CN107604927A - A kind of composite piled anchor suspension device - Google Patents

A kind of composite piled anchor suspension device Download PDF

Info

Publication number
CN107604927A
CN107604927A CN201710923362.1A CN201710923362A CN107604927A CN 107604927 A CN107604927 A CN 107604927A CN 201710923362 A CN201710923362 A CN 201710923362A CN 107604927 A CN107604927 A CN 107604927A
Authority
CN
China
Prior art keywords
composite material
anchor
waist rail
material waist
rod body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710923362.1A
Other languages
Chinese (zh)
Inventor
白晓宇
张明义
陈小钰
章伟
王永洪
刘俊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201710923362.1A priority Critical patent/CN107604927A/en
Publication of CN107604927A publication Critical patent/CN107604927A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to civil construction foundation pit construction technical field, is related to a kind of composite piled anchor suspension device, and the inner of clamp nut is connected with the occlusion of stress spread disk, and lattice steel pad is connected with stress spread disk and double web type composite material waist rails respectively;Medium-height trestle is connected with bolthole and anchor rod body respectively, anchor rod body is located at bolthole center;Injecting cement paste is marked with bolthole, bolthole surrounding is inter-pile soil;Double web type composite material waist rails form box section by composite material waist rail top flange, composite material waist rail lower flange and two blocks of composite material waist rail webs, cage bar carries out colligation using tied silk with tie hoop and connected, the stake end installation Guan Liang of bored concrete pile, steel plate washer are connected with bolt and composite material waist rail web respectively;It is easy to manual assembly to operate, construction safety is convenient, reduces operation and maintenance expenses and uses, increases the service life, and anti-electromagnetic interference capability is strong, can be recycled, and production cost is low, and popularization and application potentiality are big.

Description

A kind of composite piled anchor suspension device
Technical field:
The invention belongs to civil construction foundation pit construction technical field, is related to a kind of advanced composite material (ACM) pile-anchor retaining device, Bored concrete pile, anchor pole and waist (hat) beam made by using new, lightweight, high-strength, energy-saving and environmental protection nonmetallic materials, shape Into a set of brand-new pile-anchor supporting system.
Background technology:
At present, pattern foundation pit supporting structure mode mainly has campshed supporting, piled anchor, stake support, diaphram wall, steel sheet pile, soil cement gear Wall and soil nail wall etc., these method for protecting support exist steel expend it is more, anticorrosive it is poor, pollute environment, need large-scale construction equipment etc. Shortcoming.To simplify construction technology, ensure that construction is safe to use with foundation ditch, resource reutilization and sustainable development are realized, in foundation ditch It is always the target that industry is made great efforts that New Supporting material and method for protecting support are explored in engineering.Glass fibre reinforced composion (glass fiberreinforced polymer, abbreviation GFRP) compared with steel, because it has low engineering cost, tension strong The features such as degree is high, corrosion resistance is strong, slackness is low, electromagnetism interference is strong, has obtained the extensive concern of civil engineering field.Tradition Anchored pile supporting substitutes pattern foundation pit supporting structure inner support using reinforced anchor bolt (rope), steel wale, gives retaining piles to provide anchor pulling force, To reduce the displacement of retaining piles and internal force, and by the Deformation control of foundation ditch in allowed limits, support system its typically by The materials such as reinforcing bar, concrete or shaped steel are made, and these composition materials are perishable, can not reuse, and poor durability, waste money Cause environmental pollution in source, it can be seen that, it is imperative to seek a kind of new and advanced pile-anchor retaining device, in pattern foundation pit supporting structure Using glass fiber compound material anchored pile supporting, can saving steel, environmental protection, and can fundamentally solves component corruption Erosion problem, the operation and maintenance expenses for reducing structure are used, when extending structure service life, especially urban subway tunnel are constructed, in fender post Shield machine enter hole position reinforcing bar replaced using glass fiber-reinforced polymer, fender post driving can be directly cut when shield machine enters hole, from And avoid and cut off reinforcing bar in advance and cut the work of portal, it can not only simplify construction technology, accelerating construction progress, reduction is applied Work risk, cost is reduced, and the disturbance to the soil body after fender post can be reduced;And by modified technique, to new piled anchor Detachable Construction Mode is realized in supporting, moreover it is possible to is realized recycling for waist rail, is reduced engineering cost.Therefore, to NEW TYPE OF COMPOSITE Material pile-anchor retaining device develops significant.
The content of the invention:
The shortcomings that it is an object of the invention to overcome prior art to exist, seek design and a kind of composite piled anchor branch is provided Protection unit, glass fiber compound material anchored pile supporting is used in pattern foundation pit supporting structure, can saving steel, environmental protection, again Can fundamentally solve the problems, such as corrosion of component, the operation and maintenance expenses for reducing structure are used, extending structure service life.
To achieve these goals, the agent structure of composite piled anchor suspension device of the present invention includes anchor pole bar It is body, clamp nut, stress spread disk, lattice steel pad, inter-pile soil, bolthole, compound to medium-height trestle, injecting cement paste, double web types Material waist rail, bored concrete pile, cage bar, tie hoop, Guan Liang, inner sleeve, bolt and steel plate washer;Anchor rod body is glass fiber reinforcement Polymer (GFRP) full thread solid construction;Clamp nut and stress spread disk are made of GFRP materials, size and anchor pole bar Body is supporting, is connected threadably with anchor rod body, and clamp nut is hexagonal, and stress spread disk is in the form of annular discs, The inner of clamp nut is connected with the occlusion of stress spread disk, using the teaching of the invention it is possible to provide enough anchor forces;Lattice steel pad is by one piece of upper limb The tri-prismoid structure that steel plate, one block of bottom wing steel plate and two pieces of wedge-shaped steel plates are welded, the middle preformed hole of lattice steel pad Hole, so that anchor rod body is by the way that lattice steel pad is connected with stress spread disk and double web type composite material waist rails respectively;Triangle Medium-height trestle is made shape structure of GFRP materials, and the center portion thereof position forms the insertion circular hole of anchor rod body, to medium-height trestle point It is not connected with bolthole and anchor rod body, anchor rod body is located at bolthole center;Injecting cement paste, bolthole four are marked with bolthole Week is inter-pile soil;Double web type composite material waist rails are by composite material waist rail top flange, composite material waist rail lower flange and two pieces Composite material waist rail web form box section, composite used be GFRP materials, by mould through pultrusion, solidify once Shaping, its sectional dimension is according to design requirement flexible customization, composite material waist rail top flange and composite material waist rail lower flange system There is the hole of insertion, anchor rod body is passed through from hole, water that double web type composite material waist rails will act in building enclosure, Soil pressure passes to anchor rod body, and the stress of each anchor rod body is uniformly divided by double web type composite material waist rails Match somebody with somebody, and double web type composite material waist rails select box section, can not only improve the resistance to overturning and local stability of component Property, moreover it is possible to it is convenient that connection and installation for waist rail provide;Bored concrete pile is made up of cast in situs commerical ready-mixed concrete, inside bored concrete pile Cage bar and tie hoop be made by GFRP materials, cage bar and tie hoop carry out colligation using tied silk and connected, bored concrete pile Sectional dimension and stake is long, the section morphology and diameter of cage bar and tie hoop determine that it is to ensure to build that it, which is acted on, according to design requirement (structure) builds thing, pipeline and road safety, in Excavation Process and foundation ditch during use, maintain the soil body of free face steady It is fixed, reduce malformation, it is ensured that construction safety;The stake end installation Guan Liang of bored concrete pile, Guan Liang is through live colligation GFRP tendons cage and pours Build concrete to be made, reserving hole is easy to anchor rod body to pass freely through in Guan Liang;When double web type composite material waist rail length not It is enough, two pieces of double web type composite material waist rails are attached using inner sleeve, ensure the company of double web type composite material waist rails Contact is located among two anchor poles;The rectangular parallelepiped structure that inner sleeve is welded by the hot rolled steel plate of 4 millimeters thicks, the length of inner sleeve For 1 meter, its cross section is slightly less than the cavity cross section of double web type composite material waist rails, it is ensured that inner sleeve can answer from double web types Passed freely through in the cavity of condensation material waist rail, while the contact surface reserving hole of inner sleeve and composite material waist rail web, so as to Bolt by, using inner sleeve connect double web type composite material waist rails can obtain higher bonding strength, rigidity and surely It is qualitative, meet the requirement of waist rail;Steel plate washer is connected with bolt and composite material waist rail web respectively, is answered for dispersed Power.
The present invention realizes that the detailed process of pile-anchor retaining is:
(1) according to actual design requirement by cage bar and tie hoop colligation into steel reinforcement cage, tie hoop is wound in during colligation Cage bar simultaneously carries out banding fixed in infall with tied silk, and steel reinforcement cage is put into the hole for grout pile pre-set and pours coagulation Soil is made bored concrete pile, and bored concrete pile is used every pile driving construction, and carries out facing pile driving construction after 24 hours in concrete perfusion;Treat that bored concrete pile reaches Reach the 75% of design compression strength to the curing time 28 days of design requirement, or concrete strength of pile, in filling pile head Position performs Guan Liang, and reserving hole is passed freely through in order to anchor rod body when Guan Liang is constructed;
(2) after Guan Liang conserves 28 days or Guan Liang concrete strength reaches the 75% of design compression strength, anchor pole is indicated Position of opening, earthwork evacuation is then carried out, below earthwork evacuation to anchor pole position of opening during 0.5m, with rig between stake On soil drilling bolthole is made, the depth and diameter of bolthole are controlled by anchor force, now strictly to verify rig inclination angle and Azimuth, and ensure that drilling machine platform consolidates;
(3) centering spacer support frame is first arranged on to the outer surface of anchor rod body, is fixed with tied silk, medium-height trestle Away from according to the determination of the length of anchor rod body, 2 meters are not more than to the spacing of medium-height trestle;The anchor rod body to medium-height trestle will be installed again It is manually fed into bolthole, ensures that anchor rod body stretched straight parallel is not distorted, and external Grouting Pipe and blast pipe are connect Enter the bottom of bolthole;
(4) neat slurry to be injected along Grouting Pipe with grouting pump, slip casting uses secondary grouting technique, and the ratio of mud is 0.5~ 0.55, cement uses 425 Portland cements, and first time grouting pressure is 0.5~0.8MPa, and second of grouting pressure is 1.0~2.0MPa, and secondary grouting is carried out after the injecting cement paste intensity that once grouting is formed reaches 5.0MPa;
(5) after the intensity of injecting cement paste reaches the 80% of design strength, lattice is installed on the anchor rod body that Guan Liang is stretched out Steel pad, lattice steel pad are 2cm one block of upper limb steel plate, one block of bottom wing steel plate and two pieces of wedge-shaped steel plate welding by thickness in advance Form;Then mount stress diffusion disc and clamp nut, stress spread disk are close to lattice steel pad successively on anchor rod body Upper limb steel plate, anchor force is set to reach design requirement by tightening clamp nut, can be according to actual need to obtain bigger anchor force Several clamp nuts are cascaded;
(6) after the completion of the anchor bolt construction in Guan Liang, equally by 0.5m below earthwork evacuation to the second anchor pole position of opening When, indicate the position of opening of second layer anchor pole, repeat step (2), (3), (4);
(7) the section chi of double web type composite material waist rails is determined according to the position of the size of anchor-holding force of anchor bolt and anchor pole It is very little, drilled at the center of composite material waist rail top flange and composite material waist rail lower flange, it is ensured that anchor rod body can be from double abdomens The top flange and lower flange of template composite material waist rail pass freely through, wherein, double web type composite material waist rail hole positions include waist The connecting hole and waist rail of beam and inner sleeve and the connecting hole of anchor pole, a diameter of 50cm of waist rail and anchor pole connecting hole, waist rail with The aperture of inner sleeve connecting hole is 20cm;
(8) manually installed double web type composite material waist rails, put before double web type composite material waist rails are lifted to crater wall, Anchor rod body is set to pass through composite material waist rail lower flange and composite material waist rail top flange, composite material waist rail lower flange during installation Closely connected campshed is answered, can be carried out if necessary with backing plate or other packing materials levelling;Again from interior on composite material waist rail top flange Installation lattice steel pad, stress spread disk and clamp nut, installation and fixing means and step (5) phase are outwards installed successively Together;Need to check whether it is plane contact between bored concrete pile, lattice steel pad after double web type composite material waist rail installations, no Allow a contact;
(9) inner sleeve is put into already installed double web type composite material waist rail one end, mobile inner sleeve stack shell, made The connecting hole of inner sleeve is corresponding with double web type composite material waist rail connecting holes, and insertion bolt closely connects it, determines sleeve Position, steel plate washer have the function that dispersive stress between bolt and composite material waist rail web.
(10) repeat step (6), (7), (8), (9), by design requirement by excavation of foundation pit on earth, carry out underground structure apply During work, main structure body construction speed substep is carried out under base area, when the design strength of structure floor reaches strong concrete When spending the 75% of design load, clamp nut is gradually loosened, cuts off anchor pole, the dismounting of double web type composite material waist rails is completed, enters Row subsequent cycle uses.
The present invention compared with prior art, has advantages below:First, using made of glass fibre reinforced composion Waist rail, pile body framework, Guan Liang skeleton and anchor pole, tensile strength is high, from heavy and light, significantly improve pattern foundation pit supporting structure resistance to overturning, just Operated in manual assembly, reduce the use of live Large Construction lifting machine, construction safety is convenient;Second, glass fiber reinforcement is answered Condensation material anchor pole and pile body framework have stronger corrosion resistance, can be used for a long time in the environment of acid, alkali, villaumite and humidity, can The operation and maintenance expenses for reducing structure are used, the service life of extending structure;Third, it is different from traditional reinforcing bar, glass fibre reinforced composion Anchor pole and pile body framework be nonmagnetic body, anti-electromagnetic interference capability is strong, is used so can reduce in Excavation Monitoring and later stage During electromagnetic wave or signal interference, beneficial to construction with it is safe to use;Fourth, special attachment means enable waist rail to tear open Unload, the recycling of waist rail is realized, beneficial to sustainable development;Fifth, special lattice steel pad increase anchorage and GFRP waist rails Contact area, reduce stress concentration, prevent waist rail occur failure by shear;Sixth, the shearing resistance of glass fibre reinforced composion muscle Poor performance is cut, GFRP tendons cast-in-place concrete pile easily by shield machine cutting, is easy to improve efficiency of construction when shield machine enters hole;Seven Be glass fibre reinforced composion due to its low-carbon, environmental protection, from heavy and light, can be recycled, can produce overall economic efficiency and Environmental benefit, production cost is low, and popularization and application potentiality are big.
Brief description of the drawings:
Fig. 1 is the total profile of composite piled anchor suspension device of the present invention.
Fig. 2 is composite piled anchor suspension device sectional detail drawing of the present invention.
Fig. 3 is composite piled anchor suspension device 1-1 cross section structure schematic diagrams of the present invention.
Fig. 4 is composite piled anchor suspension device 2-2 cross section structure schematic diagrams of the present invention.
Fig. 5 is filling pile structure schematic diagram of the present invention.
Fig. 6 is inner sleeve attachment structure principle schematic of the present invention.
Fig. 7 is anchor rod anchored apparatus structure principle schematic of the present invention.
Fig. 8 is lattice steel mat structure principle schematic of the present invention, wherein (a) is front view, (b) is top view.
Fig. 9 centering schematic diagram of the structure of the bracket of the present invention.
Embodiment:
The present invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment:
The agent structure of composite piled anchor suspension device described in the present embodiment includes anchor rod body 1, clamp nut 2, answered Power diffusion disc 3, lattice steel pad 4, inter-pile soil 5, bolthole 6, to medium-height trestle 7, injecting cement paste 8, double web type composite material waist rails 9th, bored concrete pile 13, cage bar 14, tie hoop 15, Guan Liang 16, inner sleeve 17, bolt 18 and steel plate washer 19;Anchor rod body 1 is glass Fiber-reinforced polymer (GFRP) full thread solid construction;Clamp nut 2 and stress spread disk 3 are made of GFRP materials, chi It is very little supporting with anchor rod body 1, it is connected threadably with anchor rod body 1, clamp nut 2 is hexagonal, and stress expands Scattered disk 3 is in the form of annular discs, and the inner of clamp nut 2 is connected with the occlusion of stress spread disk 3, using the teaching of the invention it is possible to provide enough anchor forces;Lattice The tri-prismoid structure that formula steel pad 4 is welded by one block of upper limb steel plate, 20, one blocks of bottom wing steel plates 22 and two pieces of wedge-shaped steel plates 21, The middle reserving hole of lattice steel pad 4, so as to anchor rod body 1 by, lattice steel pad 4 respectively with stress spread disk 3 and double Web type composite material waist rail 9 is connected;Medium-height trestle 7 is made triangular shape structure of GFRP materials, and the center portion thereof position is formed The insertion circular hole of anchor rod body 1, medium-height trestle 7 is connected with bolthole 6 and anchor rod body 1 respectively, anchor rod body 1 is located at anchor pole The center of hole 6;Injecting cement paste 8 is marked with bolthole 6, the surrounding of bolthole 6 is inter-pile soil 5;Double web type composite material waist rails 9 are by compound Material waist rail top flange 10, composite material waist rail lower flange 11 and two blocks of composite material waist rail webs 12 form box section, institute Composite is GFRP materials, flexible according to design requirement through pultrusion, solidification one-shot forming, its sectional dimension by mould Customization, composite material waist rail top flange 10 and composite material waist rail lower flange 11 are formed with the hole of insertion, make anchor rod body 1 from hole Pierced, water that double web type composite material waist rails 9 will act in building enclosure, soil pressure pass to anchor rod body 1, and made The stress of each anchor rod body 1 is evenly distributed by double web type composite material waist rails 9, and double web type composite waists Beam 9 selects box section, can not only improve the resistance to overturning and local stability of component, moreover it is possible to is the connection and installation of waist rail It is convenient to provide;Bored concrete pile 13 is made up of cast in situs commerical ready-mixed concrete, cage bar 14 and tie hoop 15 inside bored concrete pile 13 Be made by GFRP materials, cage bar 14 and tie hoop 15 carry out colligation using tied silk and connected, the sectional dimension of bored concrete pile 13 and The section morphology and diameter of the long, cage bar 14 of stake and tie hoop 15 determine that it is to ensure that building (structure) builds that it, which is acted on, according to design requirement Thing, pipeline and road safety, in Excavation Process and foundation ditch during use, maintain the soil stabilization of free face, reduce Malformation, it is ensured that construction safety;The stake end installation Guan Liang 16 of bored concrete pile 13, Guan Liang 16 is through live colligation GFRP tendons cage and pours Concrete is made, and reserving hole is easy to anchor rod body 1 to pass freely through in Guan Liang 16;When double length of web type composite material waist rail 9 Not enough, two pieces of double web type composite material waist rails 9 are attached using inner sleeve 17, ensure double web type composite material waist rails 9 tie point is located among two anchor poles;The rectangular parallelepiped structure that inner sleeve 17 is welded by the hot rolled steel plate of 4 millimeters thicks, inner sleeve The length of cylinder 17 is 1 meter, and its cross section is slightly less than the cavity cross section of double web type composite material waist rails 9, it is ensured that the energy of inner sleeve 17 It is enough to be passed freely through out of double web type composite material waist rails 9 cavity, while inner sleeve 17 and composite material waist rail web 12 Contact surface reserving hole, so that bolt 18 is by the way that the double web type composite material waist rails 9 connected using inner sleeve 17 can obtain Higher bonding strength, rigidity and stability, meet the requirement of waist rail;Steel plate washer 19 respectively with bolt 18 and composite Waist rail web 12 is connected, for dispersed stress.
The present embodiment realizes that the detailed process of pile-anchor retaining is:
(1) according to actual design requirement by cage bar 14 and the colligation of tie hoop 15 into steel reinforcement cage, tie hoop 15 during colligation It is wound in cage bar 14 and carries out banding fixed with tied silk in infall, steel reinforcement cage is put into the hole for grout pile pre-set simultaneously Casting concrete is made bored concrete pile 13, and bored concrete pile 13 is carried out after 24 hours facing stake and applied using every pile driving construction in concrete perfusion Work;Treat that bored concrete pile 13 reaches the curing time 28 days of design requirement, or concrete strength of pile reaches design compression strength 75%, perform Guan Liang 16 in the pile crown position of bored concrete pile 13, reserving hole freely leads in order to anchor rod body 1 when Guan Liang 16 is constructed Cross;
(2) after Guan Liang 16 conserves 28 days or Guan Liang concrete strength reaches the 75% of design compression strength, anchor pole is indicated Position of opening, earthwork evacuation is then carried out, below earthwork evacuation to anchor pole position of opening during 0.5m, with rig in stake Between soil 5 on drilling bolthole 6 is made, the depth and diameter of bolthole 6 are controlled by anchor force, now strictly to verify inclining for rig Angle and azimuth, and ensure that drilling machine platform consolidates;
(3) medium-height trestle 7 will be first spaced installed in the outer surface of anchor rod body 1, be fixed with tied silk, to medium-height trestle 7 Spacing determined according to the length of anchor rod body 1,2 meters are not more than to the spacing of medium-height trestle;The anchor to medium-height trestle 7 will be installed again Club shaft 1 is manually fed into bolthole 6, ensures that the stretched straight parallel of anchor rod body 1 is not distorted, and by external Grouting Pipe and Blast pipe accesses the bottom of bolthole 6;
(4) neat slurry to be injected along Grouting Pipe with grouting pump, slip casting uses secondary grouting technique, and the ratio of mud is 0.5~ 0.55, cement uses 425 Portland cements, and first time grouting pressure is 0.5~0.8MPa, and second of grouting pressure is 1.0~2.0MPa, and secondary grouting is carried out after the injecting cement paste Final 8 degree that once grouting is formed reaches 5.0MPa;
(5) after the intensity of injecting cement paste 8 reaches the 80% of design strength, lattice are installed on the anchor rod body 1 that Guan Liang 16 is stretched out Structure formula steel pad 4, lattice steel pad 4 are 2cm one block of upper limb steel plate, 20, one blocks of bottom wing steel plates 22 and two pieces of wedges by thickness in advance Shape steel plate 21 is welded;Then mount stress diffusion disc 3 and clamp nut 2 successively on anchor rod body 1, stress spread disk 3 It is close to the upper limb steel plate 20 of lattice steel pad 4, anchor force is reached design requirement by tightening clamp nut 2, it is bigger to obtain Anchor force, several clamp nuts 2 can be cascaded according to being actually needed;
(6) after the completion of the anchor bolt construction in Guan Liang 16, equally by below earthwork evacuation to the second anchor pole position of opening During 0.5m, the position of opening of second layer anchor pole, repeat step (2), (3), (4) are indicated;
(7) the section chi of double web type composite material waist rails 9 is determined according to the position of the size of anchor-holding force of anchor bolt and anchor pole It is very little, drilled at the center of composite material waist rail top flange 10 and composite material waist rail lower flange 11, it is ensured that anchor rod body 1 can be from The top flange 10 and lower flange 11 of double web type composite material waist rails 9 pass freely through, wherein, double web type composite material waist rails 9 Hole position includes waist rail and the connecting hole and waist rail of inner sleeve and the connecting hole of anchor pole, and waist rail is a diameter of with anchor pole connecting hole 50cm, the aperture of waist rail and the connecting hole of inner sleeve 17 is 20cm;
(8) manually installed double web type composite material waist rails 9, double web type composite material waist rails 9 are lifted to crater wall forward swing Put, anchor rod body 1 is passed through composite material waist rail lower flange 11 and composite material waist rail top flange 10, composite waist during installation Lower flange of girder edge 11 answers closely connected campshed, can be carried out if necessary with backing plate or other packing materials levelling;Again on composite material waist rail Install installation lattice steel pad 4, stress spread disk 3 and clamp nut 2, installation and fixation side on the edge of a wing 10 successively from inside to outside Method is identical with step (5);Double web type composite material waist rails 9 need to check it between bored concrete pile 13, lattice steel pad 4 after installing Whether it is plane contact, does not allow a contact;
(9) inner sleeve 17 is put into already installed double one end of web type composite material waist rail 9, mobile inner sleeve 17 Body, make the connecting hole of inner sleeve corresponding with double web type 9 connecting holes of composite material waist rail, insert bolt 18 and closely connect it, Position sleeve, steel plate washer 19 has the function that dispersive stress between bolt 18 and composite material waist rail web 12.
(10) repeat step (6), (7), (8), (9), by design requirement by excavation of foundation pit on earth, carry out underground structure apply During work, main structure body construction speed substep is carried out under base area, when the design strength of structure floor reaches strong concrete When spending the 75% of design load, clamp nut 2 is gradually loosened, cuts off anchor pole, completes the dismounting of double web type composite material waist rails 9, Carry out subsequent cycle use.
Double web type composite material waist rails 9 are continuous in the horizontal direction described in the present embodiment, when double web type composite woods Expect that the length of waist rail 9 is inadequate, use inner sleeve 17 to be attached to it, ensure the tie point of double web type composite material waist rails 9 Among two anchor poles;During earthwork evacuation, preferably it is segmented, is layered symmetrical excavation, reduces the deformation of building enclosure, foundation ditch Excavate it is strict wait until water level decreasing to carrying out after 0.5m below excavation face, the anchor pole at Guan Liang 16 will in time construct and apply anchoring Power, ensure that foundation ditch is stable;Anchor cable spacing and accurately measuring for angle are composite material waist rail in-site installation construction most critical processes, Anchor pole spacing is measured using steel tape, to ensure required precision, using round measuring method;The inclination angle of anchor pole uses level inclination Measuring instrument measures.

Claims (2)

1. a kind of composite piled anchor suspension device, it is characterised in that agent structure includes anchor rod body, clamp nut, stress and expanded Dissipate disk, lattice steel pad, inter-pile soil, bolthole, to medium-height trestle, injecting cement paste, double web type composite material waist rails, bored concrete pile, master Muscle, tie hoop, Guan Liang, inner sleeve, bolt and steel plate washer;Anchor rod body is GFRP full thread solid constructions;Clamp nut and Stress spread disk is made of GFRP materials, and size is supporting with anchor rod body, threadably with anchor rod body phase Even, clamp nut is hexagonal, and stress spread disk is in the form of annular discs, and the inner of clamp nut is connected with the occlusion of stress spread disk, energy Enough anchor forces are enough provided;Lattice steel pad by one block of upper limb steel plate, one block of bottom wing steel plate and the welding of two pieces of wedge-shaped steel plates and Into tri-prismoid structure, the middle reserving hole of lattice steel pad, so as to anchor rod body by, lattice steel pad respectively with should Power diffusion disc is connected with double web type composite material waist rails;Medium-height trestle is made triangular shape structure of GFRP materials, wherein Center portion position forms the insertion circular hole of anchor rod body, and medium-height trestle is connected with bolthole and anchor rod body respectively, makes anchor rod body position In bolthole center;Injecting cement paste is marked with bolthole, bolthole surrounding is inter-pile soil;Double web type composite material waist rails are by compound Material waist rail top flange, composite material waist rail lower flange and two pieces of composite material waist rail web composition box sections, used answers Condensation material is GFRP materials, by mould through pultrusion, solidification one-shot forming, its sectional dimension according to design requirement flexible customization, Composite material waist rail top flange and composite material waist rail lower flange are formed with the hole of insertion, anchor rod body is passed through from hole, double Water that web type composite material waist rail will act in building enclosure, soil pressure pass to anchor rod body, and make each anchor rod body Stress evenly distributed by double web type composite material waist rails, the resistance to overturning of component and local steady can not only be improved It is qualitative, moreover it is possible to which that it is convenient that connection and installation for waist rail provide;Bored concrete pile is made up of cast in situs commerical ready-mixed concrete, in bored concrete pile The cage bar and tie hoop in portion are made by GFRP materials, and cage bar carries out colligation using tied silk with tie hoop and connected, bored concrete pile Sectional dimension and stake is long, the section morphology and diameter of cage bar and tie hoop determine according to design requirement, with ensure building, Pipeline and road safety, in Excavation Process and foundation ditch during use, maintain the soil stabilization of free face, reduce structure Deformation, it is ensured that construction safety;The stake end installation Guan Liang of bored concrete pile, Guan Liang is through live colligation GFRP tendons cage and casting concrete system Into reserving hole is easy to anchor rod body to pass freely through in Guan Liang;When double web type composite material waist rail length are inadequate, using inner sleeve Two pieces of double web type composite material waist rails are attached by cylinder, ensure that the tie point of double web type composite material waist rails is located at two anchors Among bar;The rectangular parallelepiped structure that inner sleeve is welded by the hot rolled steel plate of 4 millimeters thicks, the length of inner sleeve is 1 meter, and its is transversal Face is less than the cavity cross section of double web type composite material waist rails, it is ensured that inner sleeve can be from the sky of double web type composite material waist rails Intracavitary passes freely through, while the contact surface reserving hole of inner sleeve and composite material waist rail web, so that bolt is by using interior Double web type composite material waist rails of sleeve connection can obtain higher bonding strength, rigidity and stability, meet waist rail Requirement;Steel plate washer is connected with bolt and composite material waist rail web respectively, for dispersed stress.
2. composite piled anchor suspension device according to claim 1, it is characterised in that pile-anchor retaining is realized using the device Detailed process be:
(1) according to actual design requirement by cage bar and tie hoop colligation into steel reinforcement cage, tie hoop is wound in cage bar during colligation And banding fixed is carried out with tied silk in infall, steel reinforcement cage is put into the hole for grout pile pre-set simultaneously casting concrete system Into bored concrete pile, bored concrete pile is used every pile driving construction, and carries out facing pile driving construction after 24 hours in concrete perfusion;Treat that bored concrete pile reaches to set Count desired curing time 28 days, or concrete strength of pile reaches the 75% of design compression strength, in filling pile head position Perform Guan Liang, reserving hole is passed freely through in order to anchor rod body when Guan Liang is constructed;
(2) after Guan Liang conserves 28 days or Guan Liang concrete strength reaches the 75% of design compression strength, the perforate of anchor pole is indicated Position, earthwork evacuation is then carried out, below earthwork evacuation to anchor pole position of opening during 0.5m, with rig on inter-pile soil Bolthole is made in drilling, and the depth and diameter of bolthole are controlled by anchor force, now strictly to verify the inclination angle and orientation of rig Angle, and ensure that drilling machine platform consolidates;
(3) centering spacer support frame is first arranged on to the outer surface of anchor rod body, is fixed with tied silk, to the spacing root of medium-height trestle Determined according to the length of anchor rod body, 2 meters are not more than to the spacing of medium-height trestle;It will be provided with again artificial to the anchor rod body of medium-height trestle It is sent into bolthole, ensures that anchor rod body stretched straight parallel is not distorted, and external Grouting Pipe and blast pipe are accessed into anchor The bottom of rod aperture;
(4) neat slurry to be injected along Grouting Pipe with grouting pump, slip casting uses secondary grouting technique, and the ratio of mud is 0.5~0.55, Cement uses 425 Portland cements, and first time grouting pressure is 0.5~0.8MPa, and second of grouting pressure be 1.0~ 2.0MPa, and secondary grouting is carried out after the injecting cement paste intensity that once grouting is formed reaches 5.0MPa;
(5) after the intensity of injecting cement paste reaches the 80% of design strength, lattice steel pad is installed on the anchor rod body that Guan Liang is stretched out, Lattice steel pad is welded by one block of upper limb steel plate, one block of bottom wing steel plate and two pieces of wedge-shaped steel plates that thickness is 2cm in advance; Then mount stress diffusion disc and clamp nut, stress spread disk are close to the upper limb steel of lattice steel pad successively on anchor rod body Plate, anchor force is reached design requirement by tightening clamp nut, to obtain bigger anchor force, if can according to be actually needed by A dry clamp nut is cascaded;
(6) after the completion of the anchor bolt construction in Guan Liang, equally by 0.5m below earthwork evacuation to the second anchor pole position of opening when, mark The position of opening of bright second layer anchor pole, repeat step (2), (3), (4);
(7) sectional dimension of double web type composite material waist rails is determined according to the position of the size of anchor-holding force of anchor bolt and anchor pole, The center of composite material waist rail top flange and the drilling of composite material waist rail lower flange, it is ensured that anchor rod body can answer from double web types The top flange and lower flange of condensation material waist rail pass freely through, wherein, double web type composite material waist rail hole positions include waist rail with it is interior The connecting hole and waist rail of sleeve and the connecting hole of anchor pole, a diameter of 50cm of waist rail and anchor pole connecting hole, waist rail and inner sleeve The aperture of connecting hole is 20cm;
(8) manually installed double web type composite material waist rails, put before double web type composite material waist rails are lifted to crater wall, make anchor Club shaft passes through composite material waist rail lower flange and composite material waist rail top flange, composite material waist rail lower flange Ying Mi during installation Campshed is pasted, can be carried out if necessary with backing plate or other packing materials levelling;Again on composite material waist rail top flange from inside to outside Installation lattice steel pad, stress spread disk and clamp nut are installed successively, and installation is identical with step (5) with fixing means;It is double Need to check whether it is plane contact between bored concrete pile, lattice steel pad after the installation of web type composite material waist rail, do not allow Point contact;
(9) inner sleeve is put into already installed double web type composite material waist rail one end, mobile inner sleeve stack shell, makes inner sleeve The connecting hole of cylinder is corresponding with double web type composite material waist rail connecting holes, and insertion bolt closely connects it, positions sleeve, steel Pad has the function that dispersive stress between bolt and composite material waist rail web;
(10) repeat step (6), (7), (8), (9), by design requirement by excavation of foundation pit on earth, carrying out Underground Construction During, main structure body construction speed substep is carried out under base area, is set when the design strength of structure floor reaches concrete strength Evaluation 75% when, gradually loosen clamp nut, cut off anchor pole, complete the dismounting of double web type composite material waist rails, carry out down One recycles.
CN201710923362.1A 2017-09-30 2017-09-30 A kind of composite piled anchor suspension device Pending CN107604927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710923362.1A CN107604927A (en) 2017-09-30 2017-09-30 A kind of composite piled anchor suspension device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710923362.1A CN107604927A (en) 2017-09-30 2017-09-30 A kind of composite piled anchor suspension device

Publications (1)

Publication Number Publication Date
CN107604927A true CN107604927A (en) 2018-01-19

Family

ID=61068054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710923362.1A Pending CN107604927A (en) 2017-09-30 2017-09-30 A kind of composite piled anchor suspension device

Country Status (1)

Country Link
CN (1) CN107604927A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442372A (en) * 2018-05-03 2018-08-24 大连理工大学 A kind of antidetonation soil nailing and its construction method for pattern foundation pit supporting structure
CN108824450A (en) * 2018-08-16 2018-11-16 潘树宾 A kind of assembled deep foundation pit supporting structure and its construction method
CN110565650A (en) * 2019-09-16 2019-12-13 北京市市政四建设工程有限责任公司 multi-row ultra-deep oblique composite anchor rod pile for narrow space
CN112663624A (en) * 2020-12-21 2021-04-16 亚都建设集团有限公司 Composite support for foundation pit and construction method
CN115182360A (en) * 2022-08-04 2022-10-14 中建八局第二建设有限公司 Pile anchor waist beam supporting structure and supporting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011117172A (en) * 2009-12-02 2011-06-16 Shimizu Corp Method for checking end bearing capacity of cast-in-place pile
CN102900081A (en) * 2012-11-11 2013-01-30 青岛理工大学 Nonmetal anti-floating anchor rod and anchoring method thereof
CN204059365U (en) * 2014-08-07 2014-12-31 青岛海川建设集团有限公司 A kind of deep foundation ditch Prestressed anchor rope with pressure dispersing bracing means
CN105735322A (en) * 2016-02-04 2016-07-06 郑州安源工程技术有限公司 Design and construction method of rigid-flexible composite anti-seepage recoverable supporting structure
CN106320346A (en) * 2016-08-24 2017-01-11 陕西建工第六建设集团有限公司 Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011117172A (en) * 2009-12-02 2011-06-16 Shimizu Corp Method for checking end bearing capacity of cast-in-place pile
CN102900081A (en) * 2012-11-11 2013-01-30 青岛理工大学 Nonmetal anti-floating anchor rod and anchoring method thereof
CN204059365U (en) * 2014-08-07 2014-12-31 青岛海川建设集团有限公司 A kind of deep foundation ditch Prestressed anchor rope with pressure dispersing bracing means
CN105735322A (en) * 2016-02-04 2016-07-06 郑州安源工程技术有限公司 Design and construction method of rigid-flexible composite anti-seepage recoverable supporting structure
CN106320346A (en) * 2016-08-24 2017-01-11 陕西建工第六建设集团有限公司 Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张顺凯: "《中国优秀硕士学位论文全文数据库 工程科技II辑》", 15 December 2013, 中国学术期刊(光盘版)电子杂志社 *
张顺凯: "GFRP腰梁在基坑支护中的应用及对锚索预应力损失的影响", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442372A (en) * 2018-05-03 2018-08-24 大连理工大学 A kind of antidetonation soil nailing and its construction method for pattern foundation pit supporting structure
CN108824450A (en) * 2018-08-16 2018-11-16 潘树宾 A kind of assembled deep foundation pit supporting structure and its construction method
CN110565650A (en) * 2019-09-16 2019-12-13 北京市市政四建设工程有限责任公司 multi-row ultra-deep oblique composite anchor rod pile for narrow space
CN112663624A (en) * 2020-12-21 2021-04-16 亚都建设集团有限公司 Composite support for foundation pit and construction method
CN115182360A (en) * 2022-08-04 2022-10-14 中建八局第二建设有限公司 Pile anchor waist beam supporting structure and supporting method
CN115182360B (en) * 2022-08-04 2023-08-18 中建八局第二建设有限公司 Pile anchor waist beam supporting structure and supporting method

Similar Documents

Publication Publication Date Title
CN107604927A (en) A kind of composite piled anchor suspension device
CN107604926A (en) A kind of composite piled anchor method for protecting support
CN106284044A (en) A kind of Novel steel concrete composite bridge and construction method thereof
CN109184737A (en) The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN106351258B (en) A kind of full precast assembly steel concrete combination underground pipe gallery
CN207525755U (en) A kind of composite material piled anchor suspension device
CN107817162B (en) Rapid drawing test method for nonmetal anti-floating anchor rod with enlarged head
CN102587367A (en) Mechanical connection type anchor rod
CN108716189A (en) Large span T-steel structure beam sections for joining island bridge install closure method
CN110847041A (en) Temporary anchoring structure and anchoring method for segmental prefabricated assembled concrete box girder
CN212837830U (en) Reinforcement system for reinforcing damaged segments of shield tunnel
CN113089491A (en) Construction method of large cantilever prestressed concrete bent cap
CN211689844U (en) Corrugated steel reinforcing arch utilizing high-strength grouting material
CN112302032A (en) Steel waist beam structure and construction method thereof
CN112575789A (en) Diagonal space truss foundation pit inner support system
CN205171381U (en) Prefabricated assembly bridge bent cap positioner
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN106836021A (en) A kind of pre-stress FRP sheet material Shear Strengthening beams of concrete experimental provision
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN215105454U (en) Prefabricated and cast-in-place piled raft foundation that combines together
CN110863953A (en) Annular steel pipe concrete combined wind turbine generator tower structure
CN113944114A (en) Dismantling construction method for large-span prestressed concrete cable-stayed bridge
CN106906923A (en) The attachment means of fabricated shear wall horizontal joint and connection method
CN206859464U (en) The attachment means of fabricated shear wall horizontal joint
CN112538814A (en) Construction process of transversely prefabricated and assembled corrugated steel web PC combined box girder for bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119

RJ01 Rejection of invention patent application after publication