CN107605506A - A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method - Google Patents

A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method Download PDF

Info

Publication number
CN107605506A
CN107605506A CN201710814366.6A CN201710814366A CN107605506A CN 107605506 A CN107605506 A CN 107605506A CN 201710814366 A CN201710814366 A CN 201710814366A CN 107605506 A CN107605506 A CN 107605506A
Authority
CN
China
Prior art keywords
plate
nut
energy
duct piece
marmem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710814366.6A
Other languages
Chinese (zh)
Inventor
周福霖
朱世友
魏玉省
张颖
刘庆方
李志山
罗俊杰
刘玉杰
徐丽
谭平
陈华霆
王子琦
李斌
习智强
邹爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou University
China Railway Liuyuan Group Co Ltd
Original Assignee
Guangzhou University
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou University, CRTG Survey and Design Institute Co Ltd filed Critical Guangzhou University
Priority to CN201710814366.6A priority Critical patent/CN107605506A/en
Publication of CN107605506A publication Critical patent/CN107605506A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method, it is related to shield tunnel design and construction technical field;It includes the adjacent shield duct piece of two rings, steel plate, nut, marmem plate, bolt, segment joint;The adjacent shield duct piece intrados of two described rings is provided with steel plate and nut, and marmem plate is provided with the inside of the segment joint of the adjacent shield duct piece of two rings, and marmem plate is spun by bolt through steel plate with nut respectively.Had the beneficial effect that caused by the present invention:Large deformation is adapted to, can reset and reduce section of jurisdiction circumferential weld spacing, consumption inputting seismic energy;Marmem plate can be repaired, replaced, easy to maintenance;Produce using common segment die, without making special segment die again, make simple;Construction technology is simple, and construction investment is few.

Description

A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method
Technical field
The present invention relates to shield tunnel design and construction technical field, and in particular to a kind of shield tunnel shock-resistant and energy-dissipating shock-absorbing joint Point structure and its construction method.
Background technology
With China's economy, the fast development of society, Large Underwater Tunnel Engineering has been enter into fast-developing phase, shield method tunnel Road is widely used because of the features such as its is safe, quick, scientific and technological.Generally, shield tunnel chip architecture is not taken Special earthquake resistant construction.But the antidetonation of shield tunnel chip architecture, glissando need under complicated geological, highlight lines earthquake region severe earthquake action Design.Do not take the special main construction procedure of earthquake resistant construction duct pieces of shield tunnel as follows:
1st, section of jurisdiction makes;
2nd, section of jurisdiction is transported;
3rd, interior pipe sheet assembling;
The 4th, section of jurisdiction endless loop is installed to, longitudinally connected bolt;
5th, section of jurisdiction back-grouting.
The content of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide one kind adaptation large deformation, contracting can be resetted Tubule piece circumferential weld spacing, the shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method for consuming inputting seismic energy.
To achieve the above object, the technical solution adopted by the present invention is:A kind of shield tunnel shock-resistant and energy-dissipating damping node knot Structure, it includes the adjacent shield duct piece of two rings, steel plate, nut, marmem plate, bolt, segment joint;Two described phases Adjacent shield duct piece intrados is provided with steel plate and nut, and shape note is provided with the inside of the segment joint of the adjacent shield duct piece of two rings Recall alloy sheets, marmem plate is spun by bolt through steel plate with nut respectively.
A kind of construction method of shield tunnel shock-resistant and energy-dissipating damping node structure, it is comprised the following steps:
1st, in the section of jurisdiction intrados pre-embedded steel slab and nut apart from section of jurisdiction circumferential weld certain distance;
2nd, after the shaping of pipe sheet assembling tunnel, pre-buried steel plate and nut can form one on the intrados of tunnel duct piece Circle;
3rd, with bolt the marmem plate with bolt hole made, installed in section of jurisdiction intrados pre-embedded steel slab On;
4th, it is closely connected between mounted marmem plate and section of jurisdiction intrados.
Preferably, described steel plate and nut is embedded in the adjacent shield duct piece of two rings.
Preferably, it is provided with bolt hole on described marmem plate.
The present invention operation principle be:Using two adjacent endless tube pieces of existing shield tunnel, during by being made in section of jurisdiction Intrados pre-embedded steel slab and nut, pipe sheet assembling tunnel shaping after, by bolt have can restore to the original state performance, high ductility, The marmem plate that inputting seismic energy can be consumed is fixed on the inside of section of jurisdiction.During generation earthquake, under severe earthquake action, it can fit Stratum relative settlement is answered, reduce section of jurisdiction circumferential weld spacing and ensures tunnel structure safety.
After said structure, had the beneficial effect that caused by the present invention:
1st, large deformation is adapted to, can reset and reduce section of jurisdiction circumferential weld spacing, consumption inputting seismic energy;
2nd, marmem plate can be repaired, replaced, easy to maintenance;
3rd, produce using common segment die, without making special segment die again, make simple;
4th, construction technology is simple, and construction investment is few.
Brief description of the drawings
Fig. 1 is the cut-away view of the present invention;
Fig. 2 is node unfolding assumption diagram of the present invention;
Fig. 3 is the structure chart that A-A is cutd open in Fig. 2.
Description of reference numerals:
Two adjacent shield duct pieces 1, steel plate 2, nut 3, marmem plate 4, bolt 5, segment joints 6.
Embodiment
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Referring to such as Fig. 1 --- shown in Fig. 3, present embodiment adopts the following technical scheme that:A kind of shield tunnel antidetonation Energy-dissipating and shock-absorbing node structure, it includes the adjacent shield duct piece 1 of two rings, steel plate 2, nut 3, marmem plate 4, bolt 5, pipe Piece seam 6;Two described adjacent intrados of shield duct piece 1 are provided with steel plate 2 and nut 3, the pipe of the adjacent shield duct piece 1 of two rings The inner side of piece seam 6 is provided with marmem plate 4, and marmem plate 4 passes through steel plate 2 and spiral shell by bolt 5 respectively Cap 3 spins.
A kind of construction method of shield tunnel shock-resistant and energy-dissipating damping node structure, it is comprised the following steps:
1st, in the section of jurisdiction intrados pre-embedded steel slab and nut apart from section of jurisdiction circumferential weld certain distance;
2nd, after the shaping of pipe sheet assembling tunnel, pre-buried steel plate and nut can form one on the intrados of tunnel duct piece Circle;
3rd, with bolt the marmem plate with bolt hole made, installed in section of jurisdiction intrados pre-embedded steel slab On;
4th, it is closely connected between mounted marmem plate and section of jurisdiction intrados.
Preferably, described steel plate 2 and nut 3 are embedded in the adjacent shield duct piece 1 of two rings.
Preferably, it is provided with bolt hole on described marmem plate 4.
The operation principle of present embodiment is:Using two adjacent endless tube pieces of existing shield tunnel, by pipe Intrados pre-embedded steel slab and nut when piece makes, after the shaping of pipe sheet assembling tunnel, by bolt have the performance that can restore to the original state, High ductility, the marmem plate that can consume inputting seismic energy are fixed on the inside of section of jurisdiction.During generation earthquake, severe earthquake action Under, stratum relative settlement is adapted to, reduce section of jurisdiction circumferential weld spacing and ensures tunnel structure safety.
After said structure, had the beneficial effect that caused by present embodiment:
1st, large deformation is adapted to, can reset and reduce section of jurisdiction circumferential weld spacing, consumption inputting seismic energy;
2nd, marmem plate can be repaired, replaced, easy to maintenance;
3rd, produce using common segment die, without making special segment die again, make simple;
4th, construction technology is simple, and construction investment is few.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The skill of the industry For art personnel it should be appreciated that the present invention is not limited to the above embodiments, described in above-described embodiment and specification is explanation The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and Its equivalent thereof.

Claims (4)

  1. A kind of 1. shield tunnel shock-resistant and energy-dissipating damping node structure, it is characterised in that:It includes the adjacent shield duct piece of two rings, steel Plate, nut, marmem plate, bolt, segment joint;The adjacent shield duct piece intrados of two described rings be provided with steel plate and Nut, marmem plate, marmem plate difference are provided with the inside of the segment joint of the adjacent shield duct piece of two rings Spun by bolt through steel plate with nut.
  2. 2. a kind of construction method of shield tunnel shock-resistant and energy-dissipating damping node structure, it is characterised in that it is comprised the following steps:
    (1), in the section of jurisdiction intrados pre-embedded steel slab and nut apart from section of jurisdiction circumferential weld certain distance;
    (2), after the shaping of pipe sheet assembling tunnel, pre-buried steel plate and nut can form a circle on the intrados of tunnel duct piece;
    (3), with bolt the marmem plate with bolt hole made, installed in section of jurisdiction intrados pre-embedded steel slab On;
    (4) it is, closely connected between mounted marmem plate and section of jurisdiction intrados.
  3. A kind of 3. shield tunnel shock-resistant and energy-dissipating damping node structure according to claim 1, it is characterised in that:Described steel Plate and nut are embedded on the inside of the adjacent shield duct piece seam of two rings.
  4. A kind of 4. shield tunnel shock-resistant and energy-dissipating damping node structure according to claim 1, it is characterised in that:Described shape Bolt hole is provided with shape memory alloys plate.
CN201710814366.6A 2017-09-11 2017-09-11 A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method Pending CN107605506A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710814366.6A CN107605506A (en) 2017-09-11 2017-09-11 A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710814366.6A CN107605506A (en) 2017-09-11 2017-09-11 A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method

Publications (1)

Publication Number Publication Date
CN107605506A true CN107605506A (en) 2018-01-19

Family

ID=61063542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710814366.6A Pending CN107605506A (en) 2017-09-11 2017-09-11 A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method

Country Status (1)

Country Link
CN (1) CN107605506A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915733A (en) * 2018-08-30 2018-11-30 中国水利水电第十四工程局有限公司 A kind of steel pipe chip architecture and preparation method thereof being applicable in vacuum chuck absorption
CN109695458A (en) * 2019-01-16 2019-04-30 上海理工大学 Utilize the tunnel lining structure crack over strait repair system of marmem
CN109958457A (en) * 2019-04-09 2019-07-02 中铁第四勘察设计院集团有限公司 Pass through the section of jurisdiction interannular shear structure and its setting method in special formation tunnel
CN114547805A (en) * 2022-02-28 2022-05-27 华中科技大学 Shape memory alloy flexible inter-ring joint of shield tunnel and design method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB286472A (en) * 1927-03-22 1928-03-08 Wilhelm Minder Ferro-concrete shoring and lining in mines
JP2004238873A (en) * 2003-02-05 2004-08-26 Taisei Corp Structure for mounting fireproof plate on inner surface of tunnel lining
CN103758532A (en) * 2014-01-28 2014-04-30 华南理工大学 Short-term driving reinforcing method for metro shield tunnel pipe piece joint
CN107091093A (en) * 2017-06-16 2017-08-25 浙江科技学院(浙江中德科技促进中心) The device and method of Shield-bored tunnels has been deformed based on marmem reparation
CN207161101U (en) * 2017-09-11 2018-03-30 广州大学 A kind of shield tunnel shock-resistant and energy-dissipating damping node structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB286472A (en) * 1927-03-22 1928-03-08 Wilhelm Minder Ferro-concrete shoring and lining in mines
JP2004238873A (en) * 2003-02-05 2004-08-26 Taisei Corp Structure for mounting fireproof plate on inner surface of tunnel lining
CN103758532A (en) * 2014-01-28 2014-04-30 华南理工大学 Short-term driving reinforcing method for metro shield tunnel pipe piece joint
CN107091093A (en) * 2017-06-16 2017-08-25 浙江科技学院(浙江中德科技促进中心) The device and method of Shield-bored tunnels has been deformed based on marmem reparation
CN207161101U (en) * 2017-09-11 2018-03-30 广州大学 A kind of shield tunnel shock-resistant and energy-dissipating damping node structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张颖等: "基于柔性节点的高烈度区盾构隧道纵向地震反应减震分析", 《华南地震》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915733A (en) * 2018-08-30 2018-11-30 中国水利水电第十四工程局有限公司 A kind of steel pipe chip architecture and preparation method thereof being applicable in vacuum chuck absorption
CN108915733B (en) * 2018-08-30 2023-06-09 中国水利水电第十四工程局有限公司 Steel pipe sheet structure suitable for vacuum chuck adsorption and manufacturing method thereof
CN109695458A (en) * 2019-01-16 2019-04-30 上海理工大学 Utilize the tunnel lining structure crack over strait repair system of marmem
CN109695458B (en) * 2019-01-16 2020-08-04 上海理工大学 Cross-sea tunnel lining structure crack repair system using shape memory alloy
CN109958457A (en) * 2019-04-09 2019-07-02 中铁第四勘察设计院集团有限公司 Pass through the section of jurisdiction interannular shear structure and its setting method in special formation tunnel
CN109958457B (en) * 2019-04-09 2024-04-19 中铁第四勘察设计院集团有限公司 Inter-segment ring shearing-resistant structure penetrating through special stratum tunnel and setting method thereof
CN114547805A (en) * 2022-02-28 2022-05-27 华中科技大学 Shape memory alloy flexible inter-ring joint of shield tunnel and design method thereof
CN114547805B (en) * 2022-02-28 2024-06-04 华中科技大学 Indirect joint of shape memory alloy flexible ring of shield tunnel and design method thereof

Similar Documents

Publication Publication Date Title
CN107605506A (en) A kind of shield tunnel shock-resistant and energy-dissipating damping node structure and its construction method
CN207277561U (en) Built-in profile steel high-strength concrete stem superposed column-girder steel group frame
CN103256061B (en) Coal-mining roadway scour-preventing and energy-absorbing combined metal support and assembly method
CN104537215A (en) Method for determining longitudinal internal force of shield tunnel under load effect
CN103882798A (en) Reinforced concrete arch bridge of concrete filled steel tube stiff skeleton and construction method thereof
CN207005565U (en) A kind of non-excavation rehabilitation caves in the collapsible steel loop of pipeline
CN104533433A (en) Starting method of small-radius curve tunnel
CN109973116A (en) A kind of tunnel segment structure and its construction method of the anti-floating of shield tunnel
CN207161101U (en) A kind of shield tunnel shock-resistant and energy-dissipating damping node structure
CN104213928B (en) A kind of liner structure of shape of a hoof shield tunnel
CN108194098A (en) A kind of shield tunnel anti-collision energy absorption section of jurisdiction device
CN107798166B (en) Method for calculating combined action of load structure under water pressure in composite lining of shield tunnel
CN203531922U (en) High-toughness nodular cast iron and reinforced concrete combined tunnel wall plate
CN207813625U (en) A kind of shield tunnel anti-collision energy absorption section of jurisdiction device
CN106761816A (en) A kind of screwed joint attachment structure between the section of jurisdiction for extra-large shield-driven tunnel
CN202381845U (en) Long-distance pipe jacking twist correction equipment
CN206360706U (en) A kind of screwed joint attachment structure being used between extra-large shield-driven tunnel section of jurisdiction
CN110108151B (en) Natural ventilation cooling tower and reinforced steel pipe concrete X pillar thereof
CN105484945B (en) A kind of polygon wind power tower and its manufacturing method
CN207017165U (en) A kind of temporary support for being used to support steel box-girder
CN208644484U (en) A kind of exhaust diffuser assembly tooling
CN210178367U (en) Symmetrical lining structure of circular shield tunnel
CN204783059U (en) Poling combination bow member of tunnel work face of processing landslide
CN204783057U (en) Vertical connecting device of U -shaped of tunnel steel bow member
CN204025958U (en) A kind of underground steel lined reinforced concrete penstock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190220

Address after: 510000 No. 230 Waihuan West Road, Guangzhou University Town, Guangdong Province

Applicant after: Guangzhou University

Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Address before: 510000 No. 230 Waihuan West Road, Guangzhou University Town, Guangdong Province

Applicant before: Guangzhou University

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180119