CN110188087A - A kind of construction method of power plant equipment knowledge base - Google Patents
A kind of construction method of power plant equipment knowledge base Download PDFInfo
- Publication number
- CN110188087A CN110188087A CN201910434054.1A CN201910434054A CN110188087A CN 110188087 A CN110188087 A CN 110188087A CN 201910434054 A CN201910434054 A CN 201910434054A CN 110188087 A CN110188087 A CN 110188087A
- Authority
- CN
- China
- Prior art keywords
- power plant
- data
- asset
- knowledge base
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 15
- 230000007547 defect Effects 0.000 claims description 6
- 230000003993 interaction Effects 0.000 claims description 5
- 238000003556 assay Methods 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 4
- 230000010354 integration Effects 0.000 abstract description 3
- 238000010248 power generation Methods 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000003745 diagnosis Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000004927 fusion Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003758 nuclear fuel Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Databases & Information Systems (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Life Sciences & Earth Sciences (AREA)
- Game Theory and Decision Science (AREA)
- General Health & Medical Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Water Supply & Treatment (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to generating equipment running technology field, specially a kind of construction method of power plant equipment knowledge base, comprising the following steps: first by the data integration of Power Plant Side asset of equipments to group's database, then pass through interface routine acquisition asset of equipments data;Equipment operating index is calculated in real time with the original operating parameter of generating equipment, and the index calculated is stored;According to the experience of live professional by index, parameter formation criterion, the format being organized into system is implemented;Equipment alarm, fault message, failure cause and treatment measures are stored in the form of rules in conjunction with criterion, formation rule library.This programme has more intelligent hand down, practical than traditional knowledge base, is no longer limited to traditional knowledge acquisition mode, realizes new pass on knowledge mode: people-computer-people;Current equipment running status being analyzed for power plant operations staff, foundation is provided.
Description
Technical field
The present invention relates to generating equipment running technology field, the construction method of specifically a kind of power plant equipment knowledge base.
Background technique
(power plant) is also known as power station in power plant, is that the various non-renewable energy for containing nature are converted to electric energy
The factory of (secondary energy sources).At the end of the 19th century, with the growth of electricity needs, people start to propose to establish setting for power generation center
Think.The development of motor manufacturing technology, the expansion of electric energy application range produce increasing rapidly to the needs of electricity, and power plant is therewith
It comes into being.There are many approach of power generation in present power plant: by the title thermal power plant of thermal power generation, leaning on hydroelectric title water power
Factory, also some are by solar energy (photovoltaic) and wind-force and the power plant of tidal power generation etc..And exist by the nuclear power plant of the energy of nuclear fuel
World many countries are played a greater and greater role.
With the development of internet, in internet information in sharp increase, existing internet with magnanimity knowledge base,
Data volume is big, and data structure is complicated, and tissue is unordered, is unfavorable for subsequent application or use, currently, for domain knowledge base
Building mostly uses automatically or semi-automatically Knowledge Extraction Method.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods of power plant equipment knowledge base, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of construction method of power plant equipment knowledge base, comprising the following steps:
1) data integration of Power Plant Side asset of equipments first, is obtained into asset of equipments to group's database, then by interface routine
Data;
2), equipment operating index, and the index that will be calculated are calculated in real time with the original operating parameter of generating equipment
It is stored;
3), according to the experience of live professional by index, parameter formation criterion, the format being organized into system carries out real
It applies;
4), equipment alarm, fault message, failure cause and treatment measures are stored up in the form of rules in conjunction with criterion
It deposits, formation rule library.
As a further solution of the present invention: the step 1) first establishes asset of equipments database, equipment money in group side
Producing data includes power plant's asset data, unit asset data, system assets data, asset of equipments data, component asset data.
As a further solution of the present invention: step 1) the Power Plant Side asset of equipments data include essential information, level of factory
Measuring point, technical data, performance indicator, performance assessment criteria, discharge index, department.
As a further solution of the present invention: step 1) the unit asset data includes name plate information, important measuring point, is
System, index, experimental data, technical data, record of examination, runing time, over-temp and over-pressure, experimental assays data.
As a further solution of the present invention: step 1) the system assets data include important equipment, the peculiar point of system,
System unit.
As a further solution of the present invention: step 1) the asset of equipments data include name plate information, important component, set
Standby all measuring points, important indicator, technical data, test analysis data, defect record of examination, point inspection data, standby redundancy, case
Example, runing time.
As a further solution of the present invention: step 1) the component asset data includes name plate information measuring point, failure mould
Formula, case, runing time, standby redundancy, defect record of examination.
As a further solution of the present invention: the step 4 arranges equipment alarm, fault message, failure cause and processing
It grants criterion combination to be stored in the form of rules, formation rule library, rule base carries rule touching by the human-computer interaction page
It carrys out the coffin upon burial and holds up, implementation rule real time modifying calculates.
Compared with prior art, the beneficial effects of the present invention are: the present invention is first by the asset of equipments data set of Power Plant Side
At group side is arrived, various indexs in power plant equipment operation are recycled, rule of thumb formation criterion, then by power plant
Index criterion, equipment alarm, fault message, failure cause and the treatment measures of equipment operation are stored in the form of rules,
Rule triggering engine is carried finally by the human-computer interaction page, to realize new pass on knowledge mode: people-in formation rule library
Computer-human, this new pass on knowledge mode can be realized accumulation of knowledge, fusion transplanting, to instruct experience not enough
Engineer abundant provides strong foundation when to equipment fault diagnosis.This programme has more intelligent than traditional knowledge base
It is hand down, practical, it is no longer limited to traditional knowledge acquisition mode, realizes new pass on knowledge mode: people-computer-
People;It is capable of the index of real-time monitoring generating equipment operation, the new dynamic of meeting real-time release equipment operating index, to instruct experience
Engineer abundant not enough makes more rationally reliable judgement to current device operation conditions;It can be power plant operations staff
It analyzes current equipment running status and foundation is provided.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
Below in conjunction with embodiment, the present invention will be described in detail.
Embodiment one
A kind of construction method of power plant equipment knowledge base, comprising the following steps: 1), first by Power Plant Side asset of equipments data
It is integrated into group's database, then asset of equipments data are obtained by interface routine;2), real with the original operating parameter of generating equipment
When calculate equipment operating index, and the index calculated is stored;3), will be referred to according to the experience of live professional
Mark, parameter formation criterion, the format being organized into system are implemented;4), by equipment alarm, fault message, failure cause and
Treatment measures are stored in the form of rules in conjunction with criterion, formation rule library.
The step 1) first establishes asset of equipments database in group side, asset of equipments data include power plant's asset data,
Unit asset data, system assets data, asset of equipments data, component asset data.
Step 1) the Power Plant Side asset of equipments data include essential information, level of factory measuring point, technical data, performance indicator,
Performance assessment criteria, discharge index, department.
Step 1) the unit asset data includes name plate information, important measuring point, system, index, experimental data, technology money
Material, record of examination, runing time, over-temp and over-pressure, experimental assays data.
Step 1) the system assets data include important equipment, the peculiar point of system, system unit.
Step 1) the asset of equipments data include name plate information, important component, all measuring points of equipment, important indicator, skill
Art data, test analysis data, defect record of examination, point inspection data, standby redundancy, case, runing time.
Step 1) the component asset data includes that name plate information measuring point, fault mode, case, runing time, spare unit are standby
Part, defect record of examination.
Embodiment two
The format that the step 3 is formed is:
By the format, implementation personnel implement that batch import operation can be carried out in interface in system, implement people convenient for mitigating
The workload of member.
The step 4 by equipment alarm, fault message, failure cause and treatment measures in conjunction with criterion in the form of rules
It is stored, formation rule library, rule base carries rule triggering engine, implementation rule real time modifying meter by the human-computer interaction page
It calculates.
The present invention by the asset of equipments data integration of Power Plant Side to group side, recycles each in power plant equipment operation first
The index of kind various kinds, rule of thumb formation criterion, then believes the index criterion of power plant equipment operation, equipment alarm, failure
Breath, failure cause and treatment measures are stored in the form of rules, formation rule library, are carried finally by the human-computer interaction page
Rule triggering engine, to realize new pass on knowledge mode: people-computer-human, this new pass on knowledge mode can be real
Existing accumulation of knowledge, fusion transplanting, so that experience engineer abundant not enough be instructed to be provided with when to equipment fault diagnosis
The foundation of power.This programme has more intelligent hand down, practical than traditional knowledge base, is no longer limited to traditional knowledge acquisition
Mode realizes new pass on knowledge mode: people-computer-people;It is capable of the index of real-time monitoring generating equipment operation, meeting
The new dynamic of real-time release equipment operating index, to instruct experience engineer abundant not enough to current device operation conditions
Make more rationally reliable judgement;Current equipment running status being analyzed for power plant operations staff, foundation is provided.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of construction method of power plant equipment knowledge base, which comprises the following steps: 1), first set Power Plant Side
Standby asset data is integrated into group's database, then obtains asset of equipments data by interface routine;2), original with generating equipment
Operating parameter calculates equipment operating index in real time, and the index calculated is stored;3), according to live professional
Experience by index, parameter formation criterion, the format being organized into system is implemented;4), by equipment alarm, fault message,
Failure cause and treatment measures are stored in the form of rules in conjunction with criterion, formation rule library.
2. a kind of construction method of power plant equipment knowledge base according to claim 1, which is characterized in that the step 1)
Asset of equipments database first is established in group side, asset of equipments data include power plant's asset data, unit asset data, system money
Produce data, asset of equipments data, component asset data.
3. a kind of construction method of power plant equipment knowledge base according to claim 1, which is characterized in that the step 1)
Power Plant Side asset of equipments data include essential information, level of factory measuring point, technical data, performance indicator, performance assessment criteria, discharge index,
Department.
4. a kind of construction method of power plant equipment knowledge base according to claim 2, which is characterized in that the step 1)
When unit asset data includes name plate information, important measuring point, system, index, experimental data, technical data, record of examination, operation
Between, over-temp and over-pressure, experimental assays data.
5. a kind of construction method of power plant equipment knowledge base according to claim 2 or 4, which is characterized in that the step
Rapid 1) system assets data include important equipment, the peculiar point of system, system unit.
6. a kind of construction method of power plant equipment knowledge base according to claim 2, which is characterized in that the step 1)
Asset of equipments data include name plate information, important component, all measuring points of equipment, important indicator, technical data, test chemical examination number
According to, defect record of examination, point inspection data, standby redundancy, case, runing time.
7. a kind of construction method of power plant equipment knowledge base according to claim 2, which is characterized in that the step 1)
Component asset data includes name plate information measuring point, fault mode, case, runing time, standby redundancy, defect record of examination.
8. a kind of construction method of power plant equipment knowledge base according to claim 1, which is characterized in that the step 4
Equipment alarm, fault message, failure cause and treatment measures are stored in the form of rules in conjunction with criterion, formation rule
Library, rule base carry rule triggering engine by the human-computer interaction page, and implementation rule real time modifying calculates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910434054.1A CN110188087A (en) | 2019-05-23 | 2019-05-23 | A kind of construction method of power plant equipment knowledge base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910434054.1A CN110188087A (en) | 2019-05-23 | 2019-05-23 | A kind of construction method of power plant equipment knowledge base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110188087A true CN110188087A (en) | 2019-08-30 |
Family
ID=67717451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910434054.1A Pending CN110188087A (en) | 2019-05-23 | 2019-05-23 | A kind of construction method of power plant equipment knowledge base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110188087A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112561261A (en) * | 2020-12-03 | 2021-03-26 | 苏州热工研究院有限公司 | Application method of experience feedback data of nuclear power plant working process and computer terminal |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101763579A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Equipment management system for power station |
CN101763584A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Knowledge information bank management module for EAM system of power station |
CN105277818A (en) * | 2014-07-25 | 2016-01-27 | 武汉理工大学 | Debate logic-based power plant equipment fault diagnosis method |
CN107291830A (en) * | 2017-05-27 | 2017-10-24 | 宁夏共享模具有限公司 | A kind of creation method of equipment knowledge base |
-
2019
- 2019-05-23 CN CN201910434054.1A patent/CN110188087A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101763579A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Equipment management system for power station |
CN101763584A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Knowledge information bank management module for EAM system of power station |
CN105277818A (en) * | 2014-07-25 | 2016-01-27 | 武汉理工大学 | Debate logic-based power plant equipment fault diagnosis method |
CN107291830A (en) * | 2017-05-27 | 2017-10-24 | 宁夏共享模具有限公司 | A kind of creation method of equipment knowledge base |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112561261A (en) * | 2020-12-03 | 2021-03-26 | 苏州热工研究院有限公司 | Application method of experience feedback data of nuclear power plant working process and computer terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019184286A1 (en) | Online dynamic decision-making method and system for unit restoration | |
Vallée et al. | Impact of the wind geographical correlation level for reliability studies | |
CN103310306B (en) | Wind electricity storage field integrated information management system for monitoring and monitoring management method | |
CN108832619A (en) | Transient stability evaluation in power system method based on convolutional neural networks | |
CN103778230A (en) | Online automatic generation method for black-start scheme | |
CN109325936A (en) | Controller switching equipment defect image identification terminal and method based on neural network deep learning | |
CN115453267A (en) | Fault diagnosis system for electric power information system | |
CN107609775A (en) | A kind of active safety production risk apparatus for evaluating and method | |
CN111340337B (en) | Method for evaluating running risk of power distribution network by high-permeability distributed power grid connection | |
CN107222167A (en) | A kind of photovoltaic plant intelligent monitoring platform | |
CN110188087A (en) | A kind of construction method of power plant equipment knowledge base | |
CN104484728B (en) | A kind of power grid security comprehensive index system framework method | |
CN112308437B (en) | Line loss management method, system, device and storage medium based on big data analysis | |
CN106099905A (en) | A kind of power system transient stability emergency control method based on weak steady schematic memory | |
CN109613372A (en) | A kind of electric network failure diagnosis method based on polynary electric network database | |
CN105162116A (en) | Non-linear dual optimization method for figuring out section economic dispatch containing wind power | |
CN108429253A (en) | The construction method of the load user property model of multi-level collaborative | |
CN107679723A (en) | A kind of networking remote test method of new energy power generation grid-connection system | |
CN104749493B (en) | Grid fault equipment analyzing and reasoning method based on rule tree | |
CN105375505A (en) | Method for recognizing AC cross section in strong correlation with DC transient stability | |
CN106253328A (en) | A kind of analysis method that wind farm grid-connected point is carried out reasonable plant-site selection | |
CN203414521U (en) | Power distribution network internal overvoltage pre-warning system | |
CN202748404U (en) | Wind power grid voltage, current, and harmonic wave detection apparatus based on DSP and ARM | |
Zhang et al. | Comprehensive review of intelligent operation and maintenance of power system in China | |
CN115358639B (en) | Offshore wind power operation risk analysis system based on data analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190830 |
|
RJ01 | Rejection of invention patent application after publication |