020-04-03 | 2020-08-25 | 深圳市维度统计咨询股份有限公司 | Ocean economic operation monitoring and early warning system and computer equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104252664A (en) * | 2014-09-16 | 2014-12-31 | 国家海洋信息中心 | Ocean environment monitoring data reporting verification realization method and device |
AU2016203374A1 (en) * | 2015-06-01 | 2016-12-15 | Pgs Geophysical As | Highly-sparse seabed acquisition designs adapted for imaging geological structure and/or monitoring reservoir production |
CN106327068A (en) * | 2016-08-16 | 2017-01-11 | 福州宏泰分析技术有限公司 | Intelligent LIMS system based on monitoring of marine environment and fishery resources |
CN106682846A (en) * | 2017-01-10 | 2017-05-17 | 国家海洋信息中心 | Making method and device for marine environment monitoring data products |
CN106709844A (en) * | 2017-01-10 | 2017-05-24 | 国家海洋信息中心 | Statistical method and system for marine environment monitoring data |
-
2017
- 2017-09-15 CN CN201710832518.5A patent/CN107609778A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104252664A (en) * | 2014-09-16 | 2014-12-31 | 国家海洋信息中心 | Ocean environment monitoring data reporting verification realization method and device |
AU2016203374A1 (en) * | 2015-06-01 | 2016-12-15 | Pgs Geophysical As | Highly-sparse seabed acquisition designs adapted for imaging geological structure and/or monitoring reservoir production |
CN106327068A (en) * | 2016-08-16 | 2017-01-11 | 福州宏泰分析技术有限公司 | Intelligent LIMS system based on monitoring of marine environment and fishery resources |
CN106682846A (en) * | 2017-01-10 | 2017-05-17 | 国家海洋信息中心 | Making method and device for marine environment monitoring data products |
CN106709844A (en) * | 2017-01-10 | 2017-05-24 | 国家海洋信息中心 | Statistical method and system for marine environment monitoring data |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111581927A (en) * | 2020-04-03 | 2020-08-25 | 深圳市维度统计咨询股份有限公司 | Ocean economic operation monitoring and early warning system and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102222276B (en) | State maintenance method and device for secondary equipment of power grid | |
CN105894096B (en) | A kind of grounding net of transformer substation state evaluating method based on cloud model | |
CN112034287A (en) | Electric power safety monitoring system based on big data | |
CN109377093A (en) | Power distribution network project investment Benefit Evaluation Method | |
CN103617447B (en) | The evaluation system of intelligent substation and evaluation methodology | |
CN103942725A (en) | Power quality early-warning index screening method | |
CN103837777A (en) | Method and system for power quality assessment of power supply system | |
CN108416502A (en) | A kind of Synthetic Assessment of Eco-environment Quality method | |
CN106228468A (en) | A kind of probability simulation method of tidal current energy generating field output | |
CN107609778A (en) | Marine economy operational monitoring and assessment system and method | |
CN111930802A (en) | Anti-electricity-stealing analysis method based on Lasso analysis | |
CN103390092A (en) | Urban river ecological evaluation model and evaluation method | |
CN106651206A (en) | Method for evaluating testability evaluation index system of relay protection | |
CN109284936A (en) | A kind of electricity quality evaluation method based on the output of cloud graph visualization | |
CN111308501A (en) | Laser radar wind measurement buoy offshore contrast verification test field and test method thereof | |
CN207181396U (en) | A kind of intelligent checking system with environment-friendly function | |
CHEN et al. | Evaluation of land-use efficiency based on regional scale:—a case study in Zhanjiang, guangdong province | |
CN112116513A (en) | Management method and system for territorial space planning monitoring and early warning | |
Chen et al. | Internet of things technology in monitoring system of sustainable use of soil and land resources | |
Hengqiang et al. | Application of entropy weight coefficient method in environmental assessment of soil | |
CN110188087A (en) | A kind of construction method of power plant equipment knowledge base | |
CN115598582B (en) | Distributed mutual inductor online monitoring method, system, equipment and storage medium | |
Sun et al. | Correlation analysis of ecosystem health and economic status using satellite remote sensing: A case study of Zhejiang Province, China: A case study of Zhejiang Province, China | |
Qi et al. | Spatial Identification and Distribution Pattern of the Complexity of Rural Poverty in China Using Multisource Spatial Data | |
Chengfang et al. | Study of water pollution early warning framework based on internet of things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |
|
RJ01 | Rejection of invention patent application after publication |